Loading...
HomeMy WebLinkAboutItem No. 10 PSA Environmental Clearance Auto Center Dr/Casino Dr. Bridge Seismic RetrofitCity of Lake Elsinore 130 South Main Street __ Lake Elsinore, CA 92530 II www.lake - elsinore.org VV °"` IKo - Text File File Number: TMP 19 -750 Agenda Date: 5/12/2020 Version: 1 Status: Approval Final In Control: City Council / Successor Aqency Agenda Number: 10) File Type: Council Consent Calendar City of Lake Elsinore Page 1 Printed on 51712020 CITY OF ih41 4 LAKE LS1110 E L � DREAM EXTREME REPORT TO CITY COUNCIL To: Honorable Mayor and Members of the City Council From: Grant Yates, City Manager Prepared By: Remon Habib, City Engineer Date: May 12, 2020 Subject: Professional Services Agreement for Environmental Clearance and Final Design for Auto Center Drive /Casino Drive Bridge Seismic Retrofit Project Recommendation Authorize the City Manager to execute an Agreement for Professional Engineering Services in the amount of $1,374,266 to WKE, Inc., plus an additional 10% in contingency, in final form as approved by City Attorney. Background The Agreement will authorize WKE to start environmental studies and final design for the Auto Center Drive Bridge seismic retrofit and will evaluate needed safety upgrades in conformance with Highway Bridge Program funding criteria. The project will provide for final Plans, Specification, and Cost Estimate (PS &E) for the seismic retrofit, and NEPA and CEQA documentation. Auto Center Drive is a key link in the City of Lake Elsinore's transportation network and provides a connection from residential and commercial areas to the 1 -15 /Railroad Canyon Road Interchange. The Auto Center Drive bridge was constructed in 1957 over the San Jacinto River owned and maintained by the City of Lake Elsinore. From the biannual inspection performed by Caltrans, the bridge has been identified to be in need of a seismic retrofit rehabilitation. Discussion WKE will provide engineering services necessary for NEPA and CEQA documentation and final PS &E of the seismic retrofit of the Auto Center Drive bridge. The scope of services includes bridge seismic assessment, bridge deck condition assessment, structural analysis and design, geotechnical evaluation, hydrology /hydraulic analyses, roadway, topographic survey and mapping, utility coordination, environmental clearance and regulatory permitting, and biological resources technical studies and reports. Page 1 of 2 Fiscal Impact Professional Services Agreement will result into a cost of $1,374,266 plus an additional 10% in contingency. This work will be funded the Highway Bridge Program (HBP). Funds will be administered through the CALTRANS Local Assistance Program at District 8. Exhibits A — Agreement Page 2of2 AGREEMENT FOR PROFESSIONAL SERVICES WKE, Inc. Environmental Clearance and Final Design for Auto Center Drive /Casino Drive Bridge Seismic Retrofit Project This Agreement for Professional Services (the "Agreement ") is made and entered into as of May 12, 2020, by and between the City of Lake Elsinore, a municipal corporation ( "City ") and WKE, Inc., a Corporation ( "Consultant "). RECITALS A. The City has determined that it requires the following professional services: Environmental Clearance and Final Design for Auto Center Drive /Casino Drive Bridge Seismic Retrofit Project B. Consultant has submitted to City a proposal, dated September 16, 2019, attached hereto as Exhibit A ( "Consultant's Proposal ") and incorporated herein, to provide professional services to City pursuant to the terms of this Agreement. C. Consultant possesses the skill, experience, ability, background, certification and knowledge to perform the services described in this Agreement on the terms and conditions described herein. D. City desires to retain Consultant to perform the services as provided herein and Consultant desires to provide such professional services as set forth in this Agreement. AGREEMENT 1. Scope of Services. Consultant shall perform the services described in Consultant's Proposal (Exhibit A). Consultant shall provide such services at the time, place, and in the manner specified in Consultant's Proposal, subject to the direction of the City through its staff that it may provide from time to time. 2. Time of Performance. a. Time of Essence. Time is of the essence in the performance of this Agreement. The time for completion of the professional services to be performed by Consultant is an essential condition of this Agreement. Consultant shall prosecute regularly and diligently the professional services contemplated pursuant to this Agreement according to the agreed upon performance schedule in Consultant's Proposal (Exhibit A). b. Performance Schedule. Consultant shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in the Consultant's Proposal (Exhibit A). When requested by Consultant, extensions to the time period(s) specified may be approved in writing by the City Manager. Design Professional Services Agmt WKE Auto Center Bridge Page 1 C. Term. The term of this Agreement shall commence upon execution of this Agreement and shall continue until the services and related work are completed in accordance with the Consultant's Proposal (Exhibit A). 3. Compensation. Compensation to be paid to Consultant shall be in accordance with the fees set forth in Consultants' Proposal (Exhibit A), which is attached hereto and incorporated herein by reference. In no event shall Consultant's compensation exceed One Million Three Hundred Seventy Four Thousand Two Hundred Sixty Six dollars ($1,374,266) without additional written authorization from the City. Notwithstanding any provision of Consultant's Proposal to the contrary, out of pocket expenses set forth in Exhibit A shall be reimbursed at cost without an inflator or administrative charge. Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment. 4. Method of Payment. Contractor shall promptly submit billings to the City describing the services and related work performed during the preceding month to the extent that such services and related work were performed. Contractor's bills shall be segregated by project task, if applicable, such that the City receives a separate accounting for work done on each individual task for which Contractor provides services. Contractor's bills shall include a brief description of the services performed, the date the services were performed, the number of hours spent and by whom, and a description of any reimbursable expenditures. City shall pay Contractor no later than forty -five (45) days after receipt of the monthly invoice by City staff. 5. Background Checks. At any time during the term of this Agreement, the City reserves the right to make an independent investigation into the background of Consultant's personnel who perform work required by this Agreement, including but not limited to their references, character, address history, past employment, education, social security number validation, and criminal or police records, for the purpose of confirming that such personnel are lawfully employed, qualified to provide the subject service or pose a risk to the safety of persons or property in and around the vicinity of where the services will be rendered or City Hall. If the City makes a reasonable determination that any of Consultant's prospective or then current personnel is deemed objectionable, then the City may notify Consultant of the same. Consultant shall not use that personnel to perform work required by this Agreement, and if necessary, shall replace him or her with a suitable worker. 6. Suspension or Termination. a. The City may at any time, for any reason, with or without cause, suspend or terminate this Agreement, or any portion hereof, by serving upon the Consultant at least ten (10) days prior written notice. Upon receipt of such notice, the Consultant shall immediately cease all work under this Agreement, unless the notice provides otherwise. If the City suspends or terminates a portion of this Agreement such suspension or termination shall not make void or invalidate the remainder of this Agreement. b. In the event this Agreement is terminated pursuant to this Section, the City shall pay to Consultant the actual value of the work performed up to the time of termination, provided that the work performed is of value to the City. Upon termination of the Agreement pursuant to this Section, the Consultant will submit an invoice to the City, pursuant to Section entitled "Method of Payment" herein. Page 2 7. Plans. Studies. Documents. a. Ownership of Documents. All plans, studies, documents and other writings prepared by and for Consultant, its officers, employees and agents and subcontractors in the course of implementing this Agreement, except working notepad internal documents, shall become the property of the City upon payment to Consultant for such work, and the City shall have the sole right to use such materials in its discretion without further compensation to Consultant or to any other party. Consultant shall, at Consultant's expense, provide such reports, plans, studies, documents and other writings to City upon written request. City shall have sole determination of the public's rights to documents under the Public Records Act, and any third - party requests of Consultant shall be immediately referred to City, without any other actions by Consultant. b. Licensing of Intellectual Property. This Agreement creates a nonexclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement ( "Documents & Data "). Consultant shall require that all subcontractors agree in writing that City is granted a nonexclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were prepared by design professionals other than Consultant or provided to Consultant by the City. City shall not be limited in any way in its use of the Documents & Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. C. Confidentiality. All ideas, memoranda, specifications, plans, procedures, drawings, descriptions, computer program data, input record data, written information, and other Documents & Data either created by or provided to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant. Such materials shall not, without the prior written consent of City, be used by Consultant for any purposes other than the performance of the services under this Agreement. Nor shall such materials be disclosed to any person or entity not connected with the performance of the services under this Agreement. Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential. Consultant shall not use City's name or insignia, photographs relating to project for which Consultant's services are rendered, or any publicity pertaining to the Consultant's services under this Agreement in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of City. 8. Consultant's Books and Records. a. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant to this Agreement. Page 3 b. Consultant shall maintain all documents and records which demonstrate performance under this Agreement for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Agreement. C. Any records or documents required to be maintained pursuant to this Agreement shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City Manager, City Attorney, City Auditor or a designated representative of these officers. Copies of such documents shall be provided to the City for inspection at City Hall when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Consultant's address indicated for receipt of notices in this Agreement. d. Where City has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Consultant's business, City may, by written request by any of the above -named officers, require that custody of the records be given to the City and that the records and documents be maintained in City Hall. Access to such records and documents shall be granted to any party authorized by Consultant, Consultant's representatives, or Consultant's successor -in- interest. 9. Independent Contractor. a. Consultant is and shall at all times remain as to the City a wholly independent contractor pursuant to California Labor Code Section 3353. The personnel performing the services under this Agreement on behalf of Consultant shall at all times be under Consultant's exclusive direction and control. Neither City nor any of its officers, employees, or agents shall have control over the conduct of Consultant or any of Consultant's officers, employees, or agents, except as set forth in this Agreement. Consultant shall not at any time or in any manner represent that it or any of its officers, employees, or agents are in any manner officers, employees, or agents of the City. Consultant shall not incur or have the power to incur any debt, obligation, or liability whatsoever against City, or bind City in any manner. b. Notwithstanding any other federal, state and local laws, codes, ordinances and regulations to the contrary and except for the fees paid to Consultant as provided in the Agreement, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and /or employee contributions for PERS benefits. 10. PERS Eligibility Indemnification. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and /or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. 11. Interests of Consultant. Consultant (including principals, associates and professional employees) covenants and represents that it does not now have any investment or interest in real property and shall not acquire any interest, direct or indirect, in the area covered Page 4 by this Agreement or any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Consultant's services hereunder. Consultant further covenants and represents that in the performance of its duties hereunder no person having any such interest shall perform any services under this Agreement. Consultant is not a designated employee within the meaning of the Political Reform Act because Consultant: a. will conduct research and arrive at conclusions with respect to his /her rendition of information, advice, recommendation or counsel independent of the control and direction of the City or of any City official, other than normal agreement monitoring; and b. possesses no authority with respect to any City decision beyond rendition of information, advice, recommendation or counsel. (FPPC Reg. 18700(a)(2).) 12. Professional Ability of Consultant. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall therefore provide properly skilled professional and technical personnel to perform all services under this Agreement. All work performed by Consultant under this Agreement shall be in accordance with applicable legal requirements and shall meet the standard of quality ordinarily to be expected of competent professionals in Consultant's field of expertise. 13. Compliance with Laws. a. Consultant shall comply with all local, state and federal laws and regulations applicable to the services required hereunder, including any rule, regulation or bylaw governing the conduct or performance of Consultant and /or its employees, officers, or board members. b. Consultant represents that it has obtained and will maintain at all times during the term of this Agreement all professional and /or business licenses, certifications and /or permits necessary for performing the services described in this Agreement, including a City business license. 14. Licenses. Consultant represents and warrants to City that it has the licenses, permits, qualifications, insurance and approvals of whatsoever nature which are legally required of Consultant to practice its profession. Consultant represents and warrants to City that Consultant shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement, any licenses, permits, insurance and approvals which are legally required of Consultant to practice its profession. Consultant shall maintain a City of Lake Elsinore business license. 15. Indemnity. a. Indemnification for Professional Liability. To the fullest extent permitted by law, Consultant shall indemnify, defend and hold harmless City and any and all of its officials, employees and agents ( "Indemnified Parties ") from and against any and all claims, losses, liabilities, damages, costs and expenses, including attorney's fees and costs, to the extent they arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant. Consultant's duty to defend shall consist of reimbursement of defense costs incurred Page 5 by City in direct proportion to the Consultant's proportionate percentage of fault. Consultant's percentage of fault shall be determined, as applicable, by a court of law, jury or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the Consultant's percentage of fault, the parties agree to mediation with a third party neutral to determine the Consultant's proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the City. b. Indemnification for Other Than Professional Liability. Other than in the performance of professional services and to the full extent permitted by law, Consultant shall indemnify, defend and hold harmless City, and any and all of its employees, officials and agents from and against any liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including attorneys' fees and costs, court costs, interest, defense costs, and expert witness fees), where the same arise out of, are a consequence of, or are in any way attributable to, in whole or in part, the performance of this Agreement by Consultant or by any individual or entity for which Consultant is legally liable, including but not limited to officers, agents, employees or sub - consultants of Consultant. Consultant shall not be liable to third parties for any liability exempted by statute. C. General Indemnification Provisions. Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this section from each and every sub - consultant or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. In the event Consultant fails to obtain such indemnity obligations from others as required here, Consultant agrees to be fully responsible according to the terms of this section. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth here is binding on the successors, assigns or heirs of Consultant and shall survive the termination of this Agreement or this section. 16. Insurance Requirements. a. Insurance. Consultant, at Consultant's own cost and expense, shall procure and maintain, for the duration of the contract, unless modified by the City's Risk Manager, the following insurance policies. i. Workers' Compensation Coverage. Consultant shall maintain Workers' Compensation Insurance and Employer's Liability Insurance for his /her employees in accordance with the laws of the State of California. In addition, Consultant shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California for all of the subcontractor's employees. Any notice of cancellation or non - renewal of all Workers' Compensation policies must be received by the City at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees and volunteers for losses arising from work performed by Consultant for City. In the event that Consultant is exempt from Worker's Compensation Insurance and Employer's Liability Insurance for his /her employees in accordance with the laws of the State of California, Consultant shall submit to the City a Certificate of Exemption from Workers Compensation Insurance in a form approved by the City Attorney. Page 6 ii. General Liability Coverage. Consultant shall maintain commercial general liability insurance in an amount not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit. Required commercial general liability coverage shall be at least as broad as Insurance Services Office Commercial General Liability occurrence form CG 0001 (ed. 11/88) or Insurance Services Office form number GL 0002 (ed. 1/73) covering comprehensive General Liability and Insurance Services Office form number GL 0404 covering Broad Form Comprehensive General Liability. No endorsement may be attached limiting the coverage. iii. Automobile Liability Coverage. Consultant shall maintain automobile liability insurance covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired and non -owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence. Automobile liability coverage must be at least as broad as Insurance Services Office Automobile Liability form CA 0001 (ed. 12/90) Code 1 ( "any auto "). No endorsement may be attached limiting the coverage. iv. Professional Liability Coverage. Consultant shall maintain professional errors and omissions liability insurance appropriate for Consultant's profession for protection against claims alleging negligent acts, errors or omissions which may arise from Consultant's services under this Agreement, whether such services are provided by the Consultant or by its employees, subcontractors, or sub consultants. The amount of this insurance shall not be less than one million dollars ($1,000,000) on a claims -made annual aggregate basis, or a combined single limit per occurrence basis. b. Endorsements. Each general liability and automobile liability insurance policy shall be with insurers possessing a Best's rating of no less than A:VII and shall be endorsed with the following specific language: i. Notwithstanding any inconsistent statement in any required insurance policies or any subsequent endorsements attached thereto, the protection offered by all policies, except for Workers' Compensation, shall bear an endorsement whereby it is provided that, the City and its officers, employees, servants, volunteers and agents and independent contractors, including without limitation, the City Manager and City Attorney, are named as additional insureds. Additional insureds shall be entitled to the full benefit of all insurance policies in the same manner and to the same extent as any other insureds and there shall be no limitation to the benefits conferred upon them other than policy limits to coverages. Page 7 ii. This policy shall be considered primary insurance as respects the City, its elected or appointed officers, officials, employees, agents and volunteers. Any insurance maintained by the City, including any self- insured retention the City may have, shall be considered excess insurance only and shall not contribute with it. iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company. iv. The insurer waives all rights of subrogation against the City, its elected or appointed officers, officials, employees or agents. V. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected or appointed officers, officials, employees, agents or volunteers. vi. The insurance provided by this Policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days written notice has been received by the City. C. Deductibles and Self- Insured Retentions. Any deductibles or self- insured retentions must be declared to and approved by the City. At the City's option, Consultant shall demonstrate financial capability for payment of such deductibles or self- insured retentions. d. Certificates of Insurance. Consultant shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. Certificates of such insurance shall be filed with the City on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with the City at all times during the term of this Agreement. 17. Notices. Any notice required to be given under this Agreement shall be in writing and either served personally or sent prepaid, first class mail. Any such notice shall be addressed to the other party at the address set forth below. Notice shall be deemed communicated within 48 hours from the time of mailing if mailed as provided in this section. If to City: City of Lake Elsinore Attn: City Manager 130 South Main Street Lake Elsinore, CA 92530 With a copy to: City of Lake Elsinore Attn: City Clerk 130 South Main Street Lake Elsinore, CA 92530 If to Consultant: WKE, Inc. Attn: Dan Weddell, PE 1851 E First Street, STE 1400 Santa Ana, CA 92705 Page 8 18. Assignment and Subcontracting. The parties recognize that a substantial inducement to City for entering into this Agreement is the professional reputation, experience and competence of Consultant and the subcontractors listed in Exhibit B. Consultant shall be fully responsible to City for all acts or omissions of any subcontractors. Assignments of any or all rights, duties or obligations of the Consultant under this Agreement will be permitted only with the express consent of the City. Consultant shall not subcontract any portion of the work to be performed under this Agreement except as provided in Exhibit B without the written authorization of the City. If City consents to such subcontract, Consultant shall be fully responsible to City for all acts or omissions of those subcontractors. Nothing in this Agreement shall create any contractual relationship between City and any subcontractor nor shall it create any obligation on the part of the City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise is required by law. 19. Waiver. Waiver of a breach or default under this Agreement shall not constitute a continuing waiver of a subsequent breach of the same or any other provision under this Agreement. 20. Litigation Expenses and Attorneys' Fees. If either party to this Agreement commences any legal action against the other party arising out of this Agreement, the prevailing party shall be entitled to recover its reasonable litigation expenses, including court costs, expert witness fees, discovery expenses, and attorneys' fees. 21. Mediation. The parties agree to make a good faith attempt to resolve any disputes arising out of this Agreement through mediation prior to commencing litigation. The parties shall mutually agree upon the mediator and share the costs of mediation equally. If the parties are unable to agree upon a mediator, the dispute shall be submitted to JAMS or its successor in interest. JAMS shall provide the parties with the names of five qualified mediators. Each party shall have the option to strike two of the five mediators selected by JAMS and thereafter the mediator remaining shall hear the dispute. If the dispute remains unresolved after mediation, either party may commence litigation. 22. Prohibited Interests. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom. 23. Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non - discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Page 9 24. Prevailing Wages. Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ( "Prevailing Wage Laws "), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Consultant agrees to fully comply with all applicable federal and state labor laws (including, without limitation, if applicable, the Prevailing Wage Laws). It is agreed by the parties that, in connection with the Work or Services provided pursuant to this Agreement, Consultant shall bear all risks of payment or non - payment of prevailing wages under California law, and Consultant hereby agrees to defend, indemnify, and hold the City, and its officials, officers, employees, agents, and volunteers, free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. The foregoing indemnity shall survive termination of this Agreement. 25. Severability. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 26. Controlling Law Venue. This Agreement and all matters relating to it shall be governed by the laws of the State of California and any action brought relating to this Agreement shall be held exclusively in a state court in the County of Riverside. 27. Authority to Enter Agreement. Consultant has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and to bind each respective party. The City Manager is authorized to enter into an amendment or otherwise take action on behalf of the City to make the following modifications to the Agreement: (a) a name change; (b) grant extensions of time; (c) non - monetary changes in the scope of services; and /or (d) suspend or terminate the Agreement. 28. Counterparts. This Agreement may be executed in several counterparts, each of which shall constitute one and the same instrument and shall become binding upon the parties when at least one copy hereof shall have been signed by both parties hereto. In approving this Agreement, it shall not be necessary to produce or account for more than one such counterpart. 29. Entire Agreement; Incorporation; Conflict. This Agreement contains the entire understanding between the parties relating to the obligations described herein. All prior or contemporaneous understandings, agreements, representations and statements, oral or written, are superseded in total by this Agreement and shall be of no further force or effect. Consultant's Proposal is incorporated only for the description of the scope of services and /or the schedule of performance and no other terms and conditions from such proposal shall apply to this Agreement unless specifically agreed to in writing. In the event of conflict, this Agreement shall take precedence over those contained in the Consultant's Proposal. 30. Amendments. This Agreement may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney. [Signatures on next page] Page 10 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the date first written above. "CITY" CITY OF LAKE ELSINORE, a municipal corporation "CONSULTANT" WKE, Inc., a Corporation Grant Yates, City Manager By: Dan Weddell, PE Its: Vice President ATTEST: City Clerk APPROVED AS TO FORM: City Attorney Risk Manager Attachments: Exhibit A — Consultant's Proposal Exhibit B — List of Subcontractors Page 11 .■ CONSULTANT'S PROPOSAL [ATTACHED] EXHIBIT A EXHIBIT A -1 WKE TEAM SUMMARY PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore TASK DESCRIPTION WKE LSA WEST EMI (DBE) da BALK (DBE) EPIC TOTALS TASK 1 1.1 - PROJECT MANAGEMENT Administration and Management 244 68 46,452 12,136 184 40 34,033 8,132 22 0 4,741 0 20 0 3,556 0 0 039 0 0 0 0 0 24 12 3,788 1,917 98 93,608 22,185 1.2 Pro act Team Meetings 90 17,034 140 25,289 22 4,741 14 2,411 4 1,039 0 0 12 1,870 52 384 1.3 Schedule 18 3437 4 612 0 0 0 0 0 0 0 0 0 0 N282 4049 1.4 Establish QC Pro ram 12 2,732 0 0 0 0 0 0 0 0 0 0 0 0 2,732 1.5 Seismic Strate /Rehab Meetin s 56 11,113 0 0 0 0 6 1,145 0 0 0 0 0 0 12,258 TASK 2- PROJECT COORDINATION MEETINGS 212 33,624 64 1 0 0 0 0 0 0 0 0 0 46,446 2.1 HBP Request For Authorization 78 10,426 0 0 0 0 0 0 0 0 0 0 0 0 78 10,426 2.2 NEPA /CEQA Coordination 48 9,243 64 12,821 0 0 0 0 0 0 0 0 0 0 112 22,064 2.3 M Cit Meetings 86 13,956 0 0 0 0 0 0 0 0 0 0 0 0 86 13,956 TASK 3- REVIEW OF EXISTING CONDITIONS 22 3,582 0 0 0 0 14 2,331 0 0 0 0 0 0 3 5,913 3.1 As -Built Plan and Preliminary Report Review 14 2,483 0 0 0 0 6 1,145 0 0 0 0 0 0 20 3,628 3.2 Field Visit and Site Assessment 8 1.099 0 0 0 0 8 1,185 0 0 0 0 0 0 16 2,285 TA S 4.1 Traffic Control 132 10 1,378 0 0 0 0 0 0 0 0 0 0 0 -AMEL, 0 0 0 0 0 10 1,378 0 0 4.2 Obtain City Encroachment Permit 4 811 0 0 0 0 0 0 0 0 0 0 0 0 4 811 4.3 Asphalt Overlay Removal and Inspection 4 952 0 0 1 0 0 1 0 0 0 1 0 0 0 0 1 0 4 952 4.4 TASK 5 Deck Condition Re ort - PRELIMINARY ENGIN 114 17,537 0 0 0 0 0 0 0 0 0 0 0 0 83 0 114 17,537 5.1 Diagnostic Analysis 60 8,616 0 0 0 0 0 0 0 0 0 0 0 0 60 8,616 5.2 UtilitV Coordination - R/W Data Sheet 0 0 0 0 0 0 0 0 0 0 0 0 83 12,123 83 12,123 5.3 Draft Seismic Retrofit Strategy Report 312 44,261 0 0 0 0 24 4,581 0 0 0 0 0 0 336 48,841 5.4 Attend Public Outreach Meeting 26 3,897 0 0 0 0 0 0 0 0 0 0 0 0 26 3,897 5.5 6.1 Final Seismic Retrofit Strategy Report and 30% Plans AL PS &E Structures 34 4,646 261,905 0 0 0 0 24 4,581 0 0 0 0 0 0 405 0 58 9,227 6.1.1 60% Unchecked Details 961 125,466 0 0 0 0 0 0 0 0 0 0 0 0 961 125,466 6.1.2 Specifications 12 2,101 50 6,537 0 0 0 0 0 0 0 0 0 0 62 8,638 6.1.3 Estimate 22 2,639 0 0 0 0 0 0 0 0 0 0 0 0 22 2,639 6.1.4 Independent Check 130 17,641 0 0 0 0 0 0 0 0 0 0 0 0 130 17,641 6.1.5 1 Respond to Agency Comments 50 7,096 0 0 0 0 0 0 0 1 0 0 0 0 0 1 50 7,096 6.1.6 100% Plans Specifications, and Estimate 70 9,600 0 0 0 0 0 0 0 0 0 0 0 0 70 9,600 6.1.7 Prepare RE Pending File 6 944 0 0 0 0 0 0 0 0 0 0 0 0 6 944 6.2 Roadway 6.2.1 Roadway 98 11,399 0 0 0 0 0 0 0 0 0 0 0 0 98 11,399 6.2.2 Utilities 98 11,399 0 0 0 1 0 0 1 0 0 0 0 0 0 0 98 11,399 6.2.3 Traffic Control and Transportation Management Plan 52 6,308 0 0 0 0 0 0 0 0 0 0 0 0 52 6,308 6.2.4 Water Pollution Control and LID Report 20 3,044 0 0 0 0 0 0 0 0 0 0 0 0 20 3,044 6.2.5 Drainage Plans and Report 20 3,044 0 0 0 0 0 0 0 0 0 0 0 0 20 3,044 6.2.6 Specifications 55 8,008 0 0 0 0 0 0 0 0 0 0 0 0 55 8,008 6.2.7 Estimate 55 8,008 0 0 0 0 0 0 0 0 0 0 0 0 55 8,008 6.2.8 Respond to Agency Comments 20 3,044 0 0 0 0 0 0 0 0 0 0 0 0 20 3,044 6.2.9 100% Plans Specifications, and Estimate 93 11,531 0 0 0 0 0 0 0 0 0 0 0 0 93 11,531 6.2.10 Prepare RE Pending File 12 1,561 0 0 0 0 0 0 0 0 0 0 0 0 12 1,561 Page 1 of 4 EXHIBIT A -1 WKE TEAM SUMMARY PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore TASK FST EMI (D Guida BA 6.3 Utility Relocation 6.3.1 Potholing 2 279 0 0 0 0 0 0 0 0 0 0 25 3,456 27 3,735 6.3.2 Conflict Identification and Owner Notification 8 1,117 0 0 0 0 0 0 0 0 0 0 57 6,534 65 7,651 6.3.3 Relocation Design Coordination 12 1,555 0 0 0 0 0 0 0 0 0 0 266 32,280 278 33,835 6.3.4 Utility Agreements and Notices to Owner 2 382 0 0 0 0 0 0 0 0 0 0 57 6,975 59 7,357 6.4 1 Bid Support 6.4.1 Prepare Bid Documents 36 5,759 0 0 0 0 0 0 0 0 0 0 0 0 36 5,759 6.4.2 Attend Pre -Bid Meeting 4 764 0 0 0 0 0 0 0 0 0 0 0 0 4 764 6.4.3 Respond to RFI 12 1,904 0 0 0 0 0 0 0 0 0 0 0 0 12 1,904 6.5 Services During Construction 6.5.1 Attend Monthly Meetings 12 2,291 0 0 0 0 0 0 1 0 0 0 1 0 0 1 0 12 1 2,291 6.5.2 Review Technical Submittals 34 5,583 0 0 0 0 0 0 0 0 0 0 0 0 34 5,583 6.5.3 Respond to RFI 40 7,162 0 0 0 0 0 0 0 0 0 0 0 0 40 7,162 6.5.4 As -Built Plans 16 2,277 0 0 0 0 0 0 0 0 0 0 0 0 16 2,277 6.6 Environmental Support During Construction 6.6.1 On -Site Pre - Construction Meeting 0 0 24 3,728 0 0 1 0 0 0 0 0 0 0 0 24 3,728 6.6.2 Preconstruction Surveys birds, bats 0 0 66 10,551 0 0 0 0 0 0 0 0 0 0 66 10,551 6.6.3 Construction Monitorin 0 0 292 35,810 0 0 0 0 0 0 0 0 0 0 292 35,810 SK 7 7.1 - GEOT AL EVA Environmental Clearance & Permitting 4 L 1,313 787 306 46,363 0 0 7 1,125 0 0 0 0 0 0 0 0 317 48,275 7.2 Field Borings 0 0 0 0 0 0 66 9,236 0 0 0 0 0 0 66 9,236 7.3 Lab Work 0 0 0 0 0 0 41 5,188 0 0 0 0 0 0 41 51188 7.4 Bridge Foundation Report 3 525 0 0 0 0 195 33,028 0 0 0 0 0 0 198 33,554 8.1 H dmlo /H draulic Anal ses & Modelin 2 279 0 0 692 270 10 , 37,693 0 0 0 0 0 0 0 0 272 37,972 8.2 Scour Reporting and Recommendation 3 525 0 0 130 23,489 0 0 0 0 0 0 0 0 133 24,014 8.3a Prepare CLOMR 1 191 0 0 187 29,686 0 0 0 0 0 0 0 0 188 29,877 8.3b Prepare LOMR 1 191 558 0 0 0 105 0 15,669 0 0 0 0 0 0 0 0 0 0 106 15,860 9.1 Topographic Surveys and Mapping 2 279 0 0 0 0 0 0 150 24,335 0 0 0 0 152 24,614 9.2 Corner Record / Record of Survey 0 0 0 0 0 0 0 0 86 14,603 0 0 0 0 86 14,603 9.3 Pothole Ground Surve 2 279 0 0 0 0 0 0 48 8,107 0 0 0 0 50 8,386 TA 10.1 HNICAL STUDI Complete Preliminary Environmental Study 0 0 3 711 0 0 0 0 0 0 0 0 0 0 3 711 10.A Noise Memorandum (Type III 1 191 37 5,999 0 0 0 0 0 0 0 0 0 0 38 6,190 10.B Air Quality and GHG Analyses Construction Only) 1 191 33 5,921 0 0 0 0 0 0 0 0 0 0 34 6,112 10.0 Hazardous Materials - Initial Site Assessment Draft and Final 1 191 0 0 0 0 0 0 0 0 0 0 0 0 1 191 10.D.1 Location Hydraulic Study 1 191 0 0 30 4,736 0 0 0 0 0 0 0 0 31 4,927 10.D.2 Summary Flood lain Encroachment Report 1 191 0 0 44 6,643 0 0 0 0 0 0 0 0 45 6,834 10.D.3 Water Quality Assessment and Memorandum 5 749 0 0 0 0 0 0 0 0 0 0 0 0 5 749 Page 2 of 4 EXHIBIT A -1 WKE TEAM SUMMARY PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore TASK WEST EMI(D a BA ic 10.E Biological Resources i326 10.E.1 Site Reconnaissance Surveys 1 191 34 5,195 0 0 0 0 0 0 0 0 0 0 35 5,386 10.E.2 Natural Environment Stud Draft and Final 2 382 324 49,433 0 0 0 0 0 0 0 0 0 0 49,815 10.E.2a Focused Bird Surveys 1 191 172 21,776 0 0 0 0 0 0 0 0 0 0 173 21,967 10.E.2b MSHCP Consistent Report 4 764 180 27,079 0 0 0 0 0 0 0 0 0 0 184 27,842 10.E.3 Determination of Biologically Equivalent or Superior Preservz 4 764 96 16,090 0 0 1 0 0 0 0 1 0 0 0 0 100 16,854 10. E.4 Regional Conservation Authority - Joint Project Review 2 382 18 3,065 0 0 0 0 0 0 0 0 0 0 20 3,447 10.E.5 Jurisdictional Delineation 2 382 0 0 0 0 0 0 0 0 105 19,507 0 0 107 19,889 10.F Cultural Resources 101.1 Area of Potential Effect Map 2 405 16 2,934 0 0 0 0 0 0 0 0 0 0 18 3,339 101.2 Archaeological Survey Report 2 405 35 4,740 0 0 0 0 0 0 0 0 0 0 37 5,145 101.3 Historical Property Survey Report 2 405 21 2,984 0 0 0 0 0 0 0 0 0 0 23 3,390 10.F.4 Native American Consultation 1 0 1 0 1 25 1 3,279 1 0 1 0 0 1 0 1 0 1 0 0 1 0 0 1 0 1 25 1 3,279 11.1 Draft Cate orical Exclusion and Environmental Commitments 12 2,732 66 7,957 0 0 0 0 0 0 0 0 0 0 78 10,689 11.2 Public Review without Public Meeting 2 382 0 0 0 0 0 0 0 0 0 0 0 0 2 382 11.3 Final Categorical Exclusion and Environmental Commitments 2 382 36 4,637 0 0 0 0 0 0 0 0 0 0 38 5,019 11A.1 Screencheck Draft EA 4 764 163 24,100 0 0 0 0 0 0 0 0 0 0 167 24,863 11A.2 Draft EA 2 382 80 12,135 0 0 0 0 0 0 0 0 0 0 82 12,517 11A.3 Obtain Approval to Circulate 0 0 32 4,786 0 0 0 0 0 0 0 0 0 0 32 4,786 11A.4 Circulate Draft EA 0 0 46 5,897 0 0 0 0 0 0 0 0 0 0 46 5,897 11A.5 Response to Comments 4 764 108 16,681 0 0 0 0 0 0 0 0 0 0 112 17,444 11A.6 Final EATONSI 2 382 78 11,524 0 0 0 0 0 0 0 0 0 0 80 11,906 11A.7 NOD and NO A 0 0 9 1,359 0 0 0 0 0 0 0 0 0 0 9 1,359 12.1 Screencheck Initial Study 8 1,528 220 27,101 0 0 0 0 0 0 0 0 0 0 228 28,629 12.2 Draft Initial Study and Notice of Intent 12 2,732 108 13,192 0 0 0 0 0 0 0 0 0 0 120 15,924 12.3 Public Review without Public Meeting 2 382 46 5,764 0 0 0 0 0 0 0 0 0 0 48 6,146 12.4 Screencheck Final Initial Study with Mitigated Negative Declar 2 382 80 12,862 0 0 0 0 0 0 0 0 0 0 82 13,244 12.5 Notice of Completion and Distribution of Documents 2 382 8 1,259 0 0 0 0 0 0 0 0 0 0 10 1,641 12.6 Final IS /MND and Mitigation Monitoring and Reporting Pro ra 2 382 48 6,493 0 0 0 0 0 0 0 0 0 0 50 6,875 12.7 INItice of Determination Cit 0 0 6 995 0 0 0 0 0 0 0 0 0 0 6 995 TASK 13 13.1 - REGULATORY PER Pre-Application Meeting 12 2,574 0 0 0 0 0 0 0 0 216 25 36,607 4,226 0 0 37 6,800 13.2 USACE Section 404 Permit Application 20 4,007 0 0 0 0 0 0 0 0 71 12,081 0 0 91 16,088 13.3 Santa Ana RWQCB Section 401 Water Quality Certification 20 4,007 0 0 0 0 0 0 0 0 77 13,161 0 0 97 17,168 13.4 CDFW 1602 Permit Application 20 4,007 0 0 0 0 0 0 0 0 43 7,139 0 0 63 11,146 Page 3 of 4 EXHIBIT A -1 WKE TEAM SUMMARY PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore TASK WKE LSA W 69 264 690 690 397 TOTALS 9,017 OTHE Travel 3,084 3,824 Reproductions 384 1,005 66 0 0 198 0 1,653 Mail 825 325 108 50 25 100 285 1,718 Drilling Rig Rental 0 0 1 0 0 0 0 0 0 Drums, Soil Disposal, Lift-gate Truck 0 18,000 0 3,075 0 0 0 21,075 Drill Rig Rental and Supplies 0 0 0 24,000 0 0 0 24,000 AC Overlay Removal 12,600 0 0 0 0 0 0 12,600 Traffic Control DBE 3,450 0 0 9,870 0 0 0 13,320 Records Search 0 700 0 0 100 0 0 800 Title Reports 0 0 0 0 0 0 0 0 Permit Fees 0 0 0 0 0 0 0 0 Filing Fees 0 0 0 0 0 0 0 0 Drone 0 400 0 0 0 0 0 400 GPS 0 375 0 0 0 0 0 375 !Potholing Exhibit 10 -H Rounding Adjustment TOTAL 0 3,210 3,114 0 48 , 0 0 0 0 15,000 15,000 DBE DBE $ Total Subs $ 35.2% 35.0% 0.0 % 0.0% $ 480,423 8.9% 7.3% 7.3% $ 100,885 $ 122,902 $ 100,885 Page 4 of 4 36% 4.2% 5.9% 100.0% 4.2% 11.5% $ 57,103 $ 157,988.00 $ 48,904 $ 57,103 $ 80,839 $ 891,056.00 EXHIBIT A -2 WKE, Inc. PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 5 of 44 Break Even Multiplier 126.97% Profit 10% Escalation 3.20% TASK DESCRIPTION Principal in Charge Project Manager Senior Project Engineer III Senior Project Engineer II Project Engineer Engineer/ Designer Technician /Drafter Clerical OVERALL PROJECT 110.70 74.11 95.49 78.67 54.18 42.50 45.44 43.00 $285.23 $190.95 $246.04 $202.70 $139.60 $109.50 $117.08 $110.79 TOTAL HRS TOTAL BUDGET TASK 1 - PROJECT MANAGEMENT 30 98 24 j 16 56 0 0 20 244 $46,451.56 1.1 Administration and Management 8 40 20 68 $12,135.64 1.2 Project Team Meetings 18 36 36 90 $17,033.94 1.3 Schedule 18 18 $3,437.10 1.4 Establish QC Program 4 8 12 $2,732.12 1.5 Seismic Strategy /Rehab Meetings 4 16 16 20 56 $11,112.76 TAS - PROJECT COORDINATION MEETINGS 12 74 6 0 48 64 0 8 212 $33,624.42 2.1 1 HBP Request For Authorization 2 6 30 40 78 $10,426.14 2.2 NEPA/CEQA Coordination 6 36 6 48 $9,242.58 2.3 Monthly City Meetings 6 36 18 18 8 86 $13,955.70 TASK 3- REVIEW OF EXISTING CONDITIONS 0 4 4 0 10 4 0 0 22 $3,581.96 3.1 As Built Plan and Preliminary Report Review 2 4 8 14 $2,482.86 3.2 1 Field Visit and Site Assessment 2 2 4 8 $1 ,099.10 TASK 4 - BRIDGE DECK C N EVALUATIONS 6 6 20 8 34 34 24 0 132 $20,678.80 4.1 Traffic Control 2 4 4 10 $1,378.30 4.2 Obtain City Encroachment Permit 4 4 $810.80 4.3 Asphalt Overlay Removal and Inspection 2 2 4 $952.36 4.4 Deck Condition Report 4 2 20 4 30 30 24 114 $17,537.34 TASK 5 - PRELIMINARY E SMIC RETROM 6 4 32 34 150 116 90 0 432 $61,419.46 5.1 Diagnostic Analysis 2 8 20 30 60 $8,615.78 5.2 Utility Coordination - R/W Data Sheet 0 $0.00 5.3 Draft Seismic Retrofit Strategy Report 2 20 30 120 60 80 312 $44,260.66 5.4 Attend Public Outreach Meeting 2 4 4 16 26 $3,897.06 5.5 Final Seismic Retrofit Strategy Report and 30% Plans 4 10 10 10 34 $4,645.96 Page 5 of 44 EXHIBIT A -2 WKE, Inc. PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 6 of 44 Break Even Multiplier 126.97% Profit 10% Escalation 3.20% TASK DESCRIPTION Principal in Charge Project Manager Senior Project Engineer III Senior Project Engineer II Project Engineer Engineer/ Designer Technician /Drafter Clerical OVERALL PROJECT 110.70 74.11 95.49 78.67 54.18 42.50 45.44 43.00 $285.23 $190.95 $246.04 $202.70 $139.60 $109.50 $117.08 $110.79 TOTAL HRS TOTAL BUDGET SK 6 - FINAL PS &E 0 37 53 226 493 878 265 0 1,952 $261,905.47 6.1 Structures 6.1.1 60% Unchecked Details 24 117 142 443 235 961 $125,466.36 6.1.2 Specifications 4 8 12 $2,100.96 6.1.3 Estimate 1 1 20 22 $2,638.74 6.1.4 Independent Check 6 20 24 80 130 $17,640.64 6.1.5 Respond to Agency Comments 2 8 20 20 50 $7,095.68 6.1.6 100% Plans, Specifications, and Estimate 4 6 20 10 30 70 $9,599.76 6.1.7 Prepare RE Pending File 1 5 6 $944.04 6.2 Roadway 6.2.1 Roadway 2 16 80 98 $11,399.00 6.2.2 Utilities 2 16 1 80 1 98 $11,399.00 6.2.3 Traffic Control and Transportation Management Plan 4 8 40 52 $6,307.60 6.2.4 Water Pollution Control and LID Report 4 16 20 $3,044.40 6.2.5 Channel Improvement Plans 0 $0.00 6.2.5 Drainage Plans and Report 4 16 20 $3,044.40 6.2.6 Specifications 10 35 10 55 $8,008.00 6.2.7 Estimate 10 35 10 55 $8,008.00 6.2.8 Respond to Agency Comments 4 16 20 $3,044.40 6.2.9 100% Plans, Specifications, and Estimate 1 8 20 1 65 1 93 $11,531.10 6.2.10 Prepare RE Pending File 2 2 8 12 $1,560.60 6.3 Utility Relocation 6.3.1 Potholing 2 2 $279.20 6.3.2 Conflict Identification and Owner Notification 8 8 $1,116.80 6.3.3 Relocation Design Coordination 8 4 12 $1,554.80 6.3.4 Utility Agreements and Notices to Owner 2 2 $381.90 Page 6 of 44 EXHIBIT A -2 WKE, Inc. PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 7 of 44 Break Even Multiplier 126.97% Profit 10% Escalation 3.20% TASK DESCRIPTION Principal in Charge Project Manager Senior Project Engineer III Senior Project Engineer II Project Engineer Engineer/ Designer Technician /Drafter Clerical OVERALL PROJECT 110.70 74.11 95.49 78.67 54.18 42.50 45.44 43.00 $285.23 $190.95 $246.04 $202.70 $139.60 $109.50 $117.08 $110.79 TOTAL HRS TOTAL BUDGET 6.4 Bid Support 6.4.1 Prepare Bid Documents 2 10 24 36 $5,759.30 6.4.2 Attend Pre -Bid Meeting 4 4 $763.80 6.4.3 Respond to RFI 2 2 8 12 $1,904.10 6.5 Services During Construction 6.5.1 Attend Monthly Meetings 12 12 $2,291.40 6.5.2 Review Technical Submittals 4 10 20 34 $5,582.80 6.5.3 Respond to RFI 10 10 20 40 $7,161.90 6.5.4 As -Built Plans 1 1 2 4 8 16 $2,276.79 6.6 lEnvironmental Support During Construction 6.6.1 On -Site Pre - Construction Meeting 0 $0.00 6.6.2 Preconstruction Surveys birds, bats 0 $0.00 6.6.3 Construction Monitoring 0 $0.00 ME 0 2 1 2 2 0 0 7 1,312.54 7.1 Environmental Clearance & Permitting 2 1 2 1 4 $787.30 7.2 Field Borings 0 $0.00 7.3 1 Lab Work 1 0 $0.00 7.4 JB,idge Foundation Report 1 2 3 $525.24 TASK 8- HYDROLOGIC /HYDRAULIC ASSESS 0 2 1 0 4 0 0 7 $1,186.34 8.1 Hydrology Hydraulic Analyses & Modeling 2 2 $279.20 8.2 Scour Reporting and Recommendation 1 2 3 $525.24 8.3 Regulatory Coordination 0 1 $0.00 8.3a Prepare CLOMR 1 1 $190.95 8.3b Prepare LOMR 1 1 $190.95 9.1 Topographic Surveys and Mapping 2 2 $279.20 9.2 Corner Record / Record of Survey 0 $0.00 9.3 Pothole Ground Survey 2 2 $279.20 Page 7 of 44 EXHIBIT A -2 WKE, Inc. PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 8 of 44 Break Even Multiplier 126.97% Profit 10% Escalation 3.20% TASK DESCRIPTION Principal in Charge Project Manager Senior Project Engineer III Senior Project Engineer II Project Engineer Engineer/ Designer Technician /Drafter Clerical OVERALL PROJECT 110.70 74.11 95.49 78.67 54.18 42.50 45.44 43.00 $285.23 $190.95 $246.04 $202.70 $139.60 $109.50 $117.08 $110.79 TOTAL HRS TOTAL BUDG SK 10 - TECHNICAL STUDIES 0 22 0 6 4 0 0 0 32 $5,97 10.1 Complete Preliminary Environmental Stud 0 $0.00 10.A Noise Memorandum (Type III 1 1 $190.95 10.13 Air Quality and GHG Analyses Construction Only) 1 1 $190.95 10.0 Hazardous Materials - Initial Site Assessment Draft and Final 1 1 $190.95 10.D.1 Location Hydraulic Study 1 1 $190.95 10.D.2 Summary Flood lain Encroachment Report 1 1 $190.95 10.D.3 Water Quality Assessment 1 4 5 $749.35 10.E Biological Resources 10.6.1 Site Reconnaissance Surveys 1 1 $190.95 10.6.2 Natural Environment Stud Draft and Final 2 2 $381.90 10.6.2 Focused Bird Surveys 1 1 $190.95 10.6.2 MSHCP Consistency Report 4 4 $763.80 10.6.3 Determination of Biologically Equivalent or Superior Preservation Re ort 4 1 1 4 $763.80 10.6.4 Regional Conservation Authority - Joint Project Review 2 2 $381.90 10.6.5 Jurisdictional Delineation 2 2 $381.90 101 Cultural Resources 10.7.1 Area of Potential Effect Map 2 2 $405.40 10.7.2 Archaeological Survey Report 2 2 $405.40 10.7.3 Historical Property Survey Report 2 2 $405.40 10.7.4 Native American Consultation 0 $0.00 10.7.51 Paleontological Resources Assessment Memorandum 0 $0.00 TASK 11 - NEPA DOCUMENT CE 0 8 8 0 0 0 0 16 $3,495.92 11.1 Draft Categorical Exclusion and Environmental Commitments Record 4 8 12 $2,732.12 11.2 Public Review without Public Meeting 2 2 $381.90 11.3 Final Categorical Exclusion and Environmental Commitments Record 2 2 $381.90 Page 8 of 44 EXHIBIT A -2 WKE, Inc. PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 9 of 44 Break Even Multiplier 126.97% Profit 10% Escalation 3.20% TASK DESCRIPTION Principal in Charge Project Manager Senior Project Engineer III Senior Project Engineer II Project Engineer Engineer/ Designer Technician /Drafter Clerical OVERALL PROJECT 110.70 74.11 95.49 78.67 54.18 42.50 45.44 43.00 $285.23 $190.95 $246.04 $202.70 $139.60 $109.50 $117.08 $110.79 TOTAL HRS TOTAL BUDG SK 11A - NEPA DOCUMENT EA 0 12 0 0 0 0 0 0 12 $2 29 11A.1 Screencheck Draft EA 4 4 $763.80 11A.2 Draft EA 2 2 $381.90 11A.3 Obtain Approval to Circulate 0 $0.00 11A.4 Circulate Draft EA 0 $0.00 11A.5 Response to Comments 4 4 $763.80 11A.6 IFinal EA/FONSI 2 2 $381.90 11A.7 NOD and NOA 0 $0.00 12.1 Screencheck Initial Study 8 8 8 $1,527.60 12.2 Draft Initial Study and Notice of Intent 4 8 12 $2,732.12 12.3 Public Review without Public Meeting 2 2 $381.90 12.4 Screencheck Final Initial Study with Mitigated Negative Declaration 2 2 $381.90 12.5 Notice of Completion and Distribution of Documents 2 2 $381.90 12.6 Final IS /MND and Mitigation Monitoring and Reporting Program 2 2 $381.90 12.7 Notice of Determination (City) 0 $0.00 13.1 Pre-Application Meeting 2 2 2 8 12 $2,573.96 13.2 USACE Section 404 Permit Application 4 16 20 $4,007.00 13.3 Santa Ana RWQCB Section 401 Water Quality Certification 4 16 20 $4,007.00 13.4 1CDFW 1602 Permit Application 4 16 20 $4,007.00 Page 9 of 44 EXHIBIT A -2 WKE, Inc. PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 10 of 44 Break Even Multiplier 126.97% Profit 10% Escalation 3.20% TASK DESCRIPTION Principal in Charge Project Manager Senior Project Engineer III Senior Project Engineer II Project Engineer Engineer/ Designer Technician /Drafter Clerical OVERALL PROJECT 110.70 74.11 95.49 78.67 54.18 42.50 45.44 43.00 $285.23 $190.95 $246.04 $202.70 $139.60 $109.50 $117.08 $110.79 TOTAL HRS TOTAL BUDGET OTHER Q1RECT COST $20 Travel $3,083.80 Reproductions $384.00 Mail $825.00 Drilling Rig Rental Drums, Soil Disposal, Lift-gate Truck Drill Rig Rental and Supplies AC Overlay Removal $12,600.00 Traffic Control DBE $3,450.00 Records Search Title Reports Permit Fees Filing Fees Drone GPS Potholing Exhibit 10 -H Rounding Adjustment $3.15 TOTAL 56 303 157 348 $483,210 Page 10 of 44 EXHIBIT A -3 LSA PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 11 of 44 Principal Environments I Senior Environment I Plannei Assistant Environments I Planner Principal Biology Associate Biology Associate Biology Associate Biology Senior Biology Assistant Biology ural jResources ior a a r Associate Noise Senior Air Quality S clalist Principal Air /Noise Associate GI: Principal Cultural Administratly a Asslstanl Document Mana emenl OVERALL PROJECT DESCRIPTION 120.46 45.49 25.50 57.50 54.12 45.94 42.38 38.31 28.10 66 50.42 56.04 68.63 53.29 65.09 23.60 39.50 AGEMENT dill" 111k 4.9 2 2.91 36 $85.71 0 $193.28 4 $181.92 24 $154.42 0 $142.45 0 $128.77 0 $94.45 0 113.14 0 $169.48 0 $188.37 0 $230.69 0 $179.13 0 $218.79 0 $79.33 0 $132.77 0 TOT UDGET ,033.16 1.1 12 1.3 14 1.5 Administration and Management Project Team MeeBngs 8 32 4 24 _ _ _ _ 40 $6 132.40 140 $25289.12 4 $611.64 0 $0.00 0 $0.00 12 100 Schedule Establish OC Program Seismic Strategy /Rehab Meetings 4 TASK 2- PROJECT COORDINATION MEETINGS 4 0 8 24 0 0 0 0 0 0 0 0 0 0 0 0 64 $12,821.44 2.1 HBP Request For Authorization 0 $0.00 22 NEPA /CEOACoordination 2.3 Monthly City Meetings 8 24 8 24 64 $12,82144 0 $0.00 TASK 3- REVIEW OF EXISTING CONDITIONS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 3.1 As -Built Plan and Preliminer Report Review 0 $0.00 3.2 Feltl Visit antl Site Assessment 0 $0.00 TIONS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.1 Traffic Control 0 $0.00 4.2 Obtain Cit Encroachment Permit 0 $0.00 4.3 Asphalt Overla Removal antl Inspection 0 $0.00 4A Deck Condition Report 0 $0.00 TASK 5- PRELIMINARY ENGINEERING - SEISMIC RETRO 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 5.1 Dia nostic Anal s O 5.2 Utilil Coordination - RIW Data Sheet 0 5.3 Draff Seismic Retrofit Si rate Report 0 5.4 Attend Public Outreach Meetin 0 5.5 Final Seismic Retrofit Strategy Report antl 30% Plans 0 ;$%,�;2634 TASK 6.1 6 -FINAL PS &E Structures 2 24 60 24 0 6.1.1 60% Unchecked Details 0 6.1.2 S eciewtions z za 24 50 $6,536.70 6.1.3 Estimate 0 $0.00 6.1.4 Inde "dent Check 0 $0.00 6.1.5 Res nd to A en Comments 0 $0.00 6.1.6 100% Plans, Specifications, and Estimate 0 $0.00 6.1.7 Pre are RE Pendin File 0 $0.00 6.2 6.2.1 Roadwa Roadway 0 0 $0.00 $0.00 6.2.2 Utilities 0 $0.00 6.2.3 Traffic Control and Tmns ortafion Management Plan 0 $0.00 6.2.4 Water Pollution Control and LID Report 0 $0.00 6.2.5 Channel Im ro ment Plans O $0.00 6.2.5 Drainage Plans and Report 0 $0.00 6.2.6 S eciewtions 0 $0.00 6.2.7 Estimate 0 $0.00 6.2.8 Res nd to A en Comments 0 $0.00 6.2.9 100% Plans, S eciewtions, and EsSmale 0 $0.00 6.2.10 Pre are RE Pendin File 0 $0.00 6.3 6.3 Utility Relocation $0.00 6.3.1 Pth.ling 0 $0.00 6.3.2 Conflict Identification and Owner Notification 0 $0.00 6.3.3 Relocation Design Coordination 0 $0.00 6.3.4 Ulili Are menu and Notices to Owner 0 $0.00 6.4 Bid Su ort 0 $0.00 6.4.7 0 $0.00 6.4.2 ==.I 0 $0.00 6.4.3 Res and to RFI 0 $0.00 6.5 Services Durin Conswction 0 $0.00 6.5.1 Attend Monthly Meetings 0 $0.00 6.5.2 Review Technical Submittals 0 $0.00 6.5.3 Res nd to RFI 0 $0.00 6.5.4 As -Built Plans 0 $0.00 6.6 Environmental Support Durin Constiuction 0 $0.00 6.6.1 On -Site Pre - Construction Meetin 12 12 24 $3,728.28 6.6.2 Preconstmction Surveys (birds, bats) 4 1 12 32 8 2 8 66 1 $10,551.46 Page 11 of 44 EXHIBIT A -3 LSA PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 13 of 44 Drilling Rig Rental Drums, Soil Disposal, Lift-gate Truck Drill Rig Rental and Supplies GPS Ptholing Exhibit 10-H Rounding Adjustment Page 13 of 44 EXHIBIT A -4 WEST PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 189.36% 1 Profit 10% 1 Escalation 2.97% TASK DESCRIPTION Vice President Project Manager Senior Engineer Staff Engineer GIS Technician OVERALL PROJECT 81.92 70.38 51.99 39.14 23.95 $268.49 $230.67 $170.40 $128.28 $78.50 $0.00 TOTAL HRS TOTAL BUDGET TASK 1 - PROJECT MANAGEMENT 2 16 0 0 22 $4,740.82 1.1 Administration and Management 0 $0.00 1.2 Project Team Meetings 2 16 4 22 $4,740.82 1.3 Schedule 0 $0.00 1.4 Establish QC Program 0 $0.00 1.5 2.1 Seismic Strategy /Rehab Meetings GS HBP Re uest For Authorization 0 0 0 0 0 0 $0.00 Fn $0.00 2.2 NEPA/CEQA Coordination 0 $0.00 2.3 Monthly City Meetings 0 $0.00 SK 3- REVIEW OF EXISTING CONDITIONS 3.1 As -Built Plan and Preliminary Report Review 0 0 0 0 0 0 0 0 $0.00 $0.00 3.2 Field Visit and Site Assessment 1 0 $0.00 S LUATIONS 4.1 Traffic Control 0 0 0 0 0 $0.00 $0.00 4.2 Obtain City Encroachment Permit 0 1 $0.00 4.3 Asphalt Overlay Removal and Inspection 0 $0.00 4.4 Deck Condition Report 0 $0.00 TASK 5- PRELIMINARY SMIC RETROFI 0 0 0 0 0 0 0 $0.00 5.1 Di a nostic Anal sis 0 $0.00 5.2 Utility Coordination - R/W Data Sheet 0 $0.00 5.3 Draft Seismic Retrofit Strategy Report 0 $0.00 5.4 Attend Public Outreach Meeting 0 $0.00 5.5 Final Seismic Retrofit Strategy Report and 30% Plans 0 $0.00 TASK 6- FINAL PS &E 0 0 0 0 0 0 0 $0.00 6.1 Structures 0 $0.00 6.1.1 60% Unchecked Details 0 $0.00 6.1.2 Specifications 0 $0.00 6.1.3 Estimate 0 $0.00 6.1.4 Independent Check 0 $0.00 Page 14 of 44 EXHIBIT A -4 WEST PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 189.36% 1 Profit 10% 1 Escalation 2.97% Page 15 of 44 AL DESCRIPTION Vice President Project Manager Senior Engineer Staff Engineer GIS Technician OVERALL PROJECT 81.92 70.38 51.99 39.14 23.95 $268.49 $230.67 $170.40 $128.28 $78.50 $0.00 TOTAL HRS TOTAL BUDGET 6.1.5 Respond to Agency Comments 0 $0.00 6.1.6 100% Plans, Specifications, and Estimate 0 $0.00 6.1.7 Prepare RE Pending File 0 $0.00 6.2 Roadway 0 $0.00 6.2.1 Roadway 0 $0.00 6.2.2 Utilities 0 $0.00 6.2.3 Traffic Control and Transportation Management Plan 0 $0.00 6.2.4 1 Water Pollution Control and LID Report 0 $0.00 6.2.5 Channel Improvement Plans 0 $0.00 6.2.5 Drainage Plans and Report 1 0 $0.00 6.2.6 Specifications 0 $0.00 6.2.7 Estimate 0 $0.00 6.2.8 Respond to Agency Comments 0 $0.00 6.2.9 1 100% Plans, Specifications, and Estimate 0 $0.00 6.2.101 Prepare RE Pending File 0 $0.00 6.3 Utility Relocation 1 0 $0.00 6.3.1 Potholing 0 $0.00 6.3.2 Conflict Identification and Owner Notification 0 $0.00 6.3.3 Relocation Design Coordination 0 $0.00 6.3.4 Utility Agreements and Notices to Owner 0 $0.00 6.4 Bid Support 0 $0.00 6.4.1 1 Prepare Bid Documents 1 0 $0.00 6.4.2 Attend Pre -Bid Meeting 0 $0.00 6.4.3 Respond to RFI 0 $0.00 6.5 Services During Construction 0 $0.00 6.5.1 Attend Monthly Meetings 0 $0.00 6.5.2 Review Technical Submittals 0 $0.00 6.5.3 1 Respond to RFI 0 $0.00 6.5.4 1 As -Built Plans 0 $0.00 6.6 lEnvironmental Support During Construction 0 $0.00 Page 15 of 44 EXHIBIT A -4 WEST PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 189.36% 1 Profit 10% 1 Escalation 2.97 Page 16 of 44 DESCRIPTION Vice President Project Manager Senior Engineer Staff Engineer GIS Technician OVERALL PROJECT 81.92 70.38 51.99 39.14 23.95 $268.49 $230.67 $170.40 $128.28 $78.50 $0.00 TOTAL HRS TOTAL BUDGET 6.6.1 On -Site Pre- Construction Meeting 0 $0.00 6.6.2 Preconstruction Surveys (birds, bats) 0 $0.00 6.6.3 Construction Monitoring 0 $0.00 SK 7- GEOTECHNICAL EVALUATION 7.1 Environmental Clearance & Permitting 0 0 0 16 0 0 0 0 0 $0.00 $0.00 7.2 Field Borings 0 $0.00 7.3 Lab Work 0 $0.00 7.4 Bridge Foundation Report 0 $0.00 SK 8 - HYDROLOGIC /HYDRAULIC AS 8.1 Hydrology/ ydraulic Analyses & Modeling 7 2 152 34 120 40 336 146 77 48 0 0 NEEL 692 270 $106,535.85 $37,692.64 8.2 Scour Reporting and Recommendation 3 30 80 16 1 130 $23,488.55 8.3 Regulatory Coordination 0 $0.00 8.3a Prepare CLOMR 1 64 102 20 187 $29,685.93 8.3b Prepare LOMR 1 24 72 1 8 105 1 $15,668.73 9- SURVEYING 0 0 0 0 0 0 0 $0.00 9.1 To o ra hic Surveys and Mapping 0 $0.00 9.2 Corner Record / Record of Survey 0 $0.00 9.3 Pothole Ground Survey 0 $0.00 TASK 10 - TECHNICAL 0 20 8 36 10 0 0 74 $11,379.68 10.1 Complete Preliminary Environmental Stud 0 $0.00 10.A Noise Memorandum Type III 0 $0.00 10.B Air Quality and GHG Analyses Construction Only) 0 $0.00 10.0 Hazardous Materials - Initial Site Assessment Draft and Final 0 $0.00 10.D.1 Location Hydraulic Study 1 8 1 4 16 2 30 $4,736.44 10.D.2 I Summary Floodplain Encroachment Report 12 4 20 8 44 $6,643.24 10.D.3 Water Quality Assessment 0 $0.00 10.E Biological Resources 10.6.1 Site Reconnaissance Surveys I 1 0 1 $0.00 10.6.2 Natural Environment Stud Draft and Final 0 $0.00 10.6.2 Focused Bird Surveys 0 $0.00 Page 16 of 44 EXHIBIT A -4 WEST PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 17 of 44 Break Even Multi tier 189.36% Profit 10% Escalation 2.97 6it DESCRIPTION Vice President Project Manager Senior Engineer Staff Engineer GIS Technician OVERALL PROJECT 1 81.92 70.38 51.99 39.14 23.95 $268.49 $230.67 $170.40 $128.28 $78.50 $0.00 TOTAL HRS TOTAL BUDGET 10.6.2 MSHCP Consistency Report 0 $0.00 10.6.3 Determination of Biologically Equivalent or Superior Preservation Re ort 0 $0.00 10.6.4 Regional Conservation Authority - Joint Project Review 0 $0.00 10.6.5 Jurisdictional Delineation 0 $0.00 105 Cultural Resources 10.7.1 Area of Potential Effect Map 0 $0.00 10.7.2 Archaeological Survey Report 0 $0.00 10.7.31 Historical Property Survey Report 0 $0.00 10.7.4 Native American Consultation 0 $0.00 10.7.5 Paleontological Resources Assessment Memorandum 0 $0.00 11 -NEPA DOCUMENT (CE 0 0 0 0 0 0 $0.00 11.1 Draft Cate orical Exclusion and Environmental Commitments Record 0 $0.00 11.2 Public Review without Public Meeting 0 $0.00 11.3 Final Categorical Exclusion and Environmental Commitments Record 0 $0.00 SK 11A - NEPA DOCUM 11 A.1 Screencheck Draft EA 0 0 0 0 0 0 0 0 0 $0.00 11A.2 Draft EA 0 $0.00 11A.3 Obtain Approval to Circulate 0 $0.00 11A.4 Circulate Draft EA 0 $0.00 11A.5 Response to Comments 0 $0.00 11A.6 Final EA/FONSI 0 $0.00 11 A.7 I NOD and NOA 0 $0.00 SK 12 - CEQA DOCUMEN 12.1 Screencheck Initial Study 0 0 0 0 0 0 0 $0.00 $0.00 12.2 Draft Initial Study and Notice of Intent 0 $0.00 12.3 Public Review without Public Meeting 0 $0.00 12.4 Screencheck Final Initial Study with Mitigated Negative Declaration 0 $0.00 12.5 Notice of Completion and Distribution of Documents 0 $0.00 12.6 Final IS /MND and Mitigation Monitoring and Reporting Program 0 $0.00 12.7 1 Notice of Determination (City) 0 $0.00 Page 17 of 44 EXHIBIT A -4 WEST PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 189.36% 1 Profit 10% 1 Escalation 2.97 TASK DESCRIPTION Vice President Project Manager Senior Engineer Staff Engineer GIS Technician OVERALL PROJECT 81.92 70.38 51.99 39.14 23.95 $268.49 $230.67 $170.40 $128.28 $78.50 $0.00 TOTAL FIRS TOTAL BUDGE TASK 13 - REGULATORY P 0,1L 0 0 0 $0. 13.1 Pre -Application Meeting 0 $0.00 13.2 USACE Section 404 Permit Application 0 $0.00 13.3 Santa Ana RWQCB Section 401 Water Quality Certification 0 $0.00 13.4 CDFW 1602 Permit Application OTHER Travel 0 $0.00 $243.00 $69.00 Reproductions $66.00 Mail $108.00 Drilling Rig Rental Drums, Soil Disposal, Lift-gate Truck Drill Rig Rental and Supplies AC Overlay Removal Traffic Control Records Search Title Reports Permit Fees IFiling Fees Drone GPS Potholing Exhibit 10 -H Rounding Adjustment $3.00 TOTAL 9 188 128 376 87 0 0 788 $122,902 Page 18 of 44 EXHIBIT A -5 EMI PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 153.95% 1 Profit 10% 1 Escalation 3.0% TASK DESCRIPTION Principal Project Manager Project Geologist Senior Technician Staff Engineer OVERALL PROJECT 89.00 55.00 48.00 41.50 36.00 0.00 0.00 $256.08 $158.25 $138.11 $119.41 $103.58 $0.00 $0.00 TOTAL HRS TOTAL BUDGET TASK 1 - PROJECT MANAGEMENT A 16 6 0 0 20 1.1 Administration and Management 0 $0.00 1.2 Project Team Meetings 2 12 14 $2,411.16 1.3 Schedule 0 $0.00 1.4 Establish QC Program 0 $0.00 1.5 2.1 Seismic Strategy /Rehab Meetings GS HBP Re uest For Authorization 2 4 0 0 0 6 0 $1,145.16 $0.00 2.2 NEPA/CEQA Coordination 0 $0.00 2.3 Monthly City Meetings 0 $0.00 SK 3- REVIEW OF EXISTING CONDITIONS 3.1 As -Built Plan and Preliminary Report Review 2 2 8 4 4 0 0 0 6 $2,330.60 $1,145.16 3.2 Field Visit and Site Assessment 4 4 8 $1,185.44 S NONE LUATIONS 4.1 Traffic Control 0 0 0 0 0 0.00 $0.00 4.2 Obtain City Encroachment Permit 0 $0.00 4.3 Asphalt Overlay Removal and Inspection 0 $0.00 4.4 Deck Condition Report 0 $0.00 TASK 5 - PRELIMINARY SMIC RETROFI 5.1 Di a nostic Anal sis 16 32 0 0 0 0 0 48 0 $9,161.28 $0.00 5.2 Utility Coordination - R/W Data Sheet 0 $0.00 5.3 Draft Seismic Retrofit Strategy Report 8 16 24 $4,580.64 5.4 Attend Public Outreach Meeting 0 $0.00 5.5 Final Seismic Retrofit Strategy Report and 30% Plans 8 16 24 $4,580.64 TASK 6- FINAL PS &E 0 0 0 0 0 0 0 0 $0.00 6.1 Structures 0 $0.00 6.1.1 60% Unchecked Details 0 $0.00 6.1.2 Specifications 1 0 $0.00 6.1.3 Estimate 0 $0.00 6.1.4 Independent Check 0 $0.00 Page 19 of 44 EXHIBIT A -5 EMI PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 153.95% 1 Profit 10% 1 Escalation 3.0% Page 20 of 44 AL L DESCRIPTION Principal Project Manager Project Geologist Senior Technician Staff Engineer OVERALL PROJECT 89.00 55.00 48.00 41.50 36.00 0.00 0.00 $256.08 $158.25 $138.11 $119. $103.58 $0.00 $0.00 TOTAL HRS TOTAL BUDGET 6.1.5 Respond to Agency Comments 0 $0.00 6.1.6 100% Plans, Specifications, and Estimate 0 $0.00 6.1.7 Prepare RE Pending File 0 $0.00 6.2 Roadway 0 $0.00 6.2.1 Roadway 0 $0.00 6.2.2 Utilities 0 $0.00 6.2.3 Traffic Control and Transportation Management Plan 0 $0.00 6.2.4 Water Pollution Control and LID Report 0 $0.00 6.2.5 Channel Improvement Plans 0 $0.00 6.2.5 Drainage Plans and Report 0 $0.00 6.2.6 Specifications 0 $0.00 6.2.7 Estimate 0 $0.00 6.2.8 Respond to Agency Comments 0 $0.00 6.2.9 100% Plans, Specifications, and Estimate 0 $0.00 6.2.10 Prepare RE Pending File 0 $0.00 6.3 Utility Relocation 0 $0.00 6.3.1 Potholing 0 $0.00 6.3.2 1 Conflict Identification and Owner Notification 0 $0.00 6.3.3 Relocation Design Coordination 0 $0.00 6.3.4 Utility Agreements and Notices to Owner 1 0 $0.00 6.4 Bid Support 0 $0.00 6.4.1 Prepare Bid Documents 0 $0.00 6.4.2 Attend Pre -Bid Meeting 0 $0.00 6.4.3 1 Respond to RFI 0 $0.00 6.5 iServices During Construction 0 $0.00 6.5.1 Attend Monthly Meetings 0 $0.00 6.5.2 Review Technical Submittals 0 $0.00 6.5.3 Respond to RFI 0 $0.00 6.5.4 As -Built Plans 0 $0.00 6.6 Environmental Support During Construction 0 $0.00 Page 20 of 44 EXHIBIT A -5 EMI PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 153.95% 1 Profit 10% 1 Escalation 3.0 Page 21 of 44 DESCRIPTION Principal Project Manager Project Geologist Senior Technician Staff En ineer OVERALL PROJECT 89.00 55.00 48.00 41.50 36.00 0.00 0.00 $256.08 $158.25 $138.11 $119.41 $103.58 $0.00 $0.00 TOTAL HRS TOTAL BUDGET 6.6.1 On -Site Pre- Construction Meeting 0 $0.00 6.6.2 Preconstruction Surveys (birds, bats) 0 $0.00 6.6.3 Construction Monitoring 0 $0.00 SK 7 - GEOTECHNICAL EVALUATION 7.1 Environmental Clearance & Permitting 37 1 IIIEF1 44 2 72 4 36 aL 20 0 7 11111111 $48,577.24 $1,125.02 7.2 Field Borings 6 60 66 $9,236.10 7.3 Lab Work 1 4 36 41 $5,187.84 7.4 Bridge Foundation Report 35 132 8 20 195 $33,028.28 SK 8- HYDROLOGIC /HYDRAULI 8.1 Hydrology/ ydraulic Analyses & Modeling 0 0 0 0 0 0 0 $0.00 $0.00 8.2 Scour Reporting and Recommendation 0 $0.00 8.3 Regulatory Coordination 0 $0.00 8.3a Prepare CLOMR 0 $0.00 8.3b Prepare LOMR 0 $0.00 9- SURVEYING 1 0 0 0 0 0 0 0 0 9.1 To o ra hic Surveys and Mapping 0 $0.00 9.2 Corner Record / Record of Survey 0 $0.00 9.3 Pothole Ground Survey 0 $0.00 TASK 10 - TECHNICAL 0 0 0 0 0 0 0 0 $0.00 10.1 Complete Preliminary Environmental Stud 0 $0.00 10.A Noise Memorandum Type III 0 $0.00 10.6 Air Quality and GHG Analyses Construction Only) 0 $0.00 10.0 Hazardous Materials - Initial Site Assessment Draft and Final 0 $0.00 10.D.1 Location Hydraulic Stud 0 $0.00 10.D.2 I Summary Floodplain Encroachment Report 0 $0.00 10.D.3 Water Quality Assessment 0 $0.00 10.E Biological Resources 10.6.1 Site Reconnaissance Surveys 0 $0.00 10.6.2 Natural Environment Stud Draft and Final 0 $0.00 10.6.2 Focused Bird Surveys 0 $0.00 Page 21 of 44 EXHIBIT A -5 EMI PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multi tier 153.95% Profit 10% Escalation 3.0 rincipal DESCRIPTION 9.00 IL ME 6.08 Project Manager Project Geologist Senior Technician Staff Engineer OVERALL PROJECT 55.00 48.00 41.50 36.00 0.00 $158.25 $138.11 $119. $103.58 $0.00 $0.00 TOTAL HRS TOTAL BUDGET 10.6.2 MSHCP Consistency Report 1 0 $0.00 10.6.3 Determination of Biologically Equivalent or Superior Preservation Report 0 $0.00 10.6.4 Regional Conservation Authority - Joint Project Review 0 $0.00 10.6.5 Jurisdictional Delineation 0 $0.00 105 Cultural Resources 10.7.11 Area of Potential Effect Map 0 $0.00 10.7.21 Archaeological Survey Report 0 $0.00 10.7.3 Historical Property Survey Report 0 $0.00 10.7.4 Native American Consultation 0 $0.00 10.7.5 Paleontological Resources Assessment Memorandum 0 1 $0.00 11 - NEPA DOCUMENT (CE) 0 1 0 9 0 0 0 1 r $0.00 11.1 Draft Categorical Exclusion and Environmental Commitments Record 0 $0.00 11.2 Public Review without Public Meeting 1 0 $0.00 11.3 Final Categorical Exclusion and Environmental Commitments Record 0 $0.00 SK 11A - NEPA DOCUNlk 11A.1 iScreencheck Draft EA 0 0 0 0 0 01 0 $0.00 11A.2 Draft EA 0 $0.00 11A.3 Obtain Approval to Circulate 1 0 $0.00 11A.4 Circulate Draft EA 0 $0.00 11A.5 Response to Comments 0 $0.00 11A.6 Final EA/FONSI 0 $0.00 11 A.7 I NOD and NOA 0 $0.00 SK 12 - CEQA DOCUMEN 12.1 iScreencheck Initial Study 0 0 0 0 0 0 0 $0.00 $0.00 12.2 Draft Initial Study and Notice of Intent 0 $0.00 12.3 Public Review without Public Meeting 0 $0.00 12.4 Screencheck Final Initial Study with Mitigated Negative Declaration 0 $0.00 12.5 Notice of Completion and Distribution of Documents 0 $0.00 12.6 Final IS /MND and Mitigation Monitoring and Reporting Program 0 $0.00 12.7 Notice of Determination (City) 0 $0.00 Page 22 of 44 EXHIBIT A -5 EMI PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 153.95% 1 Profit 10% 1 Escalation 3.0 TASK DESCRIPTION Principal Project Manager Project Geologist Senior Technician Staff Engineer OVERALL PROJECT 89.00 55.00 48.00 41.50 36.00 0.00 0.00 $256.08 $158.25 $138.11 $119.41 $103.58 $0.00 $0.00 TOTAL FIRS TOTAL BUDGE TASK 13 - REGULATORY P 0 0 0 0 L $0. 13.1 Pre -Application Meeting 0 $0.00 13.2 USACE Section 404 Permit Application 0 $0.00 13.3 Santa Ana RWQCB Section 401 Water Quality Certification 0 $0.00 13.4 CDFW 1602 Permit Application OTHER Travel 0 $0.00 $263.99 Reproductions Mail $50.00 Drilling Rig Rental Drums, Soil Disposal, Lift-gate Truck $3,075.00 Drill Rig Rental and Supplies $24,000.00 AC Overlay Removal Traffic Control $9,870.00 Records Search Title Reports Riverside County Flood Control District Permit Fee lFiling Fees Drone GPS Potholing Exhibit 10 -H Rounding Adjustment $1.00 TOTAL 59 200 76 36 20 0 0 391 $100,885 Page 23 of 44 EXHIBIT A -6 Guida PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 193.96% 1 Profit 10% 1 Escalation 1 0.8% Page 24 of 44 FSK1 DESCRIP TION Survey Principal Survey Manager Project Surveyor Survey Analyst Survey Technician Licensed Party Chief Party Chief Chainman Apprentice G Clerical /Admi n OVERALL PROJECT 85.00 79.62 60.00 41.82 36.72 54.81 52.06 48.68 38.94 30.00 $277.18 $259.64 $195.66 $136.37 $119.74 $178.74 $169.77 $158.75 $126.98 $97.83 TOTAL HRS TOTAL BUDGE OJECT MANAGEMENT 1.1 Administration and Management 0 0 0 0 0 0 $1,0 $0.00 1.2 Project Team Meetings 4 4 $1,038.56 1.3 Schedule 0 $0.00 1.4 Establish QC Program 0 $0.00 1.5 Seismic Strategy /Rehab Meetings 0 $0.00 TASK ROJE COORDINATION MEETINGS 0 0 1 0 0 0 0 0 $0.00 2.1 HBP Request For Authorization 0 $0.00 2.2 NEPA/CEQA Coordination 0 $0.00 2.3 Monthly City Meetings 0 $0.00 TAS 0 0 0 0 0 0 $0.00 3.1 As -Built Plan and Preliminary Report Review 0 $0.00 3.2 Field Visit and Site Assessment 0 $0.00 4.1 Traffic Control 0 0 $0.00 4.2 Obtain City Encroachment Permit 0 $0.00 4.3 Asphalt Overlay Removal and Inspection 0 $0.00 4.4 Deck Condition Report SK 5 - PRELIMINARY ENGI 5.1 IDiagnostic Analysis 0 0 0 $0.00 $0.00 5.2 Utility Coordination - R/W Data Sheet 0 $0.00 5.3 Draft Seismic Retrofit Strategy Report 0 $0.00 5.4 Attend Public Outreach Meeting 0 $0.00 5.5 Final Seismic Retrofit Strategy Report and 30% Plans 0 $0.00 ASK 6- FINAL PS &E 0 0 0 0 0 0 0 0 6.1 iStructures 0 $0.00 6.1.1 60% Unchecked Details 0 $0.00 6.1.2 Specifications 0 $0.00 6.1.3 Estimate 0 $0.00 6.1.4 Independent Check 0 $0.00 6.1.5 Respond to Agency Comments 0 $0.00 6.1.6 100% Plans, Specifications, and Estimate 0 $0.00 6.1.7 Pre are RE Pending File 0 $0.00 6.2 Roadway 0 $0.00 6.2.1 Road ay 0 $0.00 6.2.2 Utilities 0 $0.00 6.2.3 Traffic Control and Transportation Management Plan 0 $0.00 Page 24 of 44 EXHIBIT A -6 Guida PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 193.96% 1 Profit 10% 1 Escalation 1 0.8% TASK DESCRIPTION Survey Principal Survey Manager Project Surveyor Survey Analyst Survey Technician Licensed Party Chief Party Chief Chainman Apprentice G Clerical /Admi n OVERALL PROJECT 85.00 79.62 60.00 41.82 36.72 54.81 52.06 48.68 38.94 30.00 $277.18 $259.641 $195.66 $136.37 $119.74 $178.74 $169.77 $158.75 $126.98 $97.83 TOT A&IiRS TOTAL BUDGET 6.2.4 Water Pollution Control and LID Report 0 $0.00 6.2.5 Channel Improvement Plans 0 $0.00 6.2.5 Drainage Plans and Report 0 $0.00 6.2.6 S ecifcations 0 $0.00 6.2.7 Estimate 0 $0.00 6.2.8 Respond to Agency Comments 0 $0.00 6.2.9 100% Plans, Specifications, and Estimate 0 $0.00 6.2.10 Prep are RE Pending File 0 $0.00 6.3 Utility Relocation 0 $0.00 6.3.1 Potholing 0 $0.00 6.3.2 1 Conflict Identification and Owner Notification 0 $0.00 6.3.3 Relocation Design Coordination 0 $0.00 6.3.4 Utility Agreements and Notices to Owner 0 $0.00 6.4 Bid Support 0 $0.00 6.4.1 Prepare Bid Documents 0 $0.00 6.4.2 Attend Pre -Bid Meeting 0 $0.00 6.4.3 Respond to RFI 0 $0.00 6.5 Services During Construction 0 $0.00 6.5.1 1 Attend Monthly Meetings I I 1 0 $0.00 6.5.2 Review Technical Submittals 0 $0.00 6.5.3 Respond to RFI 0 $0.00 6.5.4 As -Built Plans 0 $0.00 6.6 Environmental Support During Construction 0 $0.00 6.6.1 On -Site Pre - Construction Meeting 0 $0.00 6.6.2 Preconstruction Surveys birds, bats 0 $0.00 6.6.3 Construction Monitoring SK 7 - GEOTECHNIC 7.1 Environmental Clearance & Permitting 0 0 0 $0.00 $0.00 $0.00 7.2 Field Borings 0 $0.00 7.3 Lab Work 0 $0.00 7.4 8.1 Bridge Foundation Report U. HYDROLOGIC /HY Hydrology/Hydraulic Anal ses & Modeling 0 0 0 $0.00 $0.00 $0.00 8.2 scour Reporting and Recommendation 0 $0.00 8.3 Re ulato Coordination 0 $0.00 8.3a Pre are CLOMR 0 $0.00 8.3b Prepare LOMR 0 $0.00 Page 25 of 44 EXHIBIT A -6 Guida PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 26 of 44 Break Even Multiplier 193.96% Profit 10% Escalation 0.8% K DESCRIPTION Survey Principal Survey Manager Project Surveyor Survey Analyst Survey Technician Licensed Party Chief Party Chief Chainman Apprentice G Clerical /Admi n OVERALL PROJECT 85.00 79.62 60.00 41.82 36.72 54.81 52.06 48.68 38.94 30.00 $277.18 $259.64 $195.66 $136.37 $119.74 $178.74 $169.77 $158.75 $126.98 $97.83 TOTAL HRS SK 9 - SURVEYING 0 10 46 70 0 72 0 72 8 6 284 --Eo-TIW 9.1 To o ra hic Surveys and Mapping 4 16 40 40 40 8 2 150 $24,334.83 9.2 Corner Record /Record of Survey 4 24 24 16 16 2 86 $14,602.71 9.3 Pothole Ground Survey 2 6 6 16 16 2 48 $8,106.89 TASK 10 - TECHNICAL STUDIES 0 0 0 0 0 0 $0.00 $0.00 10.1 inary Environmental Stud 10.A Noise Memorandum (Type III 0 $0.00 10.13 Air Quality and GHG Analyses Construction Only) 0 $0.00 10.0 Hazardous Materials - Initial Site Assessment Draft and Final 0 $0.00 10.D.1 Location Hydraulic Stud 0 $0.00 10.D.2 Summary Floodplain Encroachment Report 0 $0.00 10.D.3 Water Quality Assessment 0 $0.00 10.E Biolo ical Resources 10.6.1 Site Reconnaissance Surveys 0 $0.00 10.6.2 Natural Environment Stud Draft and Final 0 $0.00 10.62 Focused Bird Surveys 0 $0.00 10.6.21 MSHCP Consistency Report 0 $0.00 10.6.3 Determination of Biologically Equivalent or Superior Preservation Report 0 $0.00 10.6.4 Regional Conservation Authority - Joint Project Review 0 $0.00 10.6.51 Jurisdictional Delineation 0 $0.00 10.F Cultural Resources 10.7.1 Area of Potential Effect Map 0 $0.00 10.7.2 Archaeological Survey Report 0 $0.00 10.7.3 Historical Property Survey Report 0 $0.00 10.7.4 Native American Consultation 0 $0.00 10.7.5 Paleontological Resources Assessment Memorandum 0 1 $0.00 TASK 11 - NEPA DOCUMENT (CE) 0 0 0 0 0 $0.00 11.1 Draft Cate orical Exclusion and Environmental Commitments Record 0 $0.00 11.2 Public Review without Public Meeting 1 0 $0.00 11.3 Final Categorical Exclusion and Environmental Commitments Record 0 $0.00 TASK 11A - NEPA DOCUMENT (EA) 0 0 0 0 0 0 $0.00 11A.1 Screencheck Draft EA 0 $0.00 11A.2 Draft EA 0 $0.00 11A.3 Obtain Approval to Circulate 0 $0.00 11A.4 Circulate Draft EA 0 $0.00 11A.5 Response to Comments 0 $0.00 11A.6 Final EA/FONSI 0 $0.00 Page 26 of 44 EXHIBIT A -6 Guida PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 193.96% 1 Profit 10% 1 Escalation 1 0.8 TASK DESCRIPTION Survey Principal Survey Manager Project Surveyor Survey Analyst Survey Technician Licensed Party Chief Party Chief Chainman Apprentice G Clerical /Admi n OVERALL PROJECT 85.00 79.62 60.00 41.82 36.72 54.81 52.06 48.68 38.94 30.00 $277.18 $259.64 $195.66 $136.37 $119.741 $178.74 $169.77 $158.75 $126.98 $97.83 TOTAL HRS TOTAL BUDGET 11A.7 I NOD and NOA 0 $0.00 TASK 12 - CEQA DOCUMENT 0 0 0 0 0 0 0 0 0 $0.00 12.1 Screencheck Initial Study 0 $0.00 12.2 Draft Initial Study and Notice of Intent 0 $0.00 12.3 Public Review without Public Meeting 0 $0.00 12.4 Screencheck Final Initial Study with Mitigated Negative Declaration 0 $0.00 12.5 Notice of Completion and Distribution of Documents 0 $0.00 12.6 Final IS /MND and Mitigation Monitoring and Reporting Program 0 $0.00 12.7 1 Notice of Determination (City) 0 $0.00 TASK 13 - REGULATORY PERMITTING 0 0 0 0 0 0 0 0 $0.00 13.1 Pre - Application Meeting 0 $0.00 13.2 USACE Section 404 Permit Application 0 $0.00 13.3 Santa Ana RWQCB Section 401 Water Quality Certification 0 $0.00 13.4 CDFW 1602 Permit Application 0 $0.00 OTHER DIRECT COST 11116- $815.00 Travel $690.00 Reproductions Mail $25.00 Drilling Rig Rental Drums, Soil Disposal, Lift-gate Truck Drill Rig Rental and Supplies AC Overlay Removal Traffic Control Records Search $100.00 Title Reports Permit Fees Filing Fees Drone GPS Potholing Exhibit 10 -H Rounding Adjustment $6.02 TOTAL 0 14 46 70 8 6 Page 27 of 44 EXHIBIT A -7 Balk Biological PA/ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 110.00% 1 Profit 10% 1 Escalation 1 4.1 TASK DESCRIPTION Staff Category 1 Staff Cate o 2 Staff Category 4 OVERALL PROJECT Staff Category 3 90.00 80.00 72.31 35.00 $216.41 $192.37 $173.87 $84.16 $0.00 $0.00 $0.00 $0.00 TOTAL HRS TOTAL BUDGET 1- PROJECT MAN ENT 0 0 0 0 0 0 0 0 0 $0.00 1.1 Administration and Management 0 $0.00 1.2 Project Team Meetings 0 $0.00 1.3 Schedule 0 $0.00 1.4 Establish QC Program 0 $0.00 1.5 Seismic Strategy /Rehab Meetings 0 $0.00 2- PROJECT COORDINATION MEETINGS 0 0 0 0 0 0 0 0 0 $0.00 Re uest For Authorization 0 $0.00 aHBP NEPA/CEQA Coordination 0 $0.00 Monthly City Meetings 0 $0.00 TASK 3- REVIEW OF EXISTING CONDITIONS 0 0 0 0 0 0 0 0 0 $0.00 3.1 As -Built Plan and Preliminary Report Review 0 $0.00 3.2 Field Visit and Site Assessment 0 $0.00 TASK 4- BRIDGE DECK CONDITION EVAL 0 0 0 0 0 0 0 0 0 $0.00 4.1 Traffic Control 0 $0.00 4.2 Obtain City Encroachment Permit 0 $0.00 4.3 Asphalt Overlay Removal and Inspection 0 $0.00 4.4 Deck Condition Report 0 $0.00 TASK 5- PRELIMINARY E OF11 0 0 0 0 0 0 0 0 0 $0.00 5.1 Diagnostic Analysis 0 $0.00 5.2 Utility Coordination - R/W Data Sheet 0 $0.00 5.3 Draft Seismic Retrofit Strategy Report 0 $0.00 5.4 Attend Public Outreach Meeting 0 $0.00 5.5 Final Seismic Retrofit Strategy Report and 30% Plans 0 $0.00 TASK 6- FINAL PS &E 0 0 0 0 $0.00 6.1 Structures 0 $0.00 6.1.1 60% Unchecked Details 0 $0.00 6.1.2 Specifications 0 $0.00 6.1.3 Estimate 0 $0.00 6.1.4 Independent Check 0 $0.00 6.1.5 Respond to Agency Comments 0 $0.00 6.1 .6 100% Plans, Specifications, and Estimate 0 $0.00 6.1.7 1 Prepare RE Pending File 0 $0.00 Page 28 of 44 EXHIBIT A -7 Balk Biological PA/ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 110.00% 1 Profit 10% 1 Escalation 1 4.1 Page 29 of 44 DESCRIPTION Staff Category 1 Staff Category 2 Staff Category 4 OVERALL PROJECT Staff Cate go 3 90.00 80.00 72.31 35.00 $216.41 $192.37 $173.87 $84.16 $0.00 $0.00 $0.00 $0.00 TOTAL HRS TOTAL BUDGE 6.2 Roadway 0 $0.00 6.2.1 Roadway 0 $0.00 6.2.2 Utilities 0 $0.00 6.2.3 Traffic Control and Transportation Management Plan 0 $0.00 6.2.4 Water Pollution Control and LID Report 0 $0.00 6.2.5 Channel Improvement Plans 0 $0.00 6.2.5 Drainage Plans and Report 0 $0.00 6.2.6 Specifications 0 $0.00 6.2.7 Estimate 0 $0.00 6.2.8 Respond to Agency Comments 0 $0.00 6.2.9 100% Plans, Specifications, and Estimate 0 $0.00 6.2.10 Prepare RE Pending File 0 $0.00 6.3 Utility Relocation 0 $0.00 6.3.1 Potholing 0 $0.00 6.3.2 Conflict Identification and Owner Notification 0 $0.00 6.3.3 Relocation Design Coordination 0 $0.00 6.3.4 Utility Agreements and Notices to Owner 0 $0.00 6.4 Bid Support 0 $0.00 6.4.1 Prepare Bid Documents 0 $0.00 6.4.2 Attend Pre -Bid Meeting 0 $0.00 6.4.3 Respond to RFI 0 $0.00 6.5 Services During Construction 0 $0.00 6.5.1 Attend Monthly Meetings 0 $0.00 6.5.2 Review Technical Submittals 0 $0.00 6.5.3 Respond to RFI 0 $0.00 6.5.4 As -Built Plans 0 $0.00 6.6 Environmental Support During Construction 0 $0.00 6.6.1 On -Site Pre- Construction Meeting 0 $0.00 6.6.2 Preconstruction Surveys birds, bats 0 $0.00 6.6.3 Construction Monitoring 0 $0.00 ASK 7- GEOTECHNICAL EVALUATION 0 0 0 0 0 0 0 0 $0.00 7.1 Environmental Clearance & Permitting 0 $0.00 7.2 Field Borings 0 $0.00 Page 29 of 44 EXHIBIT A -7 Balk Biological PA/ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 110.00% 1 Profit 10% 1 Escalation 1 4.1 DESCRIPTION �taffy Staff te o 2 Staff Category 4 OVERALL PROJECT Staff Category 3 80.00 72.31 35.00 $216.41 $192.37 $173.87 $84.16 $0.00 $0.00 $0.00 $0.00 TOTAL HRS TOTAL BUDG 7.3 Lab Work 0 $0.00 7.4 Bridge Foundation Report 0 $0.00 0 0 0 0 0 $0.00 8.1 H drolo /H draulic Analyses & Modeling 0 $0.00 8.2 Scour Reporting and Recommendation 0 $0.00 8.3 Requlatory Coordination 0 $0.00 8.3a Prepare CLOMR 0 $0.00 8.3b 9.1 Prepare LOMR Topographic Surveys and Mapping 0 0 0 0 0 0 $0.00 $0.00 $0.00 9.2 Corner Record / Record of Survey 0 $0.00 9.3 10.1 Pothole Ground Survey Complete Preliminary Environmental Stud 40 2 0 0 0 105 0 $0.00 $19,506.87 $0.00 10.A Noise Memorandum (Type III 0 $0.00 10.B Air Quali and GHG Analyses Construction Only) 0 $0.00 10.0 Hazardous Materials - Initial Site Assessment Draft and Final 0 $0.00 10.D.1 Location Hydraulic Stud 0 $0.00 10.D.2 Summary Floodplain Encroachment Report 0 $0.00 10.D.3 Water Quality Assessment 0 $0.00 10.E Biological Resources 10.6.1 Site Reconnaissance Surveys 0 $0.00 10.6.2 Natural Environment Stud Draft and Final 0 $0.00 10.6.2 Focused Bird Surveys 0 $0.00 10.6.2 MSHCP Consistent Report 0 $0.00 10.6.3 Determination of Biologically Equivalent or Superior Preservation Report 0 $0.00 10.6.4 Regional Conservation Authority - Joint Project Review 0 $0.00 10.6.5 Jurisdictional Delineation 11 52 40 2 105 $19,506.87 10.1' Cultural Resources 10.7.1 Area of Potential Effect Map 0 $0.00 10.7.2 Archaeological Survey Report 0 $0.00 10.7.3 Historical Property Survey Report 0 $0.00 10.7.4 Native American Consultation 0 $0.00 Page 30 of 44 EXHIBIT A -7 Balk Biological PA/ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 31 of 44 Break Even Multi tier 110.00% Profit 10% Escalation 4.1 ASK DESCRIPTION Staff Category 1 Staff Category 2 Staff Category 4 OVERALL PROJECT Staff Category 3 90.00 80.00 72.31 35.00 $216.41 $192.37 $173.87 $84.16 $0.00 $0.00 $0.00 $0.00 TOTAL HRS TOTAL BUDGET 10.7.5 Paleontological Resources Assessment Memorandum 0 $0.00 ASK 11 - NEPA DOCUMENT CE 0 0 0 0 0 0 0 0 0 $0.00 11.1 Draft Categorical Exclusion and Environmental Commitments Record 0 $0.00 11.2 Public Review without Public Meeting 0 $0.00 11.3 Final Categorical Exclusion and Environmental Commitments Record 0 $0.00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�UMENT EA 0 0 0 0 0 0 0 0 0 $0.00 11A.1 Screencheck Draft EA 0 $0.00 11A.2 Draft EA 0 $0.00 11A.3 Obtain Approval to Circulate 0 $0.00 11A.4 Circulate Draft EA 0 $0.00 11A.5 Response to Comments 0 $0.00 11A.6 Final EA/FONSI 0 $0.00 11A.7 NOD and NOA 0 $0.00 TASK 12 - CEQA DO C 0 0 0 0 0 0 0 $0.00 12.1 Screencheck Initial Stud 0 $0.00 12.2 Draft Initial Study and Notice of Intent 0 $0.00 12.3 Public Review without Public Meeting 0 $0.00 12.4 Screencheck Final Initial Study with Mitigated Negative Declaration 0 $0.00 12.5 Notice of Completion and Distribution of Documents 0 $0.00 12.6 Final IS /MND and Mitigation Monitoring and Reporting Program 0 $0.00 12.7 1 Notice of Determination (City) TASK 13 - REGULATOR 13.1 Pre Application Meeting 8 14 3 0 6 25 $0.00 $36,607.14 $4,225.62 13.2 USACE Section 404 Permit Application 10 56 5 71 $12,081.22 13.3 Santa Ana RWQCB Section 401 Water Quality Certification 12 60 5 77 $13,161.44 13.4 CDFW 1602 Permit Application 6 32 5 43 $7,138.86 Page 31 of 44 EXHIBIT A -7 Balk Biological PA/ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 110.00% 1 Profit 10% 1 Escalation 1 4.1 Page 32 of 44 DESCRIPTION Staff Category 1 Staff Category 2 Staff Category 4 OVERALL PROJECT Staff Cate go 3 90.00 80.00 72.31 35.00 $216.41 $192.37 $173.87 $84.16 $0.00 $0.00 $0.00 $0.00 TOTAL HRS TOTAL BUDGET Travel $690.00 Reproductions $198.00 Mail $100.00 Drilling Rig Rental Drums, Soil Disposal, Lift-gate Truck Drill Rig Rental and Supplies AC Overlay Removal Traffic Control Records Search Title Reports Permit Fees Filing Fees Drone GPS Potholing Exhibit 10 -H Rounding Adjustment $0.99 TOTAL 11 88 202 20 0 0 0 0 3 Page 32 of 44 EXHIBIT A -8 EPIC PA/ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 174.56% 1 Profit 10% 1 Escalation 3.22% TASK DESCRIPTION Right of Way Planner Right of Way Planning Analyst Utility Coordination Lead Utility Coordinator Budget & Financial Controls Analyst OVERALL PROJECT 60.10 45.67 50.00 26.44 42.40 $187.36 $142.37 $155.87 $82.42 $132.18 1 TOTAL HRS TOTAL BUDGET TASK 1 - PROJECT MANAGEMENT 6 12 6 24 $3,787.68 1.1 Administration and Management 6 6 12 $1,917.24 1.2 Project Team Meetings 12 12 $1,870.44 1.3 Schedule 0 $0.00 1.4 Establish QC Program 0 $0.00 1.5 Seismic Strategy /Rehab Meetings I I 1 0 $0.00 IffON MEETINGS 0 0 0 $0.00 2.1 HBP Request For Authorization 0 $0.00 2.2 NEPA/CEQA Coordination 0 $0.00 2.3 Monthly City Meetings 0 $0.00 ASK 3- REVIEW OF EX197M CONDITIONS 0 0 0 0 0 $0.00 3.1 As -Built Plan and Preliminary Report Review 0 $0.00 3.2 Field Visit and Site Assessment 0 $0.00 4.1 Traffic Control 0 0 0 0 $0.00 $0.00 4.2 Obtain City Encroachment Permit 0 $0.00 4.3 lAsphalt Overlay Removal and Inspection 0 $0.00 4.4 IDeck Condition Report 0 $0.00 SK 5 - PRELIMINARY 5.1 Diagnostic Analysis 16 1 16 36 1 0 83 0 123.30 $0.00 5.2 Utility Coordination - RIW Data Sheet 16 16 36 15 83 $12,123.30 5.3 Draft Seismic Retrofit Strategy Report 0 $0.00 5.4 Attend Public Outreach Meeting 0 $0.00 5.5 Final Seismic Retrofit Strategy Report and 30% Plans 0 $0.00 ASK 6 - FINAL PS &E 0 0 216 189 0 405 $49,245.30 6.1 Structures 0 $0.00 6.1.1 60% Unchecked Details 1 0 $0.00 6.1.2 Specifications 0 $0.00 6.1.3 Estimate 0 $0.00 6.1.4 Independent Check 0 $0.00 Page 33 of 44 EXHIBIT A -8 EPIC PA/ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 174.56% 1 Profit 10% 1 Escalation 3.22% 6AL . DESCRIPTION Right of Way Planner Right of Way Planning Analyst Utility Coordination Lead Utility Coordinator Budget & Financial Controls Analyst OVERALL PROJECT 60.10 45.67 50.00 26.44 42.40 rmw $18 142.37 $155.871L $82.4% $132.18 TOTAL HRS TOTAL BUDGET 6.1.5 Respond to Agency Comments 0 $0.00 6.1.6 100% Plans, Specifications, and Estimate 0 $0.00 6.1.7 Prepare RE Pending File 0 $0.00 6.2 Roadway 0 $0.00 6.2.1 Roadway 0 $0.00 6.2.2 Utilities 0 $0.00 6.2.3 Traffic Control and Transportation Management Plan 0 $0.00 6.2.4 Water Pollution Control and LID Report 0 $0.00 6.2.5 Channel Improvement Plans 0 $0.00 6.2.5 Drainage Plans and Report 0 $0.00 6.2.6 Specifications 0 $0.00 6.2.7 Estimate 0 $0.00 6.2.8 Respond to Agency Comments 0 $0.00 6.2.9 100% Plans, Specifications, and Estimate 0 $0.00 6.2.10 Prepare RE Pending File 0 $0.00 6.3 Utility Relocation 0 $0.00 6.3.1 Potholing 19 6 25 $3,456.05 6.3.2 Conflict Identification and Owner Notification 25 32 57 $6,534.19 6.3.3 IRelocation Design Coordination 141 125 266 $32,280.17 6.3.4 Utility Agreements and Notices to Owner 31 26 57 $6,974.89 6.4 Bid Support 0 $0.00 6.4.1 Prepare Bid Documents 0 $0.00 6.4.2 Attend Pre -Bid Meeting 0 $0.00 6.4.3 Respond to RFI 0 $0.00 6.5 IServices During Construction 0 $0.00 6.5.1 Attend Monthly Meetings 0 $0.00 6.5.2 Review Technical Submittals 0 $0.00 6.5.3 Respond to RFI 0 $0.00 6.5.4 As -Built Plans 0 1 $0.00 6.6 Environmental Support During Construction 0 1 $0.00 Page 34 of 44 EXHIBIT A -8 EPIC PA/ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Break Even Multiplier 174.56% 1 Profit 10% 1 Escalation 3.22% DESCRIPTION Right of Way Planner Right of Way Planning Analyst Utility Coordination Lead Utility Coordinator Budget & Financial Controls Analyst OVERALL PROJECT 60.10 45.67 50.00 26.44 42.40 $187.36 $142.37 $155.87 $82.42 $132.18 1 TOTAL HRS TOTAL BUDGET 6.6.1 On -Site Pre - Construction Meetin 0 $0.00 6.6.2 Preconstruction Surveys (birds, bats) 0 $0.00 6.6.3 Construction Monitoring 0 $0.00 TASK 7- GEOT EVALUATION 0 0 0 0 0 0 $0.00 7.1 Environmental Clearance & Permittin 0 $0.00 7.2 Field Borings 0 $0.00 7.3 Lab Work 0 $0.00 7.4 Bridge Foundation Report 0 $0.00 8- HYDROLOGIC /HYDRAULIC ASSESSMENT 0 0 1 0 0 1 0 0 1 $0.00 8.1 Hydrology /Hydraulic Analyses & Modeling 0 $0.00 8.2 Scour Reporting and Recommendation 0 $0.00 8.3 Regulatory Coordination 0 $0.00 8.3a Prepare CLOMR 0 $0.00 8.3b Prepare LOMR 0 $0.00 ASK 9- SURVEYINMENE014 0 0 0 0 0 0 $0.00 9.1 Topographic Surveys and Mapping 0 $0.00 9.2 Corner Record / Record of Survey 0 $0.00 9.3 Pothole Ground Survey 0 $0.00 TASK 10 - TECHNICAL STU 0 0 0 0 0 0 $0.00 10.1 Complete Preliminary Environmental Study 0 $0.00 10.A Noise Memorandum (Type III) 0 $0.00 10.13 Air Quality and GHG Analyses Construction Only 0 $0.00 10.0 Hazardous Materials - Initial Site Assessment Draft and Final 0 $0.00 10.D.1 Location Hydraulic Stud 0 $0.00 10.D.21Summary Flood lain Encroachment Report 0 $0.00 10.D.3 Water Quality Assessment 0 $0.00 10.E Biological Resources 10.6.1 Site Reconnaissance Surveys 0 $0.00 10.6.2 Natural Environment Stud Draft and Final 0 $0.00 10.6.2E Focused Bird Surveys I i 0 $0.00 Page 35 of 44 EXHIBIT A -8 EPIC PA/ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 36 of 44 Break Even Multi tier 174.56% Profit 10% Escalation 3.22% 6L DESCRIPTION Right of Way Planner Right of Way Planning Analyst Utility Coordination Lead Utility Coordinator Budget & Financial Controls Analyst OVERALL PROJECT an 10 45.67 50.00 26.44 42.40 142.37 $1 $82. $132.18 111L TOTAL HRS TOTAL BUDGET 10.6.2 MSHCP Consistency Report 0 $0.00 10.6.3 Determination of Biologically Equivalent or Superior Preservation Report 0 $0.00 10.6.4 Regional Conservation Authority - Joint Project Review 0 $0.00 10.6.5 Jurisdictional Delineation 0 $0.00 10.F Cultural Resources 10.7.1 Area of Potential Effect Map 0 $0.00 10.7.2 Archaeological Survey Report 0 $0.00 10.7.3 Historical Property Survey Report 0 $0.00 10.7.4 Native American Consultation 0 $0.00 10.7.5 Paleontological Resources Assessment Memorandum 0 $0.00 TASK 11 - NEPA DOCUMENT CE 0 0 0 0 AL 0 $0.00 11.1 Draft Categorical Exclusion and Environmental Commitments Record 0 $0.00 11.2 Public Review without Public Meeting 0 $0.00 11.3 Final Categorical Exclusion and Environmental Commitments Record 0 $0.00 TASK 11A - NEPA DOCUMENT EA 0 0 0 0 0 0 $0.00 11A.1 Screencheck Draft EA 0 $0.00 11A.2 Draft EA 0 $0.00 11A.3 Obtain Approval to Circulate 0 $0.00 11A.4 Circulate Draft EA 0 $0.00 11A.5 Response to Comments 0 $0.00 11A.6 Final EA/FONSI 0 $0.00 11A.7 INOD and NOA 1 0 $0.00 TASK 12 - CEQA DOCUMEN 0 0 0 0 $0.00 12.1 Screencheck Initial Study 0 $0.00 12.2 Draft Initial Study and Notice of Intent 0 $0.00 12.3 Public Review without Public Meeting 0 $0.00 12.4 Screencheck Final Initial Study with Mitigated Negative Declaration 0 $0.00 12.5 Notice of Completion and Distribution of Documents 0 $0.00 12.6 Final IS /MND and Mitigation Monitoring and Reporting Program 0 $0.00 12.7 1 Notice of Determination (City) 0 $0.00 Page 36 of 44 EXHIBIT A -8 EPIC PA/ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore Page 37 of 44 Break Even Multi tier 174.56% Profit 10% Escalation 3.22% TASK DESCRIPTION Right of Way Planner Right of Way Planning Analyst Utility Coordination Lead Utility Coordinator Budget & Financial Controls Analyst OVERALL PROJECT 60.10 45.67 50.00 26.44 42.40 $187.36 $142.37 $155.87 $82.42 $132.18 TOTAL HRS TOTAL BUDGET TASK 13 - REGULATORY P 13.1 1 Pre - Application Meeting 0 0 0 0.1. 0 $0.00 $0.00 13.2 JUSACE Section 404 Permit Application 0 $0.00 13.3 Santa Ana RWQCB Section 401 Water Quality Certification 0 $0.00 13.4 CDFW 1602 Permit Application OTHER DIRECT COST Travel 0 1 $0.00 $396.75 Reproductions Mail $285.00 Drilling Rig Rental Drums, Soil Disposal, Lift-gate Truck Drill Rig Rental and Supplies AC Overlay Removal Traffic Control Records Search Title Reports Permit Fees Filing Fees Drone G Potholing $15,000.00 Exhibit 10 -H Rounding Adjustment TOTAL $0.97 MEN $80,839.00 Page 37 of 44 ■ LIST OF SUBCONTRACTORS [ATTACHED] *3:11 :3kr: WKE Inc. EXHIBIT B -1 PA /ED and PS &E Auto Center Drive / Casino Drive Bridge City of Lake Elsinore OTHER DIRECT COST SCHEDULE MILEAGE Trips Average Miles /Trip Total Miles Cost /Mile Total Cost Santa Ana - Caltrans District 8 2 100 200 $0.575 $115.00 Santa Ana - Lake Elsinore 34 96 3,264 $0.575 $1,876.80 Satna Ana - Riverside RCA 2 80 160 $0.575 $92.00 Subtotal $825.00 0 $0.575 $0.00 Subtotal $2, 083.80 REPRODUCTION Check Prints Submittals Total Plots Cost /Sheet Total Cost Printings 11 x 17 0 0 0 $0.8 $0 2204 0 0 0 $2.5 $0 8 -1.2 x 11 0 4800 4,800 $0.08 $384 Subtotal $825.00 0 $0.00 0 $0.00 0 $0.00 Subtotal $384.00 MAIL Deliveries Average Cost /unit Total Cost Overnight Mails 20 staff $25.0 $500 Same Day Delivery Services 5 days $65.0 $325 U.S. Mail I I 1 1 $0.00 Subtotal $825.00 AC OVERLAY REMOVAL Average Cost /unit Total Cost Micromilling 2 staff $500.00 $12,600.00 Traffic Control 2 days $1,725.000 $3,450.00 Subtotal $1,000.00 $0.00 Subtotal $16, 050.00 TRAVEL Average Cost /unit Total Cost Sacramento - Caltrans (Headquarters) 2 staff $500.00 $1,000.00 $0.00 Subtotal $1,000.00 TOTAL Page 38 of 44 $20,343 IWO EXHIBIT B -2 PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore OTHER DIRECT COST SCHEDULE MILEAGE Trips Average Miles /Trip Total Miles Cost /Mile Total Cost Project Site/City of Lake Elsinore 95 70 6,650 $0.575 $3,823.75 8 -1.2 x 11 BW 1950 2000 0 $0.580 $0.00 11 x 17 Color 190 200 0 $0.580 $0.00 8 -1.2 x 11 Color 190 300 0 $0.5801 $0.00 Subtotal $3,323.75 REPRODUCTION Check PrintE Submittals Total Plots Cost /Sheet Total Cost 11 x 17 BW 200 200 400 $0.10 $40.00 8 -1.2 x 11 BW 1950 2000 3,950 $0.07 $276.50 11 x 17 Color 190 200 390 $0.75 $292.50 8 -1.2 x 11 Color 190 300 490 $0.40 $196.00 CD 40 40 $5.00 $200.00 0 $0.00 Subtotal $1,035.00 MAIL Deliveries Average Cost /unit Total Cost Overnight Mails 10 $20.00 $200.00 Same Day Delivery Services 5 $25.00 $125.00 U.S. Mail I I 1 1 $0.00 Subtotal $325.00 RECORD SEARCHES Search Average Cost /unit Total Cost Cutural Resources 1 $700.00 $700.00 GPS 5 $75.00 $0.00 Subtotal $700.00 EQUIPMENT Est. Qty. Average Cost /unit Total Cost Drone 2 $200.00 $400.00 GPS 5 $75.00 $375.00 Subtotal $775.00 Haz Mat Number Average Cost /unit Total Cost Group Delta $18,000.00 $0.00 Subtotal $18, 000.00 TOTAL Page 39 of 44 $24,629 WEST Consultants, Inc. EXHIBIT B -3 PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore OTHER DIRECT COST SCHEDULE MILEAGE Check Prints Trips Average Miles /Trip Total Miles Cost /Mile Total Cost Project Site 1 120 120 $0.575 $69.00 100 100 200 0 $0.580 $0.00 20 20 40 0 $0.580 $0.00 10 10 20 0 $0.580 $0.00 Subtotal $69.00 REPRODUCTION Check Prints Submittals Total Plots Cost /Sheet Total Cost 11 x 17 BW 20 20 40 $0.10 $4.00 8 -1.2 x 11 BW 100 100 200 $0.07 $14.00 11 x 17 Color 20 20 40 $0.75 $30.00 8 -1.2 x 11 Color 10 10 20 $0.40 $8.00 CD 1 2 1 2 $5.00 $10.00 0 $0.00 Subtotal $66.00 MAIL Deliveries Average Cost /unit Total Cost Overnight Mails 4 $20.00 $80.00 Same Day Delivery Services $0.00 U.S. Mail 4 $7.00 $28.00 Subtotal 1 $108.00 FILING FEES Deliveries Average Cost /unit Total Cost FEMA data request $300.00 Subtotal $300.00 TOTAL Page 40 of 44 $543 Earth Mechanics EXHIBIT B -4 PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore OTHER DIRECT COST SCHEDULE Geotechnical ODC Days Quantity Unit Cost Total Cost Travel 4.0 115 $0.575 $263.99 Drill Rig Rental 6 $4,000.000 $24,000.00 Traffic Control 6 0 $1,645.000 $9,870.00 Soil Cuttings Contaminants Testin g 3 $300.000 $900.00 Soil Cuttings (Drums) Disposal 15 $145.000 $2,175.00 $0.000 $0.00 $0.000 $0.00 $0.0001 $0.00 Subtotal 1 $37,208.99 Mail Deliveries Average Cost /unit Total Cost Overnight Mails 2 $25.00 $50.00 Same Day Delivery Services $25.00 $0.00 U.S. Mail $5.00 $0.00 Subtotal 1 $50.00 TOTAL Page 41 of 44 $37,259 Guida EXHIBIT B -5 PA /ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore OTHER DIRECT COST SCHEDULE MILEAGE Trips Average Miles /Trip Total Miles Cost /Mile Total Cost Project Mileage 12 100 1,200 $0.575 $690.00 Same Day Delivery Services 0 0 $0.580 $0.00 U.S. Mail 1 $100.00 0 $0.580 $0.00 Subtotal $25.00 0 $0.580 $0.00 Subtotal $690.00 MAIL Deliveries Reports Average Cost /unit Total Cost Overnight Mails 1 $25.00 $25.00 Same Day Delivery Services 0 $0.00 $0.00 U.S. Mail 1 $100.00 $0.00 Subtotal $25.00 Records Research Pages Reports Average Cost /unit Total Cost Research Copies 50 $2.00 $100.00 Preliminary Title Reports 0 $0.00 $0.00 Subtotal 1 $100.00 TOTAL Page 42 of 44 $815 Balk Biological, Inc. EXHIBIT B -6 PA/ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore OTHER DIRECT COST SCHEDULE MILEAGE Check Prints Trips Average Miles /Trip Total Miles Cost /Mile Total Cost Project Site/City of Lake Elsinore 10 120 1,200 $0.575 $690.00 400 0 400 0 $0.580 $0.00 100 0 100 0 $0.580 $0.00 200 0 1 2001 0 $0.580 $0.00 Subtotal $690.00 REPRODUCTION Check Prints Submittals Total Plots Cost /Sheet Total Cost 11 x 17 BW 150 0 150 $0.10 $15.00 8 -1.2 x 11 BW 400 0 400 $0.07 $28.00 11 x 17 Color 100 0 100 $0.75 $75.00 8 -1.2 x 11 Color 200 0 1 2001 $0.40 $80.00 CD 0 $0.00 0 $0.00 Subtotal $198.00 MAIL Deliveries Average Cost /unit Total Cost Overnight Mails 5 $20.00 $100.00 Same Day Delivery Services 0 $25.00 $0.00 U.S. Mail I I I 1 1 $0.00 Subtotal 1 $100.00 TOTAL Page 43 of 44 $988 EPIC LAND SOLUTIONS, INC. EXHIBIT B -7 PA/ED and PS &E Auto Center Drive / Casino Drive Bridge Seismic Retrofit and Deck Rehabilitation Project City of Lake Elsinore OTHER DIRECT COST SCHEDULE MILEAGE Trips Average Miles /Trip Total Miles Cost /Mile Total Cost Mileage 10 10 690 $0.575 $396.75 Same Day Delivery Services 0 $0.575 $0.00 U.S. Mail 5 $15, 000.00 0 $0.575 $0.00 Subtotal $285.00 0 $0.575 $0.00 Subtotal $396.75 MAIL Deliveries Number Average Cost /unit Total Cost Overnight Mails 10 10 $25.00 $250.00 Same Day Delivery Services $0.00 U.S. Mail 5 $15, 000.00 $7.00 $35.00 Subtotal $285.00 Potholing Number Average Cost /unit Total Cost Utility Potholes 10 $1,500.00 $15,000.00 $0.00 Subtotal $15, 000.00 TOTAL Page 44 of 44 $15,682