Loading...
HomeMy WebLinkAboutItem No. 16 Purchase Appliances Conession Stand Diamond CIP Z20003Text File City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 19-573 Agenda Date: 4/28/2020 Status: Approval FinalVersion: 1 File Type: Council Consent Calendar In Control: City Council / Successor Agency Agenda Number: 16) Page 1 City of Lake Elsinore Printed on 4/23/2020 REPORT TO SUCCESSOR AGENCY OF THE REDEVELOPMENT AGENCY OF THE CITY OF LAKE ELSINORE To: Successor Agency Board From: Grant Yates, Executive Director Prepared by: Jason Simpson, Assistant Executive Director Date: April 28, 2020 Subject: Authorize the Executive Director to execute a purchase order increase in the amount of $26,019.36 for the Purchase of Appliances and Equipment for the Rehabilitation Project of Concession Stand 3 at Diamond Stadium Project (CIP PROJECT #Z20003) Recommendation Approve and Authorize the Executive Director to increase the purchase order in the not to exceed amount of $26,019.36 with Chefs’ Toys Commercial Kitchen Design and Supply. Background On January 21, 2020, authorization was given to the Executive Director to execute a purchase order to Chefs’ Toys Commercial Kitchen Design and Supply in the not to exceed total amount of $174,972.54. After more than 20 years the Diamond Stadium concession stand 3 has reached its useful life. The remodel of this concession stand has recently been completed and a new appliance and equipment package of high quality cost effective appliances installed. The make and model numbers of each item have been pre-approved by the County Health Department to ensure complete health code compliance. Discussion A key outcome of this project is the special consideration taken to facilitate improved concession stand operations and space utilization for critical areas such as food preparation, food storage and packaging, and point of sale processes. Successful food service operations depend on high quality, relevant restaurant equipment and commercial appliances for the sustainability of their kitchens. Essential to the Health Department requirements for the renovation of concession stand 3 is the separation of food preparation and service areas. Both building structural considerations (floor plan) and updated commercial appliances and equipment were needed to satisfy these requirements in order to maintain operational permitting status. Through the course of construction serveral minor moditfication were needed to adjust the appliance and equipment package resulting in this purchase order increase of $26,019.36 The below list are the additional purchased items: 1) Commercial Cooling Reversible Hinging Door $4,632.00 2) Pacific Stainless Shelves Fabrication $1,476.01 3) New Replacement Ice Machine L&M Compressor $3,974.00 4) (3) Frozen Beverage Machines $15,937.35 Total Amount $26,019.36 Fiscal Impact Diamond Stadium Concession Stand 3 (CIP Project #Z20003) is included in the Fiscal Year 19/20 – 23/24 Capital Improvement Plan (CIP) budget. The contract amount herein is fully funded with RPTTF through the Successor Agency ROPS. Exhibits A – Change Order CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 (951) 674-3124 PROJECT CHANGE ORDER CHANGE ORDER # 1 DATE: April 28, 2020 THIS CHANGE ORDER IS APPLICABLE TO: CITY PROJECT # Z40003 CONTRACT AWARDED TO: PROJECT TITLE: Diamond Stadium Stand #1 Chef Toys Health Dept. Requirements DATE AWARDED: January 28, 2020 Authorized by: Jason Simpson TOTAL AMOUNT OF CONTRACT Assistant Executive Director PRIOR TO THIS CHANGE ORDER $174,972.54 CONTRACTOR IS AUTHORIZED TO MAKE THE FOLLOWING CHANGES: QUANTITIES INCREASED ITEM QUANTITY UNIT UNIT PRICE EXTENSION Commercial cooling reversable hinging door Pacific stainless shelves fabrication New replacement ice machine L&M compressor Frozen beverage machines Lump Sum 1.00 $4,632.00 $4,632.00 Lump Sum Lump Sum Lump Sum 1.00 1.00 3.00 $1,476.01 $3,974.00 $15,937.35 $1,476.01 $3,974.00 $15,937.35 QUANTITIES DECREASED ITEM QUANTITY UNIT PRICE EXTENSION None TOTAL $26,019.36 THE AMOUNT OF THE CONTRACT WILL BE (INCREASED) BY THE SUM OF $26,019.36 Change Order No. 1 Review by: Initials Date Approved by: Date Director Public Works: Contractor City Manager: