Loading...
HomeMy WebLinkAboutItem No. 13 SB! Lincoln Street Change OrderText File City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 19-329 Agenda Date: 9/24/2019 Status: Council Consent Calendar Version: 1 File Type: Council Consent Agreement In Control: City Council / Successor Agency Agenda Number: 13) Page 1 City of Lake Elsinore Printed on 9/19/2019 Lincoln Street Pavement Rehab CCO Page 1 of 1 REPORT TO CITY COUNCIL To:Honorable Mayor and Members of the City Council From:Grant Yates, City Manager Prepared By: Nicole McCalmont Date:September 24, 2019 Subject:SB1 - Lincoln Street Pavement Rehabilitation & Striping Contract Change Order Recommendation Approve the contract change order to All American Asphalt for the additional scope of work on Grand Avenue in the amount of $220,087.39. Background Lincoln Street Pavement Rehabilitation was submitted to CA League of Cities for Approval in order to utilize SB1 Grant allocation of $354,123 allocated to the City of Lake Elsinore for Fiscal Year 18/19. City Council awarded the contract to All American Asphalt on June 25, 2019 in the amount of $833,360.25. Discussion Grand Avenue Pavement rehabilitation was added to the Lincoln Street Pavement Rehabilitation Project scope due to the close proximity to the original project location as well as the deteriorated condition/uneven pavement of Grand Ave roadway surface. Over the years multiple utility trenching operations caused the Grand Ave roadway surface to become uneven and accelerated its deterioration. In an effort to improve the condition of pavement on Grand Ave, staff requested All American Asphalt to extend their scope of work adding these improvements which is a cost savings to the City since the contractor was already mobilized at the location. Fiscal Impact Funding for this project has been allocated within the approved CIP Budget. Exhibits A – Change Order PUBLIC WORKS CONSTRUCTION CONTRACT CONTRACT CHANGE ORDER Date 09/03/2019 C.C.O No. 1 951-674-3124 130 S. MAIN STREET LAKE ELSINORE, CA 92530 WWW.LAKE-ELSINORE.ORG PROJECT NAME SB1 Lincoln Street Pavement Rehabilitation & Striping CONTRACTOR: All American Asphalt In conformance with and as part of the existing Agreement for this project the City of Lake Elsinore authorizes and directs changes to the Agreement as described below. 1) EXTRA WORK ORDER (EWO) (Unknown or Unforeseen Work not covered by Contract) a) Extra Work Item A: Addition of Grand Avenue Rehabilitation Lump Sum Grand Avenue = $220,087.39 2) CHANGED WORK ORDER (CWO)(Significant increases in quantity of Unit-Price items; greater than 25%): a) Changed Work Item A: i)Time for completion will be increased/decreased by (+-) Zero (0) Working Days 3) CLOSING SUMMARY ORDER (CSO) (Final adjustment of original estimated contract quantities based on final measured quantities): a) Closing Summary Order: i)Addition of Work: Based on the change of additional scope of work constructed the final amount owed to the contractor is greater than the original agreement amount. Total = $220,087.39 AGREEMENT AMOUNT:Compensation as set forth in the Agreement and as amended by this and prior Contract Change Order(s) is: $1,053,447.64 Original Contract Amount: $ 833,360.25 Amount All Previous CCOs (+-): $0.00 Amount This CCO (+-): $ 220,087.39 Total Contract Amount: $1,053,447.64 CITY’S ACCEPTANCE:The above described work is hereby approved and directed to be completed in accordance with the Contract Documents. City of Lake Elsinore Rec.: _____________________ 09/03/2019 City Engineer Date App.: _____________________________ City Manager Date CONTRACTOR’S ACCEPTANCE:Contractor agrees to perform the above work as directed,in accordance with the Contract Documents, and acceptpayment describedabove as full compensation for work described subject to additions and reductions of the quantities of various items. Contractor: All American Asphalt By _________________________________________ Title: _______________________________________ Date: _______________________________________