Loading...
HomeMy WebLinkAboutItem No. 14 Change Order #2 Diamond Stadium Concession StandCity Council Agenda Report City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 19-548 Agenda Date: 4/14/2020 Status: Approval FinalVersion: 1 File Type: Successor Consent Calendar In Control: City Council / Successor Agency Agenda Number: 14) Change Order #2 in the Amount of $29,095.00 for Additional Remodeling Work to the Diamond Stadium Concession Stand 3 Capital Repairs Project CIP, Project No. RDAZ20003 Authorize the Executive Director to execute Change Order #2 in the amount of $29,095.00 with Leonida Builders Inc. in substantially the form attached and in such final form as approved by the Agency Attorney. Page 1 City of Lake Elsinore Printed on 7/1/2020 Page 1 of 2 REPORT TO SUCCESSOR AGENCY OF THE REDEVELOPMENT AGENCY OF THE CITY OF LAKE ELSINORE To: Honorable Mayor and Members of the City Council From: Grant Yates, Executive Director Prepared by: Jason Simpson, Assistant Executive Director Date: April 14, 2020 Subject: Change Order #2 in the Amount of $29,095.00 for Additional Remodeling Work to the Diamond Stadium Concession Stand 3 Capital Repairs Project CIP, Project No. RDAZ20003 Recommendation Authorize the Executive Director to execute Change Order #2 in the amount of $29,095.00 with Leonida Builders Inc. in substantially the form attached and in such final form as approved by the Agency Attorney. Background On September 24, 2019, an agreement was executed between the City and Leonida Builders Inc. for the remodeling work of the Diamond Stadium Concession Stand 3 (CIP Project #Z20003). Work has completed on the Diamond Stadium Concession Stand 3. Various remodeling issues surfaced through the construction process. In change order number 1 totaling $50,734.75 and approved by the Executive Director, the most significant change was the underground plumbing for the entire concession stand remodel, and the main connection line into the grease interceptor for the facility required complete replacement. In this change order (number 2), a significant element in this facility remodel was the addition of two service windows opening to the parking lot from the rear of the concession stand. Once the wall was opened up and examined by the structural engineer, it was determined additional structural support was needed to ensure complete stability and sheer strengthening to accommodate the window openings. Another primary consideration adding to change order number 2 is the additional electrical and plumbing services for several appliances that were requested by the Storm after the designed remodel was completed. Finally, existing fire prevention and safety lines and system services needed replacement because of serviceability issues. The cost-benefit of performing the upgrades at this time during the remodel construction process is the right decision and was completed at a fraction of the cost than if delayed to a later time. Concession Stand 3 Change Order April 14, 2020 Page 2 Discussion Because of the age of this building and considering the state of previous maintenance and upkeep, the additional remodel elements needing inclusion in this agreement are typical but not excessive. Prudent construction management decisions have been made to ensure all efforts were focused on the essential elements to create a highly functional concession stand facility that will look great and last long. Please note, the total change orders for this project only represent 13% of the total contract amount, exceeding the initially approved agreement amount by 3%. Fiscal Impact Diamond Stadium Concession Stand 3 (CIP Project #Z20003) is included in the Fiscal Year 19/20 – 23/24 Capital Improvement Plan (CIP) budget. The contract amount herein is fully funded with ROPS funding. Exhibits A – Change Order Number 2 2 DATE: QUANTITY UNIT Lump Sum 1.00 $10,810.00 Electrical circuits ice cream machines 4 replacement drops for the fire suppression Lump Sum 1.00 $7,245.00 Remove and replace walls damaged by water and Lump Sum 1.00 $11,040.00 TOTAL SUM OF 2 Review by: Initials Date Date UNIT PRICE mold abatement, and electrical circuits $11,040.00 THE AMOUNT OF THE CONTRACT WILL BE (INCREASED) BY THE $29,095.00 None THIS CHANGE ORDER IS APPLICABLE TO: CONTRACT AWARDED TO: City Manager: $29,095.00 Approved by: Contractor Change Order No. Director Public Works: (dedicated water with filter, electrical, drainage) system. CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 (951) 674-3124 April 14, 2020 PROJECT CHANGE ORDER CHANGE ORDER # Z40004 Authorized by: Jason Simpson TOTAL AMOUNT OF CONTRACT $611,000.00 QUANTITIES INCREASED CITY PROJECT # September 24, 2019DATE AWARDED: PROJECT TITLE: Diamond Stadium Stand #3 Leonida Builders Health Dept. Requirements ITEM 3 additional frozen beverage machines EXTENSIONQUANTITYITEM QUANTITIES DECREASED $10,810.00 PRIOR TO THIS CHANGE ORDER CONTRACTOR IS AUTHORIZED TO MAKE THE FOLLOWING CHANGES: Assistant City Manager $7,245.00 UNIT PRICE EXTENSION