Loading...
HomeMy WebLinkAboutCC Reso No 2016-018 CC Reso Approving Commercial Design Review No. 2016-09 For A HotelRESOLUTION NO. 2016 -018 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE, CALIFORNIA, APPROVING COMMERCIAL DESIGN REVIEW NO. 2015 -09 FOR THE DEVELOPMENT OF A NEW 36,664 SQUARE FOOT FOUR (4) STORY 64 ROOM HOTEL ON AN APPROXIMATELY 1.05 ACRE SITE GENERALLY LOCATED AT THE NORTHEAST CORNER OF DEXTER AVE AND THIRD STREET AND IS SPECIFICALLY REFERRED TO AS ASSESSOR PARCEL NUMBER 377 - 090 -036. WHEREAS, Joseph Karaki, Western States Engineering for approval of the construction of a 36,664 square foot four (4) story 64 room hotel on an approximately 1.05 acre site generally located at the northeast corner of Dexter Ave and Third Street and is specifically referred to as Assessor Parcel Number 377 - 090 -036.; and WHEREAS, pursuant to the California Environmental Quality Act (Cal. Pub. Res. Code §§ 21000 et seq.: "CEQA ") and the State Guidelines for Implementation of CEQA (14 C.C.R. §§ 15000 et seq.: "CEQA Guidelines "), public agencies are expressly encouraged to reduce delay and paperwork associated with the implementation of CEQA by using previously prepared environmental documents when those previously prepared documents adequately address the potential impacts of the proposed project (CEQA Guidelines Section 15006); and WHEREAS, the proposed project is exempt from the California Environmental Quality Act (Cal. Publ. Res. Code § §21000 et seq.: "CEQA ") and the State CEQA Guidelines (14. Cal. Code Regs § §15000 et seq.), specifically pursuant to Section 15332 (Class 32 — In -Fill Development Projects); and WHEREAS, pursuant to Lake Elsinore Municipal Code (LEMC) Chapter 17.184 (Design Review) the Planning Commission has been delegated with the responsibility of making recommendations to the City Council pertaining to the commercial design review; and WHEREAS, on February 2, 2016, at a duly noticed public hearing, the Planning Commission considered evidence presented by the Community Development Department and other interested parties with respect to this item; and adopted Planning Commission Resolution No. 2016 -14 recommending that the City Council approve Commercial Design Review No. 2015 -09; and WHEREAS, pursuant to Section 17.184.090 of the Lake Elsinore Municipal Code ( "LEMC ") the City Council of the City of Lake Elsinore has the responsibility of making decisions to approve, modify or disapprove recommendations of the Planning Commission for industrial design review applications; and CITY COUNCIL COMMISSION RESOLUTION NO. 2016 -018 PAGE 2OF3 WHEREAS, on February 23, 2016, at a duly noticed public meeting, the City Council has considered the recommendation of the Planning Commission as well as evidence presented by the Community Development Department and other interested parties with respect to this item. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: SECTION 1. The City Council has considered the proposed design for the 70 residential homes and has found it acceptable. The City Council has reviewed and analyzed the proposed project pursuant to the California Planning and Zoning Laws (Cal. Gov. Code §§ 65000 et seq.), the Lake Elsinore General Plan, and the Lake Elsinore Municipal Code and finds and determines that Commercial Design Review No. 2015 -02 is consistent with the requirements of California Planning and Zoning Law and with the goals and policies of the Lake Elsinore General Plan and the Lake Elsinore Municipal Code. SECTION 2. The City Council finds proposed project is exempt from the California Environmental Quality Act (Cal. Publ. Res. Code § §21000 et seq.: "CEQA ") and the State CEQA Guidelines (14. Cal. Code Regs § §15000 et seq.), specifically pursuant to Section 15332 (Class 32 — In -Fill Development Projects) because the Project is consistent with the applicable General Plan designation and policies, as well as zoning designation and regulations, the Project is within the City's boundaries and on a site less than five acres surrounded by urban uses, the Property has no value as habitat, and approval of the Project will not result in any significant effects relating to traffic, noise, air quality, or water quality and the Project is adequately served by all required utilities and public services. SECTION 3. That in accordance with Lake Elsinore Municipal Code Chapter 17.184, the City Council makes the following findings regarding Commercial Design Review No. 2015 -09: The project, as approved, will comply with the goals and objectives of the General Plan and the zoning district in which the project is located. The proposed hotel and ancillary improvements are compatible with the General Plan and the proposed use furthers the goals and objectives of the General Plan, and the proposed project is found to be consistent with the General Plan. The subject use is a conditionally permitted use in the CMU district, a CUP has previously been approved, and the proposed development complies with all applicable development standards. The proposed project is therefore found to be consistent with the Municipal Code. 2. The project complies with the design directives and all other applicable provisions of the Municipal Code. CITY COUNCIL COMMISSION RESOLUTION NO. 2016 -018 PAGE 3OF3 The proposed project provides a continuity of themed hotel design that is consistent with the national chains they are associated with and provides high quality materials to be used. The proposed project has effectively designed to break up massing and provides an attractive building design. Landscaping has been fully developed to mitigate visual impacts. The proposed project has been designed in such a manner as to mitigate all potential visual impacts associated with mechanical equipment. 1 Conditions and safeguards pursuant to Chapter 17.184.070 of the Municipal Code, including guarantees and evidence of compliance with conditions, have been incorporated into the approval of the Project to ensure development of the property in accordance with the objectives of Chapter 17.184. Pursuant to Section 17.184.070 of the Lake Elsinore Municipal Code, the Project was considered by the City Council at a duly noticed public meeting held on February 23, 2016. The proposed project, as reviewed and conditioned by all applicable City divisions, departments and agencies, will not have a significant effect on the environment. Furthermore, appropriate Conditions of Approval have been included that would mitigate any potential issues associated with the future development and establishment of use. SECTION 4. Based upon all of the evidence presented, the above findings, and the attached conditions of approval, the City Council hereby approves Commercial Design Review No. 2015 -09. SECTION 5. This Resolution shall take effect from and after the date of its passage and adoption. PASSED, APPROVED, AND ADOPTED at a regular meeting of the City Council of the City of Lake Elsinore, California, oe_23d d y of Fek�r0-5?p;016. Brian Tisdale; Mayor City Council of the City of Lake Elsinore ATTEST: Susan M. Domen, MMC, City Cjork APPROVED AS TO Barbara Leibold, 6it Attorney STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF LAKE ELSINORE ) I, Susan M. Domen, City Clerk of the City of Lake Elsinore, California, do hereby certify that Resolution No. 2016 -018 was adopted by the City Council of the City of Lake Elsinore, California, at a regular meeting held on the 23rd day of February 2016, and that the same was adopted by the following vote: AYES: Council Member Manos, Council Member Johnson, Mayor Pro Tern Magee, and Mayor Tisdale NOES: None ABSENT: Council Member Hickman ABSTAIN: None Susan M. Domen, MMC City Clerk Conditions of Approval Commercial Design Review 2015 -09 & Conditional Use Permit 2016 -03 La Qunita Inn Assessor Parcel Number 377 - 090 -036 GENERAL CONDITIONS Commercial Design Review 2015 -09 and Conditional Use Permit 2016 -03 (herein referred to as the project) consists of the development of 36,664 square foot four (4) story 64 room hotel on an approximately 1.05 acre site. The proposed project is generally located at the northeast corner of Dexter Ave and Third Street and is specifically referred to as Assessor Parcel Number 377 - 090 -036. 2. The applicant shall defend (with counsel acceptable to the City), indemnify, and hold harmless the City, its Officials, Officers, Employees, and Agents from any claim, action, or proceeding against the City, its Officials, Officers, Employees or Agents to attack, set aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or legislative body concerning the proposed project attached hereto. 3. Within 30 days of project approval, the applicant shall sign and complete an "Acknowledgment of Conditions" and shall return the executed original to the Community Development Department for inclusion in the case records. PLANNING DIVISION 4. Commercial Design Revivew 2015 -09 shall lapse and become void two years following the date on which the design review became effective, unless one of the following: (1) prior to the expiration of two years, a building permit related to the design review is issued and construction commenced and diligently pursued toward completion; or (2) prior to the expiration of two years, the applicant has applied for and has been granted an extension of the design review approval pursuant to subsections (B) and (C) of Lake Elsinore Municipal Code (LEMC) Section 17.184.120. Notwithstanding conditions to the contrary, a design review granted pursuant to LEMC Chapter 17.184 shall run with the land for this two -year period, subject to any approved extensions, and shall continue to be valid upon a change of ownership of the site which was the subject of the design review application. 5. All Conditions of Approval shall be reproduced on page one of building plans prior to their acceptance by the Building and Safety Division, Community Development Department. All Conditions of Approval shall be met prior to the issuance of a Certificate of Occupancy and release of utilities. 6. All site improvements shall be constructed as indicated on the approved building plans, as modified by these conditions of approval. 7. Any proposed minor revisions to approved plans shall be reviewed and approved by Page 1 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval the Community Development Director or designee. Any proposed substantial revisions to the approved plans shall be reviewed according to the provisions of the Municipal Code in a similar manner as a new application. Grading plan revisions shall be reviewed by the City Engineer. 8. All roof mounted or ground support air conditioning units or other mechanical equipment incidental to development shall be architecturally screened or shielded by landscaping so that they are not visible from neighboring property or public streets. Any roof mounted central swamp coolers shall also be screened, and the Community Development Director, prior to issuance of building permit shall approve screening plan. 9. A detailed on -site lighting plan, including a photometric diagram, shall be reviewed to ensure that all exterior on -site lighting shall be shielded and directed on -site so as not to create glare onto neighboring property and streets or allow illumination above the horizontal plane of the fixture. 10.The property address (in numerals at least six inches high) shall be displayed near the entrance and be easily visible from the front of the subject property and public right-of-way. 11. Three (3) sets of the Final Landscaping / Irrigation Detail Plans shall be submitted to the Community Development Department with appropriate fees, reviewed by the City's Landscape Architect Consultant and approved by the Community Development Director or designee, prior to issuance of a building permit. a) All planting areas shall have permanent and automatic sprinkler system with 50% plant coverage using a drip irrigation method. b) All planting areas shall be separated from paved areas with a six inch (6 ") high and six inch (6 ") wide concrete curb. Runoff shall be allowed from paved areas into landscape areas. Planting within fifteen feet (15') of ingress /egress points shall be no higher than twenty -four inches (24 "). c) Landscape planters shall be planted with an appropriate parking lot shade tree pursuant to the LEMC and Landscape Design Guidelines. d) No required tree planting bed shall be less than 5 feet wide. e) Root barriers shall be installed for all trees planted within 10 feet of hardscape areas to include sidewalks. f) Any transformers and mechanical or electrical equipment shall be indicated on landscape plan and screened as part of the landscaping plan. g) The landscape plan shall provide for ground cover, shrubs, and trees and meet all requirements of the City's adopted Landscape Guidelines. Planning Commission City Council 2/6/16 Page 2 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval h) All landscape improvements shall be bonded 100% for material and labor for two years from installation sign -off by the City. Release of the landscaping bond shall be requested by the applicant at the end of the required two years with approval /acceptance reviewed by the Landscape Consultant and approved by the Community Development Director or Designee. i) All landscaping and irrigation shall be installed within affected portion of any phase at the time a Certificate of Occupancy is requested for any building. j) Final landscape plan must be consistent with approved site plan. k) Final landscape plans to include planting and irrigation details. 1) Final landscape plans shall include drought tolerant planting consistent with Elsinore Valley Municipal Water District standards subject to plan check and approval by the City's landscape plan check consultant. m) No turf shall be permitted. 12. Landscaping installed for the project shall be continuously maintained to the reasonable satisfaction of the Community Development Director. If it is determined that the landscaping is not being maintained, the Director of Community Development shall have the authority to require the property owner to bring the landscaping into conformance with the approved landscape plan. The continued maintenance of all landscaped areas shall be the responsibility of the developer or any successors in interest. 13. No individual signs are approved as part of this approval. The applicant or designee shall submit an application for a sign permit, pay appropriate fees and receive approval from the Community Development Department for any sign(s) installed at the project site. OR The applicant shall submit a sign program for review and approval of the Planning Commission prior to installation. 14. The project shall connect to sewer and meet all requirements of the Elsinore Valley Municipal Water District (EVMWD). The applicant shall submit water and sewer plans to the EVMWD and shall incorporate all district conditions and standards. 15. Provisions of the City's Noise Ordinance shall be satisfied during all site preparation and construction activity. The applicant shall place a weatherproof 3' x 3' sign at the entrance to the project site identifying the approved days and hours of construction activity 7:00 a.m. — 5:00 p.m., Monday through Friday. Only finish work and similar interior construction may be conducted on Saturdays and may commence no earlier than 8:00 a.m. and shall cease no later than 4:00 p.m. with no construction activity to occur on Sundays or legal holidays. The sign shall identify the name and phone number of the development manager to address any complaints. 16. The proposed location of on -site construction trailers shall be approved by the Planning Commission City Council 2/6/16 Page 3 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval Community Development Director or designee. A cash bond of $1,000 shall be required for any construction trailers placed on the site and used during construction. Bonds will be released after removal of trailers and restoration of the site to an acceptable state, subject to approval of the Community Development Director or designee. Such trailer(s) shall be fully on private property and outside the public right of way. 17. Graffiti shall be removed within 24 hours. 18. The entire site shall be kept free from trash and debris at all times and in no event shall trash and debris remain for more than 24 hours. 19. Install, operate and maintain full capture systems for all storm drains that captures runoff from the facility or site. 20.The applicant shall investigate with staff, the inclusion of additional parking to reduce the parking deficiency. (Added by the Planning Commission at the February 2, 2016, meeting). 21. If any of the conditions of approval set forth herein fail to occur, or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the City shall have the right to revoke or modify all approvals herein granted, deny or further condition issuance of all future building permits, deny, revoke, or further condition all certificates of occupancy issued under the authority of approvals herein granted; record a notice of violation on the property title; institute and prosecute litigation to compel their compliance with said conditions or seek damages for their violation. BUILDING AND SAFETY 22. Any and all existing or proposed public areas shall be made accessible in accordance with Americans with Disabilities Act (ADA) requirements. 23. Any and all improvements shall be in compliance with the 2013 editions of the California Building, Plumbing and Mechanical Codes, 2013 California electrical Code, California Administrative Code, 2013 California Energy Codes, 2013 California Green Building Standards, California Title 24 Disabled Access Regulations and the Lake Elsinore Municipal Code. 24. The developer shall comply with all Municipal Code provisions regarding construction debris removal and recycling as set forth in Chapter 14.12 (Construction and Demolition Waste Management) of the Lake Elsinore Municipal Code. 25. All department approvals and fees shall be paid prior to the issuance of building permits. Planning Commission City Council 2/6/16 Page 4 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval ENGINEERING DIVISION GENERAL 26. All slopes and landscaping within public right -of -way shall be maintained by the property owner or property owner's association or another maintenance entity approved by the City Council. 27. In accordance with the City's Franchise Agreement for waste disposal & recycling, the developer shall be required to contract with CR &R Inc. for removal and disposal of all waste material, debris, vegetation and other rubbish generated during cleaning, demolition, clear and grubbing or all other phases of construction. 28. Developer shall mitigate to prevent any flooding and /or erosion downstream caused by development of the site and or diversion of drainage. 29. Any grading that affects "waters of the United States ", wetlands or jurisdictional streambeds, shall require approval and necessary permits from respective Federal and /or State agencies. 30. All required soils, geology, hydrology and hydraulic, and seismic reports shall be prepared by a Registered Civil Engineer. 31. Prior to the submittal of building plans, the applicant shall submit a conceptual striping plan for Dexter Avenue to be reviewed and approved by the City Engineer or their designee. FEES 32. The developer shall pay all Engineering Division assessed, Development Impact Fees, Plan Check and Permit fees (LEMC 16.34). Applicable Development Impact Fees include: Stephens Kangaroo Habitat Fee (K -Rat), Traffic Infrastructure Fee (TIF), Transportation Uniform Mitigation Fee (TUMF), and Area Drainage Fee. 33. Mitigation Fees will be assessed at the prevalent rate at time of payment in full. STORM WATER MANAGEMENT / POLLUTION PREVENTION / NPDES Design 34. The project is responsible for complying with the Santa Ana Region NPDES Permits as warranted based on the nature of development and /or activity. These Permits include: Planning Commission City Council 2/6/16 Page 5 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval • General Permit - Construction • General Permit - Industrial • Scrap Metal • Deminimus Discharges • MS4 35. The project shall complete and submit for review and approval to the Engineering Division BOTH a preliminary and final WQMP, incorporating the LID Principles and Stormwater BMPs. 36. The preliminary WQMP shall be approved prior to scheduling for Planning Commission; the final WQMP shall be approved prior to issuance of any grading or building permit. 37. The applicant shall use the Water Quality Management Plan for the Santa Ana Region of Riverside County guidance document and template for WQMP preparation. 38. WQMP — The Water Quality Management Plan (WQMP) specifically identifying Best Management Practices (BMPs) that will be used onsite to control identified pollutants of concern. The applicant shall utilize the MS4 Permittee Drainage Area Management Plan (DAMP), Model WQMP, and LID Guidance Manual for reference, and the MS4 Permittee's WQMP template for submittal. This WQMP shall include the following: • Detailed site and project description • Potential stormwater pollutants • Post - development drainage characteristics • Low Impact Development (LID) BMP selection and analysis • Structural and Non - Structural source control BMPs • Site design and drainage plan (BMP Exhibit) • Vector issues are addressed in the BMP design, operation and maintenance. • GIS coordinates for all LID and Treatment Control BMPs • HCOC - demonstrate that discharge flow rates, velocities, duration and volume for the post construction condition from a 2 year and 10 year 24 hour rainfall event will not cause significant adverse impacts on downstream erosion and receiving waters, or measures are implemented to mitigate significant adverse impacts to downstream public facilities and water bodies. Design goal to replicate pre - development hydrologic regime. 39. The 2010 SAR MS4 Permit requires implementation of LID Principles and LID Site Design, where feasible, to treat the pollutants of concern identified for the project, in the following manner (from highest to lowest priority) : (Section XII.E.2, XII.E.3,and X11. E. 7) Planning Commission City Council 2/6/16 Page 6 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval • Evaluation of highest and best use for sites discharging to Lake Elsinore. • Preventative measures (these are mostly non - structural measures, e.g., preservation of natural features to a level consistent with the MEP standard; minimization of Urban Runoff through clustering, reducing impervious areas, etc.) • The Project shall `Infiltrate, harvest and use, evapotranspire and /or bio -treat the 85th percentile storm event also known as the Design Capture Volume (DCV). • The Project shall consider a properly engineered and maintained bio- treatment system only if infiltration, harvesting and use and evapotranspiration cannot be feasibly implemented at the project site. • Any portion of [the DCV] that is not infiltrated, harvested and used, evapotranspired, and /or biotreated shall be treated and discharged in accordance with the requirements set forth in Section XII.G. 40. Parking lot landscaping shall be designed to with concave landscape grading and provide for treatment, retention or infiltration of runoff. 41. Project hardscape areas shall be designed and constructed to provide for drainage into adjacent landscape and permeable surfaces in low traffic roads and parking lots. 42. Water Quality Facilities that service more than one parcel shall be placed in an easement to provide for maintenance and prevent obstruction. 43. Hydromodification / Hydraulic Conditions of Concern — The project shall identify potential Hydraulic Conditions of Concern (HCOC) and implement measures to limit disturbance of natural water bodies and drainage systems; conserve natural areas; protect slopes, channels and minimize significant impacts from urban runoff. 44. CEQA — If CEQA identifies resources requiring Clean Water Act Section 401 Permitting, the applicant shall obtain certification through the Santa Ana Regional Water Quality Control Board and provide a copy to the Engineering Division. 45. The project shall use either volume -based and /or flow -based criteria for sizing BMPs in accordance with NPDES Permit Provision XII.D.4. Construction: 46. A Stormwater Pollution Prevention Plan ( SWPPP) is required for this project. A copy of the current SWPPP shall be kept at the project site and be available for review upon request. 47. Erosion & Sediment Control - Prior to the issuance of any grading or building permit, the applicant shall submit for review and approval by the City Engineer, an Erosion and Sediment Control Plan as a separate sheet of the grading plan submittal Planning Commission City Council 2/6/16 Page 7 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval to demonstrate compliance with the City's NPDES Program, California Building Code, and state water quality regulations for grading and construction activities. The Erosion and Sediment Control Plan shall identify how all construction materials, wastes, grading or demolition debris, and stockpiles of soil, aggregates, soil amendments, etc. shall be property covered, stored and secured to prevent transport into local drainages or waters by wind, rain, tracking, or dispersion. The plan shall also describe how the project will ensure that all BMPs will be maintained during construction of any future right of ways. Post Construction: 48. Recorded Operation and Maintenance (O &M) Plan that (1) describes the long -term operation and maintenance requirements for BMPs identified in the BMP Exhibit; (2) identifies the entity that will be responsible for long -term operation and maintenance of the referenced BMPs; (3) describes the mechanism for funding the long -term operation and maintenance of the referenced BMPs, and (4) provides for annual certification of water quality facilities by a registered civil engineer and /or the City for a fee if the service is available. 49.All storm drain inlet facilities shall be appropriately marked "Only Rain in the Storm Drain" using the City authorized marker to prevent illegal dumping in the drain system. 50. Prior to the issuance of a certificate of use and /or occupancy, the applicant shall demonstrate compliance with applicable NPDES permits for construction, industrial /commercial, MS4, etc. to include: • Demonstrate that all structural Best Management Practices (BMP's) described in the BMP Exhibit from the project's approved WQMP have been implemented, constructed and installed in conformance with approved plans and specifications. • Demonstrate that the project has complied with all non - structural BMPs described in the project's WQMP. • Provide signed, notarized certification from the engineer of work that the structural BMP's identified in the project's WQMP are installed and operational. • Submit a copy of the fully executed, recorded Operations and Maintenance (O &M) Plan for all structural BMPs. • Demonstrate that copies of the project's approved WQMP (with recorded O &M Plan attached) are available for each of the initial occupants (commercial /industrial) or Owner's Association as appropriate. • Agree to pay for a Special Investigation from the City of Lake Elsinore for a date twelve (12) months after the issuance of a Certificate of Use and /or Occupancy for the project to verify compliance with the approved WQMP and O &M Plan. A signed /sealed certification from the engineer of work dated 12 months after C of O will be considered in lieu of a Special Investigation by the Planning Commission City Council 2/6/16 Page 8 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval City. • Provide a recorded copy of one of the following: 1. CC &R's (they must include the approved WQMP and O &M Plan) for the project's Owners Association. 2. A water quality implementation agreement with the approved WQMP and O &M Plan attached; or 3. The final approved Water Quality Management Plan and Operations and Maintenance Plan. UTILITIES: 51. All arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of the roadway shall be the responsibility of the property owner or his agent. 52. All overhead utilities shall be undergrounded in accordance with Chapter 12.16 of the Lake Elsinore Municipal Code (LEMC) 53. Underground water rights shall be dedicated to the City pursuant to the provisions of Section 16.52.030 (LEMC), and consistent with the City's agreement with the Elsinore Valley Municipal Water District. 54. The developer shall apply for, obtain and submit to the City Engineering Division a letter from Southern California Edison (SCE) indicating that the construction activity will not interfere with existing SCE facilities (aka SCE NIL). 55. The developer shall submit a copy of the "Will Serve" letter to the City Engineering Division from the applicable water agency stating that water and sewer arrangements have been made for this project and specify the technical data for the water service at the location such as water pressure and volume etc. IMPROVEMENTS Design 56. Sight distance into and out of the project location shall comply with CALTRANS Standards. 57. The developer shall install permanent bench marks per City of Lake Elsinore Standards and at locations to be determined by City Engineer. 58. The developer shall install blue dot markers in the roadway at a right angle to Fire Hydrant locations per Lake Elsinore Standards. 59. The developer shall coordinate with Riverside Transit Authority for location and installation of bus transit facilities. Planning Commission City Council 2/6/16 Page 9 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval 60. 10 year storm runoff shall be contained within the curb and the 100 year storm runoff shall be contained within the street right -of -way. When either of these criteria are exceeded, drainage facilities shall be provided. 61. All drainage facilities in this project shall be constructed to Riverside County Flood Control District Standards. 62. A drainage study shall be provided. The study shall identify the following: identify storm water runoff from and upstream of the site; show existing and proposed off -site and onsite drainage facilities; and include a capacity analysis verifying the adequacy of the facilities. The drainage system shall be designed to ensure that runoff from a 10 -yr storm of 6 hours or 24 hours duration under developed condition is equal or less than the runoff under existing conditions of the same storm frequency. Both 6 hour and 24hour storm duration shall be analyzed to determine the detention basin capacities necessary to accomplish the desired results. 63. All natural drainage traversing the site shall be conveyed through the site, or shall be collected and conveyed by a method approved by the City Engineer. All off -site drainage, if different from historic flow, shall be conveyed to a public facility. 64. Roof drains shall not be allowed to outlet directly through coring in the street curb. Roofs should drain to a landscaped area. 65. The site shall be planned and developed to keep surface water from entering buildings (California Green Building Standards Code 4.106.3). 66. All existing storm drain inlet facilities adjacent to the subject properties shall be retrofitted with a storm drain filter; all new storm drain inlet facilities constructed by this project shall include a storm drain filter. 67. All Public Works requirements shall be complied with as a condition of development as specified in the Lake Elsinore Municipal Code (LEMC) and Lake Elsinore Public Works Standard Plans. 68. The owner shall dedicate in fee title to the City right -of -way along Dexter Avenue adjacent to the property frontage for a total right -of -way of 34' wide from centerline to the project property line. 69. The owner shall dedicate in fee title to the City right -of -way along Third Street adjacent to the property frontage for a total right -of -way of 34' wide from centerline to the project property line. 70. The developer shall construct half width street improvements on Dexter Avenue such that the ultimate right -of -way width conforms to General Plan right-of-way cross Planning Commission City Council 2/6/16 Page 10 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval sections. The cross section of roadway improvements with a painted median, parkway, and street lights shall be consistent with other adjacent development on Dexter Avenue, as recommended by the City. 71. The developer shall construct half width street improvements on Third Street such that the ultimate right -of -way width conforms to General Plan right -of -way cross sections. The cross section of roadway improvements with parkway, street lights, shall be consistent with other proposed development on Third Street, as recommended by the City. 72. Construction on Third Street shall be coordinated with the City's Engineering Department. If the City's storm drain project on Third Street is scheduled to begin, the project shall pay in -lieu fees for the required improvements on Third Street, and the City will construct. 73. Street improvement plans shall be prepared by a Registered Civil Engineer and the plans shall include curb and gutter, sidewalk, ac pavement, street lighting, median, and drainage improvements. 74. The developer shall provide signing and striping plans for the required improvements of this project. 75. If existing improvements are to be modified, the existing improvement plans on file shall be modified accordingly and approved by the City Engineer prior to issuance of building permit. Permitting /Construction 76. An Encroachment Permit shall be obtained prior to any work on City and /or State right - of -way. The developer shall submit the permit application, required fees and executed agreements, security and other required documentation prior to issuance. 77. All compaction reports, grade certifications, monument certifications (with tie notes delineated on 8 Y2" x 11" Mylar) shall be submitted to the Engineering Division before final inspection of public works improvements will be scheduled and approved. 78. All streets shall be constructed per Lake Elsinore City Standards and /or applicable specific plan. Any deviation from City standards shall be approved by the City Engineer. Acceptance of Improvements 79. A portion of the required improvements for this development may be covered under the Traffic Impact Fee (TIF). Request for reimbursement or credits shall be approved by the City Engineer and based on allowable costs in the fee program and availability of funds. Planning Commission City Council 2/6/16 Page 11 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval 80. The developer shall submit a written request for acceptance to the City Engineer, . 81. As -built plans shall be completed and signed by the City Engineer. GRADING Design: 82. A grading plan signed and stamped by a California Registered Civil Engineer shall be submitted for City review and approval for all addition and /or movement of soil (grading) on the site. The plan shall include separate sheets for erosion control, haul route and traffic control. The grading submittal shall include all supporting documentation and be prepared using City standard title block, standard drawings and design manual (available at www.lake- eisinore.org). 83. All grading plan contours shall extend to minimum of 50 feet beyond property lines to indicate existing drainage pattern. 84. The grading plan shall show that no structures, landscaping, or equipment are located near the project entrances that could reduce sight distance. 85. If the grading plan identifies alterations in the existing drainage patterns as they exit the site, a Hydrology and Hydraulic Report for review and approval by City Engineer shall be required prior to issuance of grading permits. All grading that modifies the existing flow patterns and /or topography shall be approved by the City Engineer. 86. The developer shall obtain all necessary off -site easements and /or permits for off -site grading and the applicant shall accept drainage from the adjacent property owners. Perm it/Construction: 87. Developer shall execute and submit grading and erosion control agreement, post grading security and pay permit fees as a condition of grading permit issuance. 88. A preconstruction meeting with the City Public Works Inspector (Engineering Division) is required prior to commencement of ANY grading activity. 89. Developer shall provide the city with a copy of the Notice of Intent (NOI) and Waste Discharge Identification (WDID) letter issued by the Regional Water Quality Control Board for the National Pollutant Discharge Elimination System (NPDES) program 90. Prior to commencement of grading operations, developer is to provide to the City with a map of all proposed haul routes to be used for movement of export material. All such routes shall be subject to the review and approval of the City Engineer. Haul route shall be submitted prior to issuance of a grading permit. Hauling in excess of 5,000 cy shall be approved by City Council. (LEMC 15.72.065) Planning Commission City Council 2/6/16 Page 12 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval 91. Export sites located within the Lake Elsinore City limits must have an active grading permit. 92. Applicant to provide to the City a video record of the condition of all proposed public City haul roads. In the event of damage to such roads, applicant shall pay full cost of restoring public roads to the baseline condition. A bond may be required to ensure payment of damages to the public right -of -way, subject to the approval of the City Engineer. 93. All grading shall be done under the supervision of a geotechnical engineer. Slopes steeper than 2 to 1 shall be evaluated for stability and proper erosion control and approved by the City. 94. Review of the project Storm Water Pollution Prevention Plan ( SWPPP) and sediment and erosion control plan shall be completed. A copy of the current SWPPP shall be kept at the project site and be available for review upon request. 95. Approval of the project Final Water Quality Management Plan (WQMP) for post construction shall be received prior to issuance of a grading permit. 96. Submit an approved environmental clearance document to the Engineering Division. This approval shall identify and clear all proposed grading activity anticipated for this project. 97. Developer shall pay all grading permit applicable processing, permit, security and development fees including those fees identified in an applicable development agreement, Stephens Kangaroo Rat Habitat. PRIOR TO ISSUANCE OF BUILDING PERMIT 98. Provide final soils, geology and seismic report, including recommendations for parameters for seismic design of buildings, and walls prior to building permit. 99. All required public right -of -way dedications and easements shall be prepared by the developer or his agent and shall be submitted to the Engineering Division for review and approval prior to issuance of building permit. 100. All street improvement plans, traffic signal plans, signing and striping plans shall be completed and approved by the City Engineer. 101. The developer shall pay all Capital Improvement TIF and Master Drainage Fees and Plan Check fees (LEMC 16.34). Planning Commission City Council 2/6/16 Page 13 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval Prior to Occupancy 102. All public improvements shall be completed in accordance with the approved plans or as condition of this development to the satisfaction of the City Engineer. 103. All water and sewer improvements shall be completed in accordance with Water District requirements. 104. Proof of acceptance of maintenance responsibility of landscape areas and drainage facilities shall be provided. 105. TUMF fees shall be paid. The TUMF fees shall be the effective rate at the time of payment in full in accordance with the LEMC. 106. As -built plans for all approved plan sets shall be submitted for review and approval by the City. The developer /developer /owner is responsible for revising the original mylar plans. 107. In the event of damage to City roads from hauling or other construction related activity, applicant shall pay full cost of restoring public roads to the baseline condition. 108. All final studies and reports, grade certifications, monument certifications (with tie notes delineated on 8'/2 x 11" mylar) shall be submitted in .tif format on a CD /DVD. Studies and reports include, Soils, Seismic, Hydrology, Hydraulics, Grading, SWPPP, WQMP, etc. 109. All plan sets and recorded maps shall be digitized and provided on CD /DVD as follows: • Final Map(s) - GIS Shape files* and .tif of recorded map. • Improvement Plans — GIS Shape files* and .tif of approved as built mylar. • Grading Plans - .tif of approved as built mylar. *GIS Shape files must be in projected Coordinate System: NAD 83 State Plane California Zone VI U.S. Fleet. 110. Final soil report showing compliance with recommendations, compaction reports, grade certifications, monument certifications (with tie notes delineated on 8'/2 x 11" mylar) shall be submitted in .tif format on CD to the Engineering Division before final inspection will be scheduled. 111. All required public right -of -way dedications and easements, shall be recorded with a recorded copy provided to the City prior to final occupancy. Planning Commission City Council 2/6/16 Page 14 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval 112. Documentation of responsibility for slope maintenance along right -of -ways and open spaces to be maintained by the property owner or other entity shall be provided in a recordable format and recorded prior to occupancy /final. 113. All signing and striping and traffic control devices onsite and on Dexter Avenue and Third Street shall be installed. 114. Prior to grading or building permit close -out and /or the issuance of a certificate of use or a certificate of occupancy, developer shall: • Demonstrate that all structural BMPs have been constructed, installed and are functioning in conformance with approved plans and specifications and the WQMP; • Demonstrate that they are prepared to implement all non - structural BMPs included in the conditions of approval or building /grading permit conditions; • Demonstrate that an adequate number of copies of the approved project specific WQMP are available for the future owners /occupants; and • The developer shall provide all education guidelines for Water Quality Management Practices to the tenants, operators and owners of the businesses of the development, regarding the environmental awareness on good housekeeping practices that contribute to protection of storm water quality and meet the goals of the approved WQMP in the Riverside County NPDES Drainage Area Management Plan. Contact the City NPDES Coordinator for handout/guideline information. 115. The property owner (aka Legally Responsible Party) shall execute and cause to be recorded a "Covenant and Agreement" in the form provided by the City to inform future property owners of the requirement to implement the approved final project - specific WQMP. 116. Developer shall pay all outstanding applicable processing and development fees including but not all inclusive: TUMF, MSHCP, TIF, Stephens Kangaroo Rat Habitat and area drainage prior to occupancy /final approval. CITY OF LAKE ELSINORE FIRE MARSHAL GENERAL CONDITIONS 117. Riverside County Fire Department Lake Elsinore Office of the Fire Marshal - It is the responsibility of the recipient of these Fire Department conditions to forward them to all interested parties. The permit number (as it is noted above) is required on all correspondence. Questions should be directed to the Riverside County Fire Department, Lake Elsinore Office of the Fire Marshal at 130 S. Main St., Lake Elsinore, CA 92530. Planning Commission City Council 2/6/16 Page 15 of 19 CDR 2015 -09 & Conditional Use Permit 2016 -03 Conditions of Approval Phone: (951) 671 -3124 Ext. 225. The following fire department conditions shall be implemented in accordance with the Lake Elsinore Municipal Code and the adopted codes at the time of project building plan submittal, these conditions are in addition to the adopted code requirements. 118. Blue Dot Reflectors- Blue retro- reflective pavement markers shall be mounted on private streets, public streets and driveways to indicate location of fire hydrants. Prior to installation, placement of markers must be approved by the Riverside County Fire Dept. 119. Minimum Hydrant Fire Flow- Minimum required fire flow shall be 2,750 GPM for 2 hours duration at 20 PSI residual operating pressure, which must be available before any combustible material is placed on the job site. Average spacing between hydrants 400' and 225' maximum distance from any point on the street or road frontage to hydrant. Not less than 3 hydrants shall be provided to meet this criteria. 120. Super Fire Hydrants- Super fire hydrants (6" x 4" x 2 -2 1/2 "), shall be located not less than 25 feet or more than 250 feet from any portion of the building as measured along approved vehicular travel ways. 121. Minimum Access Standards- The following access requirements are required to be implemented to ensure fire department and emergency vehicular access. All roadways shall conform to the City of Lake Elsinore approved roadway standards but in no case shall the minimum fire department vehicular access be less the following provisions: • Twenty -nine feet (29') clear width. Where parking is to be provided, each parking side shall be provided with eight (8') additional feet on each side of the fire department access. Along the private access located on the NE face of the building the access shall be increased to 30' to accommodate rescue operations in the event of a fire. • The required all weather vehicular access shall be able to support no less than 60,000 lbs. over 2 axles. • Roadway gradient shall not exceed 15% on any access road, driveways, and perimeter roads. • Turning Radius shall be 26' inside and 38' outside for all access roads. 122. Secondary Access- In the interest of Public Safety, this project shall provide an Alternate or Secondary Access. Said access shall be constructed in accordance to the City of Lake Elsinore Engineering Department standards to accommodate full fire response and community evacuation. 123. Separation of Occupancy- A fire barrier wall for the separation of occupancies is required per the California Building Code. Fire walls, fire barriers, fire partitions, smoke barriers, and smoke partitions or any other wall required to have protected openings or penetrations shall be effectively and permanently identified with signs Planning Commission City Council 2/6/16 Page 16 of 19