Loading...
HomeMy WebLinkAboutItem No. 10 Change Order Larson Road Storm Drain Imp ProjectCity of Lake Elsinore LW811-Si no 130 South Main Street Lake Elsinore, CA 92530 www.lake - elsinore.org Ne °— IKikr- ' City Council Agenda Report File Number: TMP 20 -0006 Agenda Date: 1/12/2021 Version: 1 Status: Approval Final In Control: City Council / Successor Aqency File Type: Council Consent Calendar Agenda Number: 10) Final Construction Change Order for the Larson Road Storm Drain, Water, and Street Improvement Project Authorize the City Manager to execute the final construction contract change order to Weka, Inc. for the Larson Road Storm Drain, Water, and Street Improvement project in the amount of $9,020.60. City of Lake Elsinore Page 1 Printed on 11712021 CITY OF ih41 4 LAKE LS1110 E L � DREAM EXTREME REPORT TO CITY COUNCIL To: Honorable Mayor and Members of the City Council From: Grant Yates, City Manager Prepared By: Carlos Norvani, Land Development Engineer Date: January 12, 2021 Subject: Final Construction Change Order for the Larson Road Storm Drain, Water, and Street Improvement Project Recommendation Authorize the City Manager to execute the final construction contract change order to Weka, Inc. for the Larson Road Storm Drain, Water, and Street Improvement project in the amount of $9,020.60. Background On July 14, 2020, City Council approved the award to Weka, Inc. for the Larson Road Storm Drain, Water, and Street Improvement Project in the amount of $623,725 with a 10% contingency. Larson Road is a local street currently developed with one lane in each direction. Larson Road is located north of Machado Street. A portion of Larson Road as well as the utilities were washed out at the culvert crossing due to heavy rains in February of 2018. Permanent repairs were constructed in the fall of 2020. The project scope consisted of a 12' x 4' precast concrete culvert, upgrading an existing water line from 6" to 8 ", replacing a 2" gas line, curb & gutter, driveways, asphalt berms, and constructing a new asphalt road. The old road consisted of 2" asphalt on native material. The new road consists of a 4" asphalt over 4" base material. The project was completed in December 2020. Discussion During the final billing it was discovered there was a discrepancy in the total amount of asphalt used for paving. From the Project Specifications Document, Bid Schedule A, Item 6, listed 4" asphalt with a quantity of 705 tons. This equates to 28,128 Sq. Ft. Weka Construction received an invoice from the asphalt sub - contractor with a quantity of 797 tons. This equates to 30,417 Sq. Ft. Tonnage and square footage were verified by Weka Construction and City staff. There was an accompanying increase in the cubic yardage of the base material. We received an e- mail with this discrepancy on December 7, 2020. Fiscal Impact The fiscal impact of $9,020.60 final change order will be allocated from the Drainage Fund. Final Construction Change Order - Larson Road Storm Drain, Water and Street Improvement Project Exhibits A — Final Change Order Page 2of2 CITY OF � LADE L5IIY0KE DREAM EXTREME Date 01/12/2021 PROJECT NAME Larson Road Storm Drain, Water & SIP CONTRACTOR: Weka, Inc. CONSTRUCTION CONTRACT CHANGE ORDER C.C.O FINAL In conformance with and as part of the existing Agreement for this project the City of Lake Elsinore authorizes and directs changes to the Agreement as described below. 1) EXTRA WORK ORDER (EWO) (Unknown or Unforeseen Work not covered by Contract) a) Extra Work Item A: Lump Sum = 2) CHANGED WORK ORDER (CWO) (Significant increases in quantity of Unit -Price items; greater than 25 %): a) Changed Work Item A i) Time for completion will be increased/decreased by ( + -) Zero 0 Working Days 3) CLOSING SUMMARY ORDER (CSO) (Final adjustment of original estimated contract quantities based on final measured quantities): a) Closing Summary Order: i) Payment for this work is paid as follows: Total = 59020.60 AGREEMENT AMOUNT: Compensation as set Original Contract Amount: $623,725.00 forth in the Agreement and as amended by Amount All Previous CCOs ( + -): $64,269.68 this and prior Contract Change Order(s) is: Amount This CCO ( + -): $9020.60 $697,015.28 Total Contract Amount: $697,015.28 CITY'S ACCEPTANCE: The above described CONTRACTOR'S ACCEPTANCE: Contractor agrees to perform work is hereby approved and directed to be the above work as directed, in accordance with the completed in accordance with the Contract Contract Documents, and accept payment described above Documents. as full compensation for work described subject to additions and reductions of the quantities of various items. City of Lake Elsinore Rec.: City Engineer App.: City Manager 951- 674 -3124 130 S. MAIN STREET LAKE ELSINORE, CA 92530 WWW.LAKE- ELSINORE.ORG Contractor: Weka Inc. Date I By Title: Date Date: