Loading...
HomeMy WebLinkAbout0004_4_Implementation Agrmt - Exhibit C Implementation MatrixImplementation Matrix Summerly Conditions of Approval Progress Report Number 10- December 15, 2016 Phase 1-Tracts 31920-2 through 31920-6 Description of Item Improvement Threshold Trigger Comments 1 Malaga Road Needs final AC lift, landscape & irrigation, minor damage repair 120 days from COE Complete 2 Malaga Road project wall Wall installed but need graffiti removal 30 days from COE Complete 3 Diamond Drive Needs final AC lift, median repairs and landscape 120 days from COE Complete 4 Diamond Drive Clean-up debris and un-clog drain 20 days from COE Complete 5 Summerly Place Need final AC lift, median landscape & irrigation, road repair, finish monument 50th C of O Complete 6 Summerly Place Construct improvements Complete 7 Missing fire hydrants Replace missing fire hydrants 20 days from COE Complete 8 Entry walls Install missing facades 50th C of O Complete 9 Drainage facility Modify basin and regrade channel to accommodate development flows 190 days from COE Complete 10 Village Parkway Need final AC lift and median landscape and irrigation 50th C of O Complete 11 Village Parkway Remove debris and silt in basin 30 days from COE Complete 12 Mission Trail Final AC lift, parkway landscape & irrigation, and missing facades on walls 120 days from COE Complete 13 Mission Trail Median improvements-Deleted-Striping of median only None Not required per settlement 14 Mission Trail Remove debris, trash and vegetation from ditch 20 days from COE Complete 15 Hidden Trail Construct improvements Completed Complete 16 Mission Trail and Olive Install traffic signal 300th C of O Complete 17 Mission Trail and Lemon Install traffic signal & construct southbound lane 300th C of O Complete 18 Mission Trail and Elberta (Hidden Trail)Install traffic signal & intersection improvements 50th C of O Complete 19 Main Street and Lakeshore Install traffic signal 250th C of O Condition satisfied w/ cash in-lieu 20 Railroad Canyon and Summerhill Drive NB right turn lane-Deleted from traffic report Complete 21 Railroad Canyon &I-15 NB ramps 2nd SB right turn lane Condition satisfied Modified Imp complete 22 I-15 NB & SB ramps and Bundy Canyon Traffic Signal Complete 22A Mission Trail and Bundy Canyon Dual left SB Mission to Bundy & Dual Right WB Bundy to Mission 300th C of O Complete 59 Mission Trail and Corydon Street Signal modification-SB right turn overlap phasing & Dual left and right EB Corydon to Mission 300th C of O Complete 23 Lift Station Constructed interim 0.7 MGD lift station Complete 24 Injection well Complete 25 Golf Course Complete 26 Relocate 24-in EVMWD Waterline Complete 27 Wetland Strom water pump station Temporary constructed Complete 28 Biofiltration swale Complete 29 Storm water retention basins Complete 30 San Jacinto River landscaping In maintenance period Complete 31 Natural Open Space landscaping In maintenance period Complete 32 Neighborhood Park Complete Phase 2-Tracts 31920-7 through 31920-11 33 Malaga Road Needs final AC lift Complete 34 Diamond Drive-North of Summerly Construct improvements Phased improvements Complete 34a Diamond Drive between Summerly Place-DDA C Construct improvements Phased improvements Complete-Westerly parkway L&I under construction 35 Village Parkway-North of Summerly Place Construct improvements Phased improvements Complete 35a Village Parkway between Summerly Place and Hidden Trail-DDA C Construct improvements Phased improvements Complete 36 Hidden Trail Construct improvements Phased improvements Complete-Southern parkway L&I under construction 37 Summerly Construct improvements Phased improvements Complete 38 Diamond Drive and South Summerly Place Install traffic Signal 800th C of O Deleted-Not required by EIR Traffic Mitigation 39 Diamond Drive and Malaga Road Install traffic Signal 601st C of O Complete 40 Railroad Canyon &I-15 NB ramps 2nd WB right turn lane Complete 41 Diamond Dr @ I-15 SB Ramps 2nd EB right turn lane Complete 43 Recreation Center Construct improvements 800th C of O Phase 1 complete. Phase 2 ready for permits 44 Phase 1 Community Park- 8± acres Construct improvements 700th C of O Under construction 44a Submit plans for Community Park 400th C of O Done Phase 3-Tracts 31920-12 through 31920-16 45 Diamond Drive-DDA D Construct improvements Phased improvements Under construction @BCL@880556C0 December 15, 2016 Implementation Matrix Summerly Conditions of Approval Progress Report Number 10- December 15, 2016 Description of Item Improvement Threshold Trigger Comments 46 Village Parkway-DDA A Construct improvements Phased improvements Complete 46a Village Parkway-DDA D Under construction 46b Summerly Place-DDA A Construct improvements Phased improvements Complete Summerly Place-DDA C Complete 47 Meadow Construct improvements Phased improvements Complete 48 Hidden Trail Install parkway landscape Phased improvements Complete 49 Diamond Drive and North Village Parkway Install traffic signal 700th C of O Under construction 42 Mission Trail and Campbell Street Install traffic signal 700th C of O Under construction 50 Railroad Canyon &I-15 NB ramps 2nd NB left turn lane Complete 51 Phase 2 Community Park- 4± acres Construct improvements 1000th C of O 52 Neighborhood Park-Sunshine Park Construct improvements 100th C of O for SPA Phase 3 Complete-In maintenance period Phase 4-Tracts 31920-17 through 31920-23 53 Grading DDA F Grade lots Plans approved 53a Grading DDA E & G Grade lots 54 Village Parkway-DDA F Construct improvements Plans approved 54a Village Parkway-DDA E & G Construct improvements 55 Summerly Place Construct improvements Plans approved 56 Avenue 6 and Lakeshore Install traffic signal 1481st C of O 57 Diamond Drive and Campbell Street Install traffic signal 1481st C of O 58 Diamond Drive and Lakeshore Drive Signal modification-WB right turn overlap phasing 1481st C of O Improvement completed by others 60 Railroad Canyon and Summerhill Drive NB R-turn overlap phasing & WB R-turn w/overlap phasing-See note 1 Modified Imp Complete 61 Railroad Canyon &I-15 NB ramps 3rd NB and SB through lane- See note 2 None Payment of TUMF & TIF 62 Diamond Dr a@ I-15 SB Ramps 3rd & 4th NB through lane, 3rd SB through lane, 2nd EB through lane None Payment of TUMF & TIF 63 Diamond Drive and North Summerly Place Install traffic signal 1100th C of O 64 Sewer lift station Retrofit existing lift station to allow 1800 units 1060th C of O Plans to be prepard in 1st quarter 2017 65 Neighborhood Park-Sunset Park Construct improvements 100th C of O for DDA F 66 Phase 3 Community Park- 12± acres Construct improvements 1450th C of O 67 71 Acre mitigation area Construct improvements 1450th C of O 68 20" water line Construct improvements or installed by EVMWD @ district cost EVMWD Improvement District has opted not to construct Note 1-Insufficient receiving lanes on Railroad Canyon @ Summerhill Drive Note 2-Geometric capacity does not exist 3rd through lane MCMILLIN SUMMERLY LLC, a Delaware Reviewed by City of Lake Elsinore Engineering Division. limited liability company (“Developer”)Conditions and triggers are approved. ___________________________________ Ken Seumalo, City Engineer March 8, 2011 Item added/clarified from previous progress reprot @BCL@880556C0 December 15, 2016