Loading...
HomeMy WebLinkAboutItem No. 07 Boos Main St. Commercial Facility Haul RouteCity of Lake Elsinore 130 South Main Street __ Lake Elsinore, CA 92530 II www.lake - elsinore.org VV °"` IKo - Text File File Number: ID# 19 -602 Agenda Date: 5/26/2020 Version: 1 Status: Approval Final In Control: City Council / Successor Aqency File Type: Council Consent Calendar Agenda Number: 7) City of Lake Elsinore Page 1 Printed on 512112020 CITY OF ih41 4 LAKE LS1110 E L � DREAM EXTREME REPORT TO CITY COUNCIL To: Honorable Mayor and Members of the City Council From: Grant Yates, City Manager Prepared By: Remon Habib, City Engineer Date: May 26, 2020 Subject: Boos Main Street Commercial Facility Haul Route Recommendation Approve the request for the Haul Route including the hours of operation. Background In August of 2010, the City Council passed Ordinance 1271. The Ordinance requires all projects with transportation of earth materials in excess of 5,000 cubic yards to have their haul routes approved by the City Council. Boos UP -Lake Elsinore, LLC is requesting approval of a haul route to be used during the subject development's export phase. Discussion Work will commence shortly on the Boos Main Street Commercial Facility. Export of material is required to lower the finish surface elevations of the site to comply with Americans with Disabilities Act (ADA) design guidelines and the excavation of underground storage tanks. The developer will export approximately 7,950 CY of material; it is anticipated that the disposition of material will be Maitri Road Recycling in Corona. Dennis A. Lorton has been contracted with by Boos UP -Lake Elsinore, LLC to conduct the export. Travel to export site (Loaded Trucks) • Main Street north to 1 -15 • 1 -15 to Temescal Canyon Road • Temescal Canyon Road to Maitri Road Construction Site Return from export site (Unloaded Trucks) • Maitri Road Construction Site to Temescal Canyon Road • Temescal Canyon Road to 1 -15 1 -15 to South to Main Street Main Street to Boos Development Export Site Boos Main Street Commercial Facility Haul Route May 26, 2020 Page 2 The approved hours of work will be from 8:00 am -4:00 pm. Once commenced, the export of materials will continue for up to 4 working days. Dennis A. Lorton will be required to provide video log of the condition of the haul route prior to the start of work. Boos UP -Lake Elsinore, LLC will post a $5,000 cash deposit that is refundable upon the successful completion of hauling and cleanup activities. The total amount of security being requested will cover both repair and cleanup of any spillage. Conditions for this hauling process are as follows: 1. Provide equipment in the form of a front -end loader or two (2) skid steer loaders including operator, trailer and tow vehicle, street sweeper and dump truck to respond within 30- minutes of any reported spill along the haul route. 2. Distribute the haul route and hours of operations to all haul truck operators prior to the hauling operations. 3. Provide "Slow Trucks" signs at designated locations as approved by the City Engineer. 4. Provide a flagman to aid with traffic control at the entrance to the project site. 5. Provide dust control measures including water trucks at the receiving location. 6. Daily sweeping of Main Street at the direction of the City Engineering Inspector. 7. Provide documentation that the trucks being used have passed CHP and /or DMV inspections within the past 12- months. 8. Violations of any of these conditions will result in the stoppage of work until such time that a Safety and Compliance meeting can be held with the Inspector and City Engineer. Fiscal Impact Dennis A. Lorton contractor, pursuant to the plans and specifications, will be responsible for any damage occurring to City Streets, and will place security with the City to guarantee such. Exhibits A — Haul Route Vicinity Map B — Haul Route Questionnaire C — Haul Route Agreement L Ar•Li�iB 5 I "n ILaGY 4 . TEMESCM. RAH (.h DISPOSAL SITE ' SYCILUORE e�ond rVati�nr,� ��t ,%0 S+rrt AAW Mw ntlafm HORSETWEF CANYON YON C ''a' R asa # Ck BOOS FUELING STATION HAUL ROUTE MAP A GAIGHT13N JUJURMILl F T$rra Cotta IAKEVIEW North I'ware LAG U POL o EIGHTS LAKE EDGE Lake F,} .Iv PROJECT SITE Lake FWnore Lake Elsinore Slate FB MARIAN Re[ on fork V IL'L AAWI 00 �, Lakeland t Vi l ?age xvat t"Ol De$Cription 0 Impott, City Of LAO M$ftm OOPd*ftW of Public WOOM 130,$ MaJA Sfrth4o, L i�rEt a CA 951-674-3124 W061474�M access oubid yards export cubic yofO Vrom 540 N Main Sfeet k �A -LRjtf�lo I -- Max Number of Trucks Staged' Type of TrUdk,.- street naive, on&te, PAG 0 softom Dump a 10: Wheeler Dump El 5-Axle Rod Fermin girt Name AGREEMENT FOR CONSTRUCTION OF IMPROVEMENTS WHEREAS, the undersigned, Robert D . BOOS whose business address is 410 Park Place Blvd., Suite 100, Clearwater, FL 33759 herein referred to as "Contractor ", has submitted to the City of Lake Elsinore for its approval a haul route plan for the project known as United Pacific Fuel Station ; and, WHEREAS, Contractor desires to enter into an agreement and to furnish security in compliance with the City of Lake Elsinore Municipal Code LEMC 15.72.065. ; NOW, THEREFORE, in consideration of the approval of said Haul Route plan by the City, and as a condition of such approval, the Contractor promises and agrees at his own expense to adhere to the requirements of said condition and submits with this agreement, security for all costs and expense of in repairing any damage to streets or other public facilities and the removal of any deposits of earth materials or other debris resulting from the permitted operations. The above enumeration of items is understood to be only a general designation of the work and improvements, and not a binding description thereof. It is further understood and agreed that upon default of any obligation hereunder and at any time after any such default, the City may make written demand upon the Contractor and surety to immediately remedy the default or complete the work. If said remedial activities or completion of work are not commenced within sixty (60) days after such demand is made and are not thereafter diligently prosecuted to completion and fully completed within one hundred twenty (120) days after the making of such demand (or such other time as may be contained in said demand), the City may then complete or arrange for completion of all remaining work or conduct such remedial activity as in the sole judgment of the City may be required, all at the full expense and obligation of the Contractor and surety and all without the necessity of giving any further notice to the Contractor or surety before the City performs or arranges for performance of any work, and whether or not the Contractor or surety have constructed any of the requirements at the time. In the event the City elects to complete or arrange for completion of remaining work, the City Engineer, upon such election, may require all work by the Contractor or surety to cease in order to 1 permit adequate coordination by the City for completing any remaining work not yet completed. The contractor shall provide security in the form of cash and in the amount of Five Thousand Dollars ($5,000.00) in compliance with the terms of approval. For purposes of enforcing this agreement, the term "city" includes the city council, the city manager, the city attorney, city engineer, or any of them, or any of their authorized representatives. In WITNESS WHEREOF, the Contractor has caused this agreement to be executed this day of 7 f 202-L., Ate..; MAUREEN WOLFE i� Commission #GG300298 FOR: Expires October 1, 2023 $ Bonded Thru Troy Feln Insurance 6*3*7010 /// SIGNED: Type name & title here: Maureen Wolfe SIGNED: Type name & title here: Boos UP - Lake Elsinore, LLC Type or Print name of company on line above Robert D. Boos, Manager CITY OF LAKE ELSINORE BY: Brian Tisdale, Mayor CITY OF LAKE ELSINORE ATTEST: APPROVED BY: Candice Alvarez, City Clerk CITY OF LAKE ELSINORE Grant M Yates, City Manager CITY OF LAKE ELSINORE E