HomeMy WebLinkAboutItem No. 08 Change Order No. 3 Plain Joe Studios Wayfinding SignageText File City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 19-508 Agenda Date: 3/10/2020 Status: Approval FinalVersion: 1 File Type: Council Consent Calendar In Control: City Council / Successor Agency Agenda Number: 8) Page 1 City of Lake Elsinore Printed on 3/5/2020 REPORT TO CITY COUNCIL To: Honorable Mayor and Members of the City Council From: Grant Yates, City Manager Prepared by: Jason Simpson, Assistant City Manager Date: March 10, 2020 Subject: Change Order No. 3 - PlainJoe Studios for Wayfinding Signage Recommendation Approve and authorize the City Manager to execute Change Order No. 3 for $79,356.34 for the Agreement to PlainJoe Studios' for Wayfinding Signage. Background PlainJoe Studios' assisted with the development of a branding and marketing concept for the RV Resort Rehabilitation Project. Additional work by PlainJoe Studios’ included farther- reaching content-rich, emotionally compelling, and experiential opportunities to tell the Story of the RV Resort. Key community leaders and staff worked together to develop the needed branding for the RV Resort Project. The result conceptualizes and constructed important information about the RV Resort and feeds a dialogue between campers and the campground where they stay. Much of this leads to a static and digital wayfinding system, signage, unique graphics, exhibition substance, installation of both art, and play elements, all with a common branding of the entire RV Resort. Discussion The purpose of this change order is to further the approved signage design and build for branding and wayfinding at Launch Pointe. Working with CalTrans on the Launch Pointe entrance (Riverside & Lincoln), it has been determined additional signage is needed to improve traffic movement into Launch Pointe from Lincoln. Also, this change order will provide for additional Launch Pointe marketing opportunities on the main entrance arch. Specifically, on both the right and left side of the arch, two large panels will display the Bobber Restaurant and Lake Boat Launch advertisement banners. Finally, in this change order, additional signage and pedestrian portal elements will be constructed to improve the beach access and will be installed to complement the currently under construction marina deck with ADA and staircase access to the beach from the parking lot. PlainJoe Studios’ Change Order 3 March 10, 2020 Page 2 Following the approval of this agenda, item coordination will begin on the fabrication and installation of these elements. The beach access portal will require minimal site development to support the construction of the arch. All other elements will essentially be mounted in predetermined locations to facilitate pedestrian and vehicular movement. Fiscal Impact The change order is part of the FY19/20 Capital Improvement Plan (CIP) budget funding. Exhibits A – Change Order #3 B – Cost Proposal 3 DATE: QUANTITY UNIT Lump Sum 1.00 Lump Sum 1.00 $26,645.34 Lump Sum 1.00 $23,806.90 TOTAL SUM OF 3 Review by: Initials Date Date PRIOR TO THIS CHANGE ORDER CONTRACTOR IS AUTHORIZED TO MAKE THE FOLLOWING CHANGES: Assistant City Manager $23,806.90 UNIT PRICE EXTENSIONITEM Item #1 Exterior Wayfinding ITEM QUANTITIES DECREASED $26,645.34 $28,904.10$28,904.10 Item #2 Install Item #3 Design and PM UNIT PRICE CITY PROJECT # September 26, 2017DATE AWARDED: PROJECT TITLE: Launch Pointe Signage, Beach Access PlainJoe Studios Advertizement Posters Z40007 Authorized by: Jason Simpson TOTAL AMOUNT OF CONTRACT $618,172.26 QUANTITIES INCREASED CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 (951) 674-3124 March 10, 2020 PROJECT CHANGE ORDER CHANGE ORDER # THIS CHANGE ORDER IS APPLICABLE TO: CONTRACT AWARDED TO: City Manager: $79,356.34 Approved by: Contractor Change Order No. Assistant City Manager EXTENSION THE AMOUNT OF THE CONTRACT WILL BE (INCREASED) BY THE $79,356.34 None QUANTITY Graphic #Description Quantity Total Exterior Wayfinding LPP01 Main Entry Banners Graphic - Boat Launch 1 $864.00 LPP02 Main Entry Banners Graphic - Bobber 1 $864.00 LPP Main Entry Banners Graphic Frames 2 $1,265.66 SM01a.01 La Laguna Monument Sign 1 - White Arrow 1 $56.43 SM01a.02 La Laguna Monument Sign 1 - Blue Circle 1 $156.41 SM01b La Laguna Monument Sign 1 - Wood Panels 1 SM01c La Laguna Monument Sign 1 - Cut Lettering 1 SM02a.01 La Laguna Monument Sign 2 - White Arrow 1 $56.43 SM02a.02 La Laguna Monument Sign 2 - Blue Circle 1 $156.41 SM02b La Laguna Monument Sign 2 - Wood Panels 1 SM02c La Laguna Monument Sign 2 - Cut Lettering 1 WX01a Beach Access Single Post Sign 1 $59.06 Wx01b Beach Access Single Post Sign - Directional 1 $20.39 WX02a.01 Beach Access Portals - I Beam 2 WX02a.02 Beach Access Portals - Post 1 WX02a.03 Beach Access Portals - Post 1 WX02.04 Beach Access Portals - Blue Graphic Side A 1 $157.50 WX02a.05 Beach Access Portals - Blue Stripes Side A 1 $34.33 WX02a.06 Beach Access Portals - Gray Graphic Side A 1 $48.44 WX02b.04 Beach Access Portals - Blue Graphic Side B 1 $157.50 Plain Joe Studios Launche Pointe: Phase 3 $1,952.84 $1,952.84 $21,019.10 WX02b.05 Beach Access Portals - Blue Stripes Side B 1 $34.33 WX02b.06 Beach Access Portals - Gray Graphic Side B 1 $48.44 $0.00 Install Install Labor -$26,645.34 -$0.00 - Design & Project Management Design & PM -$23,806.90 - Total $79,356.34 * Does not include Sales Tax