Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Temescal Bridge Presentation 2-15-17
PSAC Meeting February 15, 2017 TEMESCAL CANYON BRIDGE UPDATE Location 1 PSAC Meeting February 15, 2017 BRIDGE CLOSED 2 WHY DID WE CLOSE THE BRIDGE 3 WHY IS THE BRIDGE CLOSED 4 BRIDGE DAMAGED PARAPET DAMAGED GUARDRAIL DESTROYED 5 BRIDGE DAMAGED GUARDRAIL DAMAGED 6 DEBRIS BUILD UP 7 BRIDGE STRUCTURAL INTEGRITY 8 BRIDGE REPAIRS AND OPENING 9 PSAC Meeting February 15, 2017 TEMESCAL CANYON BRIDGE UPDATE Location 10 PSAC Meeting February 15, 2017 BRIDGE CLOSED 11 WHY DID WE CLOSE THE BRIDGE 12 WHY IS THE BRIDGE CLOSED 13 BRIDGE DAMAGED PARAPET DAMAGED GUARDRAIL DESTROYED 14 BRIDGE DAMAGED GUARDRAIL DAMAGED 15 DEBRIS BUILD UP 16 BRIDGE STRUCTURAL INTEGRITY 17 BRIDGE REPAIRS AND OPENING 18