HomeMy WebLinkAboutItem No. 06 SB-1 2020-21 Downtown Pavement Resurfacing Project Phase IICity of Lake Elsinore 130 South Main Street
__ Lake Elsinore, CA 92530
II www.lake - elsinore.org
VV °"` IKo - Text File
File Number: ID# 19 -601
Agenda Date: 5/26/2020 Version: 1 Status: Approval Final
In Control: City Council / Successor Aqency File Type: Council Consent
Calendar
Agenda Number: 6)
City of Lake Elsinore Page 1 Printed on 512112020
CITY OF
4
LADE LS MORE
L
DREAM EXTREME
REPORT TO CITY COUNCIL
To: Honorable Mayor and Members of the City Council
From: Grant Yates, City Manager
Prepared By: Remon Habib, City Engineer
Date: May 26, 2020
Subject: SB -1 2020 -2021 Downtown Pavement Resurfacing Project - Phase II
Recommendation
Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2020 -21 FUNDED BY SB 1: THE
ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017.
Background
The new resolution will be uploaded to the "CALSMART" web tool to obtain project approval for
SB1 funding for Fiscal Year 2020/2021.
Bucknam Infrastructure Group performed a Pavement Assessment in 2017. Based on their
pavement condition survey (9/8/2017), the downtown pavement condition indexes were rated on
a scale from 0 to 100, depicting the condition of the existing pavement. Resurfacing
recommendations are divided into the following categories based on the pavement condition:
2" Grind and Overlay
4" Grind and Overlay
Slurry Seal
Discussion
Phase I of the downtown pavement resurfacing project will include sections at a 2" grind and
overlay, along with sections at a 3" grind and overlay with a small portion of the area being
scheduled for a slurry seal. The following areas for Phase I are as follows:
Street
Name
From
To
Treatment
1
Avenue 1
Park Way
Mill Street
4" AC Overlay
2
Avenue 2
Park Way
Mill Street
4" AC Overlay
3
Avenue 3
Park Way
Mill Street
4" AC Overlay
4
Avenue 4
Park Way
Mill Street
4" AC Overlay
SB -1 2020/20221 Downtown Pavement Resurfacing Project Phase II
May 26, 2020
Page 2
5
Avenue 5
Park Way
Mill Street
4" AC Overlay
6
Avenue 6
Park Way
Mill Street
2" AC Overlay
7
Avenue 6
Mill Street
Franklin
Street
4" AC Overlay
8
Mill Street
Avenue 1
Avenue 6
2" AC Overlay
9
Mill Street
Country Club Blvd
High Street
Slurry Seal II
10
Mill Street
High Street
Avenue 1
Slurry Seal II
11
Mill Street
Avenue 6
Avenue 9
Slurry Seal II
12
Mill Street
Avenue 9
Casino Drive
2" AC Overlay
13
Park Way
High Street
Avenue 1
2" AC Overlay
14
Park Way
Avenue 1
Pepper Drive
4" AC Overlay
15
Park Way
Avenue 6
Pepper Drive
2" AC Overlay
16
Country
Club Blvd
Lakeshore Drive
Mill Street
4" AC Overlay
17
Acacia
Street
Country Club
High Street
2" AC Overlay
18
Acacia
Street
High Street
Avenue 1
Slurry Seal II
19
Lake
Street
Country Club
Center Street
2" AC Overlay
20
Lake
Street
Center Street
High Street
4" AC Overlay
21
Lake
Street
High Street
Avenue 1
Slurry Seal II
22
Center
Street
Lakeshore Drive
Acacia Street
Slurry Seal II
23
High Street
Lakeshore Drive
Mill Street
Slurry Seal II
24
Pepper
Drive
Park Way
240' s/o Park
2" AC Overlay
25
Marian
Street
Lakeshore Drive
End
4" AC Overlay
26
Avenue 9
Griffin Way
Mill Street
Slurry Seal II
27
Avenue 10
Griffin
Mill Street
Slurry Seal II
28
Avenue 11
Park Way
Mill Street
Slurry Seal II
29
Avenue 12
Park Way
CDS
Slurry Seal II
30
Park Way
Avenue 9
Avenue 12
Slurry Seal II
31
Griffin Way
Avenue 9
Avenue 10
Slurry Seal II
The estimated cost for the downtown resurfacing of Phase I is $1,535,297.00. Once SB -1
funding is secured, projects from the list above will be advertised for bid. The City of Lake
Elsinore's projected SB -1 allocation for FY 2020 -2021 is $1,031,103. Projects listed above have
been included in order to take advantage of funds that may become available. Due to the
current situation of COVID -19, SB1 funding projections may change.
SB -1 2020/20221
May 26, 2020
Page 3
Fiscal Impact
Downtown Pavement Resurfacing Project Phase II
The funding allocation
be from the allocate d
Tax /Measure A funds.
Exhibits
A - Resolution
B - Project Map
for the 2020 -21 Downtown Pavement Resurfacing Project Phase II will
SB -1 funds available with the remainder being funded from Gas
RESOLUTION NO 2020-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2020-
21 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF
2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5,
Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April
2017 in order to address the significant multi -modal transportation funding shortfalls statewide;
and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of our City of Lake Elsinore are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
WHEREAS, the City of Lake Elsinore must adopt a list of all projects proposed to receive
funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by
resolution, which must include a description and the location of each proposed project, a
proposed schedule for the project's completion, and the estimated useful life of the
improvement; and
WHEREAS, the City of Lake Elsinore, will receive and estimated $1,031,103 in RMRA funding
in Fiscal Year 2020 -21 from SB 1; and
WHEREAS, this is the third year in which the City of Lake Elsinore is receiving SB 1 funding
and will enable the City of Lake Elsinore to continue essential road maintenance and
rehabilitation projects, safety improvements, repairing and replacing aging bridges, and
increasing access and mobility options for the traveling public that would not have otherwise
been possible without SB 1 ; and
WHEREAS, the City of Lake Elsinore has undergone a robust public process to ensure public
input into our community's transportation priorities /the project list; and
WHEREAS, the City of Lake Elsinore used a Pavement Management System to develop the SB
1 project list to ensure revenues are being used on the most high - priority and cost - effective
projects that also meet the communities priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City of Lake Elsinore maintain and rehabilitate
18 streets /roads, and add active transportation infrastructure throughout the City of Lake
Elsinore this year and hundreds of similar projects into the future; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting -edge technology, materials and practices, will have significant
positive co- benefits statewide.
NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City Council
of the City of Lake Elsinore, State of California, as follows:
Section 1. The foregoing recitals are true and correct.
Section 2. The fiscal year 2020 -21 list of projects planned to be funded with Road
Maintenance and Rehabilitation Account revenues include:
Pavement rehabilitation consists of 2 to 4 inches of grind and overlay of
Asphalt pavement or slurry seal type II, depending on the existing condition of
pavement. The projected is located in the downtown area of the City of Lake
Elsinore, in Riverside County, California. The useful life of the project is
expected to be around 10 years with design to be completed in December
2020 and construction to be completed in June of 2021.
Street
Name
From
To
Treatment
1
Avenue 1
Park Way
Mill Street
4" AC Overlay
2
Avenue 2
Park Way
Mill Street
4" AC Overlay
3
Avenue 3
Park Way
Mill Street
4" AC Overlay
4
Avenue 4
Park Way
Mill Street
4" AC Overlay
5
Avenue 5
Park Way
Mill Street
4" AC Overlay
6
Avenue 6
Park Way
Mill Street
2" AC Overlay
7
Avenue 6
Mill Street
Franklin Street
4" AC Overlay
8
Mill Street
Avenue 1
Avenue 6
2" AC Overlay
9
Mill Street
Country Club Blvd
High Street
Slurry Seal II
10
Mill Street
High Street
Avenue 1
Slurry Seal II
11
Mill Street
Avenue 6
Avenue 9
Slurry Seal II
12
Mill Street
Avenue 9
Casino Drive
2" AC Overlay
13
Park Way
High Street
Avenue 1
2" AC Overlay
14
Park Way
Avenue 1
Pepper Drive
4" AC Overlay
15
Park Way
Avenue 6
Pepper Drive
2" AC Overlay
16
Country
Club Blvd
Lakeshore Drive
Mill Street
4" AC Overlay
17
Acacia
Street
Country Club
High Street
2" AC Overlay
18
Acacia
Street
High Street
Avenue 1
Slurry Seal II
19
Lake Street
Country Club
Center Street
2" AC Overlay
20
Lake Street
Center Street
High Street
4" AC Overlay
21
Lake Street
High Street
Avenue 1
Slurry Seal II
22
Center
Street
Lakeshore Drive
Acacia Street
Slurry Seal II
23
High Street
Lakeshore Drive
Mill Street
Slurry Seal II
24
Pepper
Drive
Park Way
240' s/o Park
2" AC Overlay
25
Marian
Street
Lakeshore Drive
End
4" AC Overlay
26
Avenue 9
Griffin Way
Mill Street
Slurry Seal II
27
Avenue 10
Griffin
Mill Street
Slurry Seal II
28
Avenue 11
Park Way
Mill Street
Slurry Seal II
29
Avenue 12
Park Way
CDS
Slurry Seal II
30
Park Way
Avenue 9
Avenue 12
Slurry Seal II
31
Griffin Way
Avenue 9
Avenue 10
Slurry Seal II
PASSED AND ADOPTED by the City Council of the City of Lake Elsinore, State of California
this day of , 2020, by the following vote:
Brian Tisdale, Mayor
Attest:
Candice Alvarez, City Clerk
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF LAKE ELSINORE )
I, Candice Alvarez, City Clerk of the City of Lake Elsinore, California, do hereby certify that
Resolution No. was adopted by the City Council of the City of Lake Elsinore, California,
at the Regular meeting of , and that the same was adopted by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Candice Alvarez, City Clerk
1 1
1 � 1
1 m �
' aQ 1 c7
1 � I
0
1 A
n
lingfr 51 �
1 � �
fdorfbei �� � I
1 � E
Rr ,
1 � �
1 �
1 �
now 4 -
4iy��� St
4 nn-h -dl Dr f °i
b
� SrEnit.P'�vP
"mac
=rn^0
V
V
� z �
_ � r
z � Orn
o rn
m
r
2
7i• � :7 '��'if
`-'
S�
.ti MKin S, Tt
k'�a f'
a ,
■'n
k
M ,
N
1 1
1 � 1
1 m �
' aQ 1 c7
1 � I
0
1 A
n
lingfr 51 �
1 � �
fdorfbei �� � I
1 � E
Rr ,
1 � �
1 �
1 �
now 4 -
4iy��� St
4 nn-h -dl Dr f °i
b
� SrEnit.P'�vP
"mac
=rn^0
V
V
� z �
_ � r
z � Orn
o rn
m
N
I
1
I
1
9
1 1
1 � 1
1 m �
' aQ 1 c7
1 � I
0
1 A
n
lingfr 51 �
1 � �
fdorfbei �� � I
1 � E
Rr ,
1 � �
1 �
1 �
now 4 -
4iy��� St
4 nn-h -dl Dr f °i
b
� SrEnit.P'�vP
"mac
=rn^0
V
V
� z �
_ � r
z � Orn
o rn
m