Loading...
HomeMy WebLinkAboutItem No. 17 Railroad Canyon Road Main St. Interchange Underpass Art DesignsCity Council Agenda Report City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 19-736 Agenda Date: 9/8/2020 Status: Approval FinalVersion: 1 File Type: Council Business Item In Control: City Council / Successor Agency Agenda Number: 17) Railroad Canyon Road and Main Street Interchange Underpass Art Designs Review and approve the underpass art designs for the future Railroad Canyon Road and Main Street Interchanges. Page 1 City of Lake Elsinore Printed on 9/3/2020 An REPORT TO CITY COUNCIL To: Honorable Mayor and Members of the City Council From: Grant Yates, City Manager Prepared by: Nicole Dailey, Assistant to the City Manager Date: September 8, 2020 Subject: Railroad Canyon Road and Main Street Interchange Underpass Art Designs Recommendation Review and approve the underpass art designs for the future Railroad Canyon Road and Main Street Interchanges. Background Since 2015, the City has been focused on promoting and enhancing arts and culture in our community to beautify and bring economic vitality to the City and include, when possible, incorporating public art into City capital projects. Examples include the art panels at W hisker’s Fishing Beach, the art structures along Collier Avenue, and, most recently, the light sculptures in the Historic Main Street Parking Lot. Currently, the City is in various stages of securing approval and funding to improve all five of its existing Interstate 15 (I-15) interchanges. The ultimate I-15 Railroad Canyon Road interchange is fully funded, approved, and now under construction. Also, the City has secured the funding and approvals needed to proceed with the construction of improvements on the Main Street Interchange, which should begin next year. The City has been working with our consultants, David Evans and Associates, Inc., and Hunt Designs, to identify proposed aesthetic treatments for the walls of these future underpasses on each of these interchange projects. The City intends to do incorporate these wall treatments into the future designs of all underpasses as we proceed with the approval and construction of all interchange improvements. Discussion Attached in Exhibit A and B are the proposed art designs for the future Railroad Canyon Road and Main Street Interchange projects, respectively. Both underpasses are proposed to include six metal art panels on both the north and south walls (12 total). The panels will be custom backlit, perforated art designs that include the common swishes of the City’s logo to tie into our branding. Also, each wall will include a panel with the City’s “E” and the appropriate name of the street. Railroad Canyon and Main Street Art Designs August 25, 2020 Page 2 The City plans to have a unique theme for the panels under each underpass based on where they are located. The proposed Railroad Canyon Road art designs are centered around the City’s appeal to action sports since it serves as the primary roadway to reach top extreme destinations like Elsinore Skydive, Diamond Stadium, and the Lake Elsinore Motorsports Park. The Main Street interchange, the entranceway to Historic Downtown, includes art designs capturing historical elements of our City. These proposed concepts and art designs have been refined several times and are being presented to the City Council for final review and approval. The City Council’s Beautification Subcommittee has reviewed both. Once final approval is given, the final design packages will be submitted to Caltrans for final approval. As of now, Caltrans has already approved the proposed art concept and materials. Construction of the I-15 Railroad Canyon Road Interchange is expected to be complete in late 2022, while the Main Street Interchange should be completed in 2021. Fiscal Impact There is no fiscal impact on the review and approval of the art design action requested. However, the estimated future cost of the fabrication and installation of the art panels is approximately $250,000 to $350,000 per interchange. These costs and agreements will be presented to the City Council at a future date and funded by the Capital Improvement Budget. Exhibits A – I-15 Railroad Canyon Road Interchange Underpass Art Designs B – I-15 Main Street Interchange Underpass Art Designs LAKE ELSINORE RAILROAD CANYON INTERCHANGE David Evans and Associates July 10, 2020 CONCEPT DESIGN PACKAGE 25 North Mentor Avenue Pasadena, CA 91106 626.793.7847 HUNT DESIGN PROJECT CLIENT DATE SHEET TITLE SHEET # 2.0 OF 3053_Lake Elsinore Railroad Canyon David Evans and Associates Jul 10, 2020 82 MATERIAL REFERENCECONCEPT VISUALIZATION PRIMARY VISUAL RESEARCH CONCEPT 1-Perforated Action Custom perforation allows for the articulation of dymanic images, executed in simple panels. LED illumination behind shines through the perforations at night giving starkly different day and night reads. Final color TBD. Concept & Reference PROJECT CLIENT DATE SHEET TITLE SHEET # 3.0 OF 3053_Lake Elsinore Railroad Canyon David Evans and Associates Jul 10, 2020 83 ACTION SPORT (also adventure sport and extreme sport): A term that defines various sports which are characterized by speed, height, notable physical demand and requiring highly specialized gear. Action sports are also sports that generally involve uncontrollable variables such as weather and terrain leading to heightened risk. • Lake Elsinore, branded as the Action Sports Capital of the World, serves as the perfect playground for active, thrill-seeking residents and visitors alike. The city hosts a variety of sporting events from the Lake Elsinore Grand Prix and Dream Extreme Fishing Derby to community run/walks. • From an exhaustive list of action sports and research cross-checking their availability in Lake Elsinore, the following list was created to capture the quintessential action sports of Lake Elsinore. The list can be divided into three categories: aerial, terrestrial and aquatic. • Hang Gliding • Skydiving • Baseball • Volleyball • Motorcross • Skateboarding • Off-Roading • Golf • Bowling • Jet-Skiing • Fishing • Kayaking RESEARCH ACTION SPORTS AND LAKE ELSINORE Lake Elsinore Grand Prix 2017 Lake Elsinore Dream Extreme Fishing Derby 2014 Research PROJECT CLIENT DATE SHEET TITLE SHEET # 4.0 OF 3053_Lake Elsinore Railroad Canyon David Evans and Associates Jul 10, 2020 84 Action Sports CURRENT ACTION SPORTS PROJECT CLIENT DATE SHEET TITLE SHEET # 5.0 OF 3053_Lake Elsinore Railroad Canyon David Evans and Associates Jul 10, 2020 85 ELEVATION-SOUTH WALL 1012 SCALE: 1/32”=1’-0”1 CONTEXT PLAN NTS3 ELEVATION-NORTH WALL 1014 SCALE: 1/32”=1’-0”2 Bend in wall CONCEPT 1-Perforated Action DIAMOND DR10121014RAILROAD CANYON RDElevations & Context Plan PROJECT CLIENT DATE SHEET TITLE SHEET # 6.0 OF 3053_Lake Elsinore Railroad Canyon David Evans and Associates Jul 10, 2020 86 ELEVATION-SOUTH WALL 1012 NTS1 ELEVATION-NORTH WALL 1014 NTS2 Enlarged Elevations PROJECT CLIENT DATE SHEET TITLE SHEET # 7.0 OF 3053_Lake Elsinore Railroad Canyon David Evans and Associates Jul 10, 2020 87 DAY/NIGHT VIEW NTS1 PERSPECTIVE VIEW NTS2 Views PROJECT CLIENT DATE SHEET TITLE SHEET # 8.0 OF 3053_Lake Elsinore Railroad Canyon David Evans and Associates Jul 10, 2020 88 LOGO PANEL DETAIL SCALE: 1/2” = 1’-0”2 STREET NAME PANEL DETAIL SCALE: 1/2” = 1’-0”1 1” Recess all around Fabricated, internally illuminated sign cabinet 1” Recess all around Solid panel Internally illuminated push-through acrylic6'-0"6'-2"6'-0" 6'-2" 1"2'-0"2'-2"19'-6" 19'-8" 1" Typical Details LAKE ELSINORE MAIN STREET HISTORIC DISTRICT David Evans & Associates August 12, 2020 UNDERPASS GRAPHICS CONCEPTS 25 North Mentor Avenue Pasadena, CA 91106 626.793.7847 HUNT DESIGN PROJECT CLIENT DATE SHEET TITLE SHEET # 2.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 142 Research Santa Fe Train Old Town Buildings Historic Details Imagery Narrative: Inhabiting the City PROJECT CLIENT DATE SHEET TITLE SHEET # 3.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 143 Research Poppy Fields Lake Elsinore Agriculture Imagery Narrative: Inhabiting the Landscape PROJECT CLIENT DATE SHEET TITLE SHEET # 4.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 144 Railroad Canyon Artwork Railroad Canyon PROJECT CLIENT DATE SHEET TITLE SHEET # 5.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 145 Silhouette Square Elevation Historic Main Street Historic StreetlampGrand Prix Car Show- early 1900s Car Show- mid 1900s Train Historic Downtown ClockWaterfowl-Heron Lake Elsinore Poppies Establishment Route 395 Apricots EST.18886'-0" PROJECT CLIENT DATE SHEET TITLE SHEET # 6.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 146 Day/Night View DAY/NIGHT VIEW NTS1 PROJECT CLIENT DATE SHEET TITLE SHEET # 7.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 147 Day/Night View DAY/NIGHT VIEW NTS1 PROJECT CLIENT DATE SHEET TITLE SHEET # 8.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 148 Day/Night View DAY/NIGHT VIEW NTS1 PROJECT CLIENT DATE SHEET TITLE SHEET # 9.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 149 Context Elevations Silhouettes: Squares South Wall North Wall EST.1888 PROJECT CLIENT DATE SHEET TITLE SHEET # 10.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 1410 Silhouette Circles Elevation Silhouettes: Circles Grand Prix Historic Streetlamp Route 395 Car Show- mid 1900s Poppies Train Waterfowl- Crane Car Show- early 1900s Historic Downtown ClockEstablishmentLake Elsinore Apricots EST.18886'-0" PROJECT CLIENT DATE SHEET TITLE SHEET # 11.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 1411 Context Elevations Silhouettes: Circles South Wall North Wall EST.1888 PROJECT CLIENT DATE SHEET TITLE SHEET # 12.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 1412 Context Elevations Silhouettes: Circles- 30% Larger South Wall North Wall EST.1888 PROJECT CLIENT DATE SHEET TITLE SHEET # 13.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 1413 South Wall Elevation ...\master\profile_wall_arc.mas Sep. 14, 2017 14:17:14 PROJECT CLIENT DATE SHEET TITLE SHEET # 14.0 OF 3081_Lake Elsinore Main Street David Evans & Associates Aug. 12, 2020 1414 North Wall Elevation ...\master\profile_wall_arc.mas Sep. 14, 2017 14:16:59