Loading...
HomeMy WebLinkAboutTraffic Engineer Presentation 3-15-17 PSAC Meeting March 15, 2017 SUMMERHILL DRIVE LEFT TURN SIGNAL Grape Street Summerhill Drive Railroad Canyon Road 1 SUMMERHILL DRIVE LEFT TURN SIGNAL Grape Street Summerhill Drive Railroad Canyon Road Railroad Canyon Road 2 TEMESCAL CANYON BRIDGE UPDATE Location 3 TEMESCAL CANYON BRIDGE UPDATE 4 TEMESCAL CANYON BRIDGE UPDATE 5 TEMESCAL CANYON BRIDGE UPDATE 6 TEMESCAL CANYON BRIDGE UPDATE 7 TEMESCAL CANYON BRIDGE UPDATE 8 NEW TEMESCAL CANYON BRIDGE UPDATE -Currently, the new bridge environmental documents are being prepared -Funding by Caltrans for design is anticipated for September of 2017 -Funding by Caltrans for Construction is anticipated for September of 2019 -Construction commencement is anticipated for May 2020. 9 SIDEWALK PROJECT CONSTRUCTION 10 SIDEWALK PROJECT CONSTRUCTION 11