Loading...
HomeMy WebLinkAboutItem No. 17 Purchase Class II Road baseText File City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: TMP-2814 Agenda Date: 6/12/2018 Status: Consent AgendaVersion: 1 File Type: AgreementIn Control: City Council / Successor Agency Agenda Number: 17) Page 1 City of Lake Elsinore Printed on 6/7/2018 REPORT TO CITY COUNCIL To:Honorable Mayor and Members of the City Council From:Grant Yates, City Manager Prepared by:Jason Simpson, Assistant City Manager Date:June 12, 2018 Subject: Purchase of Class II Base Material from Chandler Aggregates Inc. for the Campground Project (CIP Project #Z40007) Recommendations 1.Authorize the City Manager to execute the Purchase Order in the amount of $65,800.00. 2.Authorize the City Manager to execute a Purchase Change Order not to exceed the 10% contingency amount of $6,580.00 for adjustments in the material estimate quantities as needed. Background Staff has researched and sought the advice of the contracted site developer for the Campground Rehabilitation project and determined the direct purchase and delivery from Chandler Aggregates Inc. for the estimated 7,125 tons of class II base is the most cost effective and efficient purchase approach. The class II base products are available in the region but a local purchase helps to hold down the expensive transportation costs of this heavy bulky material. The price for class II base ranges from $9 to over $10.50 per ton and the class II base from Chandler Aggregates Inc. is sold at a competitive price of $9.12 per ton. The greatest advantage of purchasing from Chandler Aggregates is the haul because of their proximity (Nichols Road) to the project site. Haul rates are based on an 8 hour day and if less than 8 hours the haul will be billed at an 8 hour minimum, at $100.00 per hour, per truck. Therefore, delivery distance and haul rates are major considerations when purchasing bulk construction material like class II base. The shorter haul route is not only cost-effective and financially advantageous, but it also translates into lesser traffic and air quality impacts that would be associated with a longer and/or freeway based haul route. Discussion Class II base material is needed to establish the ground substance for the Campground roads with an area of over 332,000 square feet of road surface. The base course thickness will range from 6 to 7 inches and it will be built directly on top of the road subgrade. The class II base will be placed by means of attentive spreading and compacting to a high level of relative compaction, thus providing a stable foundation. The class II base will provide a clean durable surface ready for asphalting. Chandler Aggregates Inc. June 12, 2018 Page 2 Fiscal Impact RV Resort Rehabilitation Project (CIP PROJECT #Z40007) is included in the Fiscal Year 17/18 –22/23Capital Improvement Plan (CIP) budget. Exhibits A: Chandler Aggregates ProposalDated 5/31/2018 CHANDLER AGGREGATES INC. NICHOLS ROAD (951) 277-9110 (TELEPHONE) (951) 277-1341 (FAX) Material Quote To: City of Lake Elsinore Attention: Jason Simpson 130 So. Main Street Lake Elsinore, CA 92530 Delivery address:_ La Laguna R.V. Resort _ _ 32040 Riverside Drive Lake Elsinore _ Quoted by:_ Skip 22507 Date: 05/31/18__ Delivered Price Bottom Dump 7,125 Tons _Class II Base $ 9.12 per ton Due to current permit restrictions at the Nichols Road plant, haul rates are based on 6:00 a.m. load times at the plant with a full 8 hours to deliver product. Anything less than 8 hours will have to be re‐bid prior to scheduling. Haul rates are based on an 8 hour day. If less than 8 hours the haul will be billed an 8 hour minimum, at $100.00 per hour, per truck. The first 5 minutes on the job are included in price, thereafter, $_1.67 per minute. Sales tax and fees are included in delivered prices. Trucking and material are based on availability. If a short load is needed, haul is billed at a 25 ton minimum. Shipment of material constitutes acceptance of material. Haul rates are based on a minimum 8 hour delivery schedule with the load time at our plant at 7:00 a.m. Even though we bid a delivered price, this does not guarantee truck availability. There is a truck shortage due to CARB laws. All trucking is based on availability. Haul rates include the first _5_ minutes on the job, thereafter, $1.67_ per minute standby time will be charged. All prices are per U.S. ton. All material and trucking are subject to availability. Material may be limited daily. Material is subject to pre‐approval at the plant site, prior to shipment. Material is guaranteed to meet specification at Chandler plant site only. Shipment of material constitutes acceptance of material. Haul rates are subject to change without notice. Haul rates are based on fuel not exceeding _$4.50 per gallon. Shipment of material constitutes acceptance of material. Material prices are good through _July 2018. However, we cannot guarantee truck rates through _July 2018. A _7_ day advance notice red prior to shipment. Notice of intent to purchase must be received by _06/15/18 or bid is null and void.