CONDITIONS OF APPROVAL
RESOLUTION:2017-XX
PROJECT: TTM 33486
PROJECT NAME:McKenna Court
PROJECT LOCATION:APNs: 391-790-002 and 003
APPROVAL DATE:February 28, 2006
EXPIRATION DATE:February 28, 2020
GENERAL
1.Tentative Tract Map (TTM) No. 33486 is a subdivision of approximately 24 acres into 83
single family residential lots (including two existing single family residences). The Project
is located in the northern section of the City on Machado Street between Zieglinde and
Lakeshore Drives (APN 379-150-001, 002, 041 thru 044).
2.The applicant shall submit a money order, cashier’s check or check, made payable to the
County Recorder, for filing of a Certification of Fee Exemption “De Minimis Impact
Finding.” in the amount of $64.00 to the Planning Division within 48 hours of the City
Council approval date for the required Environmental Filing.
3.The applicant shall comply with those mitigation measures identified in the Mitigated
Negative Declaration No. 2005-05/Mitigation Monitoring Plan.
4.The applicant shall defend (with counsel acceptable to the City), indemnify, and hold
harmless the City, its Officials, Officers, Employees, Agents, and its Consultants
(Indemnitees) from any claim, action, or proceeding against the Indemnitees to attack, set
aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or
legislative body concerning approval, implementation and construction of Tentative Tract
Map No. 31957, which action is bought within the time period provided for in California
Government Code Sections 65009 and/or 66499.37, and Public Resources Code Section
21167, including the approval, extension or modification of Tentative Tract Map No. 31957
or any of the proceedings, acts or determinations taken, done, or made prior to the
decision, or to determine the reasonableness, legality or validity of any condition attached
thereto. The Applicant's indemnification is intended to include, but not be limited to,
damages, fees and/or costs awarded against or incurred by Indemnitees and costs of suit,
claim or litigation, including without limitation attorneys' fees, penalties and other costs,
liabilities and expenses incurred by Indemnitees in connection with such proceeding. The
City will promptly notify the applicant of any such claim, action, or proceeding against the
City. If the project is challenged in court, the City and the applicant shall enter into formal
defense and indemnity agreement, consistent with this condition.
The applicant shall defend (with counsel acceptable to the City), indemnify, and hold
harmless the City, its Officials, Officers, Employees, Agents, and its Consultants from any
claim, action, or proceeding against the City, its Officials, Officers, Employees, or Agents
to attach, set aside, void, or annul an approval of the City, its advisory agencies, appeal
boards, or legislative body concerning implementation and construction of Tentative Tract
Map No. 31957, which action is brought within the time period provided for in California
Government Code Sections 65009 and/or 66499.37 and Public Resources Code Section
TTM 33486 City Council: 2/14/17
Conditions of Approval
Applicants Initials: _____ Page 2 of 12
21167. The City will promptly notify the applicant of any such claim, action, or proceeding
against the City and will cooperate fully with the defense.
5.Within 30 days of project approval, the applicant shall sign and complete an
"Acknowledgment of Conditions" and shall return the executed original to the Community
Development Department for inclusion in the case records.
6.Tentative Tract Map No. 33486 will expire on February 28, 2020 unless within that period
of time a Final Map has been filed with the County Recorder in accordance with the State
of California Subdivision Map Act and applicable requirements of the Lake Elsinore
Municipal Code (LEMC).
PLANNING DIVISION
7.Tentative Tract Map No. 31957 will expire two (2) years from date of approval unless within
that period of time an appropriate instrument has been filed and recorded with the County
Recorder or an extension of time is granted by the City of Lake Elsinore City Council in
accordance with the Subdivision Map Act and the LEMC.
8.The Tentative Tract Map shall comply with the State of California Subdivision Map Act and
shall comply with all applicable requirements of the Lake Elsmore Municipal Code Title 16
unless, modified by approved Conditions of Approval.
9.Prior to final certificate of occupancy of the Tentative Tract Map the improvements
specified herein and approved by the Planning Commission and the City Council shall be
installed or agreements for said improvements shall be submitted to the City for approval
by the City Engineer and all other stated conditions shall be complied with. All
uncompleted improvements must be bonded for as part of the agreements. Prior to
construction of the proposed detention basin, a Fencing Plan shall be submitted for review
and approval by the Planning Division.
10.Prior to Final Map recordation, in the event that an LLMD or other acceptable entity is not
formed, the applicant shall initiate and complete the formation of a Homeowner’s
Association, approved by the City, recorded and funded in place. All Association
documents shall be approved by the City and recorded, such as Articles of Incorporation
for the Association, and Covenants, Conditions, and Restrictions (CC&R’s).
11.Membership in the Home Owner’s Association, if required, shall be mandatory for each
buyer and any successive buyer.
12.All lots shall comply with minimum standards contained in the LEMC.
13.A precise survey with closures for boundaries and all lots shall be provided per the LEMC.
14.The applicant shall comply with all conditions of the Riverside County Fire Department.
15.The applicant shall meet all requirements of Elsinore Valley Municipal Water District
(EVMWD).
16.All future structural development associated with this map shall require separate Design
TTM 33486 City Council: 2/14/17
Conditions of Approval
Applicants Initials: _____ Page 3 of 12
Review approval.
17.Prior to issuance of any grading permit and/or building permit the applicant shall sign and
complete an “Acknowledgment of Conditions” and shall return the executed original to the
Community Development Department.
18.The applicant shall comply with the following City programs: the City Source Reduction
and Recycling Element and Household Hazardous Waste Element, the County Solid
Waste Management Plan and Integrated Waste Management Plan.
19.Prior to issuance of building permit the applicant shall submit a letter of verification (will
serve letter) to the City Engineer for all required utility services.
20.The applicant shall meet all requirements of the providing electric utility company.
21.The applicant shall meet all requirements of the providing gas utility company.
22.The applicant shall meet all requirements of the providing telephone utility company.
23.The City’s Noise Ordnance shall be met during all site preparation activity. Construction
shall not commence before 7:00 AM and cease at 5:00 PM, Monday through Friday.
Construction activity shall not take place on Saturday, Sunday, or any Legal Holidays.
24.The applicant shall pay all applicable City fees, including but not limited to Development
Impact Fees (DIF) per LEMC Section 16.74, at the rate in effect at the time of payment.
ENGINEERING
General
25.A grading plan signed and stamped by a Calif. Registered Civil Engineer shall be required
if the grading exceeds 50 cubic yards or the existing flow pattern is substantially modified
as determined by the City Engineer.
26.Prior to commencement of grading operations, if off-site soils transport is required,
applicant to provide the City with a map of all proposed haul routes to be used for
movement of export material. Such routes shall be subject to the review and approval of
the City Engineer.
27.All grading shall be done under the supervision of a geotechnical engineer and he shall
certify all slopes steeper than 2 to 1 for stability and proper erosion control. All
manufactured slopes greater than 30 ft. in height shall be contoured.
28.Tract Phasing Plan shall be approved by the City Engineer. Bond public improvements for
each Phase as approved by the City Engineer. Secondary access shall be provided for
each phase.
29.An Encroachment Permit shall be obtained prior to any work on City right-of-way.
TTM 33486 City Council: 2/14/17
Conditions of Approval
Applicants Initials: _____ Page 4 of 12
30.All utilities except electrical over 12 KV shall be placed underground, as approved by the
serving utility. Arrangements for relocation of utility company facilities (power poles, vaults,
etc.) out of the roadway or alley shall be the responsibility of the property owner or his
agent.
31.Underground water rights shall be dedicated to the City pursuant to the provisions of
Section 16.52.030 (LEMC), and consistent with the City’s agreement with the Elsinore
Valley Municipal Water District.
32.The applicant shall install permanent bench marks to Riverside County Standards and at
a location to be determined by City Engineer.
33.Applicant shall pay all applicable development fees, including but not all inclusive:
Development Impact Fees (DIF) per LEMC Section 16.74, TUMF, MSHCP, TIF and
area drainage fees at the rate in effect at the time of payment.
34.10 year storm runoff shall be contained within the curb and the 100 year storm runoff shall
be contained within the street right-of-way. When either of these criteria is exceeded,
drainage facilities shall be provided.
35.Applicant shall protect all downstream properties from damages caused by alteration of
the drainage patterns, i.e., concentrations or diversion of flow. Protection shall be
provided by constructing adequate drainage facilities including enlarging existing facilities
and/or by securing a drainage easement. A maintenance mechanism shall be in place for
any private drainage facilities constructed on-site or off-site. Any grading or drainage onto
private off site or adjacent property shall require a written permission to grade and/or a
permission to drain letter from the affected landowner.
36.All drainage facilities in this tract shall be constructed to Riverside County Flood Control
District Standards. An access road for maintenance to detention/water quality basins shall
be provided.
37.All compaction reports, grade certifications, monument certifications (with tie notes
delineated on 8 ½" x 11" Mylar) shall be submitted to the Engineering Division before final
inspection of public works improvements will be scheduled and approved.
38.A precise survey with closures for boundaries and all lots shall be provided per the LEMC.
39.Street improvements including street lighting, traffic signals, and traffic signing and striping
shall be required as part of this project. The improvements shall be prepared by a
registered civil engineer and shall meet city and/or riverside county standards.
40.Construct all public works improvements from property line to one foot beyond centerline
of Machado Street, and pavement transitions per approved street plans (LEMC Title 12).
41.Onsite construction traffic will not be allowed on Clement Street or Terra Cotta Road. All
construction traffic should enter the site utilizing Machado Street.
TTM 33486 City Council: 2/14/17
Conditions of Approval
Applicants Initials: _____ Page 5 of 12
42.Street lighting and landscaping on public right-of-way shall be maintained by a
maintenance assessment district.
43.All open space and slopes and detention basin shall be owned and maintained by an
LLMD. If an LLMD or other appropriate entity cannot be formed, then maintenance shall
be provided by a home owner’s association. An access road for maintenance shall be
provided.
44.In accordance with the City’s Franchise Agreement for waste disposal & recycling, the
applicant shall be required to contract with CR&R Inc. for removal and disposal of all waste
material, debris, vegetation and other rubbish generated during cleaning, demolition, clear
and grubbing or all other phases of construction.
45.Protect palm trees in place, or contact the Community Services of City of Lake Elsinore
for Palm Tree Preservation Program, LEMC 5.78 Ordinance 1044.
46.On-site drainage shall be conveyed to a public facility, accepted by adjacent property
owners by a letter of drainage acceptance, or conveyed to a drainage easement.
47.All natural drainage traversing the site shall be conveyed through the site, or shall be
collected and conveyed by a method approved by the City Engineer.
48.Roof drains shall not be allowed to outlet directly through coring in the street curb.
49.Roofs should drain to a landscaped area.
50.Applicant shall comply with all NPDES requirements in effect; including the submittal of a
Water Quality Management Plan (WQMP) as required per the Santa Ana Regional Water
Quality Control Board.
51.Education guidelines and Best Management Practices (BMP) shall be provided to
residents of the development in the use of herbicides, pesticides, fertilizers as well as
other environmental awareness education materials on good housekeeping practices that
contribute to protection of storm water quality in the Riverside county NPDES Drainage
Area Management Plan.
Prior to Approval of final Map, unless other timing is indicated, the subdivider shall
complete the following or have plans submitted and approved, agreements executed and
securities posted:
52.Applicant shall form or annex into an LLMD. If an LLMD or other appropriate entity cannot
be formed, then the applicant shall record CC & R’s for maintenance of, the detention
basin and street lighting within the project. The CC & R’s shall be approved by the
Planning Director prior to recordation of final map.
53.Existing easements that have not been vacated will be shown on the final map.
54.Landscape easements shall be shown on the final map.
55.Applicant shall enter into an agreement with the City for the construction of public works
improvements and shall post the appropriate bonds prior to final map approval.
TTM 33486 City Council: 2/14/17
Conditions of Approval
Applicants Initials: _____ Page 6 of 12
56.Applicant shall obtain all necessary off-site easements for off-site grading from the
adjacent property owners prior to final map approval.
57.All Public Works requirements shall be complied with as a condition of development as
specified in the Lake Elsinore Municipal Code (LEMC) prior to final map approval.
58.Make an offer of dedication for all public streets and easements required by these
conditions or shown on the Tentative Map. All land so offered shall be granted to the City
free and clear of all liens and encumbrances and without cost to the city.
59.Some of the improvements shown on the Map and/or required by these conditions could
be located off-site on property which neither the City nor the subdivider may have no title
or interest to permit the improvements to be made without acquisition of title or interest.
The subdivider shall pay all costs for acquisition of title or interest.
60.A Calif. Registered Civil Engineer shall prepare street and drainage improvement plans
and specifications. Improvements shall be designed and constructed to Riverside County
Road Department Standards, latest edition, and City Codes (LEMC 12.04 and 16.34).
Street improvement plans shall show existing and future profiles at centerline of street, at
top of curb and at centerline of the alley. The profiles and contours will extend to 50’
beyond the property limits.
61.Interior streets shall be dedicated and improved to public residential street standards
(40’/60’) or as shown in the map.
62.Construct a traffic signal at Terra Cotta Road and Lakeshore Drive as required by the
Traffic Study contained within the Mitigated Monitoring Program. Note that this location is
covered under the TIF program. The applicant may ask for a reimbursement agreement
subject to the approval of the City Engineer.
63.Construct half-width street improvements along the project frontage on Machado Street.
The improvements include ac pavement, ac transitions, curb and gutter, sidewalk, street
lighting, and signing striping.
64.Construct a paved pedestrian connection that provides access from Terra Cotta Road to
the ac paved road at the northeast corner of the property.
65.Install survey monument at Terra Cotta Road and “A” Street.
66.Contribute on a fair share basis to the cost of traffic improvements as listed in Table 6-1
of the Traffic Study prepared by Urban Crossroads dated October 10, 2005.
STORMWATER/NPDES
If CEQA identifies resources requiring Clean Water Act Section 401 Permitting, the applicant shall
obtain certification through the Santa Ana Regional Water Quality Control Board and provide a
copy to the Engineering Division.
67.Project hardscape areas shall be designed and constructed to provide for drainage into
adjacent landscape.
TTM 33486 City Council: 2/14/17
Conditions of Approval
Applicants Initials: _____ Page 7 of 12
68.All storm drain inlet facilities shall be appropriately marked “Only Rain in the Storm Drain”
using the City authorized marker.
Construction
69.A Storm Water Pollution Prevention Plan (SWPPP) (as required by the NPDES General
Construction Permit) and compliance with the Green Building Code for sediment and
erosion control are required for this project.
70.Prior to grading or building permit for construction or demolition and/or weed abatement
activity projects subject to coverage under the NPDES General Construction Permit shall
demonstrate that compliance with the permit has been obtained by providing a copy of
the Notice of Intent (NOI) submitted to the State Water Resources Control Board and a
copy of the notification of the issuance of a Waste Discharge Identification (WDID)
Number or other proof of filing to the satisfaction of the City Engineer. A copy of the
SWPPP shall be kept at the project site, updated, and be available for review upon
request.
71.Erosion & Sediment Control – ALL PROJECTS - Prior to the issuance of any grading or
building permit for construction or demolition, the applicant shall submit for review and
approval by the City Engineer, an Erosion and Sediment Control Plan as a separate sheet
of the grading plan submittal to demonstrate compliance with the City’s NPDES Program
and state water quality regulations for grading and construction activities. The Erosion
and Sediment Control Plan shall identify how all construction materials, wastes, grading
or demolition debris, and stockpiles of soil, aggregates, soil amendments, etc. shall be
property covered, stored and secured to prevent transport into local drainages or waters
by wind, rain, tracking, or dispersion. The plan shall also describe how the project will
ensure that all BMPs will be maintained during construction of any future right of ways. A
copy of the plan shall be incorporated into the SWPPP as applicable, kept updated as
needed to address changing circumstances of the project site, be kept at the project site
and available for review upon request.
72.Minimum BMP’s as identified by the City shall be implemented by all projects.
Post-Construction
73.Prior to the issuance of a certificate of use and/or occupancy, the applicant shall
demonstrate compliance with applicable NPDES permits for construction, MS4, etc. to
include:
Demonstrate that the project has complied with all non-structural BMPs described
in the project’s WQMP.
Provide signed, notarized certification from the engineer of work that the structural
BMP’s identified in the project’s WQMP are installed in conformance with
approved plans and specifications and operational.
Submit a copy of the fully executed, recorded City approved Operations and
Maintenance (O&M) Plan and Agreement for all structural BMPs or a copy of the
recorded City approved CC&R.
The Operation and Maintenance (O&M) Plan and Agreement and/or CC&R’s shall
TTM 33486 City Council: 2/14/17
Conditions of Approval
Applicants Initials: _____ Page 8 of 12
(1) describe the long-term operation and maintenance requirements for BMPs
identified in the BMP Exhibit; (2) identify the entity that will be responsible for long-
term operation and maintenance of the referenced BMPs; (3) describe the
mechanism for funding the long-term operation and maintenance of the referenced
BMPS; and (4) provide for annual certification of water quality facilities by a
registered civil engineer. The City format shall be used.
Demonstrate that copies of the project’s approved WQMP (with recorded O&M
Plan or CC&R’s attached) are available for each of the initial occupants
(commercial/industrial) or HOA as appropriate.
Agree to pay for a Special Investigation from the City of Lake Elsinore for a date
twelve (12) months after the issuance of a Certificate of Use and/or Occupancy for
the project to verify compliance with the approved WQMP and O&M Plan. A
signed/sealed certification from the engineer of work dated 12 months after CofO
will be considered in lieu of a Special Investigation by the City.
Provide the City with a digital .pdf copy of the Final WQMP.
Prior to Issuance of a Grading Permit:
74.Submit grading plans with appropriate security, Hydrology and Hydraulic Reports
prepared by a Registered Civil Engineer for approval by the City Engineer. Developer
shall mitigate increased in runoff, flooding and/or erosion downstream caused by
development of the site and/or diversion of drainage.
75.Provide soils, geology and seismic report including street design recommendations.
Provide final soils report showing compliance with recommendations.
76.An Alquist-Priolo study shall be performed on the site to identify any hidden earthquake
faults and/or liquefaction zones present on-site.
77.The applicant shall obtain all necessary off-site easements for off-site grading and/or
drainage acceptance from the adjacent property owners prior to grading permit issuance.
78.Applicant to provide erosion control measures as part of their grading plan. The applicant
shall contribute to protection of storm water quality and meet the goals of the BMP in
Supplement “A” in the Riverside County NPDES Drainage Area Management Plan.
79.Applicant shall provide the city with proof of his having filed a Notice of Intent with the
Regional Water Quality Control Board for the National Pollutant Discharge Elimination
System (NPDES) program with a storm water pollution prevention plan prior to issuance
of grading permits. The applicant shall provide a SWPPP for post construction, which
describes BMP’s that will be implemented for the development and including maintenance
responsibilities.
Prior to Issuance of Building Permit:
80.All Public Works requirements shall be complied with as a condition of development as
specified in the Lake Elsinore Municipal Code (LEMC) prior to building permit.
81.Street dedications and abandonment shall be processed and approved prior to building
permit issuance.
TTM 33486 City Council: 2/14/17
Conditions of Approval
Applicants Initials: _____ Page 9 of 12
82.Submit a "Will Serve" letter to the City Engineering Division from the applicable water
agency stating that water and sewer arrangements have been made for this project and
specify the technical data for the water service at the location, such as water pressure
and volume etc. Submit this letter prior to applying for a building permit.
83.Pay all Capital Improvement Mitigation and Plan Check fees (LEMC 16.34).
84.Pay the fair share cost of Traffic Improvements required in the traffic study.
Prior to Occupancy:
85.Pay all fees and meet requirements of an encroachment permit issued by the Engineering
Division for construction of public works improvements (LEMC12.08, Res.83-78). All fees
and requirements for an encroachment permit shall be fulfilled before Certificate of
Occupancy.
86.The improvements specified herein and approved by the Planning Commission and the
City Council shall be installed, or agreements for said improvements, shall be submitted
to the City for approval by the City Engineer, and all other stated conditions shall be
complied with. All uncompleted improvements must be bonded for as part of the
agreements.
87.All compaction reports, grade certifications, monument certifications (with tie notes
delineated on 8 1/2" x 11" Mylar) shall be submitted to the Engineering Division before
final inspection of off-site improvements will be scheduled and approved.
88.All public improvements shall be completed in accordance with the approved plans to the
satisfaction of the City Engineer.
89.All traffic signing and striping shall be completed in accordance with the approved plans
to the satisfaction of the City Traffic Engineer.
90.Water and sewer improvements shall be completed in accordance with Water District
requirements.
91.The Traffic Signal at Terra Cotta Road and Lakeshore Drive shall be completed and in
operation as required by the Traffic Study contained within the Mitigation Monitoring
Program.
CITY OF LAKE ELSINORE FIRE MARSHALL
General Conditions
92.Lake Elsinore Fire Protection Planning Office Responsibility - It is the responsibility
of the recipient of Fire Department conditions to forward them to all interested parties. The
permit number is required on all correspondence. Questions should be directed to the
Riverside County Fire Department, Lake Elsinore Fire Protection Planning Division at 130
S. Main St., Lake Elsinore, CA 92530. Phone: (951) 671-3124 Ext. 225. The following fire
department conditions shall be implemented in accordance with the Lake Elsinore
TTM 33486 City Council: 2/14/17
Conditions of Approval
Applicants Initials: _____ Page 10 of 12
Municipal Code and the adopted codes at the time of project building plan submittal, these
conditions are in addition to the adopted code requirements.
93.Blue Dot Reflectors - Blue retro-reflective pavement markers shall be mounted on private
streets, public streets and driveways to indicate location of fire hydrants. Prior to
installation, placement of markers must be approved by the Riverside County Fire Dept.
94.Minimum Hydrant Fire Flow - Minimum required fire flow shall be 1,000 GPM for 2 hours
duration at 20 PSI residual operating pressure, which must be available before any
combustible material is placed on the job site. Average spacing between hydrants 500’
and 250’ maximum distance from any point on the street or road frontage to hydrant.
Standard Fire hydrants shall be installed (6”x4”x2-1/2”).
95.Standard Fire Hydrants - Super fire hydrants (6” x 4” x 2-2 1/2”), shall be located not less
than 25 feet or more than 250 feet from any portion of the building as measures along
approved vehicular travel ways. The required fire flow shall be available from any adjacent
hydrant(s) in the system.
96.Minimum Access Standards - The following access requirements are required to be
implemented to ensure fire department and emergency vehicular access. All roadways
shall conform to the City of Lake Elsinore approved roadway standards but in no case
shall the minimum fire department vehicular access be less the following provisions:
A. Twenty-four feet (24’) clear width. Where parking is to be provided, each parking
side shall be provided with eight (8’) additional feet on each side of the fire
department access.
B. Median openings or crossovers between opposing lanes of a divided highway or
street shall be located only at approved intersections at intervals of not less than
500 feet. [Ord. 529 § 3.2(F), 1973].
C. The required all weather vehicular access shall be able to support no less than
70,000 lbs. over 2 axles.
D. Roadway gradient shall not exceed 15% on any access road, driveways, and
perimeter roads.
E. Turning Radius shall be 26’ inside and 38’ outside for all access roads.
97.Secondary Access - In the interest of Public Safety, this project shall provide an Alternate
or Secondary Access. Said access shall be constructed in accordance to the City of Lake
Elsinore Engineering Department standards to accommodate full fire response and
community evacuation.
98.Automatic / Manual Gates-Gate entrances shall be at least two feet wider than the width
of the traffic lane (s) serving that gate and no less than 24 feet wide. Any gate providing
access from a road to a driveway shall be located at least 35 feet from the roadway and
shall open to allow vehicle to stop without obstructing traffic on the road. Where a one-
way road with a single traffic lane provides access to a gate entrance, a 40 foot turning
radius shall be used. Gate access shall be equipped with a rapid entry system. Plans shall
be submitted to the Fire Department for approval prior to installation. Automatic/manual
gate pins shall be rated with shear pin force, not to exceed 30 foot pounds. Automatic
gates shall be equipped with emergency backup power. Gates activated by the rapid entry
TTM 33486 City Council: 2/14/17
Conditions of Approval
Applicants Initials: _____ Page 11 of 12
system shall remain open until closed by the rapid entry system. Contact the Fire Planning
office for current plan check fees.
Prior to Building Permit Issuance
99.Plan Check Fee - Building plan check fees shall be made payable to the “City of Lake
Elsinore”, and shall be submitted to the Fire Department at the time of plan submittal.
100.Water System Plans - Applicant and/or developer shall separately submit 2 sets of water
system plans to the Fire Department for review. Plans must be signed by a registered Civil
Engineer and/or water purveyor prior to Fire Department review and approval. Mylars will
be signed by the Fire Department after review and approval. Two (2) copies of the signed
and approved water plans shall be returned to the Fire Department before release of a
building permit.
101.Prior to Building Construction Verification - This project shall be inspected and
approved by the Fire Marshal or designee prior to bringing combustible materials on site.
During such inspection all permanent road signs shall be in place, all hydrants shall on
operating and approved for use by the water purveyor, and all permanent road surfaces
shall be completed including primary and secondary access circulation.
Prior to Building Final Inspection
102.Residential Fire Sprinkler Systems for Single family and two-family 13D - Install a
complete fire sprinkler system designed in accordance with California Residential Code,
California Fire Code and adopted standards. A C-16 licensed contractor must submit
plans, along with the current fee, to the Fire Department for review and approval prior to
installation.
103.Designated Fire Lanes-The applicant shall prepare and submit to the Fire Department
for approval, a site plan designating required fire lanes with appropriate lane painting and/
or signs.
ADMINISTRATIVE SERVICES DEPARTMENT
104.Prior to approval of the Final Map, Parcel Map, Site Development Plan, or Special Use
Permit (as applicable), the applicant shall annex into Community Facilities District 2003-
01 to offset the annual negative fiscal impacts of the project on public safety operations
and maintenance issues in the City.
105.Prior to approval of the Final Map, Parcel Map, Site Development Plan, or Special Use
Permit (as applicable), the applicant shall annex into Lighting and Landscaping
Maintenance District No. 1 to offset the annual negative fiscal impacts of the project on
public right-of-way landscaped areas to be maintained by the City and for street lights in
the public right-of-way for which the City will pay for electricity and a maintenance fee to
Southern California Edison.
106.Upon completion of the Fire Station Impact Study and other impact fee studies, Developer
shall pay impact fee.
TTM 33486 City Council: 2/14/17
Conditions of Approval
Applicants Initials: _____ Page 12 of 12
107.Prior to approval of the Final Map, Parcel Map, Site Development Plan, or Special Use
Permit (as applicable), the applicant shall form a Mello-Roos Community Facility District
to fund the on-going operation and maintenance of the new parks, parkways, open space
and public storm drains constructed within the development and federal NPDES
requirements to offset the annual negative fiscal impacts of the project.
I hereby state that I acknowledge receipt of the approved Conditions of Approval for the above
named project and do hereby agree to accept and abide by all Conditions of Approval as approved
by the City Council of the City of Lake Elsinore on . I also acknowledge that all Conditions
shall be met as indicated.
Date:
Applicant’s Signature:
Print Name:
Address:
Phone Number: