REPORT TO CITY COUNCIL
To:Honorable Mayor and Members of the City Council
From:Grant Yates, City Manager
Prepared By: Brad Fagrell, City Engineer
Date:April 24, 2018
Subject:SB-1 Pavement Rehabilitation Projects (FY 2018-19 Program)
Recommendation
Approve the submission of Four (4) pavement rehabilitation projects for SB-1 funding. The
purpose of these projects are to improve the condition rating of Lincoln Street pavement from
Riverside Drive to its north end near Rice Canyon. The application submission deadline for SB-
1 projects is May 1, 2018.
Background
Bucknam Infrastructure Group has completed the 2017 Pavement Assessment Program.
Based on their most recent pavement condition survey (9/2017), Lincoln Street Pavement
Condition Indices (PCI) vary between 28 to 79, on a scale from 0 to 100. Rehabilitation
recommendations are divided into categories based on the various conditions:
2” Grind and Overlay
Type II Slurry Seal
Discussion
Priority Project Description of work Cost Estimate
1 Lincoln St. Between Riverside Dr. and
Machado St.
2” Grind and Overlay $317,160
2 Lincoln St. Between Machado St. and
Terra Cotta St.
Type II Slurry Seal $31,941
3 Lincoln St. Between Terra Cotta St.
and Grand Ave.
2” Grind and Overlay $612,000
4 Lincoln St. Between Grand Ave. and
North end of Lincoln St.
Type II Slurry Seal $117,023
Page 2 of 2
Once SB-1 funding is secured, projects from the list above will be advertised for bid. The City of
Lake Elsinore’s projected SB-1 allocation for FY 2018-19 is $1,031,103, for the first full year of
funding.
Fiscal Impact
The funding allocation for the four pavement segments listed above, will be from the allocated
SB-1 funds available, with the remainder being funded from the Highway Users Tax Account
(HUTA).
Exhibits
A – Project Map
+ � Moulltalrl S# '
* #
R2 ce Canyon , 3� 4w'go 0 if.
_ Schaal Yepani pi�
Lx+Y % t
1 rsr'rmoo
fy' B4gf> /
' view 81 SPFUCe 51.
.t0:+2" i Teirl
Cott�l Middle L)rIft%VG.D Ln rrison Ave
4 i
N a boor t
1
LakeshnTe Dr
"• , �++ 5ummarhka At
emadlwa y .S# �'I � � Pic
r � ' 3+
7 ren St a `"' _ _� ro x ac `j,s
Awe oq K pw,
`path x t�, o x
I CIf Ave 0
LT
h Canyon
F C � 11 Y� IT Perk Sr
Canyon Pa And \r,+ Vemalilles St "'6b
Suet* bark ` + 9 f'1
Cc
116
Etienrti°,Sr ` � lb � *#�� �` "PF.r
Y C t a u mo nt Si � r%kzbc halo 'p#�r 6# %, 'fix h S`
• -- - - — - [Y 1x. Park "'.
"Y ElenvnLa
U Nom If mood Sr Sc haal � �
a
# `
LE Aq 11
F ICUs St' #f#
it
r
Rd J Arrro)aser
Aharadr w#
Via Carnia 5,-
flb 1110
r m ur
12 M 4 _ firs r
3
f �