Loading...
HomeMy WebLinkAboutItem No. 09 Delivery Agreement California DOT Auto Denter Dr/Casino Dr Bridge SeismicCity Council Agenda Report City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 19-709 Agenda Date: 8/25/2020 Status: Approval FinalVersion: 1 File Type: Council Consent Calendar In Control: City Council / Successor Agency Agenda Number: 9) Project Delivery Agreement with the California Department of Transportation for the Auto Center Drive/Casino Drive Bridge Seismic Retrofit Project Authorize the City Manager to execute the Project Delivery Agreement with the California Department of Transportation (Caltrans) for the Auto Center Drive & Casino Drive Bridge Seismic Retrofit Project in such final form as approved by the City Attorney. Page 1 City of Lake Elsinore Printed on 8/20/2020 Page 1 of 1 REPORT TO CITY COUNCIL To: Honorable Mayor and Members of the City Council From: Grant Yates, City Manager Prepared By: Remon Habib, City Engineer Date: August 25, 2020 Subject: Project Delivery Agreement with the California Department of Transportation for the Auto Center Drive/Casino Drive Bridge Seismic Retrofit Project Recommendation Authorize the City Manager to execute the Project Delivery Agreement with the California Department of Transportation (Caltrans) for the Auto Center Drive & Casino Drive Bridge Seismic Retrofit Project. Background The Auto Center Drive Bridge (aka Casino Drive Bridge over San Jacinto River, Bridge No. 56C0309) is located in the City of Lake Elsinore, Riverside County, CA and carries local traffic along Auto Center Drive and Casino Drive across the San Jacinto River, just northwest of I- 15/Railroad Canyon Rd. The bridge was constructed in 1957. The City has conducted a condition assessment of the bridge in 2017. The study concluded that a seismic retrofit of key bridge components is required. Since the Project had not advanced to the Construction phase by December 31, 2019, the City is required to execute a revised Project Delivery Agreement with Caltrans. Staff is confident that the schedule outlined in the Project Delivery Agreement can be met with construction being complete by April 2024. Discussion The California Transportation Commission (“CTC”) adopted a revised Proposition 1B Local Bridge Seismic Retrofit Account Guidelines on October 9, 2019. The revised guidelines require an updated agreement between the City and Caltrans. The Project Delivery Agreement will supersede existing baseline agreements and set forth the project scope, cost, and delivery schedule. Fiscal Impact There is no additional financial impact associated with entering into the Project Delivery Agreement. The project is in the City’s FY2020-2021 – FY2024-2025 CIP Plan. Exhibits A – Agreement Local Bridge Seismic Retrofit Program Project Delivery Agreement Agency Information Agency Name:City of Lake Elsinore Contact Name:Remon Habib, City Engineer Phone:951-674-3124 ext 213 Email:rhabib@lake‐elsinore.org Project Information Bridge No.56C0309 District:8 Fed. Aid Project Number STPLZ 5074(008) Project Title & Description:Auto Center Drive / Casino Drive Bridge Seismic Retrofit Project Benefit:Seismic retrofit County Name City Zip Code Congressional District Assembly Dist Senate Dist Lake Elsinore 92530 42 67 28 Project Delivery Milestone Current Project Delivery Date Baseline Agreement Date Begin Design Date 8/2020 8/2020 NEPA Completion Date 04/2022 04/2022 Begin Right of Way Date N/A N/A Right of Way Certification Date N/A N/A 100% PS&E Date 10/2022 10/2022 Construction RFA Date 11/2022 11/2022 End Construction Date 04/2024 04/2024 Closeout Date 04/2024 04/2024 Proposed Project Cost: Highway Bridge Program Funds 19/20 20/21 21/22 22/23 23/24 24/25 Right of Way Construction 379,794 LBSRA/State Match Right of Way Construction 49,206 District 8 Bridge No: 56C0309 Project Title Auto Center Drive / Casino Drive Bridge Seismic Retrofit 8/25/2020 Date Grant Yates, City Manager City of Lake Elsinore RIHUI ZHANG Date Chief Division of Local Assistance Department of Transportation We acknowledge the scope, cost, and delivery schedule as identified above constitute the Project Delivery Dates, as agreed on (Insert  Date), by both Department of Transportation and the local agency. This project is being monitored by the California Transportation  Commission and the Department of Transportation for conformance with these dates in accordance with Local Bridge Seismic Retrofit  Account Guidelines and Highway Bridge Program Advisory Committee procedures and policies.  We certify that funding sources cited  are expected to be available in the delivery year listed. The estimated costs represent funding components for the right of way and  construction phases only. If any phase of this seismic retrofit project is not delivered in the year that has been agreed upon in this  agreement, HBP funds could be withdrawn as outlined in the Proposition 1B Local Bridge Seismic Retrofit Account Guidelines. Revised October 9, 2019