REPORT TO CITY COUNCIL
To:Honorable Mayor and Members of the City Council
From:Grant Yates, City Manager
Prepared by: Nicole McCalmont
Date:January 10, 2017
Subject:Public Works Construction Contract Award for CDBG/SB 821 Sidewalk
Improvements CIP Project No. Z10010 & Z10041
Recommendation
1.Award the Public Works Construction Agreement for the CDBG/SB 821 Sidewalk
Improvement Project to Black Rock Construction.
2.Authorize the City Manager to execute the Agreement in the amount of $324,725 to
Black Rock Construction, in substantially the form attached and in such final form as
approved by the City Attorney.
3.Authorize the City Manager to execute change orders not to exceed the 15%
contingency amount of $48,708.75.
4.Authorize the City Engineer to record the Notice of Completion once it is determined
the work is complete and the improvements are accepted into the City maintained
roadway network.
Background
In October 2014 the City entered into a supplemental agreement with the County of Riverside,
for the use of Community Development Block Grant (CDBG) funds. Included in this agreement
was a curb, gutter, and sidewalk improvement project along portions of Sumner Street,
Townsend Street, and Silver Street.
In April 2015 the City was awarded, a Bicycle and Pedestrian Facilities (SB 821) Grant. This
project also constructs new curb, gutter, and sidewalk along portions of Sumner Street, Heald
Avenue and Campus Way. Due to the similarities in the project, as well as to take advantage of
the economies of scale, it was decided to merge these two projects into one.
In March of 2016, the City awarded the design for the CDBG/SB 821 Sidewalk Improvement
project to Michael Baker International. The project was advertised in early November 2016.
Page 2 of 2
Discussion
Contractor bids were opened publicly on December 7, 2016, at 2:00 p.m. The City received
twelve (12) bids from qualified contractors. However out of the twelve bids, only four (4) were
deemed responsive, eight of the bids submitted failed to include the required Federal Bid
Documents as specified in the proposal. The lowest bid submitted by LC Paving, failed to
include the required Federal Bid Documents, therefore; Staff recommends the selection of the
second lowest bidder. The bid results are summarized below:
Contractor (Bidder) Bid Amount _
1. LC Paving**$287,484.21
2. Black Rock Construction $324,725.00
3. CT&T Concrete Paving, Inc.**$326,249.14
4. Martinez Concrete, Inc.$326,590.74
5. S&H Civilworks**$245,659.50
6. DM Contracting, Inc.**$348,765.96
7.. Hardy & Harper, Inc.$355,000.00
8. Victor Concrete, Inc.**$369,721.50
9. Roadway Engineering & Construction**$377,578.05
10. EBS General Engineering $383,992.00
11. IVL Contractors, Inc.**$415,020.50
12. Hillcrest Contracting**$447,674.00
**Bids deemed non-responsive
Fiscal Impact
Funding for this project has been allocated under the City’s adopted CIP. The funding
sources will be CDBG Funds and SB 821 Funds.
Exhibits
A – Agreement
B – Bid Proposal