HomeMy WebLinkAbout0003_2_SCW Change Order 2 - Exhibit A Steel Proposal
Page 1 of 2
Bid Proposal Rev 1
DATE: 7.1.2016
PROJECT: Rosetta Canyon Sports Park – Vehicle Archway
Lump Sum Bid: Fifty Four Thousand Two Hundred Dollars Exactly ($54,200) (including tax)
Applicable Bid Documents
Drawings: Architectural & Structural dated May 2016
Specifications: Sections: 051200
Addendum: None Noted
Summary Scope Outline (items listed below)
Items Furnished FOB Jobsite:
- Shop Drawings for Approval Electronic transmittal
- Anchor bolt templates
Items Furnished & Installed:
- HSS16x16 Steel Columns
- Radius HSS16x16 Archway
- Shop primer finish to our steel
City Sign, Steel for the Sign, Mesh and Angles are excluded.
SCW is a LA City Certified Fabricator
Shop Primer Finish Grey Coating is Included in the Price Above
GC is to provide clear unobstructed access for our labor, equipment & cranes
Specific Exclusions (in addition to those listed in the attached “Standard Exclusions and
Clarifications” unless noted above):
1. Engineering and calculations of any kind for structural or
miscellaneous steel
2. City Sign and Steel for the sign are excluded. Ref
Details A&B per detail 2/A1.8
3. Angle Iron and Mesh.
4. Anything not called out above.
5. Any metals not shown on structural drawings.
6. Steel to wood attachment
7. Ornamental metals, Handrails & Guardrails
8. Bolts for other trades
9. Miscellaneous Framing Supports
10. Concrete & Grout
11. Rebar locating
12. Nonferrous metals & Cast Iron Products
13. Partial height wall and counter supports
14. A.I.S.C. Accreditation
15. Fire Watch & Smoke Containment
16. Any Testing & Inspections
17. High Performance Coatings
18. Buy-out items
19. Anything not specifically called out above.
Thank you for the opportunity to offer our services. Please note that due to changing market conditions for raw
steel, this proposal is only valid for acceptance within Thirty (30) days of the date shown above, and is subject to
warehouse price and availability.
Thank you,
Steve Scrape
760-468-2858
Stevescrape@scwcompanies.com
SCW Contracting Corp.
CA Lic. 630435 A, C60, C51
Exp. 10/31/2017
DIR Reg. # 1000001579
Calif. Small Business #11117
SCW Contracting Corp.
2525 N. OLD HWY 395
FALLBROOK, CA 92028
PHONE: (760) 728-1308
FAX: (760) 728-2517
Page 2 of 2
Customer Acceptance
We hereby authorize SCW to proceed with the work stated herein, and agree to the terms and conditions of this proposal.
Signed_____________________________Title_________________________Date__________________
Standard Exclusions and Clarifications
The following items are standard exclusions, and unless specifically listed above as being furnished, are excluded from
our scope:
Bolts for other trades
Permit and assessments
Bonds
Cost of Testing &/or Inspections
Demolition, supports or barricades
Grouting or Dry packing or Caulking
Metal Decking or gage metals
Cutting or drilling of concrete
Protection of landscaping, sidewalks and curbs
Locating or X-ray imaging rebar in existing
structures prior to drilling for anchors
Non-ferrous metals
Field Painting or Touch Up
Galvanizing U.N.O.
High Performance Coatings
Surveying or Field measuring
Wood to Wood Connections
Simpson (or alike) Hardware
All bolts entering wood
Field Welding of Rebar
Final plumb of columns supporting
wood framing
Personnel for fire watch
Roof frame support which are not
located & shown on structure roof
plans
Gage Metals, Flashing, Sealants
Cutting openings in metal deck
Rainwater leader, downspout and
associated brackets
Providing safety cable for other
trades
Removal of safety cable
Gate or Door latches, panic
hardware, closing devises
Our bid is based on the following clarifications as being an integral part of our scope and criteria for pricing our bid:
A. Detailed drawings and submittals:
No fabrication will be performed from drawings without the Architect & Engineer’s approval. To facilitate the schedule, contractor may
circumvent this by providing us a written authorization to proceed on specific items prior to receiving the engineer’s approv al, and in so
doing; contractor accepts all liability.
Our schedule allows a maximum turnaround time of two weeks for drawing approval.
All deliveries will be stated ARO (After Receipt of Order) or ARAD (After Receipt of Approved Drawings) as applicable.
B. Prior to our arrival to set the steel, the following items must be taken care of:
General contractor will provide free and clear access (unobstructed access) to all areas (including slab) for our crew, trucks and equipment for
installation of our steel at no cost to SCW.
Block outs (diamonds) shall be provided in sufficient size to reasonably access the leveling nuts after the column is set.
At each column location, the General contractor shall establish and set one leveling nut to the correct elevation. The anchor bolt with the
leveled nut shall be identified with spray paint.
General contractor is responsible to clean all the anchor bolts of all concrete as to allow the nuts to come on and off easily.
General contractor is responsible for all traffic control measures, flagman, pedestrian barricades, and permits for off loadi ng materials and
equipment.
C. Changes in the scope after award:
The general contractor must provide a list of personnel authorized to make changes to our scope (written), and in so doing, binds the
contractor to pay all the associated costs to make the change(s).
SCW will not to proceed with extra or change order work until an executed change order has been issued. To facilitate the schedule,
contractor may circumvent this by providing us a written authorization to proceed on specific items prior to receiving the Owners change
order. General Contractor accepts all liability associated with providing written direction prior to receiving Owners change order.
D. Terms and conditions:
Upon request, we will provide a copy of the schedule of values for the items covered in our scope. Our month ly invoices will be prepared
from this schedule.
1 year standard SCW warranty
By listing SCW, this proposal in its entirety will become part of the subcontract agreement.
Unpaid invoices going beyond the agreed upon terms are subject to interest being added at the rate if 1-1/2% per month.
Retention becomes due and payable within 30 days of our completion of each phase, regardless of when the owner pays the contractor.