HomeMy WebLinkAboutPC Reso No 2018-66 (PA 2018-60, Beazer, MSHCP)RESOLUTTON NO.20r8-66
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL OF THE
CITY OF LAKE ELSINORE, CALIFORNIA, ADOPT FINDINGS THAT PLANNING
APPLTCATTON NO. 2018-60 (RESTDENT|AL DEStcN REVTEW NO. 2018-21) tS
CONSISTENT WITH THE WESTERN RIVERSIDE COUNTY MULTIPLE SPECIES
HABTTAT CONSERVATTON PLAN (MSHCp)
Whereas, Beazer Homes has filed an application with the City of Lake Elsinore (City) requesting
approval of Planning Application No. 2018-60 (Residential Design Review No. 2018-21) for the
design and construction of 57 single-family residential units, preliminary plotting, conceptual wall
and fence plan, including a new model home complex and related improvements (Project). The
Project is located in Tract Map No. 3'1920-18 (APNs: 371-270-006 and 024) of the Summerly
Development of the East Lake Specific Plan (ELSP); and,
Whereas, Section 6.0 of the Multiple Species Habitat Conservation Plan (MSHCP) requires that
all discretionary projects within a MSHCP Criteria Cell undergo the Lake Elsinore Acquisition
Process (LEAP) and the Joint Project Review (JPR) to analyze the scope of the proposed
development and establish a building envelope that is consistent with the MSHCP criteria; and,
Whereas, Section 6.0 of the MSHCP further requires that the City adopt consistency findings
demonstrating that the proposed discretionary entitlement complies with the MSHCP Criteria Cell,
and the MSHCP goals and objectives; and,
Whereas, pursuant to Lake Elsinore Municipal Code (LEMC) Chapter 17.184 (Design Review)
the Planning Commission (Commission) has been delegated with the responsibility of making
recommendations to the City Council (Council) pertaining to the residential design review; and,
Whereas, on September4, 2018 at a duly noticed Public Hearing the Commission has considered
evidence presented by the Community Development Department and other interested parties with
respect to this item.
NOW THEREFORE, THE PLANNING COMIUIISSION OF THE CITY OF LAKE ELSINORE
DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
$g!!4[ The Commission has considered the Project and its consistency with the MSHCP prior
to recommending that the Council adopt Findings of Consistency with the MSHCP.
Section 2: That in accordance with the MSHCP, the Commission makes the following findings
for MSHCP consistency:
1. The Project is a project under the City's MSHCP Resolution, and the City must make an
MSHCP Consistency finding before approval.
Pursuant to the CW's MSHCP Resolution, the PAed must be reviewed for MSHCP
consistency, which shall include an analysis of the Project's consistency with other"Plan Wide
Requirements." The Project is located within the ELSP area. Prior to the City's adoption of the
MSHCP, there were a serles of meetings between the County of Riverside, U.S. Fish and
Wildlife SeNice, and California Depaiment of Fish and Game to dlscuss conse/vation
measures within the ELSP and to decide how to ensure development within the ELSP could
PC Reso. No. 2018-66
Page 2 ot 4
proceed consistently with the MSHCP and with the U.S. Army Corps of Engineers Section
404 permit. lt was determined that a target acreage of 770 acres was wananted for MSHCP
conservation in the back basin area of the City.
The PAed site is within the ELSP and is covered by that conservation agreement. Part of
the conservation agreement also included a requirement that projects in the back basin area
be consistent with the other "Plan Wide Requirements" set forlh in the fo owing sections of
the MSHCP: Protection of Species Associated with Riparian/Riverine Areas and Vemal Pool
Guidelines (MSHCP, S 6.1 2), Protection of Nanow Endemic Plant Species (NEPS)
Guidelines (MSHCP, S 6., 3), Additional Survey A/eeds and Procedures (MSHCP, S 6 3 2),
UrbanlWildlands lnteiace Guidelines (MSHCP, S 6 1 4), Vegetation Mapping (MSHCP, S
6.3.1) requirements, Fuels Management Guidelines (MSHCP, S 6.4), and payment of the
MSHCP Local Development Mitigation Fee (MSHCP Ordinance, S 4). The Project has been
reviewed in light of these sections and is consistent therewith.
2. The Project is subject to the City's LEAP and the County's JPR processes.
The Project is located within the MSHCP Elsinore Area Plan but is not located within a MSHCP
Criteria Cell. Therefore, the project was not required to go through the LEAP or JPR
processes.
3. The Project is consistent with the Riparian/Riverine Areas and Vernal Pools Guidelines.
The previously approved ELSP and TTM 31920 was determined to be consistent with the
Riparian/Riverine and Vemal Pool Guidelines as set fotth in Section 6.1 .2 of the MSHCP. The
scope and nature of the Project have not been modified from that which was previously
approved and is therefore cors,stenl with the Riparian/Riveine Areas and Vernal Pools
Guidelines.
4. The Poect is consistent with the Protection of NEPS Guidelines.
The previously approved ELSP and TTM 31920 was consistent with the Protection of NEPS
Guidelines as set fotth in Section 6.1.3 of the MSHCP. The Project has not been modified
from that which was previously approved under the ELSP and TTM 31920. Additionally,
based upon prior approvals, the entire Project site has been graded and any plant species
which may have existed on the site have been removed and replaced with development. lt is
for these reasons that the Project is consistenf with the aforementioned g'uidelines.
5. The Project is consistent with the Additional Survey Needs and Procedures
The previously approved ELSP and TTM 31920 was consrstenl with the Additiolal Survey
Needs and Procedures as set forth in Section 6.3.2 ofthe MSHCP. The Project has not been
modified from that which was previously approved under the ELSP and TTM 31920, and the
entire project slte has been graded pursuant to previously issued permits. The Project is
consistent with the Additional Survey Needs and Procedures of the MSHCP.
6. The Project is consistent with the UrbanMildlands lnterface Guidelines.
The previously approved ELSP and TTM 31920 was conslsfent with the UrbanrWildlands
lnteiace Guidelines as set fotth in Section 6.1 .4 of the MSHCP. Because the Project has not
PC Reso. No.2018-66
Page 3 of 4
been modified from that which was previously approved under the ELSP and TTM 31920, no
fufther MSHCP review is necessa4/ and the Project ls conslstent with the UrbanAA/ildlands
lnteiace Guidelines.
7. The Project is consistent with the Vegetation Mapping requirements.
The previously approved ELSP and TTM 31920 was consistent with the Vegetation Mapping
requirements as set fotth in Section 6.3.1 of the MSHCP. Mapping was conducted as part of
the biological surveys for the original project. The PAed has not been modified from that
which was previously approved and therefore ,.s corsistent with the Vegetation Mapping
requirements.
8. The Project is consistent with the Fuels Management Guidelines.
The previously approved ELSP and TTM 31920 was cons,sten, with the Fuels Management
Guidelines as set forth in Section 6.4 of the MSHCP. The Project site is not within or adjacent
to conseNation areas where the Fuels Management Guidelines would be required. The
Project has not been modified from that which was previously approved and therefore is
consistent with the Fuel Management Guidelines.
9. The Project overall is consistent with the MSHCP.
Section 3: Based upon the evidence presented, both written and testimonial, and the above
findings, the Commission hereby recommends that the Council find that the Project is consistent
with the MSHCP.
$q!!4!i This Resolution shall take effect immediately upon its adoption.
Passed and Adopted on this 4th day of Septembet, 2018, by the following vote:
''-' 'A /"oo-
Myles,ltoss, Chairman
PC Reso. No. 2018-66
Page 4 of 4
STATE OF CALTFORNTA )
COUNry OF RIVERSIDE ) ss.
CITY OF LAKE ELSINORE )
l, Justin Kirk, Assistant Community Development Director of the City of Lake Elsinore, California,
hereby certify that Resolution No. 2018-66 was adopted by the planning commission of the cityof Lake Elsinore, califomia, at a Regular meeting held of September 4, zotg, ana that the same
was adopted by the following vote:
AYES: commissioner's Gray, Armit and Klaarenbeek; vice-chair carroll and chairman RossNOES: None
ABSENT: None
ABSTAIN: None