Loading...
HomeMy WebLinkAboutItem No. 04 2nd Amend to PSA Aguilar Consult., Inc.REPORT TO CITY COUNCIL To:Honorable Mayor and Members of the City Council From:Grant Yates, City Manager Approved by:Brad Fagrell, City Engineer Prepared By: Nicole McCalmont, Senior Engineering Technician Date:July 11, 2017 Subject:Second Amendment to Professional Services Agreement with Aguilar Consulting, Inc. Recommendation Staff recommends the City Council approve the second amendment to the Professional Services Agreement and authorize the City Manager to execute the second amendment in the amount of $57,567.49. Discussion Temescal Canyon Bridge Replacement project is currently in the Plan Approval and Environmental Document (PA&ED) phase. The proposed 4-lane Bridge location is westerly of the existing bridge in order to accommodate the proposed realignment of Temescal Canyon road to Lake Street. Since the proposed location of the Bridge is partly within Alberhill Historic District, Caltrans has required the preparation of Finding of Effect (FOE) to analyze the potential project effects on the historic property. The proposed analysis is outside of the current scope of work and the review process will extend the PA&ED completion timeline by an additional 2-3 months. The proposed project NEPA cannot be cleared until the final approval of the FOE. Fiscal Impact There is no General Fund impact. Funds required to complete the PA&ED has been secured Through Caltrans Highway Bridge (HBP) program, and Transportation Uniform Mitigation Fee (TUMF) program. Exhibits A – Amendment No. 2 Professional Services Agreement A-1 Proposal B – Original Agreement AMENDMENT NO. 2 TO AGREEMENT FOR PROFESSIONAL SERVICES Aguilar Consulting, Inc. Temescal Canyon Road Bridge over Temescal Wash Replacement This Amendment No. 2 to Agreement for Professional Services is made and entered into as of July 11, 2017, by and between the City of Lake Elsinore, a municipal corporation (“City), and Aguilar Consulting, Inc., a California corporation (“Consultant”). RECITALS A.The City and Consultant have entered into that certain Agreement for Professional Services dated as of February 16, 2015, (the “Original Agreement”), which was approved on May 27, 2014. Except as otherwise defined herein, all capitalized terms used herein shall have the meanings set forth for such terms in the Original Agreement. B.The Original Agreement provided for compensation to Consultant in an amount $799,762. C.Amendment No. 1 was executed and deemed effective June 3, 2014, to incorporate the mandatory Federal Provisions to the contract. D. The parties now desire to modify the original scope of services and increase the payment for such services as set forth in this Amendment No 2. NOW, THEREFORE, in consideration of the mutual covenants and conditions set forth herein, City and Consultant agree as follows: 1.Section 1, Scope of Services, of the Original Agreement is hereby amended to add the following: Consultant shall also perform the services described in Consultant’s June 20, 2017, Proposal (attached to this Amendment No. 2 as Exhibit A-1). Consultant shall provide such services at the time, place, and in the manner specified in Exhibit A-1, subject to the direction of the City through its staff that it may provide from time to time. 2.Section 3, Compensation, of the Original Agreement is hereby amended to read in its entirety as follows: Compensation to be paid to Consultant shall be in accordance with the fees set forth in Consultants’ Proposal (Exhibit A to the Original Agreement) and Consultant’s June 20, 2017, Proposal (Exhibit A-1 to Amendment No. 2). In no event shall Consultant’s compensation related to Exhibit A (Original Agreement) and Exhibit A-1 (Amendment No. 2) exceed Eight Hundred Fifty Seven Thousand Three Hundred Twenty Nine dollars and Thirty Two cents ($857,329.32) without additional written authorization from the City. Notwithstanding any provision of Consultant’s Proposal and/or Consultant’s June 20, 2017, Proposal to the contrary, out of pocket expenses set forth in Exhibit A and Exhibit A-1, respectively, shall be reimbursed at cost without an inflator or administrative charge. Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment. 4.Except for the changes specifically set forth herein, all other terms and conditions of the Original Agreement shall remain in full force and effect. IN WITNESS WHEREOF, the parties have caused this Amendment No. 2 to be executed on the respective dates set forth below. “CITY” CITY OF LAKE ELSINORE, a municipal corporation Grant Yates, City Manager Date: ATTEST: City Clerk APPROVED AS TO FORM: City Attorney “CONSULTANT” Aguilar Consulting, Inc., a California corporation Ceazar Aguilar, PE Date: Attachments: Exhibit A-1 – Consultant’s June 20, 2017 Proposal Exhibit B – Original Agreement EXHIBIT A-1 EXHIBIT A-1 CONSULTANT’S [date] PROPOSAL [ATTACHED] EXHIBIT B EXHIBIT B ORIGINAL AGREEMENT [ATTACHED] 1      June 20, 2017 Ms. Ati Eskandari, P.E. Project Manager City of Lake Elsinore 130 S. Main Street Lake Elsinore, CA 82530 Re: Proposed Budget Reallocation No. 3 (Budget Shift) and Budget Augmentation Request No. 1 in Support of Additional Scope of Work; Temescal Canyon Road Bridge over Temescal Wash Replacement Project; State Bridge No. 56C0050; Federal Aid Project No. BRLO-5074(015) Dear Ati: On behalf of LSA and Associates, Inc. (LSA) and David Evans & Associates, Inc. (DEA), we would like to submit our request for Budget Reallocation No. 3 and Budget Augmentation No. 1under our existing contract for your review and approval: 1. Reallocate $20,697.61 from “Task 3.3: Construction Traffic Impact Analysis” to “Task 1.2: Meetings and Coordination” for $6,942.61, “Task 3.5: Noise Study” for $4,505.00, and “Task 3.17: Traffic Analysis (LLG)” for $9,250.00. Task 3.17 is a new task not covered under the existing contract. 2. Request budget augmentation of $57,567.49 to be distributed as follow: a. “Task 1.2: Meetings and Coordination” for $5,107.29 to cover additional meetings and coordination costs associated with the new tasks. b. “Task 2.8: Floodplain Study, Bridge Hydraulics, Sediment Transport Study, and Scour Study” for $14,110.20 to develop bridge/channel options per the resource agencies’ requirements pertaining to wildlife corridor issues. c. “Task 2.11: Bridge Aesthetics Study” for $8,350.00 to prepare bridge exhibits in support of the FOE. d. “Task 3.5: Noise Study” for $495.00. e. “Task 3.8: NES/MSHCP/HANS/JPR/Focused Surveys” for $10,000.00. f. “Task 3.16: Finding of Effect (FOE) for $19,505.00. This task is a new task not covered under the existing contract. As shown on the attached revised schedule, the current total contract fee amount of $799,761.83 is increased to $857,329.32. Enclosed are ACI’s, LSA’s and DEA’s description of additional scope of work and fee schedule. 2    Please let me know if you have any questions. Sincerely,   Ceazar Aguilar, PE Principal AGUILAR CONSULTING, INC. 2155 Chicago Avenue, Suite 301 Riverside, CA 92507 (951) 300 – 1431 Phone (951) 300 – 1434 Fax (909) 709 – 4393 Cell Enclosure  Page 1 of 1    SCOPE OF WORK BUDGET AUGMENTATION REQUEST NO. 1 TEMESCAL CANYON ROAD BRIDGE OVER TEMESCAL WASH REPLACEMENT PROJECT; STATE BRIDGE NO. 56C0050; FEDERAL AID PROJECT NO. BRLO-5074(015) SCOPE OF SERVICES Task 1.2: Meetings and Coordination ACI will provide additional meetings and coordination time in support of the tasks described under this budge augmentation request. Deliverables: Meeting Notes Task 2.8: Floodplain Study, Bridge Hydraulics, Sediment Transport Study, and Scour Study ACI will prepare a study report and HEC-RAS models that reflect a longer bridge crossing (Option 1) and keeping the current bridge length but minimizing channel grading (Option 2). Both options will keep the impact or relocation of the existing Corps’ 404 JD stream to less than 500 feet. This scope includes preparation of updated bridge layout and floodplain exhibits and cross sections based on the results of the HEC-RAS models. This scope also includes preparing cross sections every 100 feet for Temescal Wash within the APE boundary that reflect the existing and proposed grades including the FEMA floodway boundary. Preliminary cost estimates for both options will be prepared. Deliverables: Study Report, Preliminary Cost Estimates, HEC-RAS Calculations, Cross Sections, and Exhibits Task 2.11: Bridge Aesthetics Study – Visual Simulation Exhibits in Support of FOE See David Evans & Associates, Inc.’s budget augmentation request letter dated June 16, 2017. Deliverables: Visual Simulation Exhibits   Task 3.5: Noise Study See LSA & Associates, Inc.’s budget augmentation request letter dated May 24, 2017. Deliverables: Noise Study Task 3.8: NES/MSHCP/HANS/JPR/Focused Surveys See LSA & Associates, Inc.’s budget augmentation request letter dated May 24, 2017. Deliverables: NES/MSHCP/HANS/JPR/Focused Surveys Task 3.16: Finding of Effect (FOE) See LSA & Associates, Inc.’s budget augmentation request letter dated May 24, 2017. Deliverables: Finding of Effect (FOE) City of Lake Elsinore 6/20/2017 Temescal Canyon Road Bridge Replacement Project COST DETAIL BY TASK TASK 1: PROJECT MANAGEMENT TASK 1.1: Project Administration and Project Controls $39,178.85 $0.00 $0.00 $39,178.85 TASK 1.2: Meetings and Coordination $120,453.88 $6,942.61 $5,107.29 $132,503.78 TASK 1.3: Quality Assurance and Quality Control $29,690.91 $0.00 $0.00 $29,690.91 TASK 2: PRELIMINARY ENGINEERING TASK 2.1: Data Collection and Research $9,078.99 $0.00 $0.00 $9,078.99 TASK 2.2: Field Review and Site Assessment $1,422.18 $0.00 $0.00 $1,422.18 TASK 2.3: Right-of-Way Research and Base Mapping $4,799.00 $0.00 $0.00 $4,799.00 TASK 2.4: Utility Research, Notification and Mapping $4,076.42 $0.00 $0.00 $4,076.42 TASK 2.5: Roadway Alternatives and Geometric Approval Drawings (GAD $30,666.54 $0.00 $0.00 $30,666.54 TASK 2.6: Preliminary Geotechnical and Bridge Foundation Reports $13,777.73 $0.00 $0.00 $13,777.73 TASK 2.7: Structure Advance Planning Study $17,112.84 $0.00 $0.00 $17,112.84 $80,001.05 $0.00 $14,019.74 $94,020.79 TASK 2.9: Preliminary Channel Improvements Plans $13,789.80 $0.00 $0.00 $13,789.80 TASK 2.10: Roadway Drainage Study $9,977.02 $0.00 $0.00 $9,977.02 TASK 2.11: Bridge Aesthetics Study $22,371.69 $0.00 $8,150.00 $30,521.69 TASK 2.12: Preliminary Right of Way Requirement Plans $3,998.63 $0.00 $0.00 $3,998.63 TASK 2.13: Preliminary Right of Way Study and Cost Estimates $2,339.55 $0.00 $0.00 $2,339.55 TASK 2.14: Preliminary Engineering Cost Estimates for Alternatives $3,294.37 $0.00 $0.00 $3,294.37 TASK 2.15: Project Study Report (Equivalent) $20,494.40 $0.00 $0.00 $20,494.40 TASK 2.16: Bridge Type Selection Report $34,720.64 $0.00 $0.00 $34,720.64 TASK 3: ENVIRONMENTAL TASKS TASK 3.1: Project Impact Area, APE $1,142.18 $0.00 $0.00 $1,142.18 TASK 3.2: Prelim. Environmental Study (PES) $7,488.65 $0.00 $0.00 $7,488.65 TASK 3.2.1: Field Review Meeting $1,607.11 $0.00 $0.00 $1,607.11 TASK 3.2.2: Final PES $1,235.83 $0.00 $0.00 $1,235.83 TASK 3.3: Construction Traffic Impact Analysis $20,697.61 ($20,697.61) $0.00 $0.00 TASK 3.4: Air Quality/Greenhouse Gas Assessment $19,439.88 $0.00 $0.00 $19,439.88 TASK 3.5: Noise Study $22,000.00 $4,505.00 $495.00 $27,000.00 TASK 3.6: Water Quality Assessment Report (WQAR) and Water Quality M $22,400.00 $0.00 $0.00 $22,400.00 TASK 3.7: Location Hydraulics Report (LHS) and Summary Floodplain En $4,582.70 $0.00 $0.00 $4,582.70 Task 3.8: NES/MSHCP/HANS/JPR/Focused Surveys $72,063.11 $0.00 $10,000.00 $82,063.11 TASK 3.9: Jurisdiction Delineation $21,863.76 $0.00 $0.00 $21,863.76 TASK 3.10: Cultural/Paleontology $65,787.89 $0.00 $0.00 $65,787.89 TASK 3.11: Initial Site Assessment for Hazardous Materials, Aerially Depo $20,797.94 $0.00 $0.00 $20,797.94 TASK 3.12: Administrative Draft IS/MND & MMRP $9,771.29 $0.00 $0.00 $9,771.29 TASK 3.12.1: Draft IS/MND & MMRP $5,446.56 $0.00 $0.00 $5,446.56 TASK 3.12.2: Response to Comments $5,429.77 $0.00 $0.00 $5,429.77 TASK 3.12.3: Final IS/MND & MMRP $4,153.26 $0.00 $0.00 $4,153.26 TASK 3.12.4: Public Hearings/NOD $1,645.15 $0.00 $0.00 $1,645.15 TASK 3.13: CE Checklist & Environ. Commitments Report $1,585.62 $0.00 $0.00 $1,585.62 TASK 3.14.1: ACOE Section 404 for Nationwide Permit $0.00 $0.00 $0.00 $0.00 TASK 3.14.2: Water Quality Control Board Section 401 $0.00 $0.00 $0.00 $0.00 TASK 3.14.3: CA Dept of F&W Streambed Alteration 1600 Agreement $0.00 $0.00 $0.00 $0.00 TASK 3.14.4: Compensatory Mitigation Plan $0.00 $0.00 $0.00 $0.00 TASK 3.15: Section 4(f) $8,892.46 $0.00 $0.00 $8,892.46 TASK 3.16: Finding of Effect (FOE) $0.00 $0.00 $19,505.00 $19,505.00 TASK 3.17: Traffic Analysis (LLG) $0.00 $9,250.00 $0.00 $9,250.00 OTHER DIRECT COSTS $20,486.57 $0.00 $290.46 $20,777.03 TOTALS $799,761.83 $0.00 $57,567.49 $857,329.32 REVISED FEE SCHEDULE BUDGET REALLOCATION NO. 3 AND BUDGET AUGMENTATION NO. 1 TASK 2.8: Floodplain Study, Bridge Hydraulics, Sediment Transport Study, and Scour Study TASK CURRENT FEE SCHEDULE BUDGET REALLOCATION REQUEST NO. 3 BUDGET AUGMENT REQUEST NO. 1 File=8001-0003 REVISED FEE SCHEDULE FOR BUDGET AUGMENTATION NO. 1_062017 COST DETAIL Federal Aid Project No. Project Name: Date: Consultant: DIRECT LABOR Classification Range Hours Total Project Manager 52 @ 71.94$ 3,740.88$ Senior Design Engineer Lynn Johnson 36 @ 44.00$ 1,584.00$ Design Engineer Chris Aguilar 60 @ 28.00$ 1,680.00$ 0@ -$ 0@ -$ 148 @ -$ FRINGE BENEFITS Rate Total *%- Total Fringe Benefits (FB) INDIRECT COSTS Total Overhead (OH)141 %- General and Administrative (G&A)0 %- Total (* Combined FB, OH and G&A)141 % 10,173.19$ Total Indirect Costs (IC) FEE (PROFIT)Rate Total 10 % 1,738.82$ Fee (DLC+FB+IC) OTHER DIRECT COSTS (ODC) David Evans & Associates, Inc. 200.00$ Subtotal Cost 200.00$ SUBCONTRACTOR COSTS LSAs & Associates, Inc. 30,000.00$ David Evans & Associates, Inc. 8,150.00$ Subtotal Cost 38,150.00$ TOTAL COST Aguilar Consulting, Inc. Ceazar Aguilar Hourly RateName CITY OF LAKE ELSINORE COST PROPOSAL Temescal Canyon Road Bridge Over Temescal Creek Replacement Project - Budget Augmentation No. 1 6/20/2017 BRLO-5074(015) City Project No. : 57,567.49$ Subtotal Direct Labor Costs 7,004.88$ Escalation (2.2%) 210.15$ Total Other Direct Costs 290.46$ 1,738.82$ Total Subcontractor Costs 38,150.00$ -$ 10,173.19$ Total Direct Labor Costs (DLC) 7,215.03$ Project Name: Temescal Canyon Road Bridge Over Temescal Creek Replacement Project - Budget Augmentation No. 1 Date: 6/20/17Federal Aid Project No. BRLO-5074(015) Consultant: Aguilar Consulting, Inc.Task No. Task DescriptionProject ManagerSenior Design EngineerDesign Engineer00Total HoursLabor CostSubconsultants Labor CostSubtotal Labor CostLoaded Rate$196.43 $120.14 $76.45 $0.00 $0.00 1.2 Meetings and Coordination260000265,107.29$ 5,107.29$ 2.8Floodplain Study, Bridge Hydraulics, Sediment Transport Study, and Scour Study26 36 60 0 0 122 14,019.74$ 14,019.74$ 2.11 Bridge Aesthetics Study000000 -$ 8,150.00$ 8,150.00$ 3.5 Noise Study000000 -$ 495.00$ 495.00$ 3.8 NES/MSHCP/HANS/JPR/Focused Surveys000000 -$ 10,000.00$ 10,000.00$ 3.16 Finding of Effect (FOE) 000000 -$ 19,505.00$ 19,505.00$ 52 36 60 0 0 148 57,277.03$ 52 36 60 0 0 148 290.46$ 57,567.49$ Total Cost w/ ODC Total HoursSubtotal ODCCITY OF LAKE ELSINORECost Proposal - Man Hour WorksheetAdditional ServicesSubtotal Hours Subtotal Labor Cost Page 2 of 3 ITEM UNIT COST ESTIMATED QUANTITY BUDGETED COST 8.5"X11" B/W $0.04 0 $0.00 8.5"X11" COLOR $0.25 0 $0.00 11"X17" B/W $0.09 8 $0.72 11"X17" COLOR $0.29 6 $1.74 24"X36" B/W $8.00 6 $48.00 24"X36" COLOR $10.00 4 $40.00 30"X42" B/W $12.00 0 $0.00 30"X42" COLOR $15.00 0 $0.00 BINDERS (3-RING) $4.00 0 $0.00 TAB $2.75 0 $0.00 $90.46 ITEM UNIT COST ESTIMATED QUANTITY BUDGETED COST Certified Mail $0.00 0 $0.00 FedEx $20.00 0 $0.00 $0.00 0 $0.00 $0.00 ITEM UNIT COST ESTIMATED QUANTITY BUDGETED COST Mileage $0.54 0 $0.00 $0.00 ITEM UNIT COST ESTIMATED QUANTITY BUDGETED COST $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 $90.46 OTHER DIRECT COSTS (ODC) SUMMARY TOTAL ODC BUDGET Mailing and Special Delivery Cost Breakdown TOTAL BUDGET Mileage & Travel Log TOTAL BUDGET Miscellaneous TOTAL BUDGET Reproduction Cost Breakdown TOTAL BUDGET Temescal Canyon Road Bridge Over Temescal Wash Bridge Replacement Project 5/25/17 (R:\ACN1401\Contract and PIF\Budget Augment Request 5-24-17 REV (2).docx) BERKELEY CARLSBAD FRESNO IRVINE LOS ANGELES PALM SPRINGS POINT RICHMOND RIVERSIDE ROSEVILLE SAN LUIS OBISPO 1500 Iowa Avenue, Suite 200, Riverside, California 92507 951.781.9310 www.lsa.net May 24, 2017 Ceazar Aguilar, PE Aguilar Consulting, Inc. 2155 Chicago Avenue, Suite 301 Riverside, CA 92507 Subject: Temescal Canyon Bridge and Road Realignment Budget Reallocation Request No. 2 and Budget Augment Request No. 1. Dear Ceazar: LSA is requesting a budget reallocation and budget augment for out of scope tasks as a result of the change in the project description and the extended length of the schedule. We are requesting a budget augmentation of $30,000.00 and a budget reallocation of $21,542.10 to cover the traffic data and noise study request by Caltrans, and additional project management. We are requesting a budget augment of $30,000.00 following out of scope items that are a result of schedule creep and a change in the project from what was originally contracted to analyze for environmental impacts:  Additional project description changes. Subsequent to the additional biological and cultural survey work the project to be analyzed for Caltrans purposes changed again. On October 25, 2016, Caltrans determined in a PDT meeting with them, the City, and City consultants the project that would be analyzed in the environmental documents would be just the bridge and 200 feet on either side of the bridge. Segments A and C are City projects will be locally funded and not required to be analyzed for Caltrans. This necessitated LSA to change its GIS mapping and analysis in the cultural and biological resources studies. The APE and Biological Study Area (BSA) map required changes to show the reduced area. It was determined by LSA the survey reports for special status species would show the entire area surveyed and would the reports would not be changed. The cultural resources analysis of the larger area had already been reviewed by Caltrans. The change in the project required the HPSR study to be revised and resubmitted to Caltrans for review.  Additional project management and meetings. We had scoped for up to 10 team meetings, one field review meeting, and one kickoff meeting (12 meetings total). The environmental phase for the PA/ED was to be complete by April 18, 2016. To date, the project is over one year off schedule and it is not anticipated to be complete by August/September 2017. The one year delay has necessitated additional project management time updating project schedules, team coordination, phone call, emails and attendance at team meetings. A request for reallocation of $6,942.61 for additional Project Management.  MSHCP Consistency Analysis and the “City’s” project. We had prepared the consistency analysis for the Caltrans project for the NES. Subsequent to preparing the document, the City, asked that the MSHCP consistency analysis and the JPR process with the Riverside 5/25/17 (R:\ACN1401\Contract and PIF\Budget Augment Request 5-24-17 REV (2).docx) 2 Region Authority (which implements the MSHCP) include the City’s project (Segment A). This necessitated us to revise the consistency analysis and the mapping to include the City’s project for submittal to the JPR on May 3, 2017. A budget augment of $10,000.00 is being requested for Task 3.8.  Noise Study Refinements. The original scope and budget did not include the additional requirements by Caltrans for traffic data from a traffic engineer or the changes to the Noise Study content. There was time spent coordinating with LLG for the traffic data. The noise study also required coordination with Caltrans, the City and the property owner for the noise monitoring. We are requesting a budget reallocation of $4,505.00 and a budget augment request of $495.00 for Task 3.5.  Traffic Data Required for the Noise and Air Quality Analysis (NEW TASK). Since a traffic study was not prepared for the proposed project, a memorandum signed by a certified transportation planner or engineer is required to provide traffic data to be used by for the noise and air quality analysis. This is a requirement of Caltrans District 8 noise staff only. The other Caltrans Districts do not have this requirement. LLG, Engineers had done work on the Alberhill Villages Specific Plan for Castle and Cook so it was more efficient to have them provide the traffic data. LSA entered into an agreement with LLG at the request of the City. Task 3.3 Construction Traffic Impact Analysis, is not required for the NEPA document; therefore, we are requesting $9,250.00 budget reallocation for this new task.  Finding of Effect (FOE) (NEW TASK). Because LSA has identified one historic property (the Alberhill Historic District) within the project’s Area of Potential Effects (APE), a Finding of Effect (FOE) is required by Section 106 (federal law). The purpose of this FOE is to analyze the potential project effects on the historic property and to determine whether any alternative would alter, directly or indirectly, any of the characteristics of the historic property that qualify it for inclusion in the National Register of Historic Places (National Register). The following is the proposed scope of work to complete the additional required work. Task 1: Review Project Information. An LSA architectural historian will review the most current project description and project plans. The purpose of this review is to determine the exact nature and extent of the proposed construction activities and their potential to adversely affect the historical significance of the historic property. A detailed project description, engineering plans, and visual simulations will be required from the engineer in order to conduct the FOE analysis. All improvements, including striping, signage, drainage, utilities, and landscaping (if proposed), will need to be included in the description and plans. In addition, if available, renderings and/or elevations should be provided, as well as a list of proposed colors and materials for the proposed bridge. Consultation with the project engineer may be necessary. Task 2: Research. Because only limited research was done to make the finding that the Alberhill Historic District is eligible for listing in the National Register of Historic Places for purposes of this project only, additional research will be required. The purpose of this 5/25/17 (R:\ACN1401\Contract and PIF\Budget Augment Request 5-24-17 REV (2).docx) 3 research is to identify the key characteristics of the district that contribute to its significance. This may entail a field visit. Task 3. Consultation with Caltrans. In an effort to streamline the process and reduce the number of potential comments on the FOE document, LSA cultural staff will meet with Caltrans District 8 Cultural staff to discuss the potential project effects on the historic property. This will ensure that LSA and Caltrans staff generally agrees on the issues and approach. LSA stipulates one meeting that may take place in person or telephonically. In addition, this meeting will be limited to LSA and Caltrans cultural staff only unless either party deems it necessary to include non-cultural staff, such as the project engineer. Task 4: Prepare FOE. Following the guidelines provided in the Caltrans Standard Environmental Reference (SER), Volume II, Chapter 2 (Cultural Resources), Section 2-5.3 (Finding of Effect Documents), an LSA architectural historian will prepare a Caltrans format FOE document using the Criteria of Adverse Effect as outlined in 36 CFR §800.5(a)(1) and (2). Attached to the FOE will be relevant project information such as: a vicinity map; a location map; the APE map; historic maps and aerial photographs; project plans; photographic simulations; sketches; and public outreach information. This scope of work allows for response to one round of client and Caltrans comments. Associated Tasks and Costs. Tasks associated with the completion of this project include graphics, word processing, and reprographics. In addition, mileage, photocopies, etc., will be included. A budget augment of $19,505.00 is being requested. Other Direct Costs. Due to anticipated increase in printing and other reproduction costs, we are requesting a budget reallocation of $844.49. Budget Spreadsheet Attached is a spreadsheet indicating the approved budget, request for reallocation of budget, the budget augment request, and the total new budget. We tried to accommodate as much of the changed project within the existing budget; however, because of the additional unanticipated staff time required to complete the environmental technical studies and the extended schedule we are requesting a budget augment to our original contract. If you agree please respond by e-mail. Thank you for your consideration of our request. Sincerely, LSA Associates, Inc. Lynn Calvert-Hayes, AICP Principal Attachment: Budget Spreadsheet City of Lake Elsinore Temescal Canyon Road Bridge Replacement Project COST DETAIL BY TASK TASK 3: ENVIRONMENTAL TASKS Project Management $14,854.67 $6,942.61 $0.00 $21,797.28 TASK 3.1: Project Impact Area, APE $1,142.18 $0.00 $0.00 $1,142.18 TASK 3.2: Prelim. Environmental Study (PES)$7,488.65 $0.00 $0.00 $7,488.65 TASK 3.2.1: Field Review Meeting $1,607.11 $0.00 $0.00 $1,607.11 TASK 3.2.2: Final PES $1,235.83 $0.00 $0.00 $1,235.83 TASK 3.3: Construction Traffic Impact Analysis $20,697.61 ($20,697.61)$0.00 $0.00 TASK 3.4: Air Quality/Greenhouse Gas Assessment $19,439.88 $0.00 $0.00 $19,439.88 TASK 3.5: Noise Study $22,000.00 $4,505.00 $495.00 $27,000.00 TASK 3.6: Water Quality Assessment Report (WQAR) and Water Quality Manag $0.00 $0.00 $0.00 $0.00 TASK 3.7: Location Hydraulics Report (LHS) and Summary Floodplain Encroach $844.49 ($844.49)$0.00 $0.00 Task 3.8: NES/MSHCP/HANS/JPR/Focused Surveys $72,063.11 $0.00 $10,000.00 $82,063.11 TASK 3.9: Jurisdiction Delineation $21,863.76 $0.00 $0.00 $21,863.76 TASK 3.10: Cultural/Paleontology $65,787.89 $0.00 $0.00 $65,787.89 TASK 3.11: Initial Site Assessment for Hazardous Materials, Aerially Deposited L $0.00 $0.00 $0.00 $0.00 TASK 3.12: Administrative Draft IS/MND & MMRP $9,771.29 $0.00 $0.00 $9,771.29 TASK 3.12.1: Draft IS/MND & MMRP $5,446.56 $0.00 $0.00 $5,446.56 TASK 3.12.2: Response to Comments $5,429.77 $0.00 $0.00 $5,429.77 TASK 3.12.3: Final IS/MND & MMRP $4,153.26 $0.00 $0.00 $4,153.26 TASK 3.12.4: Public Hearings/NOD $1,645.15 $0.00 $0.00 $1,645.15 TASK 3.13: CE Checklist & Environ. Commitments Report $1,585.62 $0.00 $0.00 $1,585.62 TASK 3.14.1: ACOE Section 404 for Nationwide Permit $0.00 $0.00 $0.00 $0.00 TASK 3.14.2: Water Quality Control Board Section 401 $0.00 $0.00 $0.00 $0.00 TASK 3.14.3: CA Dept of F&W Streambed Alteration 1600 Agreement $0.00 $0.00 $0.00 $0.00 TASK 3.14.4: Compensatory Mitigation Plan $0.00 $0.00 $0.00 $0.00 TASK 3.15: Section 4(f)$8,892.46 $0.00 $0.00 $8,892.46 TASK 3.16: Finding of Effect (FOE)$0.00 $0.00 $19,505.00 $19,505.00 TASK 3.17: Traffic Analysis (LLG)$0.00 $9,250.00 $0.00 $9,250.00 OTHER DIRECT COSTS $6,531.75 $844.49 $0.00 $7,376.24 TOTALS $292,481.04 $0.00 $30,000.00 $322,481.04 CURRENT BUDGET BUDGET REALLOCATION REQUEST BUDGET AUGMENT REQUEST REVISED BUDGET REQUEST TASK 4141 E. Inland Empire Boulevard, Ste. 250, Ontario, CA 91764 T:909.481.5750 F:909.481.5757 June 16, 2017 Mr. Ceazar Aguilar Aguilar Consulting Inc. 2155 Chicago Avenue, Ste. 301 Riverside, CA 92507 SUBJECT: LANDSCAPE ARCHITECTURAL SERVICES INCLUDING THE PREPARATION OF VISUAL SIMULATIONS FOR THE PROPOSED TEMESCAL CANYON ROAD BRIDGE IN LAKE ELSINORE, CA Dear Ceazar, On behalf of David Evans and Associates, Inc. (DEA), we are pleased to respond to your request to provide landscape architectural services including the preparation of four visual simulations depicting the proposed Temescal Canyon Road Bridge. These simulations are necessary in order to meet the needs of the Environmental documents in support of the FOE. Task 1 – Prepare Four (4) Visual Simulations in support of the FOE - $6,350 DEA will prepare four simulations at the following locations: Looking southeast at Bernard Street; looking northeast from Pacific Clay; looking west from the existing Temescal Canyon Road bridge; and finally, looking northwest from the old school house. Both ‘before’ and ‘after’ images will be provided to LSA for processing and approval. Task 2 – Prepare Three (3) Visual Simulations - $1,800 ea. (for budgetary purposes only) DEA will prepare three additional simulations at the following locations: At Bernard Street looking directly into the bridge point of entry; and two at / or near Temescal Canyon Road approximately half way between the bridge and the roadway. Both ‘before’ and ‘after’ images will be provided to LSA for processing and approval. These images will be prepared in support of resolving the resource agencies’ concern regarding the wildlife corridor. DEA will look to others to provide the high resolution jpg files and hence this task does not include a site visit nor photography to support the simulations. Task 3 – Reimbursables - $200 (estimated T & M) Government fees, delivery costs such as Federal Express charges and plotting / reproduction services are considered reimbursable fees and will be billed to you at our cost plus 10%. Mileage will be billed according to the current federal rate. Any service requested which does not fall within the scope of services listed, or any duplication of work due to changes desired by the owner or modified by the engineer, will be performed on an “Extra Services” basis and negotiated accordingly. June 16, 2017 Mr. Ceazar Aguilar Aguilar Consulting, Inc. Temescal Canyon Road Visual Simulations Page 2 DEA proposes to complete the above noted tasks for the fees indicated. Invoices will be due and payable within 30 days and will be sent monthly based upon the percentage of work completed. Should you have any questions or need clarification of any item, please feel free to call. We look forward to discussing this proposal with you. Sincerely, DAVID EVANS AND ASSOCIATES, INC. Kim S. Rhodes, PLA 3867 Vice President P:\A\AGUL0001\ Contract\Proposals\TCR Visual Simulations.doc