Loading...
HomeMy WebLinkAboutItem No. 04 Purchase of Decomposed Granite Material Chandler Aggregates, Inc. City of Lake Elsinore 130 South Main Street __ Lake Elsinore,CA 92530 II www.lake-elsinore.org VV°"` IKo- Text File File Number: ID# 19-291 Agenda Date: 8/27/2019 Version: 1 Status:Approval Final In Control: City Council/Successor Aqency File Type: Report Agenda Number:4) City of Lake Elsinore Page 1 Printed on 812212019 CITY OF LADE LS I 1A0RE DREAM EXTREME- REPORT TO CITY COUNCIL To: Honorable Mayor and Members of the City Council From: Grant Yates, City Manager Prepared by: Jason Simpson, Assistant City Manager Date: August 27, 2019 Subject: Purchase of Decomposed Granite (DG) Material from Chandler Aggregates Inc. for the RV Resort Rehabilitation Project (CIP Project#Z40007) Recommendations 1. Authorize the City Manager to execute the Purchase Order in the amount of$80,000.00. 2. Authorize the City Manager to execute a Purchase Change Order not to exceed the 10% contingency amount of$8,000.00 for adjustments in the material estimate quantities as needed. Background Staff has researched and sought the additional advice of the material providers for the RV Resort Rehabilitation project and determined the direct purchase and delivery from Chandler Aggregates Inc. for the estimated 200 truckloads of DG Material is the most cost effective and efficient purchase approach. The DG material is available in the region, but a local purchase helps to hold down the expensive transportation costs of this heavy bulky material. The price for DG ranges from $400 to over$600 per truckload and the DG from Chandler Aggregates Inc. is sold at $400 per truckload. The greatest advantage of purchasing from Chandler Aggregates is the haul because of their proximity (Nichols Road) to the project site. Haul rates are based on an 8-hour day and if less than 8 hours the haul will be billed at an 8-hour minimum, at$100.00 per hour, per truck. Therefore, delivery distance and haul rates are major considerations when purchasing bulk construction material like DG. This purchase arrangement is advantageous to the City as Chandler Aggregates Inc. is located within the City. Discussion DG material is needed to establish a stabilized nonflammable camp ground area for the RV Resort. The DG will be placed behind and adjacent to the RV camping spaces at approximately 3 to 4 inches thick. The DG will be placed by means of attentive spreading and compacting to a high level of relative compaction, thus providing a stable foundation. The DG will provide a clean durable surface for camping and greater fire resistance for camp fires in the rear of the RV spaces. Chandler Aggregates Inc. August 27, 2019 Page 2 Fiscal Impact RV Resort Rehabilitation Project(CIP PROJECT#Z40007) is included in the Capital Improvement Plan (CIP) budget. Rates from vendor are based upon quantities delivered from their pricing noted in the background. Exhibits None