Loading...
HomeMy WebLinkAbout0004_3_B - Repair ScheduleDIAMOND STADIUM CAPITAL REPAIR SCHEDULE REF # PERIOD ROPS REQUESTED (1/1/2017 to 6/30/2018) 11/2017 to 6/2018 3rd Base Concession‐ Replace Grease Trap 42,000 21/2017 to 6/2018 Administrative Offices‐Capital Repairs 53,400 31/2017 to 6/2018 Concessions‐ Replace Lighting with Energy Efficient LED 7,500 41/2017 to 6/2018 Concourse Bathrooms‐ ADA & Capital Repairs 251,180 51/2017 to 6/2018 Diamond Club‐ Repair Leak in Fountain 4,800 61/2017 to 6/2018 Dugout‐ Repair Concrete 25,000 71/2017 to 6/2018 Field‐ Repair Plumbing & Drains 42,300 81/2017 to 6/2018 Underground Plumber/In Ceiling Piping 150,000 91/2017 to 6/2018 Home Clubhouse‐ Capital Repairs 60,000 10 1/2017 to 6/2018 Kids Area‐Repair Turf 47,960 11 1/2017 to 6/2018 Operations Office‐ Capital Repair 28,900 12 1/2017 to 6/2018 Outside Landscaping‐ Drip Line Irrigation 175,500 13 1/2017 to 6/2018 Outside Landscaping‐ Drought Tolerant Plants 175,000 14 1/2017 to 6/2018 Parking Lot A‐Replace Lighting with Energy Efficient and Brighter LED Lighting 5,650 15 1/2017 to 6/2018 Parking Lot B‐Replace Lighting with Energy Efficient and Brighter LED Lighting 11,900 16 1/2017 to 6/2018 Press Box‐Replace Counters and Cabinets 295,000 17 1/2017 to 6/2018 Press Box‐Replace Lighting with Energy Efficient LED 4,980 18 1/2017 to 6/2018 Roll Off‐Repair Roof 78,950 19 1/2017 to 6/2018 Stadium Railings‐ Replace Rusted Stadium Railing in Seating Bowl 200,000 20 1/2017 to 6/2018 Suite Level Add Additional Railing for Safety Reasons 150,000 21 1/2017 to 6/2018 Suite Level‐ Replace Counters, Cabinets and Sinks 28,400 22 1/2017 to 6/2018 Suite Level‐ Replace Lighting with Energy Efficient LED 8,300 23 1/2017 to 6/2018 Terrace‐ Repair Concrete Steps 35,000 24 1/2017 to 6/2018 Umpire Room‐ Capital Repairs 22,800 25 1/2017 to 6/2018 Visiting Clubhouse‐ Capital Repairs 55,000 26 1/2017 to 6/2018 Playing Surface‐ Re Sod 210,000 27 1/2017 to 6/2018 Stadium Roof Repair/Replacement 500,000 28 1/2017 to 6/2018 Seating Bowl Concrete 250,000 28 1/2017 to 6/2018 Underground pipe repair ‐ Parking Lots A and B 138,000 30 1/2017 to 6/2018 Parking Lot A‐Replace Trash Cans 3,800 31 1/2017 to 6/2018 Parking Lot B‐Replace Trash Cans 3,800 32 1/2017 to 6/2018 Picnic Tables 21,560 33 1/2017 to 6/2018 Security System‐ Replace 48,900 34 1/2017 to 6/2018 Security‐Stadium Key 26,500 35 1/2017 to 6/2018 Replace Backlit Exit Signs through the stadium (OHSA)18,500 36 1/2017 to 6/2018 Equipment‐ Field‐Replace with Emission Compliant Blowers (AQMD, OHSA) 15,000 37 1/2017 to 6/2018 Equipment‐ Field Sprayer‐Replace Current 18,000 38 1/2017 to 6/2018 Equipment‐ Verti cutter replacement 11,900 39 1/2017 to 6/2018 Equipment‐Field Tractor 34,500 40 1/2017 to 6/2018 Equipment‐Field‐Jacobs Greens King 8,200 Totals 3,268,180.00$ CAPITAL REPAIR Equipment Replacement: