Loading...
HomeMy WebLinkAbout0030_1_STK - SRREPORT TO SUCCESSOR AGENCY OF THE REDEVELOPMENT AGENCY OF THE CITY OF LAKE ELSINORE To:Successor Agency Board From:Grant Yates, Executive Director Prepared by: Jason Simpson, Assistant Executive Director Date:November 12, 2019 Subject:Approve and authorize the Executive Director to execute the Professional Services Agreement for the Diamond Stadium Design and Architectural Services with STK Architecture Inc. Recommendation Approve and authorize the Executive Director to execute a Professional Services Agreementfor the ADA accessibilityand Health Department Code Compliance of Diamond Stadium, Diamond Club Kitchenwith STK Architecture Inc. in the amount not to exceed $87,750.00and in the form attached in such final form as approved by the AgencyAttorney. Background Staff has been working closely with Lake Elsinore Storm Management to improve ADA accessibility, andupdate current building and food serviceareas of Diamond Stadium. This agreement will focus on Diamond Club Kitchen and associated food service areas. It is important in this agreement to bring the Diamond Club Kitchen intocompliance with ADA accessibilitycode requirementsand County Health Department code standards for operational permitting.The remodel will improve ADA accessibility in the Diamond Club Kitchen and food service circulation, update appliance and kitchenequipment that is better aligned with current health department standards and simultaneously improves Diamond Clubmenuoptions. Discussion In this agreement re-design of the Diamond Club Kitchen will include new operationalfood preparation and kitchenlayout, raised celling, new wall surfaces, flooring, lighting, and commercial exhaust hood system (with fire prevention, air make-up & exhausting units). All of the existing kitchen appliances will be replaced with new current technology appliances. Foodand drink service area major component to the success of the Lake Elsinore Strom and with these needed updates and improvements both ADAand health departmentrequirements shall be met in the Diamond Club kitchen area. STK Diamond Club Kitchen –Health Department Compliance November 12, 2019 Page2 The architectural services with STK Architecture Inc. will include the major elements associated with the following: SCHEMATIC DESIGN ARCHITECTURE DESIGNDEVELOPMENT MECHANICAL, PLUMBING, ELECTRICAL ENGINEERING CONSTRUCTION DOCUMENTS GOVERNMENTAL PROCESSING(Health Department As Needed) Fiscal Impact Diamond Stadium Project (CIP Project RDA Z20003) is included in the Fiscal Year 19/20– 23/24Capital Improvement Plan (CIP) budget. The contract amount herein is fully funded with ROPSfunding. Exhibits A -Agreement B -Proposal