Loading...
HomeMy WebLinkAboutItem No. 09 CSA Change Order Unique Builders Emergency RepairCity of Lake Elsinore LW811-Si no 130 South Main Street Lake Elsinore, CA 92530 www.lake - elsinore.org Ne °— IKikr- ' City Council Agenda Report File Number: TMP 19 -1007 Agenda Date: 11/10/2020 Version: 1 Status: Approval Final In Control: City Council / Successor Aqency File Type: Council Consent Calendar Agenda Number: 9) Emergency Repair Contractor Services Agreement Change Order between Unique Builders of California. Inc. and the Citv of Lake Elsinore. 1. Approve the Emergency Repair Contractor Services Agreement Change Order with Unique Builders of California, Inc. in the amount of $52,417.60 in the form attached and in such final form as approved by the City Attorney; and 2. Authorize the City Manager to execute a Change Order not to exceed the amount of $52,417.60 for additional Emergency Repair Contractor Services for Camino Del Norte. City of Lake Elsinore Page 1 Printed on 111512020 CITY OF ins LADE 9L S I NO RT M� DREAM EXTREME, REPORT TO CITY COUNCIL To: Honorable Mayor and Members of the City Council From: Grant Yates, City Manager Prepared by: Jason Simpson, Assistant City Manager Date: November 10, 2020 Subject: Emergency Repair Contractor Services Agreement Change Order between Unique Builders of California, Inc. and the City of Lake Elsinore. Recommendations 1. Approve the Emergency Repair Contractor Services Agreement Change Order between Unique Builders of California, Inc. and the City of Lake Elsinore for $52,417.60 in the form attached and in such final form as approved by the City Attorney; and, 2. Authorize the City Manager to execute a change order not to exceed the amount of $52,417.60 for additional Emergency Repair Contractor Services for Camino Del Norte. Background On February 21, 2020 construction of the Camino Del Norte Road project was completed and the road was immediately opened by the City. The initial benefits of the major arterial roadway have been very positive, and the satisfaction of the intended circulation project traffic goals are highly favorable. On March 10, 2020, an Emergency Repair Contractor Services Agreement between Unique Builders of California, Inc. and the City of Lake Elsinore for $375,470.00 was approved. Last winter storms caused erosion damage to four storm drain locations. Despite best management practice in preparation for severe weather last winter storms caused damaging erosion from intense rainfall. Erosion control largely performed very well however, Mother Nature without discretion delivered damages to four major storm drain systems. Fortunately, these damages did not delay and prevent the on -time opening of Camino Del Norte. Nevertheless, the damages required were repaired. Discussion Unique Builders of California, Inc. has completed repair work to four of the damaged storm drains. The two additional storm drains require grading, desilting, compaction, and additional fortification with rock riprap. This action will finish the damage repairs in preparation for this upcoming winter storm. Following the approval of this change order, the scope of work will be completed. Emergency Repair Construction Services Agreement Change Order November 10, 2020 Page 2 Fiscal Impact Funds are budgeted in the Fiscal Year 2020/21 budget. Exhibits A — Change Order CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 (951) 674 -3124 PROJECT CHANGE ORDER CHANGE ORDER # 1 DATE: November 10, 2020 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - THIS CHANGE ORDER IS APPLICABLE TO: CITY PROJECT # Z10030 PROJECT TITLE: Camino Del Norte CONTRACT AWARDED TO: Unque Builders of California 1 U_r 1 IF �UTZ 1 V 91:1 �• FTi f.7 iTi [�1 y��Y��l Authorized by: Jason Simpson TOTAL AMOUNT OF CONTRACT Assistant City Manager PRIOR TO THIS CHANGE ORDER $374,470.00 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — CONTRACTOR IS AUTHORIZED TO MAKE THE FOLLOWING CHANGES: QUANTITIES INCREASED ITEM QUANTITY UNIT UNIT PRICE EXTENSION Removal of silt at headwalls at SD #6 & 7 and Lump Sum 1.00 $52,417.60 $52,417.60 prep for rock rip -rap installation Grade larger erosion cut area and compact this dozer. Construct concrete /asphalt water collector at to roadway curb opening per Caltrans engineering specifications. Grade in total over 330 lineal feet of V -ditch and place rock rip -rap. QUANTITIES DECREASED ITEM QUANTITY UNIT PRICE EXTENSION None THE AMOUNT OF THE CONTRACT WILL BE (INCREASED) BY THE SUM OF $52,417.60 Change Order No. 1 Review by: Initials Assistant City Manager City Manager: Date Approved by: U I AL Z�bY,41 /.bU Contractor Date