Loading...
HomeMy WebLinkAbout0009_1_Wolverine Fence Company Staff Report REPORT TO CITY COUNCIL TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: GRANT M. YATES, CITY MANAGER DATE: March 22, 2016 SUBJECT: Award Public Works’ Construction Agreement to Wolverine Fence for the Ball Field Back Stop Poles at Rosetta Canyon Sports Park Phase II Project (CIP PROJECT #Z40004) Recommendations 1. Award a Public Works’ Construction Agreement to Wolverine Fence. for the ball field back stop poles at Rosetta Canyon Sports Park Phase II Project (CIP PROJECT #Z40004). 2. Approve and authorize the City Manager to execute the Agreement in the not to exceed amount of $108,092.00 with Wolverine Fence in the form attached and in such final form as approved by the City Attorney. 3. Authorize the City Manager to execute change orders not to exceed the 10% contingency amount of $10,809.00 for minor as needed adjustments. Background Staff initialed bid proposals for the Flat Work and Back Stop Fencing at Rosetta Canyon Sports Park Phase II. Utilizing Bid Set “B3” contractors provided work proposals based on the structural engineering and architecture plans for the ball filed back stop poles. Two Proposals were received on or before March 14, 2016. The contractor, Wolverine Fence, providing the lowest proposal was interviewed and it was determined responsive. Discussion The purpose of this proposal is to seek a competitive pricing for the purchase and construction of the ball field back stop poles at Rosetta Canyon Sports Park Phase II Project Bid Set “B3” (CIP PROJECT #Z40004). The overall essentials in this scope of work are summarized below as general requirements: March 22, 2016  Award for Ball Field Back Stop Poles at Rosetta Canyon Sports Park  General Requirements Purchase 40 ea. 8 5/8’’ Schedule 40 Post x 30’ High 4 ea. 20’ Wide x 3’ High HDPE Backboards Behind Home Plate 40 ea. 24’’ x 96’’ Concrete Footings Structural Engineering The following bids were received from qualified contractors on or before the deadline and are listed below in the amount of bid sequence (lowest to highest): Contractor Address Amount Wolverine Fence 930 South Cypress St La Habra CA 90631 $108,092.00 Econo Fence 5261 Pedley Rd Riverside, CA 92509 $130,000.00 Following the bid opening, Staff reviewed and verified all bids for completeness. Wolverine Fence was determined to be the lowest responsive and responsible bidder. The contractor has a valid license and a review of the contractor’s references showed no issues with the quality of their work. Fiscal Impact Rosetta Canyon Sports Park Phase II Project is included in the Fiscal Year 15/16 – 19/20 Capital Improvement Plan (CIP) budget. Prepared by: Jason Simpson, Director of Administrative Services Approved by: Grant Yates, City Manager Attachments: Attachment A - Agreement for Contractor Services