Loading...
HomeMy WebLinkAbout0004_1_Traffic Engineer Update - SRREPORT TO PUBLIC SAFETY ADVISORY COMMISSION TO:Honorable Chairman and Members of the Public Safety Advisory Commission FROM:Farid Dost, Senior Civil Engineer DATE:January 18, 2017 SUBJECT: Traffic Engineer Update Recommendation Receive and file Discussion Summerly Residential Project – A new traffic signal has been installed and activated at the intersection of Diamond Drive and Malaga Road adjacent to the baseball stadium. See below picture. Summerly Residential Project – A new traffic signal is under construction at the intersection of Mission Trail and Campbell Street about a block away from the baseball stadium. It is being installed as a part of the Summerly residential project. See below picture Nichols Road & Arco Station -Yellow flexible glue down/bolt down delineators were installed in front of the Arco station on Nichols Road. These delineators should help deter drivers from making left turns into or out of the Arco station. The striping in the area was also refreshed and adjusted to enhance visibility and provide deterrent to drivers. Discussion None