HomeMy WebLinkAboutItem No. 09 Agrmnt Andy's Glass & Window Comm Hall RV ResortText File
City of Lake Elsinore 130 South Main Street
Lake Elsinore, CA 92530
www.lake-elsinore.org
File Number: ID# 17-548
Agenda Date: 2/27/2018 Status: Consent AgendaVersion: 1
File Type: AgreementIn Control: City Council / Successor Agency
Agenda Number: 9)
Page 1 City of Lake Elsinore Printed on 2/22/2018
REPORT TO CITY COUNCIL
To:Honorable Mayor and Members of the City Council
From:Grant Yates, City Manager
Prepared by:Jason Simpson, Assistant City Manager
Date:February 27, 2018
Subject:Agreement with Andy’s Glass & Window Company for the Purchase and
Installation of Doors, Windows, & Curtain Wall of Glass for the Community Hall
at the RV Resort Rehabilitation Project (CIP PROJECT #Z40007).
Recommendations
1.Award, approve and authorize the City Manager to execute an Agreement to Andy’s Glass
& Window Company for the purchase and installation of Doors, Windows, & Curtain Wall
of Glass for the Community Hall at the RV Resort Rehabilitation Project (CIP PROJECT
#Z40007), in the not to exceed amount of $137,232.00 with Andy’s Glass in the form
attached and in such final form as approved by the City Attorney.
2.Authorize the City Manager to execute change orders not to exceed a 10% contingency
amount of $13,723.00 for installation uncertainties and adjustments.
Background
Bid documents were prepared and the project was advertised in accordance with the
requirements set forth in the California Public Contract Code. On December 15, 2017, the City
posted on PlanetBids the notice inviting bids for the Doors, Windows, & Curtain Wall of Glass for
the Community Hall at the RV Resort Rehabilitation Project (CIP PROJECT #Z40007).
The deadline for the notice inviting bid was January 10, 2018.Unfortunately, no bids were
received by the City for this notice inviting bid and construction scheduling did not provide for a
re-advertisement. In order to avert construction delays on these long lead-time items, staff and
the City’s Architect took immediate action to entertain discussion with reputable local door and
glass companies for purchase and installation proposals.Andy’s Glass was able to propose a
completion of the entire scope of work for the doors, windows and curtain wall of glass as specified
in the architectural plans. The proposed amount for these items is within the anticipated
architectural estimate and the quality of the components meets and in some instances exceeds
the design criteria.
Purchase and Installation of Doors, Windows, & Curtain Wall of Glass (Community Hall) at the
RV Resort Rehabilitation Project.
February 27, 2018
Page 2
Discussion
The overall essentials in this scope of work are summarized below as general requirements:
General Requirements
Purchase & Installation of Windows
Purchase & Installation Doors
Purchase & Installation Curtain Wall of Glass
Insulation and Weather Proofing at time of Installation
Complete Glassing Protection During Construction and
Removal upon Construction Completion
Following the approval of this agenda item the purchase of the doors, windows, & curtain wall of
glass will be made. The procurement lead-time is estimated at 8 to 9 weeks. The installation will
begin immediately upon delivery to the project site. Staff has reviewed and verified the contractor
has a valid license and has provided sufficient references.
Fiscal Impact
The Purchase and Installation of Doors, Windows, & Curtain Wall of Glass for the Community Hall
at the RV Resort Rehabilitation Project (CIP PROJECT #Z40007) is included in the Fiscal Year
17/18 – 21/22 Capital Improvement Plan (CIP) budget
Exhibits
A: Agreement
B: Andy’s Glass & Window Company Proposal Dated 2/5/2018
@BCL@F00DBB98.docx Page 1
AGREEMENT FOR PUBLIC WORKS CONSTRUCTION
MIRAN ENTERPRISES, INC.
DBA ANDY'S GLASS & WINDOW COMPANY
Community Hall at the RV Resort Rehabilitation Project (CIP PROJECT #Z40007)
This Agreement for Public Works Construction (“Agreement”) is made and entered into
as of February 27, 2018, by and between the City of Lake Elsinore, a municipal corporation
(‘‘City") and Miran Enterprises, Inc., a California corporation, DBA Andy's Glass & Window
Company ("Contractor").
The City and Contractor, in consideration of the mutual promises and covenants set forth
herein, agree as follows:
1.The Project and Project Documents. Contractor agrees to construct the following
public improvements (“work”) identified as:
Doors, Windows, & Curtain Wall of Glass for the Community Hall at the RV
Resort Rehabilitation Project (the “Project”)
The City-approved plans for the construction of the Project, which are incorporated
herein by reference and prepared by City as posted on PlanetBid.
The Project Documents include this Agreement and all of the following: (1) the Notice
Inviting Bids, Instructions to Bidders, Bid Documents including Bidder’s Proposal as submitted
by the Contractor, Contract Documents, General Specifications, Special Provisions, and all
attachments and appendices; (2) everything referenced in such documents, such as
specifications, details, standard plans or drawings and appendices, including all applicable State
and Federal requirements; (3) all required bonds, insurance certificates, permits, notices, and
affidavits; and (4) any and all addenda or supplemental agreements clarifying, amending or
extending the work contemplated as may be required to insure completion in an acceptable
manner. All of the provisions of the above-listed documents are made a part of this Agreement
as though fully set forth herein.
2.Compensation.
a.For and in consideration of the payments and agreements to be made
and performed by City, Contractor agrees to construct the Project, including furnishing all
materials and performing all work required for the Project, and to fulfill all other obligations as
set forth in the Bidder’s Proposal, such contract price being One Hundred Thirty Seven
Thousand Two Hundred Thirty-Two Dollars ($137,232).
b.City hereby promises and agrees to employ, and does hereby employ,
Contractor to provide the materials, do the work, and fulfill the obligations according to the terms
and conditions herein contained and referred to, for the prices set forth, and hereby contracts to
pay the same at the time, in the manner, and upon the conditions set forth in the Project
Documents.
c.Contractor agrees to receive and accept the prices set forth in the
Bidder’s Proposal as full compensation for furnishing all materials, performing all work, and
Page 2
fulfilling all obligations hereunder. Such compensation shall cover all expenses, losses,
damages, and consequences arising out of the nature of work during its progress or prior to its
acceptance including those for well and faithfully completing the work and the whole thereof in
the manner and time specified in the Project Documents; and also including those arising from
actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of
the work, suspension or discontinuance of the work, and all other unknowns or risks of any
description connected with the work.
3.Completion of Work.
a.Contractor shall perform and complete all work within _________ (__)
working days from the date of commencement specified in the Notice to Proceed, and shall
provide, furnish and pay for all the labor, materials, necessary tools, expendable equipment,
and all taxes, utility and transportation services required for construction of the Project.
b.All work shall be performed and completed in a good workmanlike
manner in strict accordance with the drawings, specifications and all provisions of this
Agreement as hereinabove defined and in accordance with applicable laws, codes, regulations,
ordinances and any other legal requirements governing the Project.
c.Contractor shall not be excused with respect to the failure to so comply by
any act or omission of the City, the Director of Public Works, the City Engineer, a City inspector,
or a representative of any of them, unless such act or omission actually prevents the Contractor
from fully complying with the requirements of the Project Documents, and unless the Contractor
protests at the time of such alleged prevention that the act or omission is preventing the
Contractor from fully complying with the Project Documents. Such protest shall not be effective
unless reduced to writing and filed with the City within three (3) working days of the date of
occurrence of the act or omission preventing the Contractor from fully complying with the Project
Documents.
d.City and Contractor recognize that time is of the essence in the
performance of this Agreement and further agree that if the work called for under the Agreement
is not completed within the time hereinabove specified, damages will be sustained by the City
and that, it is and will be impracticable or extremely difficult to ascertain and determine the
actual amount of damages the City will sustain in the event of, and by reason of, such delay. It
is, therefore, agreed that such damages shall be presumed to be in the amount of Five Hundred
Dollars ($500) per calendar day, and that the Contractor will pay to the City, or City may retain
from amounts otherwise payable to Contractor, such amount for each calendar day by which the
Contractor fails to complete the work, including corrective items of work, under this Agreement
within the time hereinabove specified and as adjusted by any changes to the work.
4.Changes to Work. City and Contractor agree that the City may make changes to
the work, or suspend the work, and no matter how many changes, such changes or
suspensions are within the contemplation of the Contractor and City and will not be a basis for a
compensable delay claim against the City nor be the basis for a liquidated damages claims
against the Contractor.
Any change to the work shall be by way of a written instrument (“change order”) signed
by the City and the Contractor, stating their agreement to the following:
a. The scope of the change in the work;
Page 3
b. The amount of the adjustment to the contract price; and
c. The extent of the adjustment to the Schedule of Performance.
The Director of Public Works is authorized to sign any change order provided that
sufficient contingency funds are available in the City’s approved budget for the Project. All
change in the work authorized by the change order shall be performed under the applicable
conditions of the Project Documents. City and Contractor shall negotiate in good faith and as
expeditiously as possible the appropriate adjustments for such changes.
5.Bonds.Contractor shall provide, before commencing work, a Faithful
Performance Bond and a Labor and Material Bond, each for one-hundred percent (100%) of the
contract price in the form that complies with the Project Documents and is satisfactory to the
City Attorney.
6.Non-Assignability. Neither this Agreement nor any rights, title, interest, duties or
obligations under this Agreement may be assigned, transferred, conveyed or otherwise
disposed of by Contractor without the prior written consent of City.
7.Licenses. Contractor represents and warrants to City that it holds the
contractor’s license or licenses set forth in the Project Documents, is registered with the
Department of Industrial Relations pursuant to Labor Code Section 1725.5, and holds such
other licenses, permits, qualifications, insurance and approvals of whatsoever nature which are
legally required of Contractor. Contractor represents and warrants to City that Contractor shall,
at its sole cost and expense, keep in effect or obtain at all times during the term of this
Agreement, any licenses, permits, insurance and approvals which are legally required of
Contractor to practice its profession. Contractor shall maintain a City of Lake Elsinore business
license.
8.Indemnity. Contractor shall indemnify, defend, and hold harmless the City and its
officials, officers, employees, agents, and volunteers from and against any and all losses,
liability, claims, suits, actions, damages, and causes of action arising out of any personal injury,
bodily injury, loss of life, or damage to property, or any violation of any federal, state, or
municipal law or ordinance, to the extent caused, in whole or in part, by the willful misconduct or
negligent acts or omissions of Contractor or its employees, subcontractors, or agents, by acts
for which they could be held strictly liable, or by the quality or character of their work. The
foregoing obligation of Contractor shall not apply when (1) the injury, loss of life, damage to
property, or violation of law arises from the sole negligence or willful misconduct of the City or its
officers, employees, agents, or volunteers and (2) the actions of Contractor or its employees,
subcontractor, or agents have contributed in no part to the injury, loss of life, damage to
property, or violation of law. It is understood that the duty of Contractor to indemnify and hold
harmless includes the duty to defend as set forth in Section 2778 of the California Civil Code.
Acceptance by City of insurance certificates and endorsements required under this Agreement
does not relieve Contractor from liability under this indemnification and hold harmless clause.
This indemnification and hold harmless clause shall apply to any damages or claims for
damages whether or not such insurance policies shall have been determined to apply. By
execution of this Agreement, Contractor acknowledges and agrees to the provisions of this
Section and that it is a material element of consideration.
Page 4
9.Insurance Requirements.
a.Insurance. Contractor, at Contractor’s own cost and expense, shall
procure and maintain, for the duration of the Agreement, unless modified by the City’s Risk
Manager, the following insurance policies.
i.Workers’ Compensation Coverage. Contractor shall maintain
Workers’ Compensation Insurance and Employer’s Liability Insurance for his/her
employees in accordance with the laws of the State of California. In addition, Contractor
shall require each subcontractor to similarly maintain Workers’ Compensation Insurance
and Employer’s Liability Insurance in accordance with the laws of the State of California
for all of the subcontractor’s employees. Any notice of cancellation or non-renewal of all
Workers’ Compensation policies must be received by the City at least thirty (30) days
prior to such change. The insurer shall agree to waive all rights of subrogation against
City, its officers, agents, employees and volunteers for losses arising from work
performed by Contractor for City. In the event that Contractor is exempt from Worker’s
Compensation Insurance and Employer’s Liability Insurance for his/her employees in
accordance with the laws of the State of California, Contractor shall submit to the City a
Certificate of Exemption from Workers Compensation Insurance in a form approved by
the City Attorney.
ii.Commercial General Liability Coverage. Contractor shall maintain
commercial general liability insurance in an amount not less than one million dollars
($1,000,000) per occurrence for bodily injury, personal injury and property damage. If a
commercial general liability insurance form or other form with a general aggregate limit is
used, either the general aggregate limit shall apply separately to the work to be
performed under this Agreement or the general aggregate limit shall be at least twice the
required occurrence limit. Required commercial general liability coverage shall be at
least as broad as Insurance Services Office Commercial General Liability occurrence
form CG 0001 (ed. 11/88) or Insurance Services Office form number GL 0002 (ed. 1/73)
covering comprehensive General Liability and Insurance Services Office form number
GL 0404 covering Broad Form Comprehensive General Liability. No endorsement may
be attached limiting the coverage.
iii.Automobile Liability Coverage. Contractor shall maintain
automobile liability insurance covering bodily injury and property damage for all activities
of the Contractor arising out of or in connection with the work to be performed under this
Agreement, including coverage for owned, hired and non-owned vehicles, in an amount
of not less than one million dollars ($1,000,000) combined single limit for each
occurrence. Automobile liability coverage must be at least as broad as Insurance
Services Office Automobile Liability form CA 0001 (ed. 12/90) Code 1 (“any auto”). No
endorsement may be attached limiting the coverage.
iv.Builder’s Risk Coverage. Prior to the commencement of any
construction of the Project, Contractor shall obtain (or cause to be obtained) and keep in
force during the term of any construction, builder’s risk insurance insuring for all risks of
physical loss of or damage (excluding the perils of earthquake and flood).
b.Endorsements. Each general commercial liability and automobile liability
insurance policy shall be with insurers possessing a Best’s rating of no less than A:VII
and shall be endorsed with the following specific language:
Page 5
i.The City, its elected or appointed officers, officials, employees,
agents and volunteers are to be covered as additional insured with respect to liability
arising out of work performed by or on behalf of the Contractor, including materials, parts
or equipment furnished in connection with such work or operations.
ii.This policy shall be considered primary insurance as respects the
City, its elected or appointed officers, officials, employees, agents and volunteers.
Any insurance maintained by the City, including any self-insured retention the City may
have, shall be considered excess insurance only and shall not contribute with it.
iii.This insurance shall act for each insured and additional insured as
though a separate policy had been written for each, except with respect to the limits of
liability of the insuring company.
iv.The insurer waives all rights of subrogation against the City, its
elected or appointed officers, officials, employees or agents.
v.Any failure to comply with reporting provisions of the policies shall
not affect coverage provided to the City, its elected or appointed officers, officials,
employees, agents or volunteers.
vi.The insurance provided by this Policy shall not be suspended,
voided, canceled, or reduced in coverage or in limits except after thirty (30) days written
notice has been received by the City.
c.Deductibles and Self-Insured Retentions. Any deductibles or self-insured
retentions must be declared to and approved by the City. At the City’s option, Contractor shall
demonstrate financial capability for payment of such deductibles or self-insured retentions.
d.Certificates of Insurance. Contractor shall provide certificates of
insurance with original endorsements to City as evidence of the insurance coverage required
herein. Certificates of such insurance shall be filed with the City on or before commencement of
performance of this Agreement. Current certification of insurance shall be kept on file with the
City at all times during the term of this Agreement.
10.Notices. Any notice required to be given under this Agreement shall be in writing
and either served personally or sent prepaid, first class mail. Any such notice shall be
addressed to the other party at the address set forth below. Notice shall be deemed
communicated within 48 hours from the time of mailing if mailed as provided in this section.
If to City:City of Lake Elsinore
Attn: City Manager
130 South Main Street
Lake Elsinore, CA 92530
With a copy to:City of Lake Elsinore
Attn: City Clerk
130 South Main Street
Lake Elsinore, CA 92530
Page 6
If to Contractor:Miran Enterprises Inc
dba Andy's Glass & Window Company
25751 Jefferson Ave
Murrieta, Ca 92562
11.Entire Agreement. This Agreement constitutes the complete and exclusive
statement of agreement between the City and Contractor. All prior written and oral
communications, including correspondence, drafts, memoranda, and representations, are
superseded in total by this Agreement.
12.Amendments. This Agreement may be modified or amended only by a written
document executed by both Contractor and City and approved as to form by the City Attorney.
13.Assignment and Subcontracting. Contractor shall be fully responsible to City for
all acts or omissions of any subcontractors. Assignments of any or all rights, duties or
obligations of the Contractor under this Agreement will be permitted only with the express
consent of the City. Nothing in this Agreement shall create any contractual relationship between
City and any subcontractor nor shall it create any obligation on the part of the City to pay or to
see to the payment of any monies due to any such subcontractor other than as otherwise is
required by law.
14.Waiver. Waiver of a breach or default under this Agreement shall not constitute
a continuing waiver of a subsequent breach of the same or any other provision under this
Agreement.
15.Severability. If any term or portion of this Agreement is held to be invalid, illegal,
or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this
Agreement shall continue in full force and effect.
16.Controlling Law Venue. This Agreement and all matters relating to it shall be
governed by the laws of the State of California and any action brought relating to this
Agreement shall be held exclusively in a state court in the County of Riverside.
17.Litigation Expenses and Attorneys’ Fees. If either party to this Agreement
commences any legal action against the other party arising out of this Agreement, the prevailing
party shall be entitled to recover its reasonable litigation expenses, including court costs, expert
witness fees, discovery expenses, and attorneys’ fees.
18.Mediation. The parties agree to make a good faith attempt to resolve any
disputes arising out of this Agreement through mediation prior to commencing litigation. The
parties shall mutually agree upon the mediator and share the costs of mediation equally. If the
parties are unable to agree upon a mediator, the dispute shall be submitted to JAMS or its
successor in interest. JAMS shall provide the parties with the names of five qualified mediators.
Each party shall have the option to strike two of the five mediators selected by JAMS and
thereafter the mediator remaining shall hear the dispute. If the dispute remains unresolved after
mediation, either party may commence litigation.
Page 7
19.Authority to Enter Agreement and Administration. Contractor has all requisite
power and authority to conduct its business and to execute, deliver, and perform the
Agreement. Each party warrants that the individuals who have signed this Agreement have the
legal power, right, and authority to make this Agreement and to bind each respective party. The
City Manager is authorized to enter into an amendment or otherwise take action on behalf of the
City to make the following modifications to the Agreement: (a) a name change; (b) grant
extensions of time; (c) non-monetary changes in the scope of services; and/or (d) suspend or
terminate the Agreement. The Director of Public Works shall act as the Project administrator on
behalf of the City.
20.Prohibited Interests. Contractor maintains and warrants that it has not employed
nor retained any company or person, other than a bona fide employee working solely for
Contractor, to solicit or secure this Agreement. Further, Contractor warrants that it has not paid
nor has it agreed to pay any company or person, other than a bona fide employee working
solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other
consideration contingent upon or resulting from the award or making of this Agreement. For
breach or violation of this warranty, City shall have the right to rescind this Agreement without
liability. For the term of this Agreement, no member, officer or employee of City, during the term
of his or her service with City, shall have any direct interest in this Agreement, or obtain any
present or anticipated material benefit arising therefrom.
21.Equal Opportunity Employment. Contractor represents that it is an equal
opportunity employer and it shall not discriminate against any subcontractor, employee or
applicant for employment because of race, religion, color, national origin, handicap, ancestry,
sex or age. Such non-discrimination shall include, but not be limited to, all activities related to
initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff
or termination.
22.Prevailing Wages.
a.Contractor and all subcontractors shall adhere to the general prevailing
rate of per diem wages as determined and as published by the State Director of the Department
of Industrial Relations pursuant to Labor Code Sections 1770, 1773, and 1773.2. Copies of
these rates and the latest revisions thereto are on file in the office of the City Clerk of the City of
Lake Elsinore and are available for review upon request.
b.Contractor's attention is directed to the provisions of Labor Code Sections
1774, 1775, 1776, 1777.5 and 1777.6. Contractor shall comply with the provisions of these
Sections. The statutory provisions for penalties for failure to comply with the State's wage and
the hours laws will be enforced.
c.Labor Code Sections 1774 and 1775 require the Contractor and all
subcontractors to pay not less than the prevailing wage rates to all workmen employed in the
execution of the contract and specify forfeitures and penalties for failure to do so. The minimum
wages to be paid are those determined by the State Director of the Department of Industrial
Relations. Labor Code Section 1776 requires the Contractor and all subcontractors to keep
accurate payroll records, specifies the contents thereof, their inspection and duplication
procedures and certain notices required of the Contractor pertaining to their location. The
statutory penalties for failure to pay prevailing wages will be enforced. If the Project has been
awarded to Contractor on or after April 1, 2015, Contractor and its subcontractors must furnish
electronic certified payroll records to the Labor Commissioner. Beginning January 1, 2016,
Page 8
Contractor and its subcontractors must furnish electronic certified payroll records to the Labor
Commissioner without regard to when the Project was awarded to Contractor.
d.Labor Code Section 1777.5 requires Contractor or subcontractor
employing tradesmen in any apprenticeable occupation to apply to the Joint Apprenticeship
Committee nearest the site of the public works project, which administers the apprenticeship
program in that trade for a certificate of approval. The certificate will also fix the ratio of
apprentices to journeymen to be used in the performance of the Agreement. The Contractor is
required to make contributions to funds established for the administration of apprenticeship
programs if the Contractor employs registered apprentices or journeymen in any apprenticeable
trade and if other contractors on the public works site are making such contributions.
Information relative to apprenticeship standards, contributions, wage schedules and other
requirements may be obtained from the State Director of Industrial Relations or from the
Division of Apprenticeship Standards. Labor Code Section 1777.6 provides that it shall be
unlawful to refuse to accept otherwise qualified employees as registered apprentices solely on
the grounds of race, religious creed, color, national origin, ancestry, sex, or age.
e.Eight hours labor constitutes a legal day's work, as set forth in Labor
Code Section 1810.
23.Execution. This Agreement may be executed in several counterparts, each of
which shall constitute one and the same instrument and shall become binding upon the parties
when at least one copy hereof shall have been signed by both parties hereto. In approving this
Agreement, it shall not be necessary to produce or account for more than one such counterpart.
[Signatures on next page]
Page 9
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on
the date first written above.
“CITY”
CITY OF LAKE ELSINORE, a municipal
corporation
Grant Yates, City Manager
ATTEST:
City Clerk
APPROVED AS TO FORM:
City Attorney
“CONTRACTOR”
MIRAN ENTERPRISES, INC., a California
corporation, DBA Andy's Glass & Window
Company
By:_____________________
Its:_____________________
By:_____________________
Its:_____________________
Murrieta, CA 92562-6903
PH:(951) 677-7421 FAX:(951) 677-0383
ANDY'S GLASS & WINDOW CO.
25751 JEFFERSON AVE
821172 - C17
56-2322814Federal Tax ID:
Contractor License:
2/5/2018Stephanie
P/O#:
Taken By:
Installer:Date:
Time:
SalesRep:Return
Ship Via:
Adv. Code:
10:13 AM
Cust State Tax ID:
Cust Fed Tax ID:Quote: Q64086
Gus Papagolos
42095 Zevo Drive, Suite A15
TEMECULA, CA 92590
951.296.9110 CELL: (951) 764-2417 gus
City of lake Elsinore
32040 Riverside Drive
LAKE ELSINORE, CA 92530
Sold To: RETAILBill To: RETAIL
TotalSellPart NumberQty Description
1 STOREFRONT $137,232.00Storefront
Note: SUPPLY AND INSTALL COMMERCIAL CURTAIN WALL
BRONZE ALUMINUM FRAME STATIONARY WINDOWS AND
DOORS. THERMALLY IMPROVED US ALUMINUM SERIES 3150
OFFSET GLAZING 2X8 WITH 10 GUAGE STEEL STIFFENER.
LA CANTINA BIFOLD DOOR WITH SINGLE MAN DOOR.
1 FSC-M Field Labor
ESTIMATES given prior to field inspection are only estimates. QUOTES are valid for 30 days (or per
manufacturer’s written promotional deadlines). COMPETIVE PRICE GUARANTEE: We strive to be
competitive with our prices, therefore we can price match quotes that are of equal product. A copy of the price
to match will need to be provided and considered upon owner’s approval. ORDERS: A customer’s signature
on our Quote or Workorder document is considered a contract. Separate from installation (if ordered), our
Scope of Work includes: Determining necessary measurements (unless customer provided), preparation of
order specifications in addition to material production. CA Lien Law will be applied to all field service work.
Not responsible for delay caused by manufacturers delays, strike, labor trouble or causes beyond our control.
After completion of install, Andy’s Glass is not responsible for any breakage or cracking. l. Warranty: 1 year
labor. Materials are per manufactures written warranty. Care and Maintenance instructions are as provided
and can be found also on the manufacturers website. Insulated Glass: 2 year material warranty against failure
from install date. All materials are custom made to your specific needs and we are unable to offer
cancellations, refunds or credits after the order is placed. Verify your order is correct prior to signing the
approvals as we desire your 100% satisfaction!
I approve this order for processing and agree to the above information and total price Customer Signature:
X_______________________________ Date:___________
Instructions:
Sub Total:$137,232.00
$137,232.00
$0.00Tax:
Total:
Total: