Loading...
HomeMy WebLinkAbout0019_3_Temescal Canyon Bridge - Exhibit B AgreementsPROPOSAL Date 2/8/2017 Proposal # F715 Attention Attn: Mr. Julian Perez City of Lake Elsinore Public Works Dept. 521 North Langstaff Street Lake Elsinore, CA 92530 Location Of Work Temescal Canyon Road, Parapet Concrete Wall Repairs at Bridge, Lake Elsinore, Ca Project Total Title:___________________________________ Date:___________________________________ ACCEPTED: By:_____________________________________ ACCEPTANCE: By signing below, this proposal becomes a legally binding contract subject to the terms and conditions contained herein. PROPOSAL CONTITONS ATTACHED AS EXHIBIT "A" Any work not mentioned above shall not be accounted for and will be charged as an extra. Payments to be made bi-weekly as the work progresses to the value of 90% of all work completed. The entire amount of contract to be paid within 30 days after completion. DM Contracting, Inc. thanks you for the opportunity to present our cost proposal. We hereby propose to furnish all material, labor, equipment, insurance and supervision necessary to complete the following: Lic. # 771187 We are a certified DBE and SBE CUCP # 41935 State of California Certified Small Business # 1750410 Public Works Contractor Registration # 1000001550 1065 Harber Drive, Colton, CA 92324 Phone: 909.824.7071 Fax: 909.824.1547 Email: dave@dmengineeringinc.com Description UnitQtyItem #Rate Total Concrete Parapet Wall Repairs at Temescal Bridge Location: Saw cut existing 8" thick parapet concrete wall, 4 locations 3' h vertical cuts, 3 locations 5' lf horizontal cuts , and 1 location 10' lf horizontal cut. 1) Break, demo, and remove 4 areas of existing damaged and/or broken concrete parapet wall along with displaced #5 rebar, approx. 85' sf. Haul-away all debris to legal dump site. 2) Use pneumatic hand-held demo hammers during the demo and break-away process. 3) Drilling and doweling with #5 re-bar at 8" min. depth fixed and embedded. Approx. 33 drill points for #5 re-bar at 9" on center, and 16 drill points for horizontal dowels. Grout with epoxy adhesive using HILTI or equivalent. 4) Place, tie, and install #5 re-bar prior to pouring concrete material.5) Form, pour, and finish using high early strength concrete mix design with 5000 psi. 6) Strip away lumber, brackets, supports, etc, from concrete after 3 days, and clean up areas. 7) Total = LS1 37,552.00 37,552.00 Note: Base bid includes only the items and scope of work specifically mentioned above (DM portion of work only). Exclusions: New metal guardrail approach system, asphalt dike at guardrail, retrofitting work, post tension concrete, permits, testing, utilities, traffic control, asphalt patching, road work, weekend work. Items to be relocated, re-routed, raised, lowered, terminated, disconnected, and/or capped. Removal and haul-off of existing broken and/or damaged guard rail materials. $37,552.00