HomeMy WebLinkAboutPC Reso No 2017-75 (Brook Eddins, CUP)RESOLUTTON NO. 2017.75
A RESOLUTION OF THE PLANNNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALTFORNTA APPROVING PLANNTNG APPLTCATTON NO. 201642
(coNDtTtoNAL USE PERMTT NO.2017-t4) TO MODTFY A PREVTOUSLY APPROVED
CONDITIONAL USE PERMIT FOR AN ACADEMIC INSTRUCTION AND TUTORING
CENTER BY ADDING A 2,700 SQUARE FOOT CLASSROOM AND A 3,748 SOUARE
FOOT INDOOR PLAYGROUND LOCATED AT APN: 377-410-048
Whereas, Brook Eddins, Fundamentral Foundations has filed an application with the City of Lake
Elsinore (City) requesting approval of Planning Application No. 2016-42 (Conditional Use Permit
No. 2017-14) to modify a previously approved Conditional Use Permit (CUP 2016-15) for the
academic instruction/tutoring center by adding a 2,700 SF Kindergarten classroom (Suite'C")
and a 3,748 SF indoor playground (Suite "A'). The facility previously utilized Suite 'B'which is
'11,508 SF in area. The overall area for the facility will now be 17,956 SF with 10 classrooms, a
5,600 SF auditorium (forassemblies, physical education (P.E.), breaks, and lunches), a 3,748 SF
indoor playground, a storage room, a warehouse, three (3) offices, and two (2) reception areas
(Project). The Project is located at the southeastern corner of Collier Avenue and Crane Street
and more specifically referred to as 18421 Collier Avenue. (APN: 377-410-048); and,
Whereas, Chapte|I7.'168 of the Lake Elsinore Municipal Code (LEMC) provides that certain uses
have operational characteristics that, depending on the location and design of the use, may have
the potential to negatively impact adjoining properties, businesses or residents and therefore are
permitted subject to the issuance of a Conditional Use Permit, which allows the City to
comprehensively review and approve the use; and,
Whoreas, pursuant to the LEMC Chapte|17.168 (Conditional Use Permits) the Planning
Commission (Commission) has been delegated with the responsibility of reviewing and approving,
conditionally approving, or denying conditional use permits; and,
Whereas, pursuant Section '17.'168.'100 of the LEMC Chapter 17.168, the Commission has been
delegated with the responsibility of reviewing and approving, conditionally approving, or denying
modifications to CUP; and,
Whereas, on October 3, 2017, at a duly noticed Public Hearing, the Commission has considered
evidence presented bythe Community Development Department and other interested partieswith
respect to this item.
NOW, THEREFORE, THE PLANNING COMiIISSION OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SggIgI:L The Commission has considered the Project prior to making a decision and has found
it acceptable.
Sgg!!9OA The Commission hereby finds and determines that the Project is categorically exempt
from California Environmental Ouality Act (Cal. Publ. Res. Code SS21000 et seq. "CEQA") and
the State CEQA Guidelines (14. Cal. Code Regs SS15000 et seq.), specifically pursuant to
Section '15301 (Class 'l - Existing Facilities), because the Project is utilizing an existing building
for the academic instruction/tutoring center. The site is fully developed and only minor interior
alterations are planned in association with the proposed use.
PC Reso. No. 2017-75
Page 2 of 3
Section 3: That in accordance with Section 17.168.060 (Findings) of the LEMC, the Commission
makes the following findings regarding Planning Application No. 20t6-42 (CUP No. 2017-14):
1. That the proposed use, on its own merits and within the context of its setting, is in accord
with the objectives of the General Plan (GP) and the purpose of the planning district in
which the site is located.
The Project has a Busrness Professional (BP) GP Land use designation and is zoned
Commercial Manufacturing (C-M). The C-M zone estab/lshes trade school and similar
related facilities as uses sublecl to a CUP.
2. The proposed use will not be detrimental to the general health, safety, comfort or general
welfare of persons residing or working within the neighborhood ofthe proposed use orthe
City, or injurious to property or improvements in the neighborhood or the City.
The Project is located within an existing building and proposes no erterior uses. Ihe
Project does not propose either directly or indirectly any detrimental effects to the existing
surrounding community. The Project has been conditioned as such to avoid any possible
negative impacts associated with the conversion and operation of the proposed facility.
3. The Site for the intended use is adequate in size and shape to accommodate the use, and
for all the yards, setbacks, walls or fences, landscaping, buffers and other features
required by this title.
The Project has been analyzed and staff has determined that the proposed use meets all
applicable secllons of the LEMC and will complement the existing uses, based on fhe
submifted plans and the Conditions of Approval imposed upon the Project.
4. The Site for the proposed use relates to streets and highways with proper design both as
to width and type of pavement to carry the type and quantity of traffic generated by the
subject use.
The Project is located within an existing built environment, inclusive of sfreels. The existing
sfreefs are of adequate size to facilitate safe and convenient transpoftation to and hom
the site.
5. ln approving the subject use at the specific location, there will be no adverse effect on
abutting properties or the permitted and normal use thereof.
The Project has been thoroughly reviewed and conditioned by all applicable City
depaftments thereby eliminating the potential for any adverse effects.
6. Adequate conditions and safeguards pursuant to LEMC 17.68.050, including guarantees
and evidence of compliance with conditions, have been incorporated into the approval of
the subject project to ensure development of the property in accordance with the
objectives of this chapter and the planning district in which the site is located.
Pursuant to Section 17.168.040 ofthe LEMC, the Project was considered by the Planning
Commission at a duly noticed Public Hearing on October 3,2017, applicable Conditions
of Approval have been included to protect the public health, safety and general welfare.
PC Reso. No.2017-75
Page 3 of 3
Section 4: Based upon the evidence presented, the above findings, and the Conditions of
Approval imposed upon the Project, the Commission hereby approves Planning Application No.
2016-42 (CUP No. 2017-14).
Section 5: This Resolution shall take effect immediately upon its adoption.
Passed and Adopted on this 3'd day of October, 20"17, by the following
STATE OF CALIFORNIA
COUNTY OF RIVERSIDE
CITY OF LAKE ELSINORE
l, Justin Kirk, Principal Planner of the City of Lake Elsinore, California, hereby certify that
Resolution No. 2017-75 was adopted by the Planning Commission of the City of Lake Elsinore,
California, at a Regular meeting held of October 3,2017, and that the same was adopted by the
following vote:
)
) ss.
)
AYES:
NOES:
ABSENT:
ABSTAIN:
Commissioner Carroll, Vice-Chair Ross; and, Chairman Gray
None
Commissioner Armit and Commissioner Klaarenbeek
None
Planner
Justin