Loading...
HomeMy WebLinkAboutItem No. 08 Planning App No. 2017-53 Jack In the BoxText File City of Lake Elsinore 130 South Main Street Lake Elsinore, CA 92530 www.lake-elsinore.org File Number: ID# 17-523 Agenda Date: 2/13/2018 Status: Consent AgendaVersion: 1 File Type: ReportIn Control: City Council / Successor Agency Agenda Number: 8) Page 1 City of Lake Elsinore Printed on 2/8/2018 Page 1 of 3 REPORT TO CITY COUNCIL To:Honorable Mayor and Members of the City Council From:Grant Yates, City Manager Prepared by: Justin Poley, Community Development Technician Date:February 1, 2018 Subject:Planning Application No. 2017-53 (Jack in the Box)– Development of a 1,865 sq. ft. fast-food restaurant with a drive-through and related site improvements located at the southwesterly corner of Diamond Drive and Lakeshore Drive. Applicant:David Beshay, Beshay Foods, Inc Recommendation adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE, CALIFORNIA, FINDING THAT PLANNING APPLICATION NO. 2017-53 (COMMERCIAL DESIGN REVIEW NO. 2017-12) IS CONSISTENT WITH THE WESTERN RIVERSIDE COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP); and, adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE, CALIFORNIA, APPROVING COMMERCIAL DESIGN REVIEW NO. 2017-12 PROVIDING BUILDING DESIGN AND RELATED IMPROVEMENTS FOR A 1,865 SQUARE FOOT RESTAURANT WITH A DRIVE-THROUGH LOCATED AT THE SOUTHWESTERLY CORNER OF DIAMOND DRIVE AND LAKESHORE DRIVE (APN: 363-150-001, 002, 004, AND 025). Planning Commission Action On January 16, 2018, the Planning Commission unanimously recommended approval for Commercial Design Review No. 2017-12 for the development 1,865 sq. ft. fast-food restaurant with a drive-through and related site improvements on a 0.46 acre site. Additionally, the Planning Commission adopted a resolution approving Conditional Use Permit No. 2017-17 for the establishment of a drive-through restaurant. Pursuant to Chapter 17.168.070 of the Lake Elsinore Municipal Code (LEMC), the Planning Commission’s approval of the Conditional Use Permit is final unless appealed to the City Council. The only item presented to the City Council for consideration is the Commercial Design Review application. Discussion Project Request and Location The applicant is requesting approval of Planning Application No. 2017-53 (Conditional Use Permit No. 2017-17 and Commercial Design Review No. 2017-12) for the design and construction a 1,865 sq. ft. fast-food restaurant with a drive-through and related site PA 2017-53 (Jack in the Box) 02/13/2018 Page 2 of 3 improvements located at the southwesterly corner of Diamond Drive and Lakeshore Drive (APN: 363-150-001, 002, 004 and 025). Environmental Setting EXISTING LAND USE GENERAL PLAN ZONING Project Site Vacant Commercial Mixed Use (CMU)Commercial Mixed Use (CMU) North Commercial General Commercial (GC)General Commercial (C-2) South Commercial Commercial Mixed Use (CMU)Commercial Mixed Use (CMU) East Commercial Commercial Mixed Use (CMU)Commercial Mixed Use (CMU) West Commercial Diamond Specific Plan Mixed Use (MU) Analysis General Plan Consistency The Project has a General Plan Land Use designation of Commercial Mixed Use (CMU). The CMU Land Use designation provides for retail, services, restaurants, professional and administrative offices, hotels and motels, mixed-use projects, public and quasi-public uses, and similar and compatible uses. The project is proposing to develop a drive-through restaurant. Therefore, the Project is consistent with the General Plan. Municipal Code Consistency Staff has reviewed the proposed Project with respect to the relevant development standards as identified in the CMU zone and the LEMC and has detailed the requirements and the proposed development standards as follows: Development Standard Required Proposed Front yard Setback 10’20”+ Building Height N/A 23’ – 2” Landscape improvements:N/A N/A Adjacent to Street 10’20’+ Landscape coverage N/A N/A The Project also complies with the onsite parking standards listed in LEMC, Chapter 17.148 (Parking Requirements). Section 17.148.030.E of the LEMC requires one (1) space for each 45 square feet of customer area, plus one (1) space for each 200 square feet of noncustomer area for restaurants. A total of 19.2 parking spaces would be required for the proposed Project. The above parking requirement is exceeded as the project is proposing 20 total parking spaces onsite. The architectural design of the proposed building complies with the Nonresidential Development Standards (Chapter 17.112) of the LEMC. The architecture has been designed to achieve harmony and compatibility with surrounding existing commercial buildings which will help to create a uniform appearance as one enters into the Diamond Specific Plan. The colors and materials proposed will assist in blending the architecture into the existing landscape and are compatible with other colors and materials used on other properties near the project site. In addition, safe and efficient circulation has been achieved onsite. PA 2017-53 (Jack in the Box) 02/13/2018 Page 3 of 3 The Design Review Committee that includes staff from Planning, Building and Safety, Fire, and Engineering have reviewed the proposed Project, and have conditioned the Project so as to mitigate any potential concerns. Environmental Determination Staff has determined that the Project is categorically exempt from California Environmental Quality Act (Cal. Publ. Res. Code §§21000 et seq. “CEQA”) and the State CEQA Guidelines (14. Cal. Code Regs. §§15000 et seq.), specifically pursuant to Section 15303 (Class 3 – New Construction or Conversion of Small Structures) as the Project proposes to establish a 1,865 S.F. fast food restaurant (Jack in the Box) with a drive-thru lane and related site improvements on a pre-disturbed site. Exhibits: A – MSHCP Resolution B – CDR Resolution C – Conditions of Approval D – Vicinity Map E – Aerial Map F – Design Review Package RESOLUTION NO. 2018-__ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE, CALIFORNIA, FINDING THAT PLANNING APPLICATION NO. 2017-53 (COMMERCIAL DESIGN REVIEW NO. 2017-12) IS CONSISTENT WITH THE WESTERN RIVERSIDE COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP) Whereas, David Beshay, Beshay Foods, Inc. has filed an application with the City of Lake Elsinore (City) requesting approval of Planning Application No. 2017-53 (Conditional Use Permit No. 2017-17 and Commercial Design Review No. 2017-12) for the design and construction of a 1,865 S.F. fast food restaurant (Jack in the Box) with a drive-thru lane and related site improvements (Project). The Project is located at the southwesterly corner of the intersection of Diamond Drive and Lakeshore Drive (APN: 363-150-001, 002, 004 and 025); and, Whereas, Section 6.0 of the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP) requires that all discretionary projects within a MSHCP Criteria Cell undergo the Lake Elsinore Acquisition Process (LEAP) and Joint Project Review (JPR) to analyze the scope of the proposed development and establish a building envelope that is consistent with the MSHCP criteria; and, Whereas, Section 6.0 of the MSHCP further requires that the City adopt consistency findings demonstrating that the proposed discretionary entitlement complies with the MSHCP Criteria Cell, and the MSHCP goals and objectives; and, Whereas, pursuant to Chapter 17.184 (Design Review) of the LEMC, the Planning Commission (Commission) has been delegated with the responsibility of making recommendations to the City Council (Council) pertaining to design reviews; and, Whereas, on January 16, 2018 at a duly noticed Public Hearing the Commission has considered evidence presented by the Community Development Department and other interested parties with respect to this item; and, Whereas,pursuant to Section 17.184.090 of the LEMC, the Council has the responsibility of making decisions to approve, modify, or disapprove recommendations of the Commission for design review applications; and, Whereas, on February 13, 2018, at a duly noticed Public Meeting, the Council has considered the recommendation of the Commission as well as evidence presented by the Community Development Department and other interested parties with respect to this item. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1:The Council has considered the Project and its consistency with the MSHCP prior to adopting Findings of Consistency with the MSHCP. Section 2:That in accordance with the MSHCP, the Council makes the following findings for MSHCP consistency: 1.The Project is a project under the City’s MSHCP Resolution, and the City must make an MSHCP Consistency finding before approval. Reso. No. 2018-____ Page 2 of 4 Pursuant to the City’s MSHCP Resolution, the Project is required to be reviewed for MSHCP consistency, including consistency with other “Plan Wide Requirements.” The Project site is not located within a MSHCP Criteria Cell. Based upon the site reconnaissance survey there are no issues regarding consistency with the MSCHP’s other “Plan Wide Requirements.” The only requirement potentially applicable to the Project were the Protection of Species Associated with Riparian/Riverine Areas and Vernal Pool Guidelines (Section 6.1.2 of the MSHCP) and payment of the MSHCP Local Development Mitigation Fee (Section 4 of the MSHCP Ordinance). 2.The Project is subject to the City’s LEAP and the Western Riverside County Regional Conservation Authority’s (RCA) JPR. As stated above, the Project is not located within a Criteria Cell and therefore the Project was not processed through the City’s LEAP and JPR processes. 3.The Project is consistent with the Riparian/Riverine Areas and Vernal Pools Guidelines. The Project is proposing to develop a drive-through restaurant on a previously disturbed site. As such, the Riparian/Riverine Areas and Vernal Pool Guidelines as set forth in Section 6.1.2 of the MSHCP are not applicable. 4.The Project is consistent with the Protection of Narrow Endemic Plant Species (NEPS) Guidelines. The site does not fall within any NEPS Survey Areas. Neither a habitat assessment nor further focused surveys are required for the Project. Therefore, Protection of NEPS Guidelines as set forth in Section 6.1.3 of the MSHCP are not applicable to the Project. 5.The Project is consistent with the Additional Survey Needs and Procedures. The MSHCP only requires additional surveys for certain species if the Project is located in Criteria Area Species Survey Areas, Amphibian Species Survey Areas, Burrowing Owl Survey Areas, and Mammal Species Survey Areas of the MSHCP. The Project site is not located within any of the Critical Species Survey Areas. Therefore, the provisions of MSHCP Section 6.3.2 are not applicable. 6.The Project is consistent with the Urban/Wildlands Interface Guidelines. The Project site is not within or adjacent to any MSHCP criteria or conservation areas. Therefore, the Urban/Wildlands Interface Guidelines of MSHCP Section 6.1.4 are not applicable. 7.The Project is consistent with the Vegetation Mapping requirements. The Project is proposing to develop a drive-through restaurant on a previously disturbed site. There are no resources located on the Project site, requiring mapping as set forth in MSHCP Section 6.3.1. 8.The Project is consistent with the Fuels Management Guidelines. The Project site is not within or adjacent to any MSHCP criteria or conservation areas. Reso. No. 2018-____ Page 3 of 4 Therefore, the Fuels Management Guidelines of MSHCP Section 6.4 are not applicable. 9.The Project will be conditioned to pay the City’s MSHCP Local Development Mitigation Fee. As a Condition of Approval, the Project will be required to pay the City’s MSHCP Local Development Mitigation Fee at the time of issuance of building permits. 10. The Project is consistent with the MSHCP. The project consists of adding a drive-through restaurant on a previously disturbed site. As described above, the project complies with all application MSHCP requirements. Section 3:Based upon the evidence presented, both written and testimonial, and the above findings, the Council hereby finds that the Project is consistent with the MSHCP. Section 4:This Resolution shall take effect immediately upon its adoption. Section 5:The City Clerk shall certify to the adoption of this Resolution and enter it into the book of original Resolutions. Passed and Adopted on this 13 th day of February, 2018, by the following vote. Natasha Johnson, Mayor Attest: ___________________________________ Susan M. Domen, MMC City Clerk STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF LAKE ELSINORE ) I, Susan M. Domen, MMC, City Clerk of the City of Lake Elsinore, California, do hereby certify that Resolution No. 2018-____ was adopted by the City Council of the City of Lake Elsinore, California, at the Regular meeting of February 13, 2018, and that the same was adopted by the following vote: AYES: NOES: ABSENT: ABSTAIN: Reso. No. 2018-____ Page 4 of 4 Susan M. Domen, MMC City Clerk RESOLUTION NO. 2018- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE, CALIFORNIA, APPROVING COMMERCIAL DESIGN REVIEW NO. 2017-12 PROVIDING BUILDING DESIGN AND RELATED IMPROVEMENTS FOR A 1,865 S.F. FAST FOOD RESTAURANT (JACK IN THE BOX) WITH A DRIVE-THRU LANE AND RELATED SITE IMPROVEMENTS (APN: 363-150-001, 002, 004 AND 025) Whereas, David Beshay, Beshay Foods, Inc. has filed an application with the City of Lake Elsinore (City) requesting approval of Planning Application No. 2017-53 (Conditional Use Permit No. 2017-17 and Commercial Design Review No. 2017-12) for the design and construction of a 1,865 S.F. fast food restaurant (Jack in the Box) with a drive-thru lane and related site improvements (Project). The Project is located at the southwesterly corner of Diamond Drive and Lakeshore Drive (APN: 363-150-001, 002, 004, and 025); and, Whereas,pursuant to Chapter 17.184 (Design Review) of the Lake Elsinore Municipal Code (LEMC), the Planning Commission (Commission) has been delegated with the responsibility of making recommendations to the City Council (Council) pertaining to design reviews; and, Whereas,pursuant to the California Environmental Quality Act (Cal. Pub. Res. Code §§ 21000 et seq.: CEQA) and the State Guidelines for Implementation of CEQA (14 C.C.R. §§ 15000 et seq.: CEQA Guidelines), public agencies are expressly encouraged to reduce delay and paperwork associated with the implementation of CEQA by using previously prepared environmental documents when those previously prepared documents adequately address the potential impacts of the proposed project (CEQA Guidelines Section 15006); and, Whereas, CEQA Guidelines Section 15162 establishes the standard to be used when determining whether subsequent environmental documentation is necessary and says that when an environmental document has already been adopted for a project, no subsequent environmental documentation is needed for subsequent entitlements which comprise the whole of the action unless substantial changes or new information are presented by the project; and, Whereas, the Project does not present substantial changes or new information regarding the potential environmental impacts of development; and, Whereas,on January 16, 2018 at a duly noticed Public Hearing the Commission has considered evidence presented by the Community Development Department and other interested parties with respect to this item; and, Whereas,pursuant to Section 17.184.090 of the LEMC, the Council has the responsibility of making decisions to approve, modify, or disapprove recommendations of the Commission for design review applications; and, Whereas, on February 13, 2018, at a duly noticed Public Meeting, the Council has considered the recommendation of the Commission as well as evidence presented by the Community Development Department and other interested parties with respect to this item. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Reso. No. 2018-____ Page 2 of 3 Section 1:The Council has reviewed and analyzed the proposed Project pursuant to the California Planning and Zoning Laws (Cal. Gov. Code §§ 59000 et seq.), the Lake Elsinore General Plan (GP), and the LEMC and finds and determines that the proposed Project is consistent with the requirements of California Planning and Zoning Law and with the goals and policies of the GP and the LEMC. Section 2:The Council finds and determines that the Project is categorically exempt from California Environmental Quality Act (Cal. Publ. Res. Code §§21000 et seq. “CEQA”) and the State CEQA Guidelines (14. Cal. Code Regs. §§15000 et seq.), specifically pursuant to Section 15303 (Class 3 – New Construction or Conversion of Small Structures), the Project proposes to establish a 1,865 S.F. fast food restaurant (Jack in the Box) with a drive-thru lane and related site improvements on a pre-disturbed site. Section 3:That in accordance with Chapter 17.184 of the LEMC, the Council makes the following findings regarding of Planning Application No. 2017-53 (Commercial Design Review No. 2017-12): 1.The Project, as approved, will comply with the goals and objectives of the General Plan and the zoning district in which the project is located. The Project site has a General Plan Land Use designation of Commercial Mixed Use (CMU) that provides for retail, services, restaurants, professional and administrative offices, hotels and motels, mixed-use projects, public and quasi-public uses, and similar and compatible uses. Therefore, the Project is consistent with the General Plan. The current zoning for the subject site Commercial Mixed Use (CMU). The proposed use is identified as a permitted use subject to the approval of a Conditional Use Permit within the CMU zone. Further, the proposed commercial development will assist in achieving the development of a well-balanced and functional mix of residential, commercial, industrial, open space, recreational and institutional land uses. 2.The Project complies with the design directives contained in the LEMC and all applicable provisions of the LEMC. The Project is appropriate to the site and surrounding developments. The project is an infill development located at the southwesterly corner of Diamond Drive and Lakeshore Drive. The architectural design of the proposed building complies with the Nonresidential Development Standards (Chapter 17.112) of the LEMC. The architecture has been designed to achieve harmony and compatibility with surrounding existing commercial buildings which will help to create a uniform appearance as one enters into the Diamond Specific Plan. The colors and materials proposed will assist in blending the architecture into the existing landscape and are compatible with other colors and materials used on other properties near the project site. In addition, safe and efficient circulation has been achieved onsite. 3.Conditions and safeguards pursuant to Chapter 17.184.070 of the LEMC, including guarantees and evidence of compliance with conditions, have been incorporated into the approval of the Project to ensure development of the property in accordance with the objectives of Chapter 17.184. Pursuant to Section 17.184.070 of the LEMC, the Project was considered by the Commission at a duly noticed Public Hearing held on January 16, 2018. The Project, as Reso. No. 2018-____ Page 3 of 3 reviewed and conditioned by all applicable City divisions, departments and agencies, will not have a significant effect on the environment. Approval of the Project will not result in a substantial change to the previously certified Environmental Impact Report. Therefore, no additional environmental review is necessary. Section 4:Based upon all of the evidence presented, the above findings, and the conditions of approval imposed upon the Project, the Council hereby approves Planning Application No. 2017-53 (Commercial Design Review No. 2017-12). Section 5:This Resolution shall take effect immediately upon its adoption. Section 5:The City Clerk shall certify to the adoption of this Resolution and enter it into the book of original Resolutions. Passed and Adopted on this 13 th day of February, 2018, by the following vote. Natasha Johnson, Mayor Attest: ___________________________________ Susan M. Domen, MMC City Clerk STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF LAKE ELSINORE ) I, Susan M. Domen, MMC, City Clerk of the City of Lake Elsinore, California, do hereby certify that Resolution No. 2018-____ was adopted by the City Council of the City of Lake Elsinore, California, at the Regular meeting of February 13, 2018, and that the same was adopted by the following vote: AYES: NOES: ABSENT: ABSTAIN: Susan M. Domen, MMC City Clerk Applicant’s Initials: _____Page 1 of 19 CONDITIONS OF APPROVAL RESOLUTION:2017-XX, 2017-XX, and 2017-XX PROJECT: PA 2017-53/CUP 2017-17/CDR 2017-12 PROJECT NAME:Jack in the Box PROJECT LOCATION:APN: 363-150-001, 002, 004 and 025 APPROVAL DATE: EFFECTIVE DATE: EXPIRATION DATE: GENERAL Planning Application No. 2017-53 (Conditional Use Permit No. 2017-17 and Commercial Design Review No. 2017-12) is a proposal for the design and construction a 1,865 S.F. fast food restaurant (Jack in the Box) with a drive-thru lane and related site improvements (Project). The Project is located at the southwesterly corner of Diamond Drive and Lakeshore Drive (APN: 363-150-001, 002, 004 and 025). 1.The applicant shall defend (with counsel acceptable to the City), indemnify, and hold harmless the City, its Officials, Officers, Employees, Agents, and its Consultants (Indemnitees) from any claim, action, or proceeding against the Indemnitees to attack, set aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or legislative body concerning approval, implementation and construction of CUP 2017-17 and CDR 2017-12, which action is bought within the time period provided for in California Government Code Sections 65009 and/or 66499.37, and Public Resources Code Section 21167, including the approval, extension or modification of CUP 2017-17 and CDR 2017- 12 or any of the proceedings, acts or determinations taken, done, or made prior to the decision, or to determine the reasonableness, legality or validity of any condition attached thereto. The Applicant's indemnification is intended to include, but not be limited to, damages, fees and/or costs awarded against or incurred by Indemnitees and costs of suit, claim or litigation, including without limitation attorneys' fees, penalties and other costs, liabilities and expenses incurred by Indemnitees in connection with such proceeding. The City will promptly notify the applicant of any such claim, action, or proceeding against the City. If the project is challenged in court, the City and the applicant shall enter into formal defense and indemnity agreement, consistent with this condition. 2.Within 30 days of project approval, the applicant shall sign and complete an "Acknowledgment of Conditions" and shall return the executed original to the Community Development Department for inclusion in the case records. 3.The developer shall pay all Development Impact Fees, Plan Check and Permit fees (LEMC 16.34). In addition to applicable development impact fees set forth in Condition of Approval No. 23 which include Development Impact Fees (DIF), Fire Facilities Fees, and Traffic Infrastructure Fees (TIF) per LEMC Section 16.74, Transportation Uniform Mitigation Fees (TUMF) per LEMC Section 16.83, Area Drainage Fees per LEMC Section 16.72, MSHCP Fee per LEMC Section 16.85, the developer shall pay Railroad Canyon Road Benefit District Fee and Stephens Kangaroo Habitat Fee (K-Rat). All Capital Improvement Impact/Mitigation Fees, and Plan Check fees shall be paid in full at the prevalent rate in effect at the time of payment. PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 2 of 16 4.Mitigation Fees will be assessed at the prevalent rate at time of payment in full. PLANNING DIVISION 5.Commercial Design Review No. 2017-12 shall lapse and become void two years following the date on which the design review became effective, unless one of the following: (1) prior to the expiration of two years, a building permit related to the design review is issued and construction commenced and diligently pursued toward completion; or (2) prior to the expiration of two years, the applicant has applied for and has been granted an extension of the design review approval pursuant to subsections (B) and (C) of Lake Elsinore Municipal Code (LEMC) Section 17.184.120. Notwithstanding conditions to the contrary, a design review granted pursuant to LEMC Chapter 17.184 shall run with the land for this two-year period, subject to any approved extensions, and shall continue to be valid upon a change of ownership of the site which was the subject of the design review application. 6.Conditional Use Permit No. 2017-17 shall lapse and become void two years following the date on which the conditional use permit became effective, unless one of the following: (1) prior to the expiration of two years, a building permit related to the conditional use permit is issued and construction commenced and diligently pursued toward completion; or (2) prior to the expiration of two years, the applicant has applied for and has been granted an extension of the design review approval pursuant to subsections (B) and (C) of Lake Elsinore Municipal Code (LEMC) Section 17.168.080. Subject to the provisions of LEMC Section 17.168.110, a conditional use permit granted pursuant to the provisions of this section shall run with the land and shall continue to be valid upon a change of ownership of the site or structure which was the subject of the Conditional Use Permit application. 7.The Conditional Use Permit granted herein shall run with the land and shall continue to be valid upon a change of ownership of the site or structure which was the subject of this approval. An application for modification, expansion or other change in a Conditional Use Permit shall be reviewed according to the provisions of the LEMC, Title 17 in a similar manner as a new application. 8.If operation of this use triggers concerns related to parking, noise, traffic, or other impacts, at the discretion of the Community Development Director, this Conditional Use Permit may be referred back to the Planning Commission for subsequent review at a Public Hearing. If necessary, the Commission may modify or add conditions of approval to mitigate such impacts, or may revoke said Conditional Use Permit. 9.All Conditions of Approval shall be reproduced on page one of building plans prior to their acceptance by the Building and Safety Division, Community Development Department. All Conditions of Approval shall be met prior to the issuance of a Certificate of Occupancy and release of utilities. 10.All future development proposals shall be reviewed by the City on a project-by-project basis. If determined necessary by the Community Development Director or designee, additional environmental analysis will be required. 11.Any proposed minor revisions to approved plans shall be reviewed and approved by the Community Development Director or designee. Any proposed substantial revisions to the PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 3 of 16 approved plans shall be reviewed according to the provisions of the Municipal Code in a similar manner as a new application. Grading plan revisions shall be reviewed by the City Engineer. 12.The applicant shall provide all project-related on-site and off-site improvements as required by these Conditions of Approval. 13.Provisions of the City's Noise Ordinance (LEMC Chapter 17.176) shall be satisfied during all site preparation and construction activity. Site preparation activity and construction shall not commence before 7:00 AM and shall cease no later than 5:00 PM, Monday through Friday. Only finish work and similar interior construction may be conducted on Saturdays and may commence no earlier than 8:00 am and shall cease no later than 4:00 p.m. Construction activity shall not take place on Sunday, or any Legal Holidays. 14.No individual signs are approved as part of this approval. The applicant or designee shall submit an application for a sign permit, pay appropriate fees and receive approval from the Community Development Department for any sign(s) installed at the project site. OR The applicant shall submit a sign program for review and approval of the Planning Commission prior to installation. 15.Monument signage shall be designed in a manner consistent and complimentary to the existing Walgreen’s sign located at 160 DIAMOND DR 16.Graffiti shall be removed within 24 hours. 17.The existing landscape areas adjacent to the use shall be maintained and the site policed for litter daily. 18.The applicant shall maintain all exterior lighting surrounding the property to curb loitering and discourage criminal behavior. 19.“No Loitering” signs shall be posted and enforced throughout the parking lot at all times. The sign design and placement shall be indicated on the construction plans prior to issuance of the building permit. 20.All materials and colors depicted on the approved plans shall be used. If the applicant wishes to modify any of the approved materials or colors depicted on the plans, the applicant shall submit a proposal setting forth the modifications for review by the Community Development Director or his designee 21.The entire site shall be kept free from trash and debris at all times and in no event shall trash and debris remain for more than 24 hours. 22.The applicant shall comply with all applicable City Codes and Ordinances. 23.The applicant shall pay all applicable City fees, including but not limited to: Development Impact Fees (DIF), Fire Facilities Fees, and Traffic Infrastructure Fees (TIF) per LEMC Section 16.74, Transportation Uniform Mitigation Fees (TUMF) per LEMC Section 16.83, Area Drainage Fees per LEMC Section 16.72, MSHCP Fee per LEMC Section 16.85, Capital Improvement Impact/Mitigation Fees, and Plan Check fees, at the rate in effect at the time of payment. PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 4 of 16 24.The applicant shall construct a six foot tall wall from the Southerly boundary of the Westerly properties gate, to the Northerly project boundary or to the end of the trash enclosure. ENGINEERING DIVISION GENERAL 25.All slopes and landscaping within public right-of-way shall be maintained by the property owner or property owner’s association or another maintenance entity approved by the City Council. 26.All open space and slopes outside the public right-of-way shall be owned and maintained by property owner or property owner’s association. 27.In accordance with the City’s Franchise Agreement for waste disposal & recycling, the developer shall be required to contract with CR&R Inc. for removal and disposal of all waste material, debris, vegetation and other rubbish generated during cleaning, demolition, clear and grubbing or all other phases of construction. 28.Developer shall mitigate to prevent any flooding and/or erosion downstream caused by development of the site and or diversion of drainage. 29.All required soils, geology, hydrology and hydraulic, and seismic reports shall be prepared by a Registered Civil Engineer. STORM WATER MANAGEMENT / POLLUTION PREVENTION / NPDES Design: 30.The project is responsible for complying with the Santa Ana Region NPDES Permits as warranted based on the nature of development and/or activity. These Permits include: Deminimus Discharges MS4 31.A Water Quality Management Plan (WQMP) (preliminary and final) shall be prepared using the Santa Ana Region 8 approved template and guidance and submitted for review and approval to the City. The preliminary WQMP shall be approved prior to Planning Commission hearing. The Final WQMP shall be approved by the City prior to precise grading plan approval and issuance of ANY permit for construction. 32.The Final WQMP shall document the following: Detailed site and project description. Potential stormwater pollutants. PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 5 of 16 Post-development drainage characteristics. Structural and Non-Structural source control BMPs. Treatment Control BMPs Site design and drainage plan (BMP Exhibit). Documentation of how vector issues are addressed in the BMP design, operation and maintenance. GIS Decimal Minute Longitude and Latitude coordinates for all LID and Treatment Control BMP locations. HCOC – demonstrate that discharge flow rates, velocities, duration and volume for the post construction condition from a 2 year and 10 year, 24 hour rainfall event will not cause adverse impacts on downstream erosion and receiving waters, or measures are implemented to mitigate significant adverse impacts downstream public facilities and water bodies. Evaluation documentation shall include pre-and post-development hydrograph volumes, time of concentration and peak discharge velocities, construction of sediment budgets, and a sediment transport analysis. The Operation and Maintenance (O&M) Plan and Agreement (1) describe the long- term operation and maintenance requirements for BMPs identified in the BMP Exhibit; (2) identify the entity that will be responsible for long-term operation and maintenance of the referenced BMPs; (3) describe the mechanism for funding the long-term operation and maintenance of the referenced BMPS (to include a copy of documentation of annexation or formation of a CFD); and (4) provide for annual certification of water quality facilities by a registered civil engineer. The City format shall be used. 33.This project is falls under the Highest and Best Use category and is exempt from the 2010 SAR MS4 Permit requirement for implementation of LID Principles and LID Site Design. The project pollutants of concern shall be treated and discharged in accordance with the requirements set forth in Section XII.G of NPDES Permit R8-2010-0033. 34.Parking lot landscaping areas shall be designed to provide for treatment, retention or infiltration of runoff. 35.Project hardscape areas shall be designed and constructed to provide for drainage into adjacent landscape for treatment prior to discharge off site. 36.If CEQA identifies resources requiring Clean Water Act Section 401 Permitting, the applicant shall obtain certification through the Santa Ana Regional Water Quality Control Board and provide a copy to the Engineering Division. 37.All storm drain inlet facilities shall be appropriately marked “Only Rain in the Storm Drain” using the City authorized marker. 38.The project shall use either volume-based and/or flow-based criteria for sizing BMPs in accordance with NPDES Permit Provision XII.D.4. 39.The project site shall implement trash full capture methods/devices approved by the Santa Ana Regional Water Quality Control Board. A list of State approved devices is available upon request. Construction PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 6 of 16 40.Erosion & Sediment Control – Prior to the issuance of any grading or building permit for construction or demolition, the applicant shall submit for review and approval by the City Engineer, an Erosion and Sediment Control Plan as a separate sheet of the grading plan submittal to demonstrate compliance with the City’s NPDES Program, Green Building Code and state water quality regulations for grading and construction activities. The Erosion and Sediment Control Plan shall identify how all construction materials, wastes, grading or demolition debris, and stockpiles of soil, aggregates, soil amendments, etc. shall be property covered, stored and secured to prevent transport into local drainages or waters by wind, rain, tracking, or dispersion. The plan shall also describe how the project will ensure that all BMPs will be maintained during construction of any future right of ways. 41.Minimum good housekeeping and erosion and sediment control BMP’s as identified by the City shall be implemented by all projects. Post-Construction 42.Prior to the issuance of a certificate of use and/or occupancy, the applicant shall demonstrate compliance with applicable NPDES permits for construction, industrial/commercial, MS4, etc. to include: Demonstrate that the project has complied with all non-structural BMPs described in the project’s WQMP. Provide signed, notarized certification from the engineer of work that the structural BMP’s identified in the project’s WQMP are installed in conformance with approved plans and specifications and operational. Submit a copy of the fully executed, recorded City approved Operations and Maintenance (O&M) Plan and Agreement for all structural BMPs. Demonstrate that copies of the project’s approved WQMP (with recorded O&M Plan attached) are on site. Agree to pay for a Special Investigation from the City of Lake Elsinore for a date twelve (12) months after the issuance of a Certificate of Use and/or Occupancy for the project to verify compliance with the approved WQMP and O&M Plan. A signed/sealed certification from the engineer of work dated 12 months after CofO will be considered in lieu of a Special Investigation by the City. Provide the City with a digital .pdf copy of the Final WQMP. FINAL TRACT OR PARCEL MAP 43.The developer shall submit for plan check review and approval a final map. 44.Prior to City Council approval of the Parcel Map, the developer shall, in accordance with Government Code, have constructed all improvements or noted on the title sheet of the map the improvements to be constructed or have improvement plans submitted and approved, agreements executed and securities posted. UTILITIES: 45.All arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of the roadway shall be the responsibility of the property owner or his agent. PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 7 of 16 46.All overhead utilities shall be undergrounded in accordance with Chapter 12.16 of the Lake Elsinore Municipal Code (LEMC) 47.Underground water rights shall be dedicated to the City pursuant to the provisions of Section 16.52.030 (LEMC), and consistent with the City’s agreement with the Elsinore Valley Municipal Water District. 48.The developer shall apply for, obtain and submit to the City Engineering Division a letter from Southern California Edison (SCE) indicating that the construction activity will not interfere with existing SCE facilities (aka SCE NIL). 49.The developer shall submit a copy of the "Will Serve" letter to the City Engineering Division from the applicable water agency stating that water and sewer arrangements have been made for this project and specify the technical data for the water service at the location, such as water pressure and volume etc. IMPROVEMENTS Design 50.Sight distance into and out of the project location shall comply with CALTRANS Standards. 51.The developer shall install permanent bench marks per City of Lake Elsinore Standards and at locations to be determined by City Engineer. 52.The developer shall install blue dot markers in the roadway at a right angle to Fire Hydrant locations per Lake Elsinore Standards. 53.The developer shall coordinate with Riverside Transit Authority for location and installation of bus transit facilities. 54.10 year storm runoff shall be contained within the curb and the 100 year storm runoff shall be contained within the street right-of-way. When either of these criteria are exceeded, drainage facilities shall be provided. 55.All drainage facilities in this project shall be constructed to Riverside County Flood Control District Standards. 56.A drainage study shall be provided. The study shall identify the following: identify storm water runoff from and upstream of the site; show existing and proposed off-site and onsite drainage facilities; and include a capacity analysis verifying the adequacy of the facilities. The drainage system shall be designed to ensure that runoff from a 10-yr storm of 6 hours or 24 hours duration under developed condition is equal or less than the runoff under existing conditions of the same storm frequency. Both 6 hour and 24 hour storm duration shall be analyzed to determine the detention basin capacities necessary to accomplish the desired results. 57.All natural drainage traversing the site shall be conveyed through the site, or shall be collected and conveyed by a method approved by the City Engineer. All off-site drainage, PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 8 of 16 if different from historic flow, shall be conveyed to a public facility. 58.Roof drains shall not be allowed to outlet directly through coring in the street curb. Roofs should drain to a landscaped area. 59.The site shall be planned and developed to keep surface water from entering buildings (California Green Building Standards Code 4.106.3). 60.All Public Works requirements shall be complied with as a condition of development as specified in the Lake Elsinore Municipal Code (LEMC) and Lake Elsinore Public Works Standard Plans. 61.The owner shall dedicate in fee title to the City right-of-way along Lakeshore Drive adjacent to the property frontage, for a total right-of-way of 60’ wide from centerline to the project property line. 62.The owner shall dedicate in fee title to the City right-of-way along Diamond Drive adjacent to the property frontage, for a total right-of-way of 50’ wide from centerline to the project property line. 63.Street improvement plans shall be prepared by a Registered Civil Engineer and the plans shall include curb and gutter, sidewalk, ac pavement, street lighting, traffic signal modification and drainage improvements. 64.The developer shall construct half-width street improvements and dedicate right-of-way on Diamond Drive such that the ultimate right-of-way width conforms to General Plan right-of- way cross sections. The cross section of roadway improvements with a raised median (if applicable and if applicable, developer shall pay cash-in-lieu of construction of ½ the raised median), parkway, street lights, and traffic signal modification shall be consistent with other proposed development on Diamond Drive, as recommended by the City. The road improvements for Diamond Drive shall be consistent with the Traffic Analysis (revised) dated December 182017 and the General Plan Circulation Plan. 65.The developer shall construct Commercial Driveway approaches for each access point, per the City’s Standard No 118B. 66.The developer shall provide signing and striping plans for the required improvements of this project. The plans shall also incorporate traffic calming measures on local streets. 67.If existing improvements are to be modified, the existing improvement plans on file shall be modified accordingly and approved by the City Engineer prior to issuance of building permit. Permitting/Construction 68.An Encroachment Permit shall be obtained prior to any work on City and/or State right-of- way. The developer shall submit the permit application, required fees and executed agreements, security and other required documentation prior to issuance. 69.All compaction reports, grade certifications, monument certifications (with tie notes delineated on 8 ½" x 11" Mylar) shall be submitted to the Engineering Division before final PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 9 of 16 inspection of public works improvements will be scheduled and approved. 70.All streets shall be constructed per Lake Elsinore City Standards and/or applicable specific plan. Any deviation from City standards shall be approved by the City Engineer. Acceptance of Improvements 71.The developer shall submit a written request for acceptance to the City Engineer. 72.As-built plans shall be completed and signed by the City Engineer. GRADING Design: 73.A grading plan signed and stamped by a California Registered Civil Engineer shall be submitted for City review and approval for all addition and/or movement of soil (grading) on the site. The plan shall include separate sheets for erosion control, haul route and traffic control. The grading submittal shall include all supporting documentation and be prepared using City standard title block, standard drawings and design manual (available at www.lake-elsinore.org). 74.All grading plan contours shall extend to minimum of 50 feet beyond property lines to indicate existing drainage pattern. 75.The grading plan shall show that no structures, landscaping, or equipment are located near the project entrances that could reduce sight distance. 76.If the grading plan identifies alterations in the existing drainage patterns as they exit the site, a Hydrology and Hydraulic Report for review and approval by City Engineer shall be required prior to issuance of grading permits. All grading that modifies the existing flow patterns and/or topography shall be approved by the City Engineer. 77.The developer shall obtain all necessary off-site easements and/or permits for off-site grading and the applicant shall accept drainage from the adjacent property owners. Permit/Construction: 78.Developer shall execute and submit grading and erosion control agreement, post grading security and pay permit fees as a condition of grading permit issuance. 79.A preconstruction meeting with the City Public Works Inspector (Engineering Division) is required prior to commencement of ANY grading activity. 80.Developer shall provide the city with a copy of the Notice of Intent (NOI) and Waste Discharge Identification (WDID) letter issued by the Regional Water Quality Control Board for the National Pollutant Discharge Elimination System (NPDES) program 81.Prior to commencement of grading operations, developer is to provide to the City with a map of all proposed haul routes to be used for movement of export material. All such routes shall be subject to the review and approval of the City Engineer. Haul route shall be PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 10 of 16 submitted prior to issuance of a grading permit. Hauling in excess of 5,000 cy shall be approved by City Council. (LEMC 15.72.065) 82.Export sites located within the Lake Elsinore City limits must have an active grading permit. 83.Applicant to provide to the City a video record of the condition of all proposed public City haul roads. In the event of damage to such roads, applicant shall pay full cost of restoring public roads to the baseline condition. A bond may be required to ensure payment of damages to the public right-of-way, subject to the approval of the City Engineer. 84.All grading shall be done under the supervision of a geotechnical engineer. Slopes steeper than 2 to 1 shall be evaluated for stability and proper erosion control and approved by the City. 85.A copy of the current SWPPP shall be kept at the project site and be available for review upon request. 86.Approval of the project Final Water Quality Management Plan (WQMP) for post construction shall be received prior to issuance of a grading permit. 87.Submit an approved environmental clearance document to the Engineering Division. This approval shall identify and clear all proposed grading activity anticipated for this project. 88.Developer shall pay all grading permit applicable processing, permit, security and development fees including those fees identified in an applicable development agreement, Stephens Kangaroo Rat Habitat. PRIOR TO ISSUANCE OF BUILDING PERMIT 89.Provide final soils, geology and seismic report, including recommendations for parameters for seismic design of buildings, and walls prior to building permit. 90.All required public right-of-way dedications and easements shall be prepared by the developer or his agent and shall be submitted to the Engineering Division for review and approval prior to issuance of building permit. 91.The Parcel or Final Tract Map shall be recorded. 92.All street improvement plans, traffic signal plans, signing and striping plans shall be completed and approved by the City Engineer. 93.The developer shall pay all Capital Improvement TIF and Master Drainage Fees and Plan Check fees (LEMC 16.34). Prior to Occupancy 94.All public improvements shall be completed in accordance with the approved plans or as condition of this development to the satisfaction of the City Engineer. 95.All water and sewer improvements shall be completed in accordance with Water District PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 11 of 16 requirements. 96.Proof of acceptance of maintenance responsibility of slopes, open spaces, landscape areas, and drainage facilities shall be provided. 97.TUMF fees shall be paid. The TUMF fees shall be the effective rate at the time of payment in full in accordance with the LEMC. 98.As-built plans for all approved plan sets shall be submitted for review and approval by the City. The developer/developer/owner is responsible for revising the original mylar plans. 99.In the event of damage to City roads from hauling or other construction related activity, applicant shall pay full cost of restoring public roads to the baseline condition. 100. All final studies and reports, grade certifications, monument certifications (with tie notes delineated on 8 ½ x 11” mylar) shall be submitted in .tif format on a CD/DVD. Studies and reports include, Soils, Seismic, Hydrology, Hydraulics, Grading, SWPPP, WQMP, etc. 101. All plan sets and recorded maps shall be digitized and provided on CD/DVD as follows: Final Map(s) - GIS Shape files* and .tif of recorded map. Improvement Plans – GIS Shape files* and .tif of approved as built mylar. Grading Plans - .tif of approved as built mylar. *GIS Shape files must be in projected Coordinate System: NAD 83 State Plane California Zone VI U.S. Fleet. 102. All required public right-of-way dedications and easement agreement(s) not processed on the final map for ingress and egress through adjacent property(ies) shall be recorded with a recorded copy provided to the City prior to building permit issuance. 103. Documentation of responsibility for slope maintenance along right-of-ways and open spaces to be maintained by the property owner shall be provided in a recordable format and recorded prior to occupancy/final. 104. All signing and striping and traffic control devices onsite and on Lakeshore Drive and Diamond Drive shall be installed. 105. The developer shall pay fee in-lieu of construction of future median improvements on Diamond Drive and Lakeshore Drive. The fee shall be equal to current cost estimate for improvements (including contingency) plus an additional 15% of the total construction cost estimate to cover design and administrative costs. The cost estimate shall be approved by City staff. 106. Prior to grading or building permit close-out and/or the issuance of a certificate of use or a certificate of occupancy, developer shall: o Demonstrate that all structural BMPs have been constructed, installed and are functioning in conformance with approved plans and specifications and the WQMP; o Demonstrate that they are prepared to implement all non-structural BMPs included in the conditions of approval or building/grading permit conditions; o Demonstrate that an adequate number of copies of the approved project specific WQMP are available for the future owners/occupants; and PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 12 of 16 o The developer shall provide all education guidelines for Water Quality Management Practices to the tenants, operators and owners of the businesses of the development, regarding the environmental awareness on good housekeeping practices that contribute to protection of storm water quality and meet the goals of the approved WQMP in the Riverside County NPDES Drainage Area Management Plan. Contact the City NPDES Coordinator for handout/guideline information. 107. The property owner (aka Legally Responsible Party) shall execute and cause to be recorded a “Covenant and Agreement” in the form provided by the City to inform future property owners of the requirement to implement the approved final project-specific WQMP. 108. Developer shall pay all outstanding applicable processing and development fees including but not all inclusive: TUMF, MSHCP, TIF, Stephens Kangaroo Rat Habitat and area drainage prior to occupancy/final approval. BUILDING DIVISION General Conditions 109. Final Building and Safety Conditions. Final Building and Safety Conditions will be addressed when building construction plans are submitted to Building and Safety for review. These conditions will be based on occupancy, use, the California Building Code (CBC), and related codes which are enforced at the time of building plan submittal. 110. Compliance with Code. All design components shall comply with applicable provisions of the 2016 edition of the California Building, Plumbing and Mechanical Codes: 2016 California Electrical Code; California Administrative Code, 2016 California Energy Codes, 2016 California Green Building Standards, California Title 24 Disabled Access Regulations, and Lake Elsinore Municipal Code. 111. Green Measures. The application shall provide 10% voluntary green measures on the project, as stipulated by the 2016 California Green Building Standards. 112. Disabled Access. Applicant shall provide details of all applicable disabled access provisions and building setbacks on plans to include: a.All ground floor units to be adaptable. b.Disabled access from the public way to the entrance of the building. c.Van accessible parking located as close as possible to the main entry. d.Path of accessibility from parking to furthest point of improvement. e.Path of travel from public right-of-way to all public areas on site, such as clubhouse, trach enclosure tot lots and picnic areas. 113. Street Addressing. Applicant must obtain street addressing for all proposed buildings by requesting street addressing and submitting a site plan for commercial or multi-family residential projects or a recorded final map for single- family residential projects. PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 13 of 16 114. Clearance from LEUSD. A receipt or clearance letter from the Lake Elsinore School District shall be submitted to the Building and Safety Department to ensure the payment or exemption from School Mitigation Fees. 115. Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit approvals prior to commencement of any construction work. 116. Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light standards, and any block walls will require separate approvals and permits. 117. Sewer and Water Plan Approvals. On-site sewer and water plans will require separate approvals and permits. 118. Electrical Meter. Applicant shall provide a house electrical meter to provide power for the operation of exterior lighting, irrigation pedestals and fire alarm systems for each building on the site. Developments with single user buildings shall clearly show on the plans how the operation of exterior lighting and fire alarm systems when a house meter is not specifically proposed. 119. Submitting Plans and Calculations. Applicant must submit to Building and Safety four (4) complete sets of plans and two (2) sets of supporting calculations for review and approval including: a.An electrical plan including load calculations and panel schedule, plumbing schematic, and mechanical plan applicable to scope of work. b.A Sound Transmission Control Study in accordance with the provisions of the Section 1207, of the 2013 edition of the California Building Code. c.A precise grading plan to verify accessibility for the persons with disabilities. d.Truss calculations that have been stamped by the engineer of record of the building and the truss manufacturer engineer. Prior to Issuance of Grading Permit(s) 120. Onsite Water and Sewer Plans. Onsite water and sewer plans, submitted separately from the building plans, shall be submitted to Building and Safety for review and approval. 121. Demolition Permits. A demolition permit shall be obtained if there is an existing structure to be removed as part of the project. Prior to Issuance of Building Permit(s) 122. Plans Require Stamp of Registered Professional. Applicant shall provide appropriate stamp of a registered professional with original signature on the plans. Prior to Beginning of Construction 123. Pre-Construction Meeting. A pre-construction meeting is required with the building inspector prior to the start of the building construction. CITY OF LAKE ELSINORE FIRE MARSHAL PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 14 of 16 General Conditions 124.Riverside County Fire Department Lake Elsinore Office of the Fire Marshal - It is the responsibility of the recipient of these Fire Department conditions to forward them to all interested parties. The permit number (as it is noted above) is required on all correspondence. Questions should be directed to the Riverside County Fire Department, Lake Elsinore Office of the Fire Marshal at 130 S. Main St., Lake Elsinore, CA 92530. Phone: (951) 671-3124 Ext. 225. The following fire department conditions shall be implemented in accordance with the Lake Elsinore Municipal Code and the adopted codes at the time of project building plan submittal, these conditions are in addition to the adopted code requirements. 125.Blue Dot Reflectors - Blue retro-reflective pavement markers shall be mounted on private streets, public streets and driveways to indicate location of fire hydrants. Prior to installation, placement of markers must be approved by the Riverside County Fire Dept. 126.Minimum Hydrant Fire Flow - Minimum required fire flow shall be 2,000 GPM for 2 hours duration at 20 PSI residual operating pressure, which must be available before any combustible material is placed on the job site. Average spacing between hydrants 450’ and 225’ maximum distance from any point on the street or road frontage to hydrant. 127.Hydrant System - A combination of on-site and off-site super fire hydrant (s) (6” x 4” x 2- 1/2” x 2-1/2”) will be located not less than 25 feet or more than 250 feet from any portion of the building as measured along approved vehicular travel ways. The required fire flow shall be available from any adjacent hydrant (s) in the system Average spacing between hydrants 450’ and 225’ maximum distance from any point on the street or road frontage to hydrant. 128.Minimum Access Standards - The following access requirements are required to be implemented to ensure fire department and emergency vehicular access. All roadways shall conform to the City of Lake Elsinore approved roadway standards but in no case shall the minimum fire department vehicular access be less the following provisions: 1. Twenty-four feet (24’) clear width. Where parking is to be provided, each parking side shall be provided with eight (8’) additional feet on each side of the fire department access. 2. Median openings or crossovers between opposing lanes of a divided highway or street shall be located only at approved intersections at intervals of not less than 500 feet. [Ord. 529 § 3.2(F), 1973]. 3. The required all weather vehicular access shall be able to support no less than 75,000 lbs. over 2 axles. 4. Roadway gradient shall not exceed 15% on any access road, driveways, and perimeter roads. 5. Turning Radius shall be 24’ inside and 48’ outside for all access roads. 129.Secondary Access - In the interest of Public Safety, this project shall provide an Alternate or Secondary Access. Said access shall be constructed in accordance to the City of Lake Elsinore Engineering Department standards to accommodate full fire PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 15 of 16 response and community evacuation. All secondary access roads are subject to review by the fire department. 130.Operating Permit Required - This project has been review and may require an operating permit in addition to the construction permit that has been conditioned for this project in accordance with 105.6 of The California Fire Code. Prior to Building Permit Issuance 131.Plan Check Fee - Building plan check fees shall be made payable to the “City of Lake Elsinore”, and shall be submitted to the Fire Department at the time of plan submittal. 132.Water System Plans - Applicant and/or developer shall submit 2 sets of water system plans to the Fire Department for review. The plans must be signed by a registered Civil Engineer and/or water purveyor prior to Fire Department review and approval. Mylars will be signed by the Fire Department after review and approval. Two (2) copies of the signed and approved water plans shall be returned to the Fire Department before release of a building permit. 133.Prior to Building Construction Verification - This project shall be inspected and approved by the Fire Marshal or designee prior to bringing combustible materials on site. During said inspection all permanent road signs shall be in place, all hydrants shall on operating and approved for use by the water purveyor, and all permanent road surfaces shall be completed including primary and secondary access circulation. Prior to Building Final Inspection 134.Fire Sprinkler System 13 - Install a complete fire sprinkler system designed in accordance with California Building Code, California Fire Code and adopted standards. Sprinkler systems with pipe sizes larger than 4 inches in diameter will require the Engineer or Architect of Record certification with details and calculations with “wet signature” that the building structural system is designed to support the seismic and gravity loads for the support of the additional weight of the sprinkler system. The PIV and FDC shall be located to the front of the building in an approved location, unobstructed and within 50 feet of an approved road or driveway, within 200 feet of a hydrant. A C-16 licensed contractor must submit plans, along with the current fee, to the Fire Department for review and approval prior to installation. 135.Sprinkler System Monitoring - Install an alarm monitoring system for fire sprinkler system(s) with 20 or more heads. Valve monitoring, water-flow alarm and trouble signals shall be automatically transmitted to an approved central station, remote station or proprietary monitoring station in accordance with California Building Code, California Fire Code and adopted standards. An approved audible sprinkler flow alarm shall be provided on the exterior in an approved location. The location of the Fire Alarm Control Unit shall be located in an environmentally controlled location in accordance with 10.14 (NFPA 72, 2013). A C-10 licensed contractor must submit plans designed in accordance with adopted standards, along with the current fee, to the Fire Department for review and approval prior to installation. 136.Designated Fire Lanes - The applicant shall prepare and submit to the Fire Department for approval, a site plan designating required fire lanes with appropriate lane painting and/ PA 2017-53/CUP 2017-17/CDR 2017-12 PC: January 16, 2018 Conditions of Approval CC: February 13, 2018 Applicant’s Initials: _____Page 16 of 16 or signs. 137.Display Boards - Display Boards will be as follows: Each complex shall have an illuminated diagrammatic representation of the actual layout which shows name of complex, all streets, building designators, unit members, and fire hydrant locations within dimension and located next to roadway access. 138.Knox Rapid Entry Box - A rapid entry Knox Box shall be installed on the outside of the building. Key(s) shall have durable and legible tags affixed for identification of the correlating tenant space. Special forms are available from this office for ordering the Knox Box. If the building/facility is protected with a fire alarm or burglar alarm system, it is recommended that the lock box be “tamper” monitoring. 139.Fire Extinguishers – Minimum Install portable fire extinguishers complying with Section 906 of the 2013 California Fire Code with a minimum rating of 2A-10BC and signage. Fire Extinguishers located in public areas shall be in recessed cabinets mounted 48” (inches) to center above floor level with maximum 4” projection from the wall. Contact Fire Dept. for proper placement of equipment prior to installation. I hereby state that I acknowledge receipt of the approved Conditions of Approval for the above named project and do hereby agree to accept and abide by all Conditions of Approval as approved by the City Council of the City of Lake Elsinore on February 13, 2018. I also acknowledge that all Conditions shall be met as indicated. Date: Applicant’s Signature: Print Name: Address: Phone Number: MI S S I ON T RLDIAMOND DRLAKESHORE DR CASIN O D R I 15 AUTO CENTER D R LAKESHORE DR I 1 5 MISSION TRL MI S S I ON T RLDIAMOND DRLAKESHORE DR CASIN O D R I 15 AUTO CENTER D R LAKESHORE DR I 1 5 MISSION TRL Planning Application No. 2017-53VICINITY MAP PROJECT SITE ´ DIAMOND DRLAKESHORE DR MISSION TRL LAKESHORE DR MISSION TRL Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, U SDA, USGS, AEX, Getmapping, Aerogrid, IGN,IGP, swisstopo, and the GIS User CommunityDIAMOND DRLAKESHORE DR MISSION TRL LAKESHORE DR MISSION TRL Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, U SDA, USGS, AEX, Getmapping, Aerogrid, IGN,IGP, swisstopo, and the GIS User Community Planning Application No. 2017-53AERIAL MAP PROJECT SITE ´ ALL REPORTS, PLANS AND DOCUMENTS PREPARED BY MARKS ARCHITECTS SHALL REMAIN THE PROPERTY OF MARKS ARCHITECTS AND IS INTENDED FOR USE FOR THIS SPECIFIC PROJECT ONLY. Ⓒ PLANNING SUBMITTAL 12.14.17 L ICE N S E D A RCH I T E C T TITLE SHEET TS1.0 JIB #5472 2598 E. LAKESHORE DR. VICINITY MAP GENERAL NOTESBUILDING DATA CONSULTANT INFORMATION LEGEND & ABBREVIATIONS LANDSCAPE SHEET INDEX ARCHITECTURAL SITE CIVIL ℄ 7 MARK 11A KITCHEN NEW GROUND UP JACK IN THE BOX RESTAURANT LAKE ELSINORE, CA 92530 ARCHITECT CIVIL ENGINEER LANDSCAPE ARCHITECT TRAFFIC ENGINEER “ ” DEFERRED SUBMITTALS APPLICABLE CODES 1280.00 FF1279.50 PAD GB GB RIDGE GB GB RID G E 1. 0 % 1.0 % 1.4% 2.2% 4.2 % 1.7% 3. 3 % 0. 5 0 % 1.5 % 1.25% 3. 3 % 1. 2 % 1.7 % 1.6 % 1.5 % 4. 0 % 1. 8 % 1. 7 % 3. 4 % 24.0'2.5' 12.0' 19 . 0 ' 17 . 0 ' 9.0' 20 . 0 ' 1. 5 ' 24 . 0 ' 2.0 % 1.7 % 127 9 . 0 1. 0 % 1278.0 1279.0 128 0 . 0 1.25% DI A M O N D D R . LA K E S H O R E D R . S89° 44' 10.00" W L=170.00' S0 0 ° 1 3 ' 3 0 . 0 0 " E L= 1 8 5 . 5 2 ' N5 9 ° 5 1 ' 1 6 . 5 0 " W L= 1 9 7 . 2 8 ' S0 0 ° 1 3 ' 3 0 . 0 0 " E L= 8 5 . 7 9 ' 65.0' 2. 2 ' 4.7' 38. 3 ' 7.1 ' 6.7 ' 10. 0 ' 30 . 0 ' 30.0'10.0'10.0' 50. 0 ' 30.0'10.0'5.0'5.0' 5. 7 ' 9.0'8.0'9.0' ACCESSIBLEVAN DE D I C A T I O N N5 9 ° 5 1 ' 1 6 . 5 0 " W L= 1 9 7 . 2 8 ' S0 0 ° 1 3 ' 3 0 . 0 0 " W L= 8 7 . 5 3 ' 0. 5 0 % 0.50%GB 24 . 0 ' RIDGE 12 . 0 ' 11. 0 ' 3. 5 % 24.0 ' 1277.11 FS 1278.95 TC 1278.45 FS/TG TRENCH DRAIN 1278.75 TC 1278.25 TG/FS CATCH BASIN 1277.50 TC 1277.00 TG CATCH BASIN 1280.10 FS 1279.55 FS 1280.05 FS 1280.00 FS 1279.50 FS 1279.35 FS 1280.50 TC 1280.00 FS-HP 1280.50 TC 1280.00 FS-HP 1279.98 FS 1279.90 FS 1279.80 TC 1279.30 FS 1278.75 TC 1278.25 FL C&G 1278.37 FS 1279.35 TC 1278.85 FS 1280.00 TC 1279.50 FS 1280.95 TC 1279.40 FS 1280.00 FF 1279.50 FS 1280.00 TC 1279.50 FS 1279.38 FS 1279.88 TC 1279.38 FS 1279.88 TC 1279.38 FS 1279.90 TC 1279.40 FS 1279.08 FS 1277.59 FS 1277.97TC 1277.47 FL 1279.12 FS 1279.10FS 1279.82 TC 1279.32FS 1279.58 TC 1278.08 FS 1279.75 FS 1278.94 TC 1278.44 FS 1277.96 TC 1277.46 FS 1280.70 TC 1279.20 FS 1279.61 TC 1279.11 FS 1279.88 TC 1279.38 FS 1279.40 TC 1278.90 FS 1279.00 TC 1278.62 FS 1278.50 FL 1278.30 TC 1277.80 FS 1277.90 FS EXISTING PROPERTY LINE 1279.68 TC 1279.18 FS 1278.70 TC 1278.20 FS (1277.50EG)(1277.00 EG) (1283.40 TW) (1277.90 EG) (178.56 EG) PROPOSED CURB & GUTTER PROPOSED 88' LONG, 8' Ø CMP STORMWATER INFILTRATION SYSTEM 1267.50 BOTTOM INV PROPOSED PVC STORM DRAIN PIPE PROPOSED PVC STORM DRAIN PIPE EXISTING SITE WALL 178.57 FG (1283.94 TW) (1278.44 EG) (1278.41 TC) (1277.76 FL) 1277.67 TG CATCH BASIN 1279.94 TC 1279.44 FS 1278.88 TC 1279.38 FS 1279.64 TC 1279.14 FS PROPOSED PVC STORM DRAIN PIPE CHIMNEY CONNECTION TO CMP PIPE PROPOSED PVC STORM DRAIN PIPE 1279.55 FG PROPOSED PROPERTY LINE PROPOSED ADA CURB RAMP EXISTING CORNER SIDEWALK EXISTING MONITORING WELL TO BE RELOCATED EXISTING STREET LIGHT TO BE RELOCATED PROPOSED CURB AND GUTTER WITH 5' SIDEWALK EXISTING SIDEWALK PROPOSED SIDEWALK CONNECTION TO EXISTING EXISTING WM AND BFP TO BE RELOCATED EXISTING FLAG MONUMENT TO BE RELOCATED PROPOSED PROPERTY LINE 1279.02 FS 1280.04 TC 1279.54 FS128.00 TC 1279.60 FS PROPOSED DRIVEWAY INGRESS MATCH EXISTING GUTTER 1279.24 TC 1278.74 FS 1279.50 TC 1279.00 FS 1279.23 TC 1278.82 FS 1279.08 FS 1279.98 FS NON PROTOTYPICAL PLANNING SUBMITTAL 08.17.17 CG-01 CONCEPTUAL GRADING EXISTING CONCRETE PROPOSED PAVEMENT LANDSCAPING PROPERTY LINE CENTERLINE PROPOSED STORM DRAIN LEGEND VICINITY MAP 15 15 CONCEPTUAL GRADING NET FILL: 500 CY CIVIL ENGINEER COMMERCIAL DEVELOPMENT RESOURCES 4121 WESTERLY PLACE, #112 NEWPORT BEACH, CA 92660 P: 949.610.8997 ARCHITECT MARKS ARCHITECTS 2643 4TH AVE. SAN DIEGO, CA 92103 P: 619.702.9448 SOILS ENGINEER CW SOILS MURRIETA, CA 92562 P: 951.304.3935 SURVEYOR COMMERCIAL DEVELOPMENT RESOURCES 4121 WESTERLY PLACE, #112 NEWPORT BEACH, CA 92660 CONSTRUCTION NOTE 1. ALL OFF-SITE IMPROVEMENTS INCLUDING: TRAFFIC SIGNAL, TRAFFIC CONTROL, SIGNING AND STRIPING , NEW ADA CORNER RAMP, STREET WIDENING, NEW CURB, GUTTER AND SIDEWALK, ARE TO BE COMPLETED PER SEPARATE PLANS AND PERMITS AND ARE SHOWN FOR REFERENCE ONLY ON THIS SHEET. ALL REPORTS, PLANS AND DOCUMENTS PREPARED BY MARKS ARCHITECTS SHALL REMAIN THE PROPERTY OF MARKS ARCHITECTS AND IS INTENDED FOR USE FOR THIS SPECIFIC PROJECT ONLY. Ⓒ PLANNING SUBMITTAL 12.14.17 L ICE N S E D A RCH I T E C T SITE PLAN N NORTH KEY NOTES SITE PLAN SD1.0S89° 44' 10.00" W L=170.00' S0 0 ° 1 3 ' 3 0 . 0 0 " E L= 1 8 5 . 5 2 ' N5 9 ° 5 1 ' 1 6 . 5 0 " W L= 1 9 7 . 2 8 ' S0 0 ° 1 3 ' 3 0 . 0 0 " E L= 8 5 . 7 9 ' ACCESSIBLEVAN DE D I C A T I O N N5 9 ° 5 1 ' 1 6 . 5 0 " W L= 1 9 7 . 2 8 ' S0 0 ° 1 3 ' 3 0 . 0 0 " W L= 8 7 . 5 3 ' S89° 44' 10.00" W L=150.00' S0 0 ° 1 3 ' 3 0 . 0 0 " E L= 1 7 4 . 4 3 ' PARKINGNO 24'- 0 " 12 ' - 0 " 30 ' - 0 " 65'-0"2'-3"23'-11"4'-8"5'-9"24'-4" 12'-0" 9'-9"10'-0"40'-0" 11'- 0 " 10' - 7 " 36'- 6 " 16' - 6 " 7'-0 " 4' - 5 " 4' - 4 " 19 ' - 0 " 24 ' - 0 " 15 ' - 6 " 1' - 6 " 2' - 3 " 11 SPACES @9'-0" EA. 3 SPACES@ 9'-0" EA.8'-0"6 SPACES @ 9'-0" EA. 27'-2"11'-6"19'-4"4'-7" LEGEND 37 ' - 7 " 5' - 9 " S89° 44' 10.00" W L=170.00' N5 9 ° 5 1 ' 1 6 . 5 0 " W L= 1 9 7 . 2 8 ' S0 0 ° 1 3 ' 3 0 . 0 0 " E L= 8 5 . 7 9 ' ACCESSIBLEVAN DE D I C A T I O N N5 9 ° 5 1 ' 1 6 . 5 0 " W L= 1 9 7 . 2 8 ' S0 0 ° 1 3 ' 3 0 . 0 0 " W L= 8 7 . 5 3 ' PARKINGNO NON PROTOTYPICAL ALL REPORTS, PLANS AND DOCUMENTS PREPARED BY MARKS ARCHITECTS SHALL REMAIN THE PROPERTY OF MARKS ARCHITECTS AND IS INTENDED FOR USE FOR THIS SPECIFIC PROJECT ONLY. Ⓒ PLANNING SUBMITTAL 08.04.17 2643 fourth avenue San Diego, CA 92103 ph. 619.544.1977 www.asotelo.com s LANDSCAPE ARCHITECTS LANDSCAPE CONCEPT PLAN L1.005' 10'20' ™ . ™ ™ UTILITY KITCHEN WOMEN MEN WALK-IN COOLER WALK-IN FREEZER SERVICE PUBLIC DINING GALLEY/PREP WORKSTATION ROOM DRY STORAGE F L O O R P L AN N ALL REPORTS, PLANS AND DOCUMENTS PREPARED BY MARKS ARCHITECTS SHALL REMAIN THE PROPERTY OF MARKS ARCHITECTS AND IS INTENDED FOR USE FOR THIS SPECIFIC PROJECT ONLY. Ⓒ PLANNING SUBMITTAL 12.14.17 L ICE N S E D A RCHI T E C T HIGH MOISTURE REGIONS KEY NOTES FLOOR PLAN A1.0 GENERAL NOTES S O U T H E L E V A T I O N W E S T E L E V A T I O N ALL REPORTS, PLANS AND DOCUMENTS PREPARED BY MARKS ARCHITECTS SHALL REMAIN THE PROPERTY OF MARKS ARCHITECTS AND IS INTENDED FOR USE FOR THIS SPECIFIC PROJECT ONLY. Ⓒ PLANNING SUBMITTAL 12.14.17 L ICE N S E D A RCH I T E C T EXTERIOR ELEVATIONS A4.0 MATERIAL/FINISH: EXTERIOR FINISH SCHEDULE USE CHECKED BOX ONLY COLOR: GENERAL NOTES: 2598 N O R T H E L E V A T I O N E A S T E L E V A T I O N ALL REPORTS, PLANS AND DOCUMENTS PREPARED BY MARKS ARCHITECTS SHALL REMAIN THE PROPERTY OF MARKS ARCHITECTS AND IS INTENDED FOR USE FOR THIS SPECIFIC PROJECT ONLY. Ⓒ PLANNING SUBMITTAL 12.14.17 L ICE N S E D A RCH I T E C T EXTERIOR ELEVATIONS A4.1 MATERIAL/FINISH: EXTERIOR FINISH SCHEDULE USE CHECKED BOX ONLY COLOR: GENERAL NOTES: