Loading...
HomeMy WebLinkAbout0011_5_Feasibility Analysis SR74-I15 RBBD Proposal (DS)A L B E R T A. A S S O C I A T E S Corporate Headquarters 3788 McCray Street Riverside, CA 92506 951.686.1070 Palm Desert Office 36-951 Cook Street #103 Palm Desert, CA 92211 760.568.5005 Murrieta Office 41391 Kalmia Street #320 Murrieta, CA 92562 951.686.1070 011590 November 30, 2015 Mr. Jason Simpson Director of Administrative Services CITY OF LAKE ELSINORE 130 South Main Street Lake Elsinore, CA 92530 RE: Proposal for Preparation of Feasibility Analysis for SR74-115 Interchange Road and Bridge Benefit District (RBBD) Dear Mr. Simpson: Albert A. WEBB Associates is pleased to provide you with this proposal for Preparation to Feasibility Analysis for SR74-115 interchange RBBD. Enclosed you will find our Scope of Work (Exhibit "A"), and Compensation for Services (Exhibit "B") for your review and consideration. If you find this proposal acceptable, please issue an agreement for WEBB to sign. We appreciate this opportunity to be of service to your firm and look forward to hearing from you. If you have any questions regarding this proposal, please contact us at 951-686-1070. Sincerely, ALBERT A. WEBB ASSOCIATES 09�" M41" Dilesh Sheth, P.E.IT.E. Vice President V ®In1 www.webbassociates.com G:\Proposals\FORMAL PROPOSALS\City of Lake Elsinore\011590 Feasibility Analysis for SR74-115 Interchange RBBD\01159G_redsiuiiiiy r,ndiybi»ni4-iii RBBD Proposal_2015-11-25.docx EXHIBIT "A" SCOPE OF WORK Road Bridge Benefit District Scope of Services • Establish road bridge benefit district boundary. • Obtain and review conditions of approval of projects within the district boundary. • Obtain and review traffic impact studies of projects within the district boundary. • Field review and collect inventory of existing roadway network. • Prepare a base map showing existing lanes and future lanes need per General Plan. • Prepare cost estimate for the General Plan Roadways including Interchanges using TUMF Unit Cost Estimates. • Identify TUMF reimbursable facilities within the district. Prepare cost estimate of TUMF improvements. • Identify DIF improvements within the district. Prepare cost estimate of DIF improvements. • Identify priority and regionally significant projects within the District. • Estimate area of vacant land by General Plan land use within the district. Assume floor area ratio for the commercial, office, and industrial land uses. • Estimate TUMF and DIF obligation for proposed projects and the vacant land. • Determine additional cost for the improvements with current TUMF and DIF rate for the participant projects and undeveloped land. Determine preliminary fair share for the additional cost. • Identify Funding for priority and regionally significant projects. • Present draft Feasibility report to the City and participative projects. • Finalized the report per City staff's comments. Page 2 of 3 G:\Proposals\FORMAL PROPOSALS\City of Lake Elsinore\011590 Feasibility Analysis for SR74-115 Interchange RBBD\011590_Feasibility Analysis SR74-115 RBBD Proposal_2015-11-25.docx EXHIBIT "B" COMPENSATION FOR SERVICES We propose to be compensated a fixed fee for services performed according to the scope of services included as Exhibit A and outlined as follows: Proposed Fee Schedule For the services performed related to the projects which are not listed herein, compensation shall be at the hourly rates set forth on Attachment A, together with reimbursement, at cost, for incidental expenses incurred in connection with such services, together with reimbursement for outside services at cost plus 15%. Page 3 of 3 G:\Proposals\FORMAL PROPOSALS\City of Lake Elsinore\011590 Feasibility Analysis for SR74-115 Interchange RBBD\011590_Feasibility Analysis SR74-115 RBBD Proposal_2015-11-25.docx A L B E R T A. Attachment A LIAM i i FEE SCHEDULE ULE S S O C I A T E S RATES CLASSIFICATION HO R Engineers/Project Manager/Planners/Scientist/ Assessment/Special Tax Consultants/Landscape Architects/Designers PrincipalII.......................................................................................................................... 198.00 PrincipalI............................................................................................................................ 190.00 SeniorIII............................................................................................................................ 173.00 SeniorII............................................................................................................................. 162.00 SeniorI............................................................................................................................... 157.00 AssociateIII........................................................................................................................ 149.00 AssociateII......................................................................................................................... 128.00 AssociateI.......................................................................................................................... 122.00 AssistantV........................................................................................................................... 105.00 AssistantIV........................................................................................................................ 101.00 AssistantIII........................................................................................................................ 92.00 AssistantII........................................................................................................................... 76.00 AssistantI........................................................................................................................... 62.00 Survey Services 3 -Person Survey Party .......................................................................................................... 242.00 2 -Person Survey Party .......................................................................................................... 212.00 1 -Person Survey Party .......................................................................................................... 130.00 Directorof Survey............................................................................................................... 167.00 Manager of Field Operations............................................................................................... 124.00 SurveyTechnician II............................................................................................................ 108.00 SurveyTechnician I............................................................................................................. 89.00 Inspection Services ConstructionManager........................................................................................................ 150.00 InspectorII......................................................................................................................... 105.00 InspectorI.......................................................................................................................... 94.00 Administrative Services ProjectCoordinator............................................................................................................. 86.00 Administrative Assistant III.................................................................................................. 72.00 Administrative Assistant II................................................................................................... 62.00 Administrative Assistant I................................................................................................... 46.00 Other Direct Expenses IncidentalCharges.............................................................................................................. Cost Postageand Telephone....................................................................................................... Cost In-house Prints, Copies and Delivery .................................................................................. Cost Traveland Subsistence........................................................................................................ Cost SpecialConsultant....................................................................................... 275.00/Hour GISLicense Fee................................................................................................................... 39.00/Hour SubcontractedServices........................................................................................................ Cost + 15% Survey/Inspector Vehicle..................................................................................................... 0.77/Mile Mileage................................................................................................................................ 0.68/Mile NOTE: All rates are subject to change based on annual inflation and cost of living adjustments. 'A FINANCE CHARGE of one and one half percent (1-1/2%) per month (18% per year) will be added to any unpaid amount commencing thirty (30) days from date of invoice. A mechanic's lien may be filed for any invoice remaining unpaid after thirty (30) days from date of invoice. SCH 34 (07/01/08 REV) Lofy , LAKEFjLSIN0RJE IV 1] trkt, :' 1 .l: A" City of Lake Elsinore Feasibility Analysis for SR74-115 RBBD A L B E R T A. A S S 0 C I A T E S DATE DESCRIPTION STATUS Phase 1 - Preparation of Feasibility Analysis Wk of 11/30 Review Traffic Studies and Conditions of Approval Wk of 11/30 Field Review and Data Collection Wk of 12/7 Identify Future Development by Land Use in the District Wk of 12/14 Identify DIF and TUMF Improvements in the District Wk of 12/14 Prepare Cost Estimate for General Plan Roadway Improvements Wk of 1/4 Determine Preliminary Fair Share Cost Estimate for Undeveloped District Wk of 1/11 and 1/18 City Review of Fair Share Cost Wk of 1/25 Revision to Fair Share Cost Estimate (based on City's comments) Wk of 1/25 Finalize Fair Share Cost Estimate and Feasibility Analysis