HomeMy WebLinkAboutItem No. 25 Extension of Time Request Vesting Tent TM No. 28214 Alberhill RanchCity Council Agenda Report
City of Lake Elsinore 130 South Main Street
Lake Elsinore, CA 92530
www.lake-elsinore.org
File Number: ID# 19-804
Agenda Date: 12/8/2020 Status: Approval FinalVersion: 1
File Type: Council Public
Hearing
In Control: City Council / Successor Agency
Agenda Number: 25)
Extension of Time Request for Vesting Tentative Tract Map No. 28214 (Alberhill Ranch)
Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE, CALIFORNIA,
APPROVING A THREE-YEAR EXTENSION OF TIME TO JANUARY 13, 2022 FOR VESTING
TENTATIVE TRACT MAP NO. 28214.
Page 1 City of Lake Elsinore Printed on 12/3/2020
Page 1 of 3
REPORT TO CITY COUNCIL
To: Honorable Mayor and Members of the City Council
From: Grant Yates, City Manager
Prepared by: Damaris Abraham, Senior Planner
Date: December 8, 2020
Subject: Extension of Time Request for Vesting Tentative Tract Map No. 28214
(Alberhill Ranch)
Applicant: Gregory Lansing, Lansing Companies
Recommendation
Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A THREE-YEAR EXTENSION OF TIME TO JANUARY 13, 2022
FOR VESTING TENTATIVE TRACT MAP NO. 28214.
Background
On January 13, 2004, the City Council approved Vesting Tentative Tract Map (VTTM) 28214 and
Addendum No. 2 to the Alberhill Ranch Specific Plan Environmental Impact Report, the original
expiration of the map was January 13, 2006.
Pursuant to section 66452.6 (1) of the Subdivision Map Act, VTTM 28214 expiration date was
extended from January 13, 2006 to January 13, 2014, due to the recordation of several final maps
and an obligation for offsite improvements.
On July 11, 2013, AB 116 was enacted which extended for 24 months the expiration date of any
approved tentative map or vesting tentative map that was approved on or after January 1, 2000,
thus extending the expiration date of VTTM 28214 to January 13, 2016.
Pursuant to the Subdivision Map Act, Government Code Section 66452.6(e), the time at which
the map expires may be extended by the legislative body for a period not exceeding a total of six
(6) years.
On February 9, 2016, the City Council approved a three-year extension of time for VTTM 28214
to January 13, 2019.
VTTM 28214 is eligible for an additional three (3) year extension of time through the City’s Map
Extension process and represents the final extension of time allowed by the Subdivision Map Act
and the LEMC.
EOT for VTTM 28214
12/08/2020
Page 2 of 3
On June 28, 2018, the property owner, Castle & Cooke Alberhill Home Building, Inc., applied for
a three (3) year extension of time, which stayed the expiration of VTTM 28214 until action by the
City Council. The City and property owner subsequently entered into a Tolling Agreement to allow
for further evaluation of the conditions of approval, completion of an updated traffic impact
analysis, opportunities for public outreach and due diligence by the applicant.
Discussion
VTTM 28214 is a subdivision of approximately 163 acres into 913 single family residential lots,
one (1) multi-family residential lot, and six (6) public and institutional lots, generally located east
of Lake Street and south of Nichols Road, encompassing APNS 389-020-063, 390-130-006, 020,
021, 390-160-001, 002, 012, 390-170-001, 390-190-011, 019, 391-200-007, 012, 391-230-002,
391-240-003, 391-800-011, 393-170-007, 003, 393-200-004, 010, 393-230-003, 004, 005, 009,
010, 393-370-005.
The current development within VTTM 28214 consists of 567 completed single-family dwelling
units and a 23-acre sports park. A Focused Traffic Impact Analysis (TIA) dated February 25, 2020
was prepared by Linscott, Law & Greenspan Engineers (LLG) to assess the traffic impact
requirements for the remaining development, which consists of 344 single-family dwelling units,
373 multi-family dwelling units, and the 850-student elementary school. In accordance with
Section 66498.1 (C) of the Subdivision Map Act, Condition of Approval No. 102 has been revised
to update timing and the required road improvements for the buildout of VTTM 28214. (Please
see Exhibit F – COA#102 Improvement Comparison document for more information.)
Environmental Determination
Pursuant to CEQA Guidelines Section 15162, staff has determined the proposed project would
not have a significant effect on the environment and no new environmental documentation is
necessary because all potentially significant effects have been adequately analyzed in an earlier
Environmental Impact Report (EIR). All potentially significant impacts have been avoided or
mitigated pursuant to the earlier EIR and none of the conditions described in Section 15162 exist.
1. Addendum No. 2 to the Alberhill Ranch Specific Plan Final EIR, prepared for VTTM 28214
was approved by the City Council in 2004.
2. As part of the extension of time request, a Focused Traffic Impact Analysis dated February
25, 2020 prepared by Linscott, Law & Greenspan Engineers (LLG) to assess the traffic
impact requirements and the most current City requirements for development. Conditions
of approval were updated to reflect the most current City requ irements for development.
These update only reflect changes to the timing of proposed infrastructure improvements
and will not result in any modifications to the previously approved Project.
3. No substantial changes that require major revisions to the EIR Addendum exist and no
new information of substantial importance that require revisions to the earlier EIR
Addendum exist.
EOT for VTTM 28214
12/08/2020
Page 3 of 3
Fiscal Impact
The time and costs related to processing this extension of time request have been covered by the
Developer Deposit paid for by the applicant. No General Fund budgets have been allocated or
used in the processing of this application.
Exhibits
A – EOT Resolution
B – Conditions of Approval
C – Vicinity Map
D – Aerial Map
E – VTTM 28214
F – COA#102 Improvement Comparison
RESOLUTION NO. 2020-____
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A THREE-YEAR EXTENSION OF TIME TO JANUARY
13, 2022 FOR VESTING TENTATIVE TRACT MAP NO. 28214
Whereas, the property owner, Castle & Cooke Alberhill Home Building, Inc., submitted a request
for an extension of time for Vesting Tentative Tract Map (VTTM) No. 28214 on June 28, 2018;
and
Whereas, the Lake Elsinore Municipal Code (LEMC) Section 16.24.160 requires that a land
divider wishing to extend the life of a tentative tract map make a written application to the City
Council (City) not less than thirty (30) days prior to the expiration of the tentative tract map
requesting an extension of time on the map; and
Whereas, on December 8, 2020, at a duly noticed Public Hearing the Council has considered the
recommendation of City staff as well as evidence presented by the Community Development
Department and other interested parties with respect to this item.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE, CALIFORNIA,
DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1: The Council has reviewed and analyzed the proposed extension of time for VTTM No.
28214 prior to making its decision to extend the life of the map for a period of three (3) years.
Section 2: The Council finds and determines that and no new environmental documentation is
necessary because all potentially significant effects have been adequately analyzed in an earlier
Environmental Impact Report (EIR). All potentially significant impacts have been avoided or
mitigated pursuant to the earlier EIR and none of the conditions described in Section 15162 exist.
Addendum No. 2 to the Alberhill Ranch Specific Plan Final EIR, prepared for VTTM 28214 was
approved by the City Council in 2004. As part of the extension of time request, a Focused Traffic
Impact Analysis dated February 25, 2020 prepared by Linscott, Law & Greenspan Engineers
(LLG) was prepared to assess the traffic impact requirements and the most current City
requirements for development. Conditions of approval were updated to reflect the most current
City requirements for development. These updates only reflect changes to the timing of proposed
infrastructure improvements and will not result in any modifications to the previously approved
Project. No substantial changes that require major revisions to the EIR Addendum exist and no
new information of substantial importance that require revisions to the earlier EIR Addendum
exist.
Section 3: That in accordance with the California Subdivision Map Act (Cal. Gov. Code Section
66000 et. seq.) and the City of Lake Elsinore Municipal Code Section 16.24.160, the City Council
makes the following findings for the approval of an extension of time for VTTM No. 28214:
1. The proposed subdivision, together with the provisions for its design and improvements,
is consistent with the City of Lake Elsinore General Plan. The proposed subdivision is
compatible with the objectives, policies, general land uses and programs specified in the
General Plan (Government Code Section 66473.5).
a. VTTM No. 28214 is located in the Adopted Specific Plan General Plan designation.
CC Reso. No. 2020-____
Page 2 of 3
b. All offsite mitigation measures have been identified in a manner consistent with the
General Plan.
c. All recreational amenities have been provided in a manner consistent with the
General Plan.
2. The site of the proposed division of land is physically suitable for the proposed density of
development in accordance with the General Plan.
a. The overall density and design is consistent and compatible with the adjacent
communities.
3. The effects that the Project are likely to have upon the housing needs of the region, the
public service requirements of its residents and the available fiscal and environmental
resources have been considered and balanced.
a. The Project is consistent with the City’s General Plan. During the approval of the
General Plan, housing needs, public services and fiscal resources were scrutinized
to achieve a balance within the City.
4. Subject to the attached conditions of approval, the proposed division of land or type of
improvements is not likely to result in any significant environmental impacts.
a. The Project has been adequately conditioned by all applicable departments and
agencies and will not therefore result in any significant environmental impacts. The
proposed use, together with the conditions applicable thereto, will not be detrimental
to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
5. The design of the proposed division of land or type of improvements is not likely to cause
serious public health problems.
a. VTTM No. 28214 has been designed in a manner consistent with the General Plan
and does not divide previously established communities.
6. The design of the proposed division of land or type of improvements will not conflict with
easements, acquired by the public at large, for access through or use of property within
the proposed division of land.
a. All known easements or request for access have been incorporated into the design
of Vesting Tentative Tract Map No. 28214.
b. The map has been circulated to City departments and outside agencies, and
appropriate conditions of approval have been applied to the Project.
Section 4: Based upon the evidence presented, both written and testimonial, and the above
findings, and the Conditions of Approval imposed upon the project, the Council hereby approves
a three-year extension of time for VTTM 28214 to January 13, 2022.
Section 5: This Resolution shall take effect immediately upon its adoption.
CC Reso. No. 2020-____
Page 3 of 3
Section 6: The City Clerk shall certify to the adoption of this Resolution and enter it into the book
of original Resolutions.
Passed and Adopted on this 8th day of December, 2020.
Brian Tisdale, Mayor
Attest:
___________________________________
Candice Alvarez, MMC
City Clerk
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF LAKE ELSINORE )
I, Candice Alvarez, MMC, City Clerk of the City of Lake Elsinore, California, do hereby certify that
Resolution No. 2020-____ was adopted by the City Council of the City of Lake Elsinore, California,
at the regular meeting of December 8, 2020, and that the same was adopted by the following
vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Candice Alvarez, MMC
City Clerk
Applicant’s Initials: _____ Page 1 of 17
CONDITIONS OF APPROVAL
(New text underlined and deletions in strikethrough)
PROJECT: VTTM 28214
PROJECT NAME: Alberhill Ranch
PROJECT LOCATION: APNs: 389-020-063, 390-130-006, 020, 021, 390-160-
001, 002, 012, 390-170-001, 390-190-011, 019, 391-200-
007, 012, 391-230-002, 391-240-003, 391-800-011, 393-
170-007, 003, 393-200-004, 010, 393-230-003, 004, 005,
009, 010, 393-370-005
APPROVAL DATE: January 13, 2004
EXPIRATION DATE: January 13, 2022
PLANNING DIVISION
General Conditions
The Extension of Time for Vesting Tentative Tract Map No. 28214 will expire on January 13, 2022
three years from date of approval unless within that period of time a Final Map has been filed with
the County Recorder.
1. Future development shall comply with those standards and guidelines contained in the
Specific Plan Description, Specific Plan Regulations, Specific Plan Design Element, and
Specific Plan Implementation Sections as contained in the 1992 Murdock Alberhill Ranch
Specific Plan document, and conditions of approval established with the 1989 Alberhill
Ranch Specific Plan and the 1992 Murdock Alberhill Ranch Specific Plan.
2. Vesting Tentative Tract Map No. 28214 shall comply with the State of California
Subdivision Map Act and applicable requirements contained in the Murdock Alberhill
Ranch Specific Plan document and the Lake Elsinore Municipal Code (LEMC), unless
modified by approved Conditions of Approval.
3. Future development shall comply with those requirements and provisions contained in the
Murdock Alberhill Ranch Development Agreement, dated January 4, 1992.
5. The applicant shall participate in the City of Lake Elsinore Citywide Landscaping and
Street Lighting District, as appropriate.
6. The applicant shall provide all project-related onsite and offsite improvements as
described in the Murdock Alberhill Ranch Specific Plan document.
7. The applicant shall implement those mitigation measures identified in the 1989 Final
Alberhill Ranch Specific Plan EIR, 1992 Addendum No. 1 to the Final Alberhill Ranch
Specific Plan EIR, and the 2003 Addendum No. 2 to the Final Alberhill Ranch Specific
Plan EIR.
8. All future proposals shall be reviewed by the City on a project-by-project basis. If
determined necessary by the Community Development Director or designee, additional
environmental analysis will be required.
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 2 of 17
9. The applicant shall defend (with counsel acceptable to the City), indemnify, and hold
harmless the City, its Officials, Officers, Employees, Agents, and Consultants agents
(collectively referred to individually and collectively as "Indemnities") from any claim,
action, or proceeding to attack, set aside, void, or annul an approval by Indemnitees
concerning approval, implementation and construction of the Murdock Alberhill Ranch
Specific Plan, including the approval, extension or modification of VTTM 28124 or to
determine the reasonableness, legality or validity of any condition attached thereto. The
Applicant's indemnification is intended to include, but not be limited to, damages, fees
and/or costs awarded against or incurred by Indemnities and costs of suit, claim or
litigation, including without limitation attorneys' fees, penalties and other costs, liabilities
and expenses incurred by Indemnities in connection with such proceeding. The City will
promptly notify the applicant of any such claim, action, or proceeding against the City. If
the project is challenged in court, the City and the applicant shall enter into formal defense
and indemnity agreement, consistent with this condition.
10. Provisions of the City's Noise Ordinance shall be satisfied during all site preparation and
construction activity. Site preparation activity and construction shall not commence before
7:00 AM and shall cease at 5:00 PM, Monday through Friday. Construction activity shall
not take place on Saturday, Sunday, or any Legal Holidays.
11. The applicant shall sign and complete an "Acknowledgment of Conditions" and shall return
the executed original to the Community Development Department.
12. The applicant shall revise the Draft Addendum No. 2 EIR, per comments from the City
Attorney, prior to City Council certification of the document.
Prior to Final Tract Map Approval
13. All lots shall comply with applicable standards contained in the Murdock Alberhill Ranch
Specific Plan document, LEMC, or Zoning Code.
14. A precise survey with closures for boundaries and all lots shall be provided per the LEMC.
15. Street names within the subdivision shall be approved by the Community Development
Director or Designee.
16. All of the improvements shall be designed by the applicant's Civil Engineer to the
specifications of the City of Lake Elsinore.
17. Future construction shall meet all Riverside County Fire Department standards for fire
protection and any additional requirements requested by the County Fire Department
(refer to attached).
Prior to Design Review Approval
18. All future structural development associated with the Murdock Alberhill Ranch Specific
Plan and VTTM No. 28214, including building designs, landscaping improvements, site
plans, etc. require separate Design Review approval.
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 3 of 17
Prior to Grading Permit Issuance
19. The applicant shall obtain all necessary State and Federal permits, approvals, or other
entitlements, where applicable, prior to each phase of development of the project.
20. Prior to the issuance of any grading permits, the applicant shall submit a final grading plan,
subject to all requirements of the City Grading Ordinance to the City Engineer for approval.
Said grading plan shall address those grading standards and guidelines contained in the
Murdock Alberhill Ranch Specific Plan document.
21. Grading shall not be permitted outside the area of the designated project boundary unless
appropriate approvals have been obtained.
22. Grading easements shall be coordinated with affected property owners.
23. Prior to issuance of a grading permit, grading and construction plans shall incorporate
erosion control measures.
24. Any alterations to the topography, ground surface, or any other site preparation activity
will require appropriate grading permits. A Geologic Soils Report with associated
recommendations will be required for grading permit approval, and all grading must meet
the City's Grading Ordinance, subject to the approval of the City Engineer and the
Planning Division. Analysis of impacts of fills and cuts greater than 60 feet shall be
provided. Interim and permanent erosion control measures are required. The applicant
shall bond 100 percent for material and labor for one year for erosion control landscaping
at the time the site is rough graded.
Prior to Building Permit Issuance
25. The applicant shall pay all appropriate traffic impact mitigation fees.
26. Prior to approval of a Final Map the applicant shall de-annex from Community Facilities
District No. 2003-1 and annex into Community Facilities District No. 2015-1 (Safety) the
Law Enforcement, Fire and Paramedic Services Mello-Roos Community Facilities District
to offset the annual negative fiscal impacts of the project on public safety operations and
maintenance issues in the City. Alternatively, the applicant may propose alternative
financing mechanisms to fund the annual negative fiscal impacts of the project with
respect to Public Safety services. City shall pay all administrative costs of de-annexation
from CFD 2003-1 and annexation into CFD 2015-1 or other mitigation process, as
applicable. Contact City of Lake Elsinore Administrative Services Department at
JSimpson@lake-elsinore.org.
27. Prior to approval of the Final Map or if deemed appropriate by the City Engineer, prior to
issuance of building permit, the applicant shall initiate and complete the formation of a
Homeowner’s Association, approved by the City, recorded, and in place. All Association
documents shall be approved by City Planning and Engineering and the City Attorney and
recorded, such as the Articles of Incorporation for the Association; and Covenants,
Conditions and Restrictions (CC&Rs). At a minimum, the CC&Rs shall include language
to ensure the following conditions:
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 4 of 17
The HOA shall maintain landscaping along parkways and project streets,
recreational areas, walkways, and drainage easements.
The HOA shall maintain all streets, entry gates, walls, and monumentation.
28. Prior to issuance of building permit, a Fuel Modification Plan and Program shall be
approved by the Fire Department for future phases. Said Plan and Program shall show
those special treatments necessary to achieve an acceptable level of risk in regard to the
exposure of structures to flammable vegetation and shall describe the method of removal
and installation, and provisions for maintenance.
29. The applicant shall comply with the following City programs: the City Source Reduction
and Recycling Element and Household Hazardous Waste Element, the County Solid
Waste Management Plan and Integrated Waste Management Plan.
30. Prior to issuance of building permit, the applicant shall submit a letter of verification (will-
serve letter) to the City Engineer, for all required utility services.
31. The applicant shall meet all requirements of Elsinore Valley Municipal Water District
(EVMWD).
32. The applicant shall pay applicable fees and obtain proper clearance from the Lake
Elsinore Unified School District (LEUSD) prior to issuance of building permits.
33. Pay all applicable fees including park fees.
34. The applicant shall provide connection to public sewer for each lot within any subdivision.
No service laterals shall cross adjacent property lines and shall be delineated on
engineering sewer plans and profiles for submittal to the EVMWD.
35. The applicant (master developer) shall prepare a Community-Wide Wall Plan for the entire
VTTM No. 28214 area.
36. Prior to issuance of building permits for each future tract, the applicant (merchant builder)
for each individual tract shall prepare a Final Wall and Fence Plan addressing the
following:
Show that a masonry or decorative block wall will be constructed along all
boundaries for the particular tract.
Show materials, colors, and heights of side yard fences for proposed lots.
Show that all front return walls shall be decorative masonry block walls. Front
return wood fences shall not be permitted.
Show that side walls for corner lots shall be decorative masonry block walls.
37. The applicant shall submit plans to the electric utility company for a layout of the street
lighting system. The cost of street lighting, installation as well as energy charges shall be
the responsibility of the applicant and/or the HOA. Said plans shall be approved by the
City and shall be installed in accordance with the City Standards.
38. The applicant shall meet all requirements of the providing electric utility company.
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 5 of 17
39. The applicant shall meet all requirements of the providing gas utility company.
40. The applicant shall meet all requirements of the providing telephone utility company.
41. A bond is required guaranteeing the removal of all trailers used during construction.
42. Future signage requires a permit and shall be subject to Planning Division review and
approval prior to installation.
ENGINEERING DIVISION
43. All Public Works requirements shall be complied with as a condition of development as
specified in the Lake Elsinore Municipal Code (LEMC) prior to final map approval.
44. Pay all Capital Improvement and Plan Check fees (LEMC 16.34, Resolution 85-26). The
applicant shall pay the City’s traffic mitigation fee of $1,197 per unit a t building permit and
the drainage fee is $7,645 per acre (Rice Cyn Distr) and some areas are $5,380 per acre
(Nichols St. SW Distr.).
45. Submit a "Will Serve" letter to the City Engineering Division from the applicable water
agency stating that water and sewer arrangements have been made for this project.
Submit this letter prior to final map approval.
46. Construct all public works improvements per approved street plans (LEMC 12.04). Plans
must be approved and signed by the City Engineer prior to final map approval (LEMC
16.34).
47. Street improvement plans and specifications shall be prepared by a Calif. Registered Civil
Engineer. Improvements shall be designed and constructed to Riverside County Road
Department Standards, latest edition, and City Codes (LEMC 12.04 and 16.34).
48. Applicant shall enter into an agreement with the City for the construction of public works
improvements and shall post the appropriate bonds prior to final map approval.
49. Desirable design grade for local streets should not exceed 9.5%. The maximum grade of
15% should only be used because of design constraints.
50. The landscaped median in Lake Street and Nichols Road shall be 14 ft. wide and not 24
feet.
51. The intersection of Street II with Collector A shall be eliminated and Street II shall end in a
cul-de-sac at Collector A. Street II shall connect to Street GG or Street JJ just south of
Collector A.
52. The intersection of Collector A and Street C shall be relocated south and should be
opposite H Street.
53. Collector “A” shall have a minimum horizontal radius of 650 feet and the minimum design
speed shall be 35 mph.
54. Terra Cotta Road shall have a 90 ft. Right-of-way, 70 ft. curb to curb and a 14 ft. painted
median not a raised landscaped median.
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 6 of 17
55. Nichols Road shall have a 120 ft. right-of-way, 96 ft curb to curb and a 14 ft. raised
landscaped median.
56. Lake Street shall have a 120 ft. right-of-way, 96 ft. curb to curb and a 14 ft. raised
landscaped median.
57. Dual lefts may be required on Lake St. at Nichols Road, this section of Lake St. shall have
the R/W increased 12 ft. with appropriate tapers installed.
58. Provide an in-lieu fee of $ 87,360.00 for half the landscaping in a raised landscaped median
for Lake St. and Nichols Road.
59. Applicant shall pay a fee for reconstructing the existing ultimate half street width of Nichols
Road and Lake St. to the ultimate full street width along the tract boundary, the amount for
reconstruction subject to the approval of the City Engineer.
60. Pay all fees and meet requirements of encroachment permit issued by the Engineering
Division for construction of public works improvements (LEMC 12.08 and Resolution 83-
78).
61. All compaction reports, grade certifications, monument certifications (with tie notes
delineated on 8 ½" x 11" Mylar) shall be submitted to the Engineering Division before final
inspection of public works improvements will be scheduled and approved.
62. The applicant shall install 3 permanent bench marks to Riverside County Standards and at
a location to be determined by City Engineer.
63. Applicant shall obtain all necessary off-site easements for off-site grading from the adjacent
property owners prior to final map approval.
64. Arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of
the roadway or alley shall be the responsibility of the property owner or his agent.
65. Provide fire protection facilities as required in writing by Riverside County Fire.
66. Provide street lighting and show lighting improvements as part of street improvement plans
as required by the City Engineer.
67. Developer shall install blue reflective pavement markers in the street at all fire hydrant
locations.
68. Applicant shall submit a traffic control plan showing all traffic control devices for the tract to
be approved prior to final map approval. All traffic control devices shall be installed prior to
final inspection of public improvements. This includes No Parking and Street Sweeping
Signs for streets within the tract.
69. All improvement plans and tract maps shall be digitized. At Certificate of Occupancy
applicant shall submit tapes and/or discs which are compatible with City's ARC Info/GIS or
developer to pay $300 per sheet for City digitizing.
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 7 of 17
70. All utilities except electrical over 12 kv shall be placed underground, as approved by the
serving utility.
71. Apply and obtain a grading permit with appropriate security prior to building permit
issuance. A grading plan signed and stamped by a Calif. Registered Civil Engineer shall
be required if the grading exceeds 50 cubic yards or the existing flow pattern is substantially
modified as determined by the City Engineer.
72. Provide soils, geology and seismic report including street design recommendations.
Provide final soils report showing compliance with recommendations.
73. An Alquist-Priolo study shall be performed on the site to identify any hidden earthquake
faults and/or liquefaction zones present on-site.
74. All grading shall be done under the supervision of a geotechnical engineer and he shall
certify all slopes steeper than 2 to 1 for stability and proper erosion control. All
manufactured slopes greater than 30 ft. in height shall be contoured.
75. Individual lot drainage shall be conveyed to a public facility or accepted by adjacent
property owners by a letter of drainage acceptance or conveyed to a drainage easement.
76. On-site drainage facilities located outside of road right-of-way should be contained within
drainage easements shown on the final map. A note should be added to the final map
stating: “Drainage easements shall be kept free of buildings and obstructions”.
77. All natural drainage traversing site shall be conveyed through the site, or shall be collected
and conveyed by a method approved by the City Engineer.
78. Submit Hydrology and Hydraulic Reports for review and approval by City Engineer and the
Riverside County Flood Control District prior to approval of final map. Developer shall
mitigate any flooding and/or erosion caused by development of site and diversion of
drainage.
79. All drainage facilities in this tract shall be constructed to Riverside County Flood Control
District Standards.
80. Storm drain inlet facilities shall be appropriately stenciled to prevent illegally dumping in the
drain system, the wording and stencil shall be approved by the City Engineer.
81. Roof and yard drains will not be allowed to outlet through cuts in the street curb. Roof drains
should drain to a landscaped area whenever feasible.
82. 10 year storm runoff should be contained within the curb and the 100 year storm runoff
should be contained within the street right-of-way. When either of these criteria are
exceeded, drainage facilities should be installed.
83. Any concentration or diversion of drainage which increases flow from the pre-construction
conditions requires a drainage acceptance letter from the downstream property owners for
outletting the proposed stormwater run-off on private property.
84. Developer shall be subject to all Master Planned Drainage fees and will receive credit for
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 8 of 17
all Master Planned Drainage facilities constructed.
85. Provide Tract Phasing Plan for the City Engineer's approval. Bond public improvements
for each Phase as approved by the City Engineer.
86. Applicant will be required to install BMP’s using the best available technology to mitigate
any urban pollutants from entering the watershed.
87. Applicant shall obtain approval from Santa Ana Regional Water Quality Control Board for
their storm water pollution prevention plan including approval of erosion control for the
grading plan prior to issuance of grading permits. The applicant shall provide a SWPPP for
post construction which describes BMP’s that will be implemented for the development and
including maintenance responsibilities.
88. Education guidelines and Best Management Practices (BMP) shall be provided to residents
of the development in the use of herbicides, pesticides, fertilizers as well as other
environmental awareness education materials on good housekeeping practices that
contribute to protection of stormwater quality and met the goals of the BMP in Supplement
“A” in the Riverside County NPDES Drainage Area Management Plan.
89. Applicant shall provide first blush BMP’s using the best available technology that will reduce
storm water pollutants from parking areas and driveway aisles.
90. Intersection site distance shall meet the design criteria of the CALTRANS Design Manual
(particular attention should be taken for intersections on the inside of curves). If site
distance can be obstructed, a special limited use easement must be recorded to limit the
slope, type of landscaping and wall placement.
91. The landscaping in the median and parkway on Collector A shall be analyzed by a traffic
or civil engineer to insure that the sight distance meets Caltrans Design Manual criteria.
92. Intersecting streets on the inside radius of a curve will only be perm itted when adequate
sight distance is verified by a registered civil engineer.
93. No residential lot shall front and access shall be restricted on Collector A, Nichols Road,
and Lake Street and so noted on the final map.
94. If right-of-way is abandoned as part of this development, then adjacent property affected
by the abandonments must still have access to public maintained right-of-way.
95. Applicant shall record CC & R’s for the tract prohibiting on-street storage of boats,
motorhomes, trailer, and trucks over one-ton capacity, roof mounted or front yard
microwave satellite antennas. The CC & R’s shall be approved by the Community
Development Director prior to recordation of final map.
96. Applicant shall provide a homeowner’s association with CC & R’s for maintenance of the
open space.
97. Developer shall provide an approved open space conservation easement dedicated to the
HOA for the tracts’ open space with a fuel modification zone for a fire break to be
maintained by a homeowner’s association.
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 9 of 17
98. The large open space lots adjacent to residential lots shall have areas designated as fuel
modification zones for a firebreak to be maintained by a homeowner’s association.
99. All open space and slopes except for public parks and schools and flood control district
facilities, outside the public right-of-way will be owned and maintained by either a home
owner’s association or private property owner.
100. In accordance with the City’s Franchise Agreement for waste disposal & recycling, the
applicant shall be required to contract with CR&R Inc. for removal and disposal of all waste
material, debris, vegetation and other rubbish generated during cleaning, demolition, clear
and grubbing or all other phases of construction.
101. The phasing plan in the project’s traffic study does not match that shown on Tentative Tract
Map 28214. The traffic study’s phasing plan shall be used in the conditions of approval.
There shall be no C of O in Phase 2 until Phase 1 offsite infrastructure has been completed.
There shall be no C of O in Phase 3 until Phase 2 offsite infrastructure has been completed.
102. The current development within VTTM 28214 consists of 567 completed single-family
dwelling units and a 23-acre sports park. A Focused Traffic Impact Analysis (TIA) dated
February 25, 2020 was prepared by Linscott, Law & Greenspan Engineers (LLG) to assess
the traffic impact requirements for the remaining development, which consists of 344
single-family dwelling units, 373 multi-family dwelling units, and the 850-student elementary
school. The required improvements are outlined as follows:
PHASES 9 THROUGH 17 - 344 SINGLE FAMILY LOTS
Lake Street and Nichols Road – Intersection improvements
Intersection to be reconstructed to its ultimate width with signalization placed at
ultimate locations and interim traveled lane transitions consistent with County
transportation standards.
o Completion: Improvements shall be completed prior to the 125th building permit
within Phases 9 through 17.
Nichols Road – Lake Street to Alberhill Ranch Road
Nichols Road between Lake Street and Alberhill Ranch Road shall be widened on the
south side of Nichols Road to provide its ultimate half -width including two (2) new
eastbound lanes. The existing two (2) lanes of pavement shall be restriped and
converted to two (2) westbound lanes for a total of four (4) lanes.
Improvements shall include: construction of thirty-five feet (35’) of new paving, curb
and gutter, sidewalks, parkway landscaping, street trees and street lights. Widening
shall include interim transition paving and striping to match existing conditions at the
Alberhill Ranch Road/Nichols Road and Lake Street/Nichols Road intersections.
The new pavement on the south side of Nichols Road shall be installed 2-inches lower
than the ultimate finished surface to accommodate future utility improvements. After
completion of the future utility improvements, the developer shall install the final 2-
inches of pavement.
o Completion: Improvements shall be completed prior to the 200th building permit
within Phases 9 through 17.
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 10 of 17
Lake Street – Alberhill Ranch Road to Nichols Road
Lake Street between Alberhill Ranch Road and Nichols Road shall be widened along
the east side of Lake Street along the frontage of Tract 28214 to provide its ultimate
half-width including an additional thirty feet (30’), two (2) northbound lanes and two (2)
southbound lanes for a total of four (4) lanes.
Improvements shall include: construction of approximately thirty (30’) feet of new AC
pavement and base material, curb and gutter, sidewalks, parkway landscaping, street
trees and street lights.
Lake Street shall be restriped for four (4) travel lanes and widening shall include interim
transition paving and striping to match existing conditions at the Alberhill Ranch
Road/Lake Street and Nichols/Lake Street intersections.
Existing SCE power poles near the Lake Street/Nichols Road intersection shall be
relocated by the developer of Phase 4 during construction of the Lake Street segment
of Mountain Avenue to Alberhill Ranch Road.
o Completion: Improvements shall be completed prior to the 50th building permit
within Phases 9 through 17.
The applicant shall notify the City at least one month in advance should the applicant
request to defer this Condition past the 50th building permit. The request for deferral
shall include all good faith efforts to construct the improvements and any impediments
to this effort which is the basis for the deferral. The City Council shall consider the
deferral at a regularly scheduled meeting.
Nichols Road – Alberhill Ranch Road to Terra Cotta Road
Nichols Road between Alberhill Ranch Road and Terra Cotta Road shall be widened
to provide two (2) eastbound lanes and one (1) westbound lane for a total of three (3)
lanes. A total pavement width of fifty-one feet (51’) shall be constructed to
accommodate the three travel lanes.
Pavement improvements shall be located on the south side of Nichols Road and will
include grinding the existing +35’ wide AC pavement, as needed, and providing a
minimum 2-inches AC pavement overlay; the construction of an additional sixteen feet
(16’) of AC pavement and base material. Widening shall include interim transition
paving and striping to match existing conditions at the Alberhill Ranch Road/Nichols
Road intersection.
Improvements shall include: curb and gutter, sidewalks, parkway landscaping, street
trees and street lights on the south side of Nichols Road.
The new pavement on the south side of Nichols Road shall be installed 2-inches lower
than the ultimate finished surface to accommodate future utility improvements. After
completion of the future utility improvements, the developer shall install the final 2-
inches of pavement.
o Completion: Improvements shall be completed prior to the 100th building permit
of Phases 9 through 17.
Alberhill Ranch Road and Brianna Circle – Intersection Improvements
Completion of intersection improvements in Alberhill Ranch Road and Brianna Circle
including installation of a south bound left turn pocket on Alberhill Ranch Road onto
“B’ Street. Install 4-way stop-signs and revise roadway striping.
o Completion: Improvements shall be completed prior to the 25th building permit
of Phases 9 through 17.
The applicant shall notify the City at least one month in advance should the applicant
request to defer this Condition past the 50th building permit. The request for deferral
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 11 of 17
shall include all good faith efforts to construct the improvements and any impediments
to this effort which is the basis for the deferral. The City Council shall consider the
deferral at a regularly scheduled meeting.
Nichols Road and Alberhill Ranch Road – Intersection Improvements
Intersection to be reconstructed to its ultimate width with signalization placed at
ultimate locations and interim traveled lane transitions consistent with County
transportation standards.
o Completion: Improvements shall be completed prior to the 50th building permit
within Phases 9 through 17.
The applicant shall notify the City at least one month in advance should the applicant
request to defer this Condition past the 50th building permit. The request for deferral
shall include all good faith efforts to construct the improvements and any impediments
to this effort which is the basis for the deferral. The City Council shall consider the
deferral at a regularly scheduled meeting.
Alberhill Ranch Road – Easterly Parkway improvements
Alberhill Ranch Road between Nichols Road and two hundred and seventy-five feet
(275’) east of the Hudson Lane intersection shall be completed with easterly parkway
improvements including sidewalk, landscaping, and street trees.
o Completion: Improvements shall be completed prior to the 125th building permit
within Phases 9 through 17.
PHASE 18 - MULTIFAMILY SITE
Nichols Road – Terra Cotta Road to East Tract Boundary Line of Phase 18
Nichols Road between Terra Cotta Road and the east tract boundary line of Phase 18
shall be widened to provide two (2) eastbound lanes and one (1) westbound lane for
a total of three (3) lanes. A total pavement width of fifty-one feet (51’) shall be
constructed to accommodate the three travel lanes.
Pavement improvements shall be located on the south side of Nichols Road and will
include grinding the existing +35’ wide AC pavement, as needed, and providing a
minimum 2-inches AC pavement overlay; the construction of an additional sixteen feet
(16’) of AC pavement and base material. Widening shall include interim transition
paving and striping to match existing conditions further east along Nichols Road.
Improvements shall include: curb and gutter, sidewalks, parkway landscaping, street
trees and street lights on the south side of Nichols Road.
The new pavement on the south side of Nichols Road shall be installed 2-inches lower
than the ultimate finished surface to accommodate future utility improvements. After
completion of the future utility improvements, the developer shall install the final 2-
inches of pavement.
o Completion: Improvements shall be completed prior to the 75th building permit
within Phase 18.
Terra Cotta Road – Nichols Road to the South Tract Boundary Line of Phase 18
Terra Cotta Road between Nichols Road and the south tract boundary line of Phase
18 shall improve the ultimate roadway section of ninety feet (90’), including four (4)
travel lanes, a painted median and necessary drainage improvements.
Improvements shall include: construction of new AC pavement and base material,
along with curb and gutter, sidewalks, parkway landscaping, street trees and street
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 12 of 17
lights on the both the east and west sides of Terra Cotta Road.
Developer shall coordinate with the owner/developer of Tract 36557-Terracina for the
construction of that portion of the 32 feet (32’) of AC pavement and base material in
Terra Cotta Road that Tract 36557 has been conditioned to install.
Terra Cotta Road shall be striped for four (4) travel lanes and appropriate left turn
lanes and shall include interim transition paving and striping to match existing
conditions at the Terra Cotta Road/Nichols Road intersection and on Terra Cotta Road
at the tract boundary.
Completion: Improvements shall be completed prior to the 75th building permit within
Phase 18
PHASE 4 – MULTIFAMILY SITE
Lake Street – Mountain Avenue to Alberhill Ranch Road
Lake Street between Mountain Avenue and Alberhill Ranch Road shall be redesigned
and reconstructed with an appropriate vertical curve at a design speed of 55 mph and
graded to the Urban Arterial ultimate width including the necessary drainage
improvements.
Lake Street between Mountain Avenue and Alberhill Ranch Road shall be widened to
provide its ultimate half-width including two (2) northbound lanes and two (2)
southbound lanes for a total of four (4) lanes to the satisfaction of the City Engineer.
Improvements shall include: construction of new AC pavement and base material,
along with curb and gutter, sidewalks, parkway landscaping, street trees and street
lights on the east side of Lake Street.
Lake Street shall be restriped for four (4) travel lanes and appropriate left turn lanes
and shall include interim transition paving and striping to match existing conditions at
the Mountain Avenue/Lake Street and Alberhill Ranch Road /Lake Street intersections.
o Completion: Improvements shall be completed prior to the 50th building permit
of Phase 4.
Lake Street and Alberhill Ranch Road – Intersection Improvements
Intersection to be reconstructed to its ultimate width with signalization placed at
ultimate locations and interim traveled lane transitions consistent with County
transportation standards.
o Completion: Improvements shall be completed prior to the 50th building permit
of Phase 4.
Lake Street and RPN 4 MF Driveway – Intersection Improvements
Intersection to be constructed to its ultimate width with signalization placed at ultimate
locations.
Widen and restripe the south leg to provide a second northbound through lane and a
second southbound departure lane. Widen and restripe the north leg to provide a
second southbound through lane and a second northbound departure lane.
o Completion: Improvements shall be completed prior to the 50th building permit
of Phase 4.
The mitigation measures noted in the 2004 Urban Crossroads traffic study from page 1-5
through page 1-13 and the 2011 LLG Engineers traffic study pages 21 & 22 and Figure 8-
1 shall be incorporated into these conditions and are modified, refined, corrected and/or
added as set forth below Any request to modify this condition of approval 102, including
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 13 of 17
without limitation the C of O threshold for each Phase improvement shall be presented to
the City Council for consideration and shall be effective only upon approval by the City
Council.
Lake Street curve alignment improvement north of Coal Road shall have a minimum
design speed of 55 mph and a minimum radius of 1,750 feet and be completed by
240th C of O. 8/23/11 REVISED COA “Condition Satisfied"
Lake Street and the north/southbound ramps, the improvements shall be completed
by the 240th For clarification-NB Ramps: Traffic Signal, NB left turn lane, WB left turn
lane, and WB thru/right turn, SB Ramps: Traffic Signal, SB left turn lane 10/27/15
REVISED COA: Lake Street / I-15 improvements required by Condition of Approval
No. 102 to VTTM 28214 be completed at the 486th Certificate of Occupancy. Bonds
& agreements approved at 10/27/15 CC meeting
Lake Street and Temescal Canyon Road, the improvements shall be completed by the
240th C of O. For clarification-Traffic Signal, NB left turn lane, EB left turn lane. 8/23/11
REVISED COA: Interim improvements complete, construct ultimate intersection by
project build out (1620th C of O).
Lake Street and Collector “A”, the improvements shall be completed by the 240th C of
O., WB right turn lane. 8/23/11 REVISED COA “Condition Satisfied"
Lake Street and Mountain Street, the improvements shall be completed by the 240th
C of O. 8/23/11 REVISED COA “Condition Satisfied"
Lake Street curves, north of the curve improved in Phase 1, shall be realigned and
improved to a design speed of 55 mph minimum and 1,750 foot minimum radius by
the 464th C of O of Phase 2. 8/23/11 REVISED COA: Road to be modified "to the
satisfaction of the City Engineer" by 1200th C of O.
Lake Street interim roadway improvements may be reduced to 62 ft. of R/W to
accommodate a 1,750 ft. radius. Interim roadway improvements may include a super
elevation design to be approved by the City Engineer and shall include a
reconstruction replacement cost. 8/23/11 REVISED COA “Condition Satisfied"
Lake Street from Nichols Road to Mountain Street, the improvements shall be
completed by the 464th C of O of Phase 2. The curves shall be realigned and improved
to a design speed of 55 mph minimum and 1,750 foot minimum radius. For clarification
– Construct Lake Street from Nichols Road to Mountain Street at its Ultimate half-
section width as an Urban Arterial (120’ right of way). 8/23/11 REVISED COA:
Security shall be posted in the amount approved by the City Engineer for all
unconstructed and unsecured improvements no later than the 1200th C of O.
Nichols Road from Lake Street to Terra Cotta, construct at ultimate half section by the
464th C of O of Phase 2. For clarification- Construct Nichols Road from Lake Street to
Terra Cotta Road at its ultimate half-width section as a Major (and dedicate off-set for
a 120’ ROW). Includes WB left turn lane on Terra Cotta, WB thru lane, and EB single
lane left turn/thru lane. 8/23/11 REVISED COA: Construct interim 2-lane road
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 14 of 17
including interim drainage improvements and pedestrian/bike path by the 464th C of
O – “Condition Satisfied”. Build ultimate half width from Lake to east side of Tract
30836 by 1612th C of O.
Construct Nichols Road from Terra Cotta Road to Collier Avenue as an interim 2-lane
divided road including 2-lane bridge over Alberhill Creek by the 464th C of O of Phase
2. 8/23/11 REVISED COA: Construction of interim 2-lane road with elevated section
by 464th C of O. “Condition Satisfied” Construct ultimate bridge connection of Nichols
Road to Collier Avenue by project build out (1620th C of O).
Developer shall work with the City on a design to realign Collier Avenue at Nichols
Road to the west away from the freeway allowing more storage for entry to the freeway
ramps.
Nichols Road and the northbound I-15 ramps, construct a traffic signal by the 464th C
of O. 8/23/11 REVISED COA: Install signal and additional lane to off-ramp by 1200th
C of O.
Nichols Road and the southbound I-15 ramps, construct a traffic signal by the 464th C
of O. 8/23/11 REVISED COA: Install signal and additional lane to off-ramp by 1200th
C of O.
Nichols Road and Lake Street, signal and widening improvements shall be completed
when Nichols Road is extended to Collector “A”. 8/23/11 REVISED COA “Condition
Satisfied"
Install pedestrian walkway along southerly side of Nichols Road from Terra Cotta Road
to “A” Street in Tract 30836 as soon as Nichols is extended to Tract 30836. 8/23/11
REVISED COA: Construct sidewalk along Nichols Road by 1st C of O of Tract 30836.
Lake Street from I-15 Freeway to Nichols Road, construct interim 4-lane section by
the 650th C of O. For clarification- an interim 4 lane undivided cross section. 8/23/11
REVISED COA: Construct interim 4-lane roadway for Lake Street from Freeway to
Nichols by project build out (1620th C of O).
Complete Nichols Road from the project TAZ 4 west boundary to the project TAZ 4
east boundary to its ultimate full section prior to the last C of O for Lot 974. For
clarification-TAZ 4 is the property immediately east of Terra Cotta Road. Lot 974 is
the proposed multi-family lot. Nichols Road at the Ultimate full width section as a Major,
and dedicate 120’ ROW.
Terra Cotta Road from Nichols Road to south project boundary, construct by the 1st C
of O in lot 974. For clarification, construct Terra Cotta Road at its full width as a
Secondary, from Nichols Road to Kings Highway.
Lake Street and I-15 Freeway SB-ramps, install NB right turn lane by 650th C of O of
Phase 3. 1/12/16 REVISED COA: Lake Street right turn onto the southbound I-15
onramp required by Condition of Approval No. 102 to VTTM 28214 be completed at
the 650th Certificate of Occupancy. Bonds & Agreements approved @ 1/12/16 CC
meeting
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 15 of 17
Collector “A” and Nichols Road construct traffic signal by the 650th C of O of Phase
3. For clarification – Collector A is Alberhill Ranch Road. 1/12/16 Revised COA: The
traffic signal at the intersection of Nichols Road and Alberhill Ranch Road required by
Condition of Approval No. 102 to VTTM 28214 be completed at the 650th Certificate
of Occupancy. Bonds & Agreements approved @ 1/12/16 CC meeting.
Collier Avenue and Nichols Road, construct intersection improvements by the 650th
C of O. For clarification-Traffic Signal and WB turn lane 8/23/11 REVISED COA:
Provide exclusive westbound left turn and northbound left and right turn lanes by 464th
C of O - "Condition Satisfied". Install signal in conjunction with bridge connection by
project build out.
FIRE DIVISION
GENERAL CONDITIONS
103. Riverside County Fire Department at Lake Elsinore Office of the Fire Marshal
Responsibility- It is the responsibility of the recipient of these Fire Department conditions
to forward them to all interested parties. The permit number (as it is noted above) is
required on all correspondence.
Questions should be directed to the Riverside County Fire Department, Lake Elsinore
Office of the Fire Marshal at 130 S. Main St., Lake Elsinore, CA 92530. Phone: (951) 671-
3124 Ext. 225. The following fire department conditions shall be implemented in
accordance with the Lake Elsinore Municipal Code and the adopted codes at the time of
project building plan submittal, these conditions are in addition to the adopted code
requirements.
104. Blue Dot Reflectors- Blue retro-reflective pavement markers shall be mounted on private
streets, public streets and driveways to indicate location of fire hydrants. Prior to
installation, placement of markers must be approved by the Riverside County Fire Dept.
105. Minimum Hydrant Fire Flow- Minimum required fire flow shall be 1,000 GPM for 2 hours
duration at 20 PSI residual operating pressure, which must be available before any
combustible material is placed on the job site. Average spacing between hydrants 500’ and
250’ maximum distance from any point on the street or road frontage to hydrant.
106. Standard Fire Hydrants- Super fire hydrants (6” x 4” x 2-2 1/2”), shall be located not less
than 25 feet or more than 250 feet from any portion of the building as measured along
approved vehicular travel ways. The required fire flow shall be available from any adjacent
hydrant (s) in the system
107. Hazardous Fire Area- The proposed project is located in a high or very high fire zone as
adopted in the Lake Elsinore Municipal Code. The project shall adhere to all high fire
requirements as prescribed in the Title 24 Codes, any applicable state and local codes
pertaining to high fire. The structures shall comply with Chapter 7A of the Building Code
and or Section R327 of the California Residential Code. Roofing Materials shall be
classified at not less than class “A”.
108. Fuel modification Plan- Fuel modification plans shall be provided to the Lake Elsinore
Fire Protection Planning office. Plans shall include fuels modeling and comprehensive
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 16 of 17
details with regard to the vegetation management plan. The fuels modification zone s hall
be not less than 100’ from all structures and may be required to be increased.
ANY HABITAT CONSERVATION ISSUES AFFECTING THE IMPLEMENTATION OF
THIS FUEL MODIFICATION PLAN SHALL BE COORDINATED WITH THE
RESPONSIBLE WILDLIFE AND/OR OTHER CONSERVATION AGENCY PRIOR TO THE
LAND DEDICATION.
109. Secondary Access- In the interest of Public Safety, this project shall provide an Alternate
or Secondary Access. Said access shall be constructed in accordance to the City of Lake
Elsinore Engineering Department standards to accommodate full fire response and
community evacuation.
PRIOR TO BUILDING PERMIT ISSUANCE
110. Water System Plans- Applicant and/or developer shall submit 2 sets of water system plans
to the Fire Department for review. The plans must be signed by a registered Civil Engineer
and/or water purveyor prior to Fire Department review and approval. Mylars will be signed
by the Fire Department after review and approval. Two (2) copies of the signed and
approved water plans shall be returned to the Fire Department before release of a building
permit.
111. Prior to Building Construction Verification- This project shall be inspected and
approved by the Fire Marshal or designee prior to bringing combustible materials on site .
During said inspection all permanent road signs shall be in place, all hydrants shall on
operating and approved for use by the water purveyor, and all permanent road surfaces
shall be completed including primary and secondary access circulation.
PRIOR TO BUILDING FINAL INSPECTION
112. Residential Fire Sprinkler Systems for Single family and two-family 13D- Install a
complete fire sprinkler system designed in accordance with California Residential Code,
California Fire Code and adopted standards. A C-16 licensed contractor must submit plans,
along with the current fee, to the Fire Department for review and approval prior to
installation.
VTTM 28214
Conditions of Approval City Council: December 8, 2020
Applicant’s Initials: _____ Page 17 of 17
I hereby state that I acknowledge receipt of the approved Conditions of Approval for the above
named project and do hereby agree to accept and abide by all Conditions of Approval as approved
by the City Council of the City of Lake Elsinore on_______________. I also acknowledge that all
Conditions shall be met as indicated.
Date:
Applicant’s Signature:
Print Name:
Address:
Phone Number:
ASH STLAKE ST
LAKESHORE DRTERRA COTTA RDNICHOLS RDCOAL AVE
KINGS HWY
HOFF AVE
MOU NTAIN ST
GRAND AVEDRYDEN STB
AILE
Y A
V
E
RUNNING DEER RD
SPRUCE ST
GUNDER AVENICH
OLAS RD
KIWI WAY
LADRILLO ST
VISTA VIEW
PEARL ST
BE LM ON T A V E
FIR CIR
NAVEL WAY
DRIFTWOOD LN
ISABELLA CIR
FERN CIRPOPLAR CIRBRIANNA CIR
BANYON CIRLAKE STASH STLAKE ST
LAKESHORE DRTERRA COTTA RDNICHOLS RDCOAL AVE
KINGS HWY
HOFF AVE
MOU NTAIN ST
GRAND AVEDRYDEN STB
AILE
Y A
V
E
RUNNING DEER RD
SPRUCE ST
GUNDER AVENICH
OLAS RD
KIWI WAY
LADRILLO ST
VISTA VIEW
PEARL ST
BE LM ON T A V E
FIR CIR
NAVEL WAY
DRIFTWOOD LN
ISABELLA CIR
FERN CIRPOPLAR CIRBRIANNA CIR
BANYON CIRLAKE STVESTING TEN TATIVE TRACT MAP NO. 2 8214VICINITY MAP
PROJECT SITE
´
ASH STLAKE ST
LAKESHORE DRTERRA COTTA RDNICHOLS RDCOAL AVE
KINGS HWY
HOFF AVE
MOU NTAIN ST
GRAND AVEDRYDEN STB
AILE
Y A
V
E
RUNNING DEER RD
SPRUCE ST
GUNDER AVENICH
OLAS RD
KIWI WAY
LADRILLO ST
VISTA VIEW
PEARL ST
BE LM ON T A V E
FIR CIR
NAVEL WAY
DRIFTWOOD LN
ISABELLA CIR
FERN CIRPOPLAR CIRBRIANNA CIR
BANYON CIRLAKE STSource: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, U SDA, USGS, AeroGRID, IGN, and the GIS UserCommunityASH STLAKE ST
LAKESHORE DRTERRA COTTA RDNICHOLS RDCOAL AVE
KINGS HWY
HOFF AVE
MOU NTAIN ST
GRAND AVEDRYDEN STB
AILE
Y A
V
E
RUNNING DEER RD
SPRUCE ST
GUNDER AVENICH
OLAS RD
KIWI WAY
LADRILLO ST
VISTA VIEW
PEARL ST
BE LM ON T A V E
FIR CIR
NAVEL WAY
DRIFTWOOD LN
ISABELLA CIR
FERN CIRPOPLAR CIRBRIANNA CIR
BANYON CIRLAKE STSource: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, U SDA, USGS, AeroGRID, IGN, and the GIS UserCommunity
VESTING TEN TATIVE TRACT MAP NO. 2 8214AERIAL MAP
PROJECT SITE
´
Lk�
VLST//VG TA/VTA T/I/E TRA C T NO. 282 14
Ilj JII
II I
11 I'I
I 111
III
I��s
Ili
11 I `III
11
I ICI R P
II
-- \ J Ili'141��
II
1I III
II II
15
14
75J,
,, I�� IIs_s I 13
r I 1534.
®II I'l11 26
1
• `'J� II I�gIgI I 1533
11
II III ,I 10
b
III II 0;J5.6
I I,l ,�� 11526.E
-
ml
bl
II ail- I
1505.8 bll
7499.
AA .
I 7493.E
I UU
174�J 15
1469 1 y
ILtyp
11-
�I
��s I I� IIII III '
-
I
R/W
61 1 MED/AN
SIDEWALK
EACH S/DE
TERRA COTTA RD.
30 'QM/N.
2 2' MIN R E HOUSE PAD
f� ►l Pv
�06 MAC
E �ARIE 2:1
HOUSE PAD S� 1 MAX' s" PCC CONCRETE
(TYPICAL)
R/W
3' PUBL/C j
UTILITY ESMT.
2.1 TO MEET 2
EXIST. GRADE
I
ONSITE CUL DE SAC
Rlw
I 27' 27'
7' 20' 20'
3' PUBL/C 5'
UT/L/TY ESMT ! S/DE S
LANDSCAPE
PARKWAY
LANDSCAPE
PARKWAY
ONSI TE LOCAL
R/W
60'
3030'
ME SH CIRCL E
3' PUBL/C
Ur/L /rY ESMr.
2:1 TO MEET
EXIST GRADE
LANDSCAPE
PARKWA Y
R I/W
I
I
3' PUBL/C
UTILITY ESMT.
I
2A,'
2.• 1 TO MEET
EXIST GRADE
5�
LANDSCAPE
PARKWA Y
R/W
i
I
2
9' PUBL/C
UTILITY ESMT.
I
I
2.• 1 TO MEET
EXIST. GRADE
I,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I2
I
I
I
200 0 200 400 600
SCAL F /N FEET
L 0 T SUMA 11A 8 /y TA HL E
NUMBERED PARCELS NUMBERED PARCELS NUMBERED PARCEL S
R-M
(5, 000 S.F. M/N)
L OT N0.
GROSS AREA
(S. F.)
284
11,002
255
7,686
256
7,369
287
7,163
258
7,147
289
7, 138
290
7,129
291
7,120
292
7,,110
293
7,101
294
7,,092
295
7,,083
296
7, 737
297
6, 637
298
5,100
299
5,100
300
5,100
30 /
5,100
302
5,100
303
5,100
304
5,100
305
5,100
306
5,100
307
5,100
308
5,213
309
6,565
370
6, 312
3 / 1
7, 539
312
8,195
313
8, 326
314
8, 431
315
8, 387
316
8,293
317
9,199
3/8
9,103
3/9
9,019
320
8, 032
321
9,264
322
9,645
323
9,846
324
9, 354
325
10,958
326
12,749
327
6,642
329
5,005
329
5,009
330
5,399
3,3 /
5,560
332
5,620
333
5,291
334
5,357
335
5, 430
336
5,292
337
5,144
335
5, 158
339
5,173
340
5,199
34/
5,566
342
10,863
343
9,752
344
9,281
345
8,919
346
8,814
347
9, 124
348
7,,418
349
7, 373
fR - M
(5, 000 S.F. MIN)
LOT NO.
GROSS AREA
(S. F.)
950
7, 032
35 /
7, 823
952
8,460
353
8,987
354
8,166
,355
7,841
,356
7,890
.357
6, 830
355
8,536
359
6,014
360
5,181
361
5,065
362
5,064
363
5,098
364
5,062
365
5,057
366
5,077
367
5, 035
.369
5,003
J69
5,114
370
5,373
371
5,622
372
5,750
373
5,861
374
6,565
375
8,899
376
7,799
377
7,937
378
8,543
379
8,507
350
8,107
38 /
8,174
352
7,818
353
8,491
384
8,755
355
8,055
986
7,641
.387
7, 931
358
7,590
389
8,264
390
9,078
391
9,161
392
12,930
TOTAL R-MLOTS 109
TOTAL LOTAREA 777,496 S. F.
AVERAGELOTAREA 7, 133 S. F.
NU/IiIBEREO PARCEL S
SF
(5, 500 S.F. MIN)
LOT NO.
GROSS AREA
(SF)
LOT NO.
GROSS AREA
(S.F.)
506
17,756
572
10,592
507
8,243
573
10,553
505
7,651
574
10,449
509
7,252
575
11,144
510
9,080
576
10,404
511
7,093
577
9,942
512
19,648
575
11,958
513
10,179
579
11,520
514
6,917
550
14,967
515
6,908
531
15,167
516
6,920
552
13, 823
517
7,065
583
12,413
515
7, 361
554
12,109
519
7,463
555
16,105
520
7,272
556
10,142
521
7,599
587
9,544
522
7,529
588
9,642
523
7,294
559
8,716
524
7,390
590
8,995
525
9, 434
591
8,726
526
8,427
592
8,995
527
8, 924
5,3
9,495
525
11, 630
594
9, 493
529
8,549
595
9,030
530
6,671
596
8,939
531
9,466
597
9,636
532
8,057
598
10,240
533
7,496
599
9,209
534
6,892
600
8,928
535
7,869
601
9, 387
556
10,660
602
9,209
557
10, 803
603
9,155
538
10,289
604
6,858
539
9, 723
605
6, 389
540
9,824
606
6,099
541
10,055
607
6,064
542
10,627
605
6,566
543
10,697
609
6,752
544
10,700
610
6, 696
545
10,777
611
7,239
546
9,775
612
7,257
547
9,935
613
8,923
549
9,201
614
7,643
549
7,047
615
8,235
550
6,744
616
8, 073
551
6,920
617
7,947
552
9,695
615
7,698
553
9, 367
619
7,694
554
9,765
620
7,844
555
8,247
621
8 832
556
8,371
622
9,062
557
9,291
623
8 378
558
9,214
624
9,427
559
8, 138
625
10 384
560
9,101
626
11 534
561
9,440
627
11,477
562
10,964
628
11 431
563
11, 306
629
11,780
564
10,401
650
9,592
565
11,981
63/
10,589
566
11,706
632
8,497
567
16,012
633
8,614
565
13,302
634
7,561
569
10, 306
635
7,791
570
9,399
636
8,046
571
9, 847
637
7, 791
RSF
(5, 500 S.F. M/N)
LOT NO.
GROSS AREA
(S F.)
LOT NO.
GROSS AREA
(S. F.)
1
6, 315
67
18, 374
2
6,702
68
11,114
3
6,780
69
8,612
4
7, 083
70
8,278
5
7,072
71
8,504
6
7,087
72
8,116
7
7,169
73
7,781
8
7,262
74
7, 693
9
7,694
75
7,727
/0
7, 303
76
8, 137
/ 1
7, 301
77
9,922
12
7,241
75
9,181
/3
7, 387
79
6,481
14
7,715
80
6, 523
15
8, 143
5 /
6,145
16
8, 683
52
6,670
17
9, 182
53
6,951
/5
7,768
54
7,015
19
8, 381
55
6,902
20
8, 283
56
6,625
21
8,017
57
7,610
22
7, 334
55
8, 534
23
6, 853
59
8, 353
24
6, 319
90
7,977
25
6,518
91
9,680
26
6,211
92
7,275
27
6,149
93
9,184
25
6, 344
94
7,777
29
6, 538
95
7,285
30
6, 732
96
7,569
3/
6,806
97
7,542
32
6,755
95
7,146
33
6,209
99
7,162
34
6,798
100
7,188
35
10,056
/O /
7, 993
36
6,224
102
6,907
37
6,182
/03
6, 323
38
6, 137
104
7,094
39
6,046
105
6,663
40
5,956
106
7,116
41
6, 293
107
6,976
42
6, 134
/OS
7,513
43
6,018
/ 09
7,009
44
7,065
/ 10
9,059
45
9, 153
/ 1 /
7, 866
46
9, 437
112
5,992
47
11,248
/ 13
6,096
45
13, 372
114
7,148
49
11,462
115
7,922
50
9, 749
116
7,343
51
9,025
117
7,200
52
9,647
/ 15
7,560
53
8, 317
119
7, 632
54
7,987
120
7,248
55
7,656
121
8,979
56
7, 326
122
7,797
57
9,598
123
7, 631
55
6,998
/24
7,650
59
6,914
125
7,668
60
6,659
126
7,597
61
6,769
127
7,702
62
6,980
128
6,991
63
7, 059
129
7, 231
64
5, 959
I30
9,917
65
7,143
/3/
10,544
66
6,550
/32
6,909
RSF
(5, 500 S.F. M/N)
LOT NO.
GROSS AREA
(SF)
LOT NO.
GROSS AREA
(S.F.)
/33
6, 883
199
7, 036
134
6,972
200
6,772
/35
7,020
201
6, 534
/36
7,231
202
6,651
/37
7,542
203
7, 315
/38
7,765
204
6,022
/39
7,403
205
6,417
140
7, I36
206
6,251
141
7,009
207
6,588
142
7,176
208
6,587
143
17,119
209
6,526
144
16 340
210
6, 314
145
6,829
211
6,190
146
7, 035
212
6,058
147
6,942
213
6, 232
148
7,004
214
6,222
149
11,819
215
6,087
150
9, 443
216
6,672
151
8, 373
217
10, 346
152
30,269
218
9,344
153
14,977
219
9,251
154
9,169
220
9,412
155
9,166
221
9,382
156
9,672
222
9,259
157
8, 134
223
9,009
159
6,650
224
8, 723
159
5, 927
225
9,170
160
5, 838
226
9,205
161
5,869
227
8,384
162
5,760
229
6, 906
163
6,257
229
7,163
164
6,203
230
23/
7,,003
165
6,389
7,,161
166
6,115
232
7,153
167
5, 523
233
7, 073
169
5,571
234
6,849
169
5,599
235
6,949
170
5,627
236
6, 273
171
5,711
237
6,353
772
5,884
238
6,481
/ 73
6,521
239
6,086
174
9,919
240
6, 234
175
6,194
241
7,705
176
6,185
242
15,998
177
6,231
243
244
10,559
179
6,019
10,290
179
5,871
245
246
70,040
/50
5,846
10,150
/5 /
5,773
247
9,864
192
5,693
248
9,944
/83
5,657
249
10,929
184
5,641
250
71,265
195
5,671
251
9,432
/56
5,999
252
7, 790
197
8,111
253
7,, 093
/88
13,142
254
7,237
159
10,468
255
9,032
/ 90
12,517
256
9,840
19/
8,096
257
9,886
192
8,819
258
10,906
/93
8,699
259
9,424
194
8, 305
260
8,141
195
8,107
261
7,,245
196
7,858
262
7,859
197
7,587
263
8,505
195
7, 301
264
8,632
NUM3f-RED PARCELS
RSF
(5, 500 S.F. MIN)
LOT NO.
GROSS AREA
(S F)
LOT NO.
GROSS AREA
(S. F.)
265
7,,004
440
6,714
266
6,675
441
9,705
267
11,207
442
8,252
268
9,924
443
8,007
269
11, 308
444
8,016
270
9, 544
445
8,051
271
9, 535
446
8,51
272
11, 179
447
8,256
273
10,446
445
7,826
274
12,607
449
7, 529
275
11,458
450
7,448
276
9,569
451
11, 360
277
7,477
452
10,128
278
7,411
453
7,942
279
6,507
454
7, 326
290
6,299
455
8, 327
281
6,797
456
6,559
292
9, 705
457
6, 653
253
6,570
458
6,486
393
6,451
459
5,934
394
5,810
460
5,697
395
5,698
461
6,131
396
5,770
462
6,571
397
5,683
463
6,849
398
5,678
464
6,842
399
5,672
465
8,022
400
5,654
466
10,958
401
5,991
467
10,317
402
6,130
469
13,387
403
5,903
469
7,,541
404
5,949
470
8, 344
405
5,996
471
9,744
406
6,142
472
9, 114
407
7,648
47J
9,475
409
8,962
474
17,168
409
9,571
475
15, 366
410
9,960
476
12,894
411
9,509
477
7,994
412
8,400
475
6, 304
413
10,802
479
6, 322
414
12,091
490
5,913
415
12,079
481
5,663
416
7,957
492
5,704
417
7,642
453
5,750
419
8,455
494
5,991
419
8,791
455
6,679
420
6,499
496
11,299
421
6,993
497
10,411
422
7,532
489
12,719
423
8,115
499
12,254
424
8,448
490
11,572
425
8,204
491
12,172
426
7,896
492
9,876
427
7,599
493
9,950
428
7, 348
494
9, 837
429
7,,659
495
10,469
430
9,292
496
11,215
43I
10,751
497
10,059
432
9,968
498
8,263
433
9,703
499
9,707
434
9,140
500
9,559
435
8,246
501
8,567
436
7,,689
502
16,406
437
6,760
503
15,609
435
6,846
504
9,186
439
6,845
505
8,041
NUMRSRED PARCELS NU1Wz6zSREO PARCELS NUIVRE-REO PARCEL S
)IR5F
(5, 500 S.F. MIN)
LOT NO.
GROSS AREA
(S F.)
LOT NO.
GROSS AREA
(S. F.)
635
7, 538
704
7,822
639
8, 231
705
7,724
640
7,925
706
7,828
641
7,979
707
8,064
642
7,904
709
8,240
643
7,266
709
8,538
644
6,530
710
9,100
645
12,560
711
10,383
646
9, 737
712
10,569
647
9,482
713
9, 617
648
11,209
714
8,816
649
11,144
715
8,303
650
11,334
716
10,412
651
10,945
717
10,429
652
10,719
719
11,665
653
70,217
719
11,646
654
71, 337
720
11,445
655
70,787
721
11, 366
656
70,085
722
10,629
657
10,129
723
10, 993
659
70, 713
724
9,971
659
11, 431
725
9, 981
660
13,551
726
70,281
661
9,859
727
11,172
662
7,919
729
12,992
663
7,952
729
15, 235
664
8, 613
730
75,571
665
9, 337
731
13, 674
666
10, 237
732
72,801
667
9,957
733
12,397
668
8,448
732
71, 310
669
8,778
735
9, 312
670
8,261
736
8,170
671
7,849
737
8,528
672
7,982
735
8, 179
673
9,392
739
7,601
674
8,545
740
8,017
675
8, 636
741
6,995
676
6,791
742
7, 039
677
6,649
743
9,357
678
7,049
744
12,019
679
13, 447
745
9, 327
680
10,908
746
8,447
681
11,525
747
7,764
682
10,908
749
9,756
683
8,974
749
10,915
694
8,784
750
7,866
685
16,965
751
7,095
686
12,217
752
7,947
687
11, 036
753
17,291
688
11,007
754
13,, 748
689
12,742
755
10, 393
690
11,966
756
11,519
691
11,154
757
9, 836
692
10,883
755
9,444
693
11, 083
759
9,572
694
10,904
760
10,223
695
11,128
761
8, 990
696
10,853
762
10,509
697
9,255
763
10, 530
698
16,249
764
13,160
699
14, 637
700
10,756
RSF
(5, 500 S.F. MIN)
LOT NO.
GROSS AREA
(S. F.)
765
14,458
766
15,219
767
11,932
768
11,404
769
15,493
770
10, 347
771
6,121
772
8, 563
773
8,852
774
8, 834
775
7, 796
776
8,953
777
14,507
775
12,476
779
11,060
790
10, 393
75/
10,253
752
10, 314
753
10,907
794
9,462
755
16,008
796
22,625
787
12,192
789
9, 336
789
8, 98 /
790
7, 319
791
7,992
792
8,362
793
8, 736
794
8, 430
795
7, 636
796
9, 344
797
8, 98 /
798
8,209
799
7, 179
800
10,089
50 /
7,318
902
7,272
803
7,092
504
6,350
805
9,426
906
8,006
907
7,034
908
7,492
509
8, 203
910
8, 063
5 / /
7,191
912
6, 919
813
6,827
814
7,200
915
8, 735
316
11,499
817
10,971
819
8,619
819
8, J75
820
7,962
821
7,794
822
7,748
823
8,577
S24
I3,320
825
11,577
826
10,707
827
10, 209
SFF
(5, 500 S.F. M1N)
LOT NO.
GROSS AREA
(SF)
GROSS AREA
LOT NO. (S.F.)
828
10, 283
894
7,077
829
10,275
995
6,944
530
10,340
996
7,975
83/
9,127
997
10,907
532
8,249
899
8,692
533
8,509
899
9,368
854
7,453
900
15,120
535
7,751
90 /
12,939
536
8,469
902
8,799
837
8,424
903
9,484
838
9,092
904
9,929
839
7,,717
905
70,041
940
7,472
906
9,952
941
7,629
907
8,041
842
7,002
909
7,698
843
6,291
909
7,101
844
6,039
910
6,893
845
19,301
9//
7,859
846
16, 336
912
7,821
847
9, 380
913 9,144
TOTAL RSFLOTS 804
TOTAL LOTAREA 7,114,260 S. F.
8,948 S.F. A I�ERAGELOTAREA
845
13,937
549
11,444
850
11,407
85 /
11, 307
852
15,409
853
8,555
854
9,125
555
6,769
556
7,,399
857
6,476
858
7,097
859
7,159
960
7, 326
561
962
7,901
7,590
863
864
7,109
7,,536
865
7,131
866
7,071
867
10,619
968
15,314
869
10,940
970
571
11,991
13, 185
972
9,765
573
9,800
874
9,968
875
9,648
576
14,207
577
578
8, 533
8,678
879
8,915
580
8, 339
581
7,135
582
9,161
583
7,,360
884
7,427
585
8,301
886
11,596
587
10,718
588
9,450
85.9
8,897
5.90
7, 523
701
9,580
891
9,027
702
9,258
892
9,678
709
8,054
893
7,629
NOTES
1. EXISTING LAND USE- VACANT
2. EXISTING ZONING- AL BERH/L L RANCH SPECIFIC PLAN
3. PROPOSED LAND USE.- PLANNING AREA TWO (RES/DENT/AL)
4. PARK REQU/REMENTS TO BE MET BY LAND DEDICATION,
IMPROVEMENTS AND � OR FEES IF REQUIRED, WITHIN THE ALBERHILL
RANCH SPEC/F/C PLAN.
5. WATER & SEWER SERVICE PROVIDE SY.• ELS/NORE VALLEY MUNICIPAZ
WATER DISTR/CT.
6. GAS SERVICE TO BE PROVIDED SY• SOUTHERN CAL/FORN/A GAS CO.
7. ELECTRIC SERVICE PROVIDED SY.• SOUTHERN CAL/FORK/A ED/SON CO.
8. TELEPHONE SERVICE PROVIDED SYGENERAL TELEPHONE CO. OF CALIFORNIA.
9. CABLE TELEV/S/ON TO BE PROVIDED SY. KING V/DEOCABLE
10. SCHOOL DISTRICT- LAKE ELS/NORE UNIFIED SCHOOZ DISTRICT
11. ALL MAJOR SLOPES OR COMMON AREAS, OPEN SPACE, PRIVATE DRA/NA GE
FACILITIES, F/RE BREAKS, HABITAT AREAS, ROAD ACCESS EASEMENTS, AND
ANY OTHER COMMON AMEN/T/ES SHALL BE MAINTAINED SY A HOMEOWNERS
ASSOCIATION OR ESTABLISHED SUBJECT TO CURRENT STATE LAWS AND
BE SUBJECT TO THE APPROVAL OF THE CITY ATTORNEY AND COMMUNITY
DIRECTOR WHO SHALL REVIEW ALL CC & R S AND RULES FOR THEIR
ADEQUACY AND COMPLETENESS. THE CITY ATTORNEY SHALL REVIEW CC &
R'S, HOMEOWNERS ASSOC/AT/ON DOCUMENTS AND ALL DOCUMENTS TO
CONVEY T/TL E TO THE HOMEOWNERS ASSOC/A T/ON.
12. ALL SLOPES ARE PRIVATE UNLESS THEY ARE W/TH/N A LETTERED
H.O.A. MAINTAINED LOT
13. THIS /S AN APPLICATION FOR A DEVELOPMENT PERM/T
14. MIN/MUM RES/DENT/AL LOT SIZE- 5,500 S.F.
15. REFER TO CONDITIONS OF APPROVAL FOR REQUIRED L/M/TS OF LAKE STREET
AND N/CHOLS ROAD IMPROVEMENTS
LOT SUMMARY TABLE
Lot No. Land Use
1-913 RES/DEVRAL LOTS/R-M & R-SF
914 MUL T/ FAM/L Y
915 PUBLIC PARK
916 SCHOOL SITE
917 BOOSTER PUMP STAT/ON
918 & 919 EVMWD RESERVOIR
920 COMMERC/AL SITE/ MUL T/- FAMIL Y OVERLAY
LOT 'N ; 'DD'' "LL " PRIVATE PARK
'ZZ" & 'DDD "
LOT 'A "'M , H. O.A. LOTS
'EE" 'KK"
'MM „ "YY"
'AAA"
'EEE" 'BBBB "
LEGAL DESCRIPTION
A PORT/ON OF PARCEL 1, LLA NO. 89-12 AS SHOWN
ON THE DOCUMENT RECORDED JUL Y 19, 1990 AS
INSTRUMENT NO. 266712 OFF/C/AL RECORDS Of -
THE COUNTY OF RIVERS/DE, STATE OF CAL/FORN/A.
STATEMENT OF OW/1/Ef)5H/P
/ HEREBY STATE THAT THIS MAP WAS PREPARED UNDER
MY SUPERV/S/ON AND THAT THE OWNER OF RECORD HAS
KNOWLEDGE OF AND CONSENTS TO THE F/L/NG OF TH/S MAP. QRp - E SS/0N
c;
DATE w No.26928 ?0 m
Exp.3/31/13
s7 CIVIC
qTF OF CAUF��
I
W'L Y
E'L Y
R/W
R/W
120 '
60'
60'
I
12'
48'
48'
12'
�
6' 6'
8' 20' 13'
7'
7'
/3' 20' S'
6' 6'
4'
1/'
12'
I
�.�
BIKE
LANE
BIKE
LANE
�
2
29
22"
---------
29
2q
RAISED
8 " PCC CURB & GUTTER
MED/AN
8" PCC CURB & GUTTER
MEANDERING
MEANDERING
6' SIDEWALK
6' SIDEWALK
LAKE ST & NICHOL S RD
UL TIMATE STREET SECTION (SEE NOTE 15)
f
R/W R/W
I 90'
45' 45'
15' 27' 27' /5'
VAR/ES 4- 14'
SEE PLAN
2.• 1 TO MEET ?� 2.0� _ _ _ _ _ _ _ _ 2.09 2-=0- 2. > TO MEET
EXIST. GRADE I EXIST. GRADE
6' RAISED
MEANDERING MEDIAN
SIDEWALK
EACH S/DE
ALBERHILL RANCH RD
PREPARED FOr9•
CASTLE & COOKE ALBERH/LL RANCH, LL C
6455 ALBERH/LL RANCH R0,40
LAKE EL S/NORE, CA 92530
(951) 245- 0476
Pr9EPARED BY
I
Comparison of Condition of Approval 102
Original Condition of Approval cross conditioned certain improvements between VTTM 28214
and VTTM 35773 (Formerly 30836). This cross conditioning led to certain frontage improvements
along VTTM 28214 not being required until occupancy issuance in VTTM 35773 (Formerly
30836). Table 1 below identifies the total number of units completed in VTTM 28214, to be
completed in VTTM 28214 and the lots remaining in VTTM 35773 (Formerly 30836).
Table 1 – Unit Count by Residential Tract
Multi Family Single Family Total
VTTM 28214 – Completed 0 567 567
VTTM 28214 – Balance 373 344 717
VTTM 35773 (Formerly 30836) 0 275 275
Total 373 1,186 1,559
The guiding principals employed when addressing this Condition of Approval, were resolving the
longstanding traffic issues in the Alberhill portion of the community, identifying specific phases of
development and allocating specific improvements to those areas and the acceleration of the
timing of certain improvements.
PHASES 9 THROUGH 17 - 344 SINGLE FAMILY LOTS
Lake Street and Nichols Road – Intersection improvements
Existing Condition of Approval timeline: Not previously asserted.
Revised Condition Completion timeline: 125th building permit within Phases 9 through 17.
When including the previously constructed residential units, this translates to 692 building
permits.
Net change: Defines improvements and milestones.
Applicable Condition of Approval
Intersection to be reconstructed to its ultimate width with signalization placed at ultimate
locations and interim traveled lane transitions consistent with County transportation
standards.
o Completion: Improvements shall be completed prior to the 125th building
permit within Phases 9 through 17.
Nichols Road – Lake Street to Alberhill Ranch Road and Nichols Road – Alberhill Ranch
Road to Terra Cotta Road
Existing Condition of Approval timeline: by 1612th C of O.
Revised Condition Completion timeline: 200th building permit within Phases 9 through 17
for the segment of improvements from Lake to Albherhill Ranch Road (Phase 1) and 200th
building permit within Phases 9 through 17 for the segment of improvements from Albherhill
Ranch Road to Terra Cotta (Phase 2). When including the previously constructed residential
units, this translates to 767 permits for Phase 1 and 667 permits for Phase 2.
Net change: Revised condition changes milestone from Certificate of Occupancy to building
permit, separates the improvement to include two segments from Lake to the Albherhill
Ranch Road and Albherhill Ranch Road to Terracotta, accelerates the timing of the
improvements by reducing the milestone by 845 residential units for the first phase and 945
for the second phase and eliminates the cross conditioning with VTTM 35773 (Formerly
30836) requirement to meet the required threshold.
Applicable Conditions of Approval
Nichols Road from Lake Street to Terra Cotta, construct at ultimate half section by the
464th C of O of Phase 2. For clarification- Construct Nichols Road from Lake Street to
Terra Cotta Road at its ultimate half-width section as a Major (and dedicate off-set for a
120’ ROW). Includes WB left turn lane on Terra Cotta, WB thru lane, and EB single lane
left turn/thru lane. 8/23/11 REVISED COA: Construct interim 2-lane road including
interim drainage improvements and pedestrian/bike path by the 464th C of O –
“Condition Satisfied”. Build ultimate half width from Lake to east side of Tract 30836 by
1612th C of O.
Install pedestrian walkway along southerly side of Nichols Road from Terra Cotta Road
to “A” Street in Tract 30836 as soon as Nichols is extended to Tract 30836. 8/23/11
REVISED COA: Construct sidewalk along Nichols Road by 1st C of O of Tract 30836
Phase 1
Nichols Road between Lake Street and Alberhill Ranch Road shall be widened on the
south side of Nichols Road to provide its ultimate half-width including two (2) new
eastbound lanes. The existing two (2) lanes of pavement shall be restriped and
converted to two (2) westbound lanes for a total of four (4) lanes.
Improvements shall include: construction of thirty-five feet (35’) of new paving, curb and
gutter, sidewalks, parkway landscaping, street trees and street lights. Widening shall
include interim transition paving and striping to match existing conditions at the Alberhill
Ranch Road/Nichols Road and Lake Street/Nichols Road intersections.
The new pavement on the south side of Nichols Road shall be installed 2-inches lower
than the ultimate finished surface to accommodate future utility improvements. After
completion of the future utility improvements, the developer shall install the final 2-inches
of pavement.
o Completion: Improvements shall be completed prior to the 200th building permit
within Phases 9 through 17.
Phase 2
Nichols Road between Alberhill Ranch Road and Terra Cotta Road shall be widened to
provide two (2) eastbound lanes and one (1) westbound lane for a total of three (3) lanes.
A total pavement width of fifty-one feet (51’) shall be constructed to accommodate the
three travel lanes.
Pavement improvements shall be located on the south side of Nichols Road and will
include grinding the existing +35’ wide AC pavement, as needed, and providing a
minimum 2-inches AC pavement overlay; the construction of an additional sixteen feet
(16’) of AC pavement and base material. Widening shall include interim transition paving
and striping to match existing conditions at the Alberhill Ranch Road/Nichols Road
intersection.
Improvements shall include: curb and gutter, sidewalks, parkway landscaping, street
trees and street lights on the south side of Nichols Road.
The new pavement on the south side of Nichols Road shall be installed 2-inches lower
than the ultimate finished surface to accommodate future utility improvements. After
completion of the future utility improvements, the developer shall install the final 2-inches
of pavement.
o Completion: Improvements shall be completed prior to the 100th building permit of
Phases 9 through 17.
Lake Street – Alberhill Ranch Road to Nichols Road
Existing Condition of Approval timeline: by 1612th CofO.
Revised Condition Completion timeline: 100th building permit within Phases 9 through 17.
When including the previously constructed residential units, this translates to 667 permits.
Net change: Revised condition changes milestone from Certificate of Occupancy to building
permit, separates the improvement to include two segments from Nichols to the Albherhill
Ranch Road Albherhill Ranch Road to Mountain, accelerates the timing of the improvements
by reducing the milestone by 945 residential units for the first phase and eliminates the cross
conditioning with VTTM 35773 (Formerly 30836) requirement to meet the required
threshold. Phase two (2) improvements are included in the Phase 4 Multifamily section.
Applicable Conditions of Approval
Lake Street from Nichols Road to Mountain Street, the improvements shall be completed
by the 464th C of O of Phase 2. The curves shall be realigned and improved to a design
speed of 55 mph minimum and 1,750 foot minimum radius. For clarification – Construct
Lake Street from Nichols Road to Mountain Street at its Ultimate half-section width as
an Urban Arterial (120’ right of way). 8/23/11 REVISED COA: Security shall be posted
in the amount approved by the City Engineer for all unconstructed and unsecured
improvements no later than the 1200th C of O.
Lake Street between Alberhill Ranch Road and Nichols Road shall be widened along
the east side of Lake Street along the frontage of Tract 28214 to provide its ultimate half-
width including an additional thirty feet (30’), two (2) northbound lanes and two (2)
southbound lanes for a total of four (4) lanes.
Improvements shall include: construction of approximately thirty (30’) feet of new AC
pavement and base material, curb and gutter, sidewalks, parkway landscaping, street
trees and street lights.
Lake Street shall be restriped for four (4) travel lanes and widening shall include interim
transition paving and striping to match existing conditions at the Alberhill Ranch
Road/Lake Street and Nichols/Lake Street intersections.
Existing SCE power poles near the Lake Street/Nichols Road intersection shall be
relocated by the developer of Phase 4 during construction of the Lake Street segment
of Mountain Avenue to Alberhill Ranch Road.
o Completion: Improvements shall be completed prior to the 50th building permit within
Phases 9 through 17.
The applicant shall notify the City at least one month in advance should the applicant
request to defer this Condition past the 50th building permit. The req uest for deferral
shall include all good faith efforts to construct the improvements and any impediments
to this effort which is the basis for the deferral. The City Council shall consider the
deferral at a regularly scheduled meeting.
Alberhill Ranch Road and Brianna Circle – Intersection Improvements
Existing Condition of Approval timeline: Not previously asserted.
Revised Condition Completion timeline: 100th building permit within Phases 9 through 17.
When including the previously constructed residential units, this translates to 667 permits.
Net change: Defines improvements and milestones.
Applicable Conditions of Approval
Completion of intersection improvements in Alberhill Ranch Road and Brianna Circle
including installation of a south bound left turn pocket on Alberhill Ranch Road onto
“B’ Street. Install 4-way stop-signs and revise roadway striping.
o Completion: Improvements shall be completed prior to the 25th building permit of
Phases 9 through 17.
The applicant shall notify the City at least one month in advance should the applicant
request to defer this Condition past the 50th building permit. The request for deferral
shall include all good faith efforts to construct the improvements and any impediments
to this effort which is the basis for the deferral. The City Council shall consider the
deferral at a regularly scheduled meeting.
Nichols Road and Alberhill Ranch Road – Intersection Improvements
Existing Condition of Approval timeline: by 650th CofO.
Revised Condition Completion timeline: 50th building permit within Phases 9 through 17.
When including the previously constructed residential units, this translates to 617 permits.
Net change: Revised condition changes milestone from Certificate of Occupancy to building
permit and accelerates by reducing the milestone of the improvements by 33 residential
units.
Applicable Conditions of Approval
Collector “A” and Nichols Road construct traffic signal by the 650th C of O of Phase 3.
For clarification – Collector A is Alberhill Ranch Road. 1/12/16 Revised COA: The traffic
signal at the intersection of Nichols Road and Alberhill Ranch Road required by
Condition of Approval No. 102 to VTTM 28214 be completed at the 650th Certificate of
Occupancy. Bonds & Agreements approved @ 1/12/16 CC meeting.
Intersection to be reconstructed to its ultimate width with signalization placed at ultimate
locations and interim traveled lane transitions consistent with County transportation
standards.
o Completion: Improvements shall be completed prior to the 50th building permit
within Phases 9 through 17.
The applicant shall notify the City at least one month in advance should the applicant
request to defer this Condition past the 50th building permit. The request for deferral
shall include all good faith efforts to construct the improvements and any impediments
to this effort which is the basis for the deferral. The City Council shall consider the
deferral at a regularly scheduled meeting.
Alberhill Ranch Road – Easterly Parkway improvements
Existing Condition of Approval timeline: Not previously asserted.
Revised Condition Completion timeline: 100th building permit within Phases 9 through 17.
When including the previously constructed residential units, this translates to 692 permits.
Net change: Defines improvements and milestones.
Applicable Conditions of Approval
Alberhill Ranch Road between Nichols Road and two hundred and seventy-five feet
(275’) east of the Hudson Lane intersection shall be completed with easterly parkway
improvements including sidewalk, landscaping, and street trees.
o Completion: Improvements shall be completed prior to the 125th building permit
within Phases 9 through 17.
PHASE 18 - MULTIFAMILY SITE-229 MF Units
Nichols Road – Terra Cotta Road to East Tract Boundary Line of Phase 18
Existing Condition of Approval timeline: by 229th CofO.
Revised Condition Completion timeline: 50th building permit within Phases 18.
Net change: Revised condition changes milestone from Certificate of Occupancy to building
permit, separates the improvement to include two segments from Terra Cotta to the easterly
project boundary and easterly project boundary to Collier Avenue accelerates the timing of
the improvements by 170 residential units for the first phase and eliminates the cross
conditioning with VTTM 35773 (Formerly 30836) requirement to meet the requ ired
threshold. Phase two (2) improvements will be included in VTTM 35773 Conditions of
Approval.
Applicable Conditions:
Construct Nichols Road from Terra Cotta Road to Collier Avenue as an interim 2-lane
divided road including 2-lane bridge over Alberhill Creek by the 464th C of O of Phase 2.
8/23/11 REVISED COA: Construction of interim 2-lane road with elevated section by
464th C of O. “Condition Satisfied” Construct ultimate bridge connection of Nichols Road
to Collier Avenue by project build out (1620th C of O).
Complete Nichols Road from the project TAZ 4 west boundary to the project TAZ 4 east
boundary to its ultimate full section prior to the last C of O for Lot 974. For clarification-
TAZ 4 is the property immediately east of Terra Cotta Road. Lot 974 is the proposed
multi-family lot. Nichols Road at the Ultimate full width section as a Major, and dedicate
120’ ROW.
Nichols Road between Terra Cotta Road and the east tract boundary line of Phase 18
shall be widened to provide two (2) eastbound lanes and one (1) westbound lane for a
total of three (3) lanes. A total pavement width of fifty-one feet (51’) shall be constructed
to accommodate the three travel lanes.
Pavement improvements shall be located on the south side of Nichols Road and will
include grinding the existing +35’ wide AC pavement, as needed, and providing a minimum
2-inches AC pavement overlay; the construction of an additional sixteen feet (16’) of AC
pavement and base material. Widening shall include interim transition paving and striping
to match existing conditions further east along Nichols Road.
Improvements shall include: curb and gutter, sidewalks, parkway landscaping, street trees
and street lights on the south side of Nichols Road.
The new pavement on the south side of Nichols Road shall be installed 2-inches lower
than the ultimate finished surface to accommodate future utility improvements. After
completion of the future utility improvements, the developer shall install the final 2-inches
of pavement.
o Completion: Improvements shall be completed prior to the 75th building permit
within Phase 18.
Terra Cotta Road – Nichols Road to the South Tract Boundary Line of Phase 18
Existing Condition of Approval timeline: 1st C of O in lot 974.
Revised Condition Completion timeline: 50th building permit within Phase 18.
Net change: Revised condition changes milestone from Certificate of Occupancy to building
permit, timing remains the same.
Applicable Conditions of Approval
Terra Cotta Road from Nichols Road to south project boundary, construct by the 1st C of
O in lot 974. For clarification, construct Terra Cotta Road at its full width as a Secondary,
from Nichols Road to Kings Highway.
PHASE 4 – MULTIFAMILY SITE – 144 MF Units
Lake Street – Mountain Avenue to Alberhill Ranch Road
Existing Condition of Approval timeline: by 1612th CofO.
Revised Condition Completion timeline: 50th building permit within Phase 4. When including
the previously constructed residential units, this translates to 617 permits.
Net change: Revised condition changes milestone from Certificate of Occupancy to building
permit, separates the improvement to include two segments from Nichols to the Albherhill
Ranch Road Albherhill Ranch Road to Mountain, accelerates the timing of the improvements
by reducing the milestone by 995 residential units for the second phase and eliminates the
cross conditioning with VTTM 35773 (Formerly 30836) requirement to meet the required
threshold. Phase one (1) improvements are included in the Phases 9-17 Singe Family
section.
Applicable Conditions of Approval
Lake Street from Nichols Road to Mountain Street, the improvements shall be completed
by the 464th C of O of Phase 2. The curves shall be realigned and improved to a design
speed of 55 mph minimum and 1,750 foot minimum radius. For clarification – Construct
Lake Street from Nichols Road to Mountain Street at its Ultimate half-section width as
an Urban Arterial (120’ right of way). 8/23/11 REVISED COA: Security shall be posted
in the amount approved by the City Engineer for all unconstructed and unsecured
improvements no later than the 1200th C of O.
Lake Street between Mountain Avenue and Alberhill Ranch Road shall be redesigned
and reconstructed with an appropriate vertical curve at a design speed of 55 mph and
graded to the Urban Arterial ultimate width including the necessary drainage
improvements.
Lake Street between Mountain Avenue and Alberhill Ranch Road shall be widened to
provide its ultimate half-width including two (2) northbound lanes and two (2) southbound
lanes for a total of four (4) lanes to the satisfaction of the City Engineer.
Improvements shall include: construction of new AC pavement and base material, along
with curb and gutter, sidewalks, parkway landscaping, street trees and street lights on
the east side of Lake Street.
Lake Street shall be restriped for four (4) travel lanes and appropriate left turn lanes and
shall include interim transition paving and striping to match existing conditions at the
Mountain Avenue/Lake Street and Alberhill Ranch Road /Lake Street intersections.
o Completion: Improvements shall be completed prior to the 50th building permit of
Phase 4.
Lake Street and Alberhill Ranch Road – Intersection Improvements
Existing Condition of Approval timeline: Not previously asserted.
Revised Condition Completion timeline: 50th building permit within Phase 4.
Net change: Defines improvements and milestones.
Applicable Conditions of Approval
Intersection to be reconstructed to its ultimate width with signalization placed at ultimate
locations and interim traveled lane transitions consistent with County transportation
standards.
o Completion: Improvements shall be completed prior to the 50th building permit of
Phase 4.
Lake Street and RPN 4 MF Driveway – Intersection Improvements
Existing Condition of Approval timeline: Not previously asserted.
Revised Condition Completion timeline: 50th building permit within Phase 4.
Net change: Defines improvements and milestones.
Applicable Conditions of Approval
Intersection to be constructed to its ultimate width with signalization placed at ultimate
locations.
Widen and restripe the south leg to provide a second northbound through lane and a
second southbound departure lane. Widen and restripe the north leg to provide a second
southbound through lane and a second northbound departure lane.
o Completion: Improvements shall be completed prior to the 50th building permit of
Phase 4.
Portions of Condition of Approval 102 not being modified:
Lake Street curve alignment improvement north of Coal Road shall have a minimum
design speed of 55 mph and a minimum radius of 1,750 feet and be completed by 240th C
of O. 8/23/11 REVISED COA “Condition Satisfied"
Lake Street and the north/southbound ramps, the improvements shall be completed by the
240th For clarification-NB Ramps: Traffic Signal, NB left turn lane, WB left turn lane, and WB
thru/right turn, SB Ramps: Traffic Signal, SB left turn lane 10/27/15 REVISED COA: Lake
Street / I-15 improvements required by Condition of Approval No. 102 to VTTM 28214 be
completed at the 486th Certificate of Occupancy. Bonds & agreements approved at
10/27/15 CC meeting
Lake Street and Collector “A”, the improvements shall be completed by the 240th C of O.,
WB right turn lane. 8/23/11 REVISED COA “Condition Satisfied"
Lake Street and Mountain Street, the improvements shall be completed by the 240th C of
O. 8/23/11 REVISED COA “Condition Satisfied"
Developer shall work with the City on a design to realign Collier Avenue at Nichols Road to
the west away from the freeway allowing more storage for entry to the freeway ramps.
Nichols Road and the northbound I-15 ramps, construct a traffic signal by the 464th C of O.
8/23/11 REVISED COA: Install signal and additional lane to off-ramp by 1200th C of O.
Nichols Road and the southbound I-15 ramps, construct a traffic signal by the 464th C of O.
8/23/11 REVISED COA: Install signal and additional lane to off-ramp by 1200th C of O.
Lake Street from I-15 Freeway to Nichols Road, construct interim 4-lane section by the 650th
C of O. For clarification- an interim 4 lane undivided cross section. 8/23/11 REVISED COA:
Construct interim 4-lane roadway for Lake Street from Freeway to Nichols by project build
out (1620th C of O).
Lake Street and I-15 Freeway SB-ramps, install NB right turn lane by 650th C of O of Phase
3. 1/12/16 REVISED COA: Lake Street right turn onto the southbound I-15 onramp required
by Condition of Approval No. 102 to VTTM 28214 be completed at the 650th Certificate of
Occupancy. Bonds & Agreements approved @ 1/12/16 CC meeting
Collier Avenue and Nichols Road, construct intersection improvements by the 650th C of
O. For clarification-Traffic Signal and WB turn lane 8/23/11 REVISED COA: Provide
exclusive westbound left turn and northbound left and right turn lanes by 464th C of O -
"Condition Satisfied". Install signal in conjunction with bridge connection by project build
out.
Conditions of Approval deleted from VTTM
Lake Street and Temescal Canyon Road, the improvements shall be completed by the 240th
C of O. For clarification-Traffic Signal, NB left turn lane, EB left turn lane. 8/23/11 REVISED
COA: Interim improvements complete, construct ultimate intersection by project build out
(1620th C of O).
Lake Street curves, north of the curve improved in Phase 1, shall be realigned and improved
to a design speed of 55 mph minimum and 1,750 foot minimum radius by the 464 th C of O
of Phase 2. 8/23/11 REVISED COA: Road to be modified "to the satisfaction of the City
Engineer" by 1200th C of O.
Collier Avenue and Nichols Road, construct intersection improvements by the 650th C of
O. For clarification-Traffic Signal and WB turn lane 8/23/11 REVISED COA: Provide
exclusive westbound left turn and northbound left and right turn lanes by 464th C of O -
"Condition Satisfied". Install signal in conjunction with bridge connection by project build
out.