HomeMy WebLinkAbout0009_1_Gunnerson Rehab - SRPage 1 of 2 REPORT TO CITY COUNCIL To:Honorable Mayor and Members of the City Council From:Grant Yates, City Manager Prepared by: Nicole McCalmont Date:November 15, 2016 Subject:Public Works Construction Contract Award for Gunnerson Rehabilitation CIP Project No. 4530 Federal-Aid No. STPL 5074 (017) Recommendation 1.Award the Public Works Construction Agreement for the Gunnerson Rehabilitation Project to R.J. Noble Company. 2.Authorize the City Manager to execute the Agreement in the amount of $524,955.80 to R.J. Noble Company, in substantially the form attached and in such final form as approved by the City Attorney. 3.Authorize the City Manager to execute change orders not to exceed the 15% contingency amount of $78,743.37. 4.Authorize the City Engineer to record the Notice of Completion once it is determined the work is complete and the improvements are accepted into the City maintained roadway network. Background This project consists of the rehabilitation of Gunnerson Street from Lakeshore Drive to SR74/Riverside Drive. The method of repair includes, but is not limited to, cold milling the existing asphalt pavement to variable depths and repaving with an asphalt overlay. The project will also include minor storm drain improvements. Signing and striping per Caltrans standards and specifications. Adjustment of water and gas valves to grade, raising manhole covers to grade and other ancillary improvements relative to a removal and reconstruct pavement overlay project. Page 2 of 2 Discussion Contractor bids were opened publicly on November 9, 2016, at 2:00 p.m. The City received five (5) bids from qualified contractors. The bid results are summarized below: Contractor (Bidder) Location Bid Amount_ 1. R.J. Noble Orange, CA $524,955.80 2. All American Asphalt Corona, CA $533,500.00 3. Calmex Engineering, Inc. Bloomington, CA $595,427.61 4. Vance Corporation Rialto, CA $648.254.00 5. Hardy & Harper, Inc.Santa Ana, CA $707,000.00 Fiscal Impact Funding for this project has been allocated under the City’s adopted CIP. The funding sources will be T.R.I.P. Funds, Measure A funds, Gas Tax and STPL Grant Funds. Exhibits A – Agreement RJ Noble B – Bid Proposal