Loading...
HomeMy WebLinkAbout0011_4_Engineering Resources - Exhibit C ProposalI"NSA% nab Engineering Resources of Sowhern California 100.00OP January 12, 2017 Gus Papagolos, Project Manager City of Lake Elsinore 130 South Main Street Lake Elsinore CA 92530 SUBJECT: ENGINEERING SERVICES PROPOSAL REGARDING RIVERSIDE DRIVE LIFT STATION RELOCATION Dear Mr. Papagolos: As you are aware, Engineering Resources of Southern California, Inc. (ERSQ is currently a member of a consulting team designing the widening Riverside Drive, also State Highway 74, in conjunction with and adjacent to the La Laguna RV Resort. In the area of widening, there exists a lift station designated A-4 by the current owner, Elsinore Valley Municipal Water District (District). The lift station was constructed for the City as Pump Station No. 3 in 1970. Wastewater delivered by three sewers is collected in the pump station wet well and discharged to a 10 -inch force main constructed in 1997, by the District. The lift station includes a prefab duplex pump chamber wet well, electrical service, motor control center, and standby generator. Existing pump station base is approximately 27 feet below the surface. Prospective project, then, involves the design of a replacement lift station to the southeast into the La Laguna RV Resort. Issues to be considered are that of the depth of the pump station, force main and sewer, possible dewatering required during construction, odor from wet well vents, and adequate maintenance access. PROPOSED ENGINEERING SERVICES Services required and proposed to be conducted will involve civil, mechanical, and electrical design for preparation of plans, specifications, and estimates for a replacement lift station. It is anticipated these will need to be conducted to current standards of the District. District representative indicates that standard design now is for construction of a single/combined pump chamber/wet well, different from the existing dry pump chamber/wet well. Basis of our proposed design and PS&E preparation effort will be the District's standard and that capacity of the replacement lift station will be the same as the existing facility. Proposed tasks to be performed include the following: 3550 E. Florida Avenue, Suite B. Hemet CA 92544 951/765-6622 951/765-6621 FAX 100.000P Gus Papagolos, Project Manager City of Lake Elsinore December 21, 2016 Page 2 Conduct research and consult with the City and the District regarding current design standards and requirements for lift station design. 2. Research the design and sizing of the existing lift station and verify design criteria applicable for the new lift station. 3. Select a suitable site for the replacement lift station, anticipated to be within the Park and potentially at the site of the existing Boat Launch Lift Station. Effort will include consultation and involvement of both the City and the District. 4. Obtain elevation of the existing sewer invert in Riverside Drive by a sub consultant. 5. Coordinate conduct of a geotechnical investigation by a sub consultant retained by the City. 6. Review opportunities for the collection of Park wastewater, from existing sewered area(s) and proposed; finalize station capacity and sizing of pumps, motor, and generator. 7. Coordinate with architect's sub consultant regarding electrical service design for the replacement lift station. 8. Prepare plans, specifications, and estimates that is PS&E for the civil and mechanical features including the lift station and appurtenant facilities, gravity sewer and force mains. 9. Submittals will be made to the appropriate agencies, either the District and/or the City, at preliminary concept and at the 30%, 50%, 90%, and 100% completion stages; final submittals will be made of stamped and signed plans and specifications for City and District approval. PROJECTPERSONNEL Oversight and coordination with the City concerning the design effort will be the responsibility of Matt Brudin, P.E. who holds a similar position concerning ERSC' efforts for the La Laguna project. 100.00OP Gus Papagolos, Project Manager City of Lake Elsinore December 21, 2016 Page 3 Project Manager for the design effort will be Mr. John Egan, P.E. In his many years of experience, Mr. Egan has been responsible for design and/or modifications of numerous lift stations for Crestline Sanitation District and the County of San Bernardino. Mr. Ron Worthington, P.E., will provide oversight of the design as well as quality assurance/quality control reviews and detailed review of pians and specifications. Electrical design, as indicated, will be conducted by the firnn. of T -Squared Engineering of Vista, the current electrical consultant for the La Laguna project. Specifically responsible for the electrical design is Mr. Farzad Tadayon, P.E., of the firm. Geotechnical investigation will be the responsibility of Inland Foundation Engineering through the City. PROPOSED ENGINEERING FEE ERSC will complete the design services for the replacement lift station as described for a lump sum amount of $42,340. Derivation of the fee amount is shown on the accompanying spreadsheet. We appreciate the opportunity of submitting our proposal and engineering qualifications to the City for the replacement lift station project. Should there be any questions, please contact the undersigned. Respectfull Submitted, Matt Brudin, P.E. Principal MB/Ir enc. S:IADMIN116007001 - La Laguna RV Resort\Addl Authorization No RRequest of Addl Authorization No l .wpd