Loading...
HomeMy WebLinkAboutItem No. 09 Amend No. 1 PSA GeoMat Testing LabsText File City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 19-494 Agenda Date: 2/25/2020 Status: Approval FinalVersion: 1 File Type: Council Consent Calendar In Control: City Council / Successor Agency Agenda Number: 9) Page 1 City of Lake Elsinore Printed on 2/20/2020 Page 1 of 2 REPORT TO CITY COUNCIL To: Honorable Mayor and Members of the City Council From: Grant Yates, City Manager Prepared By: Nicole McCalmont, Sr. Engineer Technician Date: February 25, 2020 Subject: Amendment No. 1 to the Professional Services Agreement with GeoMat Testing Laboratories, Inc. for the Camino Del Norte Improvement Project CIP No. Z10030 Recommendation Authorize the City Manager to execute Amendment No. 1 to the Agreement for Professional Services with GeoMat Testing Laboratories, Inc., for construction geotechnical services on the Camino Del Norte Improvement Project in the amount of $38,930 plus a 10% contingency, in a form as approved by the City Attorney. Background The Camino Del Norte project includes the realignment of Canyon Estates Drive and the extension of Camino Del Norte. The limits of the realignment/extension are from approximately 500 feet south of Franklin Street to 1,200 feet south of Main Street. The Camino Del Norte Improvement Project consists of constructing new roadway; drainage cross culverts and inlets; sidewalks, curb and gutter; and a traffic signal at the intersection of Canyon Estate Drive- Camino Del Norte at Franklin Street intersection. Discussion GeoMat Testing Laboratories, Inc., provided geotechnical services during the construction phase of the Camino Del Norte extension project, including establishing the over excavation limits per plan, bottom excavation observed for elevation competency, subbase material suitability, compaction tests, AC Temperature Monitoring, Soil Density, Aggregate Gradation, Trench Stability and other geotechnical testing as required by the project. Amendment No. 1 will allow GeoMat to invoice 158 hours for work already performed during construction phase of the project for the months of January and February. In addition, it will allow GeoMat to provide geotechnical field services during the installation of long-term erosion control BMP’s and over-side drainage conveyance systems related to the work currently under design by Dost Engineering. Amendment No. 1 PSA GeoMat February 25, 2020 Page 2 of 2 Fiscal Impact Funding for this project has been allocated under the City’s adopted CIP. Exhibits A – Amendment No. 1 AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL SERVICES GeoMat Testing Laboratories, Inc. Geotechnical and Materials Testing Camino Del Norte Improvement Project No. Z10030 This Amendment No. 1 to Agreement for Professional Services (“Amendment No. 1”) is made and entered into as of February 25, 2020, by and between the City of Lake Elsinore, a municipal corporation (“City), and GeoMat Testing Laboratories, Inc., a California corporation (“Consultant”). RECITALS A. The City and Consultant have entered into that certain Agreement for Professional Services dated as of October 23, 2018, (the “Original Agreement”). Except as otherwise defined herein, all capitalized terms used herein shall have the meanings set forth for such terms in the Original Agreement. B. The Original Agreement provided for compensation to Consultant in an amount $86,900. C. The parties now desire to modify the scope of services and increase the payment for such services as set forth in this Amendment No 1. NOW, THEREFORE, in consideration of the mutual covenants and conditions set forth herein, City and Consultant agree as follows: 1. Section 1, Scope of Services, of the Original Agreement is hereby amended to add the following: Consultant shall also perform the services described in Consultant’s February 03, 2020, Proposal (attached to this Amendment No. 1 as Exhibit A-1). Consultant shall provide such services at the time, place, and in the manner specified in Exhibit A-1, subject to the direction of the City through its staff that it may provide from time to time. 2. Section 3, Compensation, of the Original Agreement is hereby amended to read in its entirety as follows: Compensation to be paid to Consultant shall be in accordance with the fees set forth in Consultants’ Proposal (Exhibit A to the Original Agreement) and Consultant’s February 03, 2020, Proposal (Exhibit A-1 to Amendment No. 1). In no event shall Consultant’s compensation related to Exhibit A to the Original Agreement exceed Eighty-Six Thousand Nine Hundred dollars ($86,900) without additional written authorization from the City. In no event shall Consultant’s compensation related to Exhibit A-1 to Amendment No. 1 exceed Thirty-Eight Thousand Nine Hundred Thirty dollars ($38,930) without additional written authorization from the City. Notwithstanding any provision of Consultant’s Proposal and/or Consultant’s February 03, 2020 Proposal to the contrary, out of pocket expenses set forth in Exhibit A and Exhibit A-1, respectively, shall be reimbursed at cost without an inflator or administrative charge. Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment. 4. Except for the changes specifically set forth herein, all other terms and conditions of the Original Agreement shall remain in full force and effect. IN WITNESS WHEREOF, the parties have caused this Amendment No. 1 to be executed on the respective dates set forth below. “CITY” CITY OF LAKE ELSINORE, a municipal corporation “CONSULTANT” GeoMat Testing Laboratories, Inc., a California corporation Grant Yates, City Manager Date: Haytham Nabilsi, Principal Date: ATTEST: City Clerk APPROVED AS TO FORM: City Attorney Attachments: Exhibit A-1 – Consultant’s Proposal EXHIBIT A-1 CONSULTANT’S PROPOSAL [ATTACHED]