HomeMy WebLinkAbout0004_3_B - Repair ScheduleDIAMOND STADIUM CAPITAL REPAIR SCHEDULE
REF # PERIOD
ROPS REQUESTED
(1/1/2017 to
6/30/2018)
11/2017 to 6/2018 3rd Base Concession‐ Replace Grease Trap 42,000
21/2017 to 6/2018 Administrative Offices‐Capital Repairs 53,400
31/2017 to 6/2018 Concessions‐ Replace Lighting with Energy Efficient LED 7,500
41/2017 to 6/2018 Concourse Bathrooms‐ ADA & Capital Repairs 251,180
51/2017 to 6/2018 Diamond Club‐ Repair Leak in Fountain 4,800
61/2017 to 6/2018 Dugout‐ Repair Concrete 25,000
71/2017 to 6/2018 Field‐ Repair Plumbing & Drains 42,300
81/2017 to 6/2018 Underground Plumber/In Ceiling Piping 150,000
91/2017 to 6/2018 Home Clubhouse‐ Capital Repairs 60,000
10 1/2017 to 6/2018 Kids Area‐Repair Turf 47,960
11 1/2017 to 6/2018 Operations Office‐ Capital Repair 28,900
12 1/2017 to 6/2018 Outside Landscaping‐ Drip Line Irrigation 175,500
13 1/2017 to 6/2018 Outside Landscaping‐ Drought Tolerant Plants 175,000
14 1/2017 to 6/2018 Parking Lot A‐Replace Lighting with Energy Efficient and
Brighter LED Lighting
5,650
15 1/2017 to 6/2018 Parking Lot B‐Replace Lighting with Energy Efficient and
Brighter LED Lighting
11,900
16 1/2017 to 6/2018 Press Box‐Replace Counters and Cabinets 295,000
17 1/2017 to 6/2018 Press Box‐Replace Lighting with Energy Efficient LED 4,980
18 1/2017 to 6/2018 Roll Off‐Repair Roof 78,950
19 1/2017 to 6/2018 Stadium Railings‐ Replace Rusted Stadium Railing in Seating
Bowl
200,000
20 1/2017 to 6/2018 Suite Level Add Additional Railing for Safety Reasons 150,000
21 1/2017 to 6/2018 Suite Level‐ Replace Counters, Cabinets and Sinks 28,400
22 1/2017 to 6/2018 Suite Level‐ Replace Lighting with Energy Efficient LED 8,300
23 1/2017 to 6/2018 Terrace‐ Repair Concrete Steps 35,000
24 1/2017 to 6/2018 Umpire Room‐ Capital Repairs 22,800
25 1/2017 to 6/2018 Visiting Clubhouse‐ Capital Repairs 55,000
26 1/2017 to 6/2018 Playing Surface‐ Re Sod 210,000
27 1/2017 to 6/2018 Stadium Roof Repair/Replacement 500,000
28 1/2017 to 6/2018 Seating Bowl Concrete 250,000
28 1/2017 to 6/2018 Underground pipe repair ‐ Parking Lots A and B 138,000
30 1/2017 to 6/2018 Parking Lot A‐Replace Trash Cans 3,800
31 1/2017 to 6/2018 Parking Lot B‐Replace Trash Cans 3,800
32 1/2017 to 6/2018 Picnic Tables 21,560
33 1/2017 to 6/2018 Security System‐ Replace 48,900
34 1/2017 to 6/2018 Security‐Stadium Key 26,500
35 1/2017 to 6/2018 Replace Backlit Exit Signs through the stadium (OHSA)18,500
36 1/2017 to 6/2018 Equipment‐ Field‐Replace with Emission Compliant Blowers
(AQMD, OHSA)
15,000
37 1/2017 to 6/2018 Equipment‐ Field Sprayer‐Replace Current 18,000
38 1/2017 to 6/2018 Equipment‐ Verti cutter replacement 11,900
39 1/2017 to 6/2018 Equipment‐Field Tractor 34,500
40 1/2017 to 6/2018 Equipment‐Field‐Jacobs Greens King 8,200
Totals 3,268,180.00$
CAPITAL REPAIR
Equipment Replacement: