REPORT TO CITY COUNCIL
TO: HONORABLE MAYOR
AND MEMBERS OF THE CITY COUNCIL
FROM: GRANT M. YATES
CITY MANAGER
DATE: JULY 14, 2015
SUBJECT: CAPITAL IMPROVEMENT PLAN FOR FY 2015 -16 THROUGH 2019-
2020
Recommendation
Staff recommends that City Council adopt Resolution 2015 — _ adopting the proposed
5 -year Capital Improvement Plan for fiscal years 2015 -16 through 2019 -20.
Background
By direction of the City Council, City staff updates and maintains a Five Year Capital
Improvement Plan (CIP) in conjunction with the annual budget cycle. Included in the
CIP are construction projects, facility improvements, and purchases. Utilizing input from
Council, staff and the public, provided at the Budget Study session held on May 26,
2015; various projects were developed and proposed in this Cycle of the CIP. In
compliance with Government Code 65401, the Planning Commission reviewed the
City's program and found it in conformance with the City's General Plan.
CIP Projects have been classified into two types of projects, Construction and Non -
Construction CIP, and four categories: Circulation, Facilities, Infrastructure, and Parks.
The Construction CIP are projects concerning major infrastructure or specific
improvement projects. The Non - Construction CIP are major purchases by the City or
recurring street improvements, studies, plans, or equipment (i.e., annual slurry seal,
traffic lights, IT /Computer implementations, etc.).
Discussion
This CIP budget document was developed by incorporating input from the City Council
and key management team members, based on community comments and feedback
received throughout the year. This team then, through several internal workshops,
identified and evaluated community needs in the areas of roads /streets, bridges, public
buildings, parks and recreation facilities projects. Each proposed project was reviewed
Capital Improvement Plan for FY 2015 -16 through FY2019 -20
July 14, 2015
Page 2
and discussed to ensure funding, timing, and necessity were appropriately addressed.
An Operating Budget and CIP Budget workshop was held on May 26, 2015. This
workshop provided the City Council with an overview of the major projects, and to
receive public comments concerning the five -year program. All projects were evaluated
by to ensure consistency with the City of Lake Elsinore General Plan, while considering
the City's long -term vision as developed by the City Council. The Planning Commission
also considered the proposed CIP projects and adopted the attached Resolution finding
consistency with the City's General Plan.
Projects in this document have been scheduled in each of the five fiscal years based on
community needs, as determined by the City Council and availability of funding.
Additionally, since many projects in the CIP are conceptual in nature, the general outline
for cost estimates provided in last year's CIP document was revised and utilized as
shown on the Parameters for CIP Budget Cost page. The fiscal years 2016 -20 CIP
identifies a total of 99 projects consisting of 41 Circulation Projects totaling $25,078,125;
17 Facilities Projects totaling $25,605,340; 17 Infrastructure Projects totaling
$9,051,825, and 24 Park Projects totaling $16,681,274. The total cost to complete all of
the proposed projects is $76,416,564, of which $47,231,108 is programmed for FY
2015 -16. Also of note, in this document, there are over $29.1 million in projects with
unspecified funding sources. These projects have been identified as necessary
infrastructure for the City, and will require that funding sources be identified before the
projects can commence. Inclusion of those with funding still needed in the document
assists staff with seeking grants and negotiating improvements with potential 3rd parties.
Other key elements to the Capital Improvement Plan are:
- Continue improvements fund by the Total Road Improvement Program (T.R.I.P.
Measure A Sales Tax Bond) financing to fund Citywide Pavement Rehabilitation
and other Street related capital projects. ($5,144,728)
- Camino Del Norte Street Improvements ($3,000,000)
- Rosetta Canyon Park Improvements ($7,123,871)
- Serenity Park Improvements ($1,017,800)
- Central Avenue Drainage Improvements ($3,138,879)
- Whisker's Fishing Beach Improvements ($420,000)
- Several Interchange Projects, Traffic Signals, and other improvements are listed
in more detail within the attached CIP document.
Fiscal Impact
The Capital Improvement Plan for Fiscal Year 2015 -16 through 2019 -20 includes
improvements throughout the City. Total capital improvement plan cost is $76,416,564
with $47,231,108 in funding identified. Funding sources include, but are not limited to,
development fees from TIF and Area Drainage, grants including CDBG, Measure -A and
Gas Tax, and assessment districts for specific project areas.
Capital Improvement Plan for FY 2015 -16 through FY2019 -20
July 14, 2015
Page 3
Prepared by: Jason Simpson
Director of Administrative Services
Approved by: Grant M. Yates
City Manager
Attachment: City Council Resolution No. 2015 -_
FY2016 -2020 Capital Improvement Plan - Project Summary by
Type of Project
/.
F
0
t
z
C
c
i
C
r
6 !i li I I
9 !! ! II
4
o � II III ii
cKI I i Iilll
a lx
x I Iil.l �
x
'
% t7 Ia gisi€ 'ai §i $la
It
I
% I
LJj
I' 'I
e oS
m a"
I,I
!
III
e
c
z
r
c
c
i
C
e,
B
£if3 !o
Q
a
i
c
5
ii
i^
n
'-
n
v
n�
s3,
Q
a
i
c
5
ii
i^
n
Q
a
i
c
5
i^
n
n
v
n�
.,
oqu'
yyB
Y3�
�
G
G
«P
Q�
e t
Q
a
i
c
5
R�
v
Q
a
i
c
5
i
C
G
Z
G
r
M1�
5
k
i
SNLL
S
z.
tt
It
�E
Ia
�.a
I
It
tl
rl
�f
?
YJ
It
9
C
It
Nq�1
i
C
G
Z
G
r
0
�e
z
a
i
0
s
z
'o
r
i
C
i
5
0
n "' u
�r
E elm
e ='
m e°
A
UJ
X
IB��ca
Py
!`ff�
Al
el
6
zE$
Ie-
f.
n "' u
�r
E elm
e ='
m e°
A
UJ
X
Cie
sso ass! -s
X
i�l�l J a;et 3 R ,Is
S1
gx
R
ICI
l
by
gT
IIII 11 t
II II II II"
1
c
yy
1 1 1 1 1 I i II 11
z
s
Ti
t
IS
LILI
'III
�I
i
r
lu
�J S
°s
11
IIII 11 III
11!
ash
1E3111 tIIlI3
u
�
'aa
t
111
I III IIIIIII'.I
II
�
o
IIIII 11 111.
1
1
8
�
t
�;�
III III IlillilI
i
I
s
-!!i
Ile nx
It11I1 I;
11.1
I�I��I
1
11.1
II11
t l 1 l
1 1! l
��
I'II
IIj111
1 1
111
°
Li
a
b
n
Es
h
6
S1
by
gT
c
yy
z
s
Ti
t
IS
LILI
'III
�I
i
r
lu
�J S
°s
11
IIII 11 III
11!
ash
1E3111 tIIlI3
I
11
'aa
t
111
I III IIIIIII'.I
II
�
IIIII 11 111.
1
1
8
�
t
�;�
III III IlillilI
i
I
11.1
I�I��I
1
11.1
��
I'II
IIj111
1 1
111
°
Es
6
=�
{11.
a
$
I IIIIa II ItIJ
I
ilia
1 ii
�III11.1
li ))
1111111
1
1 1 1
III<
a
Ilil�la 1111�1�'l
I
a�
„'k
iiiliid
���
II ill1
II�I.i
1
IRI
&�
3
I:.'1111111aS
l.I
3N��
Il
IIIII
k$IN
111.' II11 it
I
Iil;'
11 11
IIIII
I In In In
T
LLJS
Y:
z
8 rz
€
E
1
u I
III
0
S1
1 I
c
yy
z
s
Ti
IS
LILI
i
r
lu
�J S
RESOLUTION NO. 2015 -
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, ADOPTING THE CAPITAL
IMPROVEMENT PLAN FOR FISCAL YEARS 2015 -16 THROUGH
2019 -20.
WHEREAS, the City of Lake Elsinore annually adopts and updates a long -range
program of proposed capital improvement projects with single and multiple -year capital
expenditures to guide the planning, scheduling and budgeting of capital improvement
projects during the next five -year period, and
WHEREAS, staff has prepared a proposed Capital Improvement Plan ( "CIP ") for
Fiscal Years 2015 -16 through 2019 -20 which includes appropriations for each capital
improvement project presented in the budget, with some projects spanning multiple fiscal
years; and
WHEREAS, on May 26,
2015
the
City Council held a study session on the
proposed budget for Fiscal Years
2015 -16;
2019 -20 was
and
WHEREAS, the May 26, 2015 study session included discussions about the 2015-
16 to 2019 -20 CIP; and
WHEREAS, the proposed CIP for Fiscal Years 2015 -16 through 2019 -20 was
submitted to the Lake Elsinore Planning Commission at its regularly scheduled public
meeting of June 16, 2015; and
WHEREAS, in accordance with Government Code Section 65401, the Lake
Elsinore Planning Commission, by PC Resolution 2014 - , made a finding that CIP for
Fiscal Years 2015 -16 through 2019 -20 conforms to the Lake Elsinore General Plan; and
WHEREAS, the Planning Commission has caused to be transmitted to the City
Council a copy of its report and resolution finding that the CIP for Fiscal Years 2015 -16
through 2019 -20 conforms to the Lake Elsinore General Plan; and
WHEREAS, the proposed
CIP for
Fiscal
Years
2015 -16
through
2019 -20 was
submitted to the City Council at a
noticed
public
hearing
on July
14, 2015;
and
WHEREAS, the City Council considered testimony and evidence presented at the
public hearing on July 14, 2015, and reviewed the proposed CIP for Fiscal Years 2015-
16 through 2019 -20 in light of all information presented.
CITY COUNCIL RESOLUTION NO. 2015 -_
Page 2 of 4
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE
DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. The City Council confirms and accepts the finding of the Lake
Elsinore Planning Commission that the CIP for Fiscal Years 2015 -16 through 2019 -20
conforms to the Lake Elsinore General Plan.
SECTION 2. The City Council finds that the CIP for Fiscal Years 2015 -16 through
2019 -20 demonstrates the efficient appropriation of public funds relating to the
implementation of capital improvement projects anticipated to be undertaken throughout
the City over the course of the ensuing five years. The City Council further finds that the
CIP is a governmental fiscal activity which does not involve a commitment to a specific
project that may result in potentially significant impacts on the environment and that the
adoption of the CIP is not a "project' within the meaning of CEQA. Individual projects
developed pursuant to the CIP will be subject to CEQA.
SECTION 3. The CIP for Fiscal Years 2015 -16 through 2019 -20 is hereby
approved and adopted. A copy of the CIP for Fiscal Years 2015 -16 through 2019 -20
hereby adopted and certified by the City Clerk, shall be filed with the City Manager or a
designated representative, and a further copy so certified shall be placed and shall remain
on file in the Office of the City Clerk where it shall be available for inspection.
SECTION 4. This Resolution shall take effect from and after the date of its passage
and adoption.
PASSED, APPROVED AND ADOPTED this 14h day of July, 2015, by the
following vote:
AYES:
COUNCILMEMBERS:
NOES:
COUNCILMEMBERS:
ABSENT:
COUNCILMEMBERS:
ABSTAIN:
COUNCILMEMBERS:
Steve Manos, Mayor
City of Lake Elsinore
CITY COUNCIL RESOLUTION NO. 2015 -
Page 3 of 4
ATTEST:
Virginia Bloom, City Clerk
City of Lake Elsinore
APPROVED AS TO FORM:
Barbara Zeid Leibold, City Attorney
City of Lake Elsinore
CITY COUNCIL RESOLUTION NO. 2015 -
Page 4 of 4
STATE OF CALIFORNIA j SS
COUNTY OF RIVERSIDE JJ
CITY OF LAKE ELSINORE
I, VIRGINIA J. BLOOM, City Clerk of the City of Lake Elsinore, California, hereby certify
that Resolution No. 2015 -_ was adopted by the City Council of the City of Lake Elsinore at a
regular meeting held on the 14th day of July, 2015 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Virginia J. Bloom, CMC
City Clerk
RESOLUTION NO. 2015 -47
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
LAKE ELSINORE, CALIFORNIA, FINDING THAT THE 2015/2016-
2020/2021 CAPITAL IMPROVEMENT PROGRAM CONFORMS TO THE
LAKE ELSINORE GENERAL PLAN
WHEREAS, the City Council of the City of Lake Elsinore ( "City ") has directed Staff
to assemble a five (5) year program of capital improvement projects to be used as a
guideline for construction of City facilities and infrastructure; and
WHEREAS, this program of projects is collectively called the Capital Improvement
Program; and
WHEREAS, the list of construction projects and improvements either enhances
existing facilities or provides for new facilities in accordance with the guidelines and
requirements contained in the Lake Elsinore General Plan; and
WHEREAS, staff has reviewed all projects both funded and unfunded and finds
them to be consistent with the guidelines set forth in the Lake Elsinore General Plan;
and
WHEREAS, pursuant to California Government Code Section 65401, the Planning
Commission, as a recommending body, must make a finding that proposed capital
projects conform with the Lake Elsinore General Plan; and
WHEREAS, the Planning Commission shall submit a report to the City Council
regarding the capital projects conformity with the general plan in accordance with
California Government Code Section 65401; and
WHEREAS, on June 16, 2015, at its regularly scheduled meeting the Planning
Commission has considered evidence presented by the Public Works Department, the
Community Development Department and other interested parties with respect to this
item.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1, The Planning Commission has considered the capital improvement
projects and has determined that the Capital Improvement Program conforms to the
Lake Elsinore General Plan based upon the following findings:
1. The 2015/2016 - 2020/2021 Capital Improvement Program is consistent with
the goals, policies and restrictions of the City's 2011 General Plan and
facilitates upgrades and improvements to existing facilities and related
amenities throughout the various elements of the General Plan, thereby
enhancing the quality of life in Lake Elsinore.
2. The Capital Improvement Program includes master plan studies which
PLANNING COMMISSION RESOLUTION NO. 2015 -47
PAGE 2 OF 3
provide for organized development of future facilities appropriate to the
various elements of the General Plan, thereby enhancing the quality of life
in Lake Elsinore,
SECTION 2. This Resolution shall take effect from and after the date of its
passage and adoption.
PASSED, APPROVED AND ADOPTED this 16rd day of June 2015, by the
following vote:
John Gray Chapman
City of Lake Elsinore Planning Commission
ATTEST:
Richard J. MacHott, LEER Green Associate
Planning Manager
PLANNING COMMISSION RESOLUTION NO. 2015 -47
PAGE 3 OF 3
STATE OF CALIFORNIA
COUNTY OF RIVERSIDE
CITY OF LAKE ELSINORE SS
I, Richard J. MacHott, Planning Manager of the City of Lake Elsinore, California,
hereby certify that Resolution No. 2015 -47 as adopted by the Planning Commission of
the City of Lake Elsinore at a regular meeting held on the 16rd day of June 2015, and that
the same was adopted by the following vote:
AYES: CHAIRMAN GRAY, VICE CHAIR JORDAN, COMMISSIONER ARMIT,
COMMISSIONER FLEMING
NOES: COMMISSIONER RAY
ABSTAIN: NONE
ABSENT: NONE
Richard J. MacHott, LEED Green Associate
Planning Manager
CAPITAL IMPROVEMENT PLAN APPROPRIATIONS - FYZUIS -Ib & FU I URt
PROJECT SUMMARY BY TYPE OF PROJECT AND PRIORITY
ANNUAL CITYWIDE SLURRY SEAL PROGRAM STREET IMPROVEMENT PROIECI
ANNUAL CRACK SEAT & POTHOLE REPAIRS STREET MAINTENANCE
ANNUAL CURB, GU TI ER & SIDEWALK PROGRAM STREET MAINTENANCE
ANNUAL LANDSCAPE RENOVATION STREET IMPROVEMENT PROJECT
ANNUAL ON -CALF. TRAFFIC OPERATIONS SERVICES STREET" MAINTENANCE _
ANNUAL PAVEMENT MANAGEMEN I PROGRAM (STUDY) STREET MAINTENANCE
ANNUAL ROADWAY DRAINAGE REPAIR & MAINTENANCE DRAINAGE MAINTENANCE
ANNUALSIDEWALKIMPROVEMENI "S -CDBG _ _ STREET IMPROVEMENT PROJECT_
ANNUAL TRAFFIC STRIPING MAINTENANCE _ STREETMAINI "ENANCE _
nTVTPArrlr NAnnFI HPnATr 4 TRAFFIC SIGNAL IMPROVEMENTS
COLLIER ISLAND MODIFICATION PHASE I _ S RLt I uVlrnwelweN I VhUJtU I
GUNNERSON REHABILITATION PHASE I STREET IMPROVEMENT" PROJECT
1 -15 /RAILROAD CANYON ROAD SB EXIT RAMP DECELERATION LANE STREET IMPROVEMENT PROJECT
MAIN STREET INTERCHANGE STREET IMPROVEMENT PROJECT
TEMESCAL CANYON ROAD - BRIDGE & ROAD WIDENING PHASE: I _ STREET IMPROVEMENT PROJECT
'I "RAPFIC MONITORING CAMERAS TRAFFIC SIGNAL IMPROVEMENTS
TRAFFIC SIGNAL INSTALLATION AT G_RAND_AVENUE & RIVERSIDE DRIVE TRAFFIC SIGNAL IMPROVEMENTS
_ DOWNTOWN -'STREET REHABILITATION & SLURRY SEAL STREET IMPROVEMENT PROJECT__
MAIN STREET OVERLAY SULPHUR TO HEALD - 4405 STREET IMPROVEMENT PROJECT
RAILROAD CANYON ROAD BARRIERS STREET IMPROVEMENT PROJECT
TRAFFIC SIGNAL REPAIR AT CASINO & DIAMOND I KAI-M, JIGNAL uvlrnuvtlV1tlN u
TRAFFIC SIGNAL INSTALLA'T'ION AT CANYON HILLS ROAD & SAGE LANE TRAFFIC SIGNAL IMPROVEMENTS
TRAFFIC SIGNAL INSTALLATION ATSUMMERHILL & VIA SCENICA TRAFFIC SIGNAL IMPROVEMENTS
_ LAKESHORE DRIVE PARKING LOT (ENNIS PROPERTY) PARKING LOT
STREET SIGN REPLACEMENT SIGNAGE
CAMINO DEL NORTE STREET IMPROVEMENT PROJECT
STREET IMPROVEMENT
ROSETTA CANYON DIKE I.ANE STRIPING aj KIFINU
CENTRALAVENUL' /DEXTER STREET TRAFFIC SIGNAL MODIFICATION TRAFFIC SIGNAL IMPROVEMENTS
TRAFFIC SIGNAL MODIFICATION - LAKESHORE /DIAMOND DR TRAFFIC SIGNAL IMPROVEMENTS
CITYWIDE PAVEMENT REHABILITATION PROGRAM (T. R.I.P.) STREET IMPROVEMENT PROJECT
GRAND AVENUE PAVEMENT REHABILITATION - CITY /COUNTY PROJECT STREET IMPROVEMENT PROJECT
1 -15 /FRANKLIN STREET INTERCHANGE- PHASE 11 STREET IMPROVEMENT PROJECT
- 15 /RAILF20AD CANYON ULTIMATE INTERCHANGE - PHASE 1 STREET IMPROVEMENT PROJECT
1 -15 /STATE ROUTE 74 fCENTRALAVENUE) INTERCHANGE PROJECT STREET IMPROVEMENT PROJECT
LAKE STREET INTERCHANGE STUDY znittl IIVII'RUVtlyaLNI rnuMll
LOST ROAD IMPROVEMENTS _ STREET IMPROVEMENT PROJECT
MISSION TRAIL TRAFFIC SIGNAL SYNCHRONIZATION PROJECT i �v STREET IMPROVEMENT PROJECT
ANNUAL LIBRARY BOOK PURCHASES -4209 EQUIPMENT
ANNUAL BUILDING REPAIR RESERVE - 4380 BUILDING
ANNUAL FACILITIES FURNITURE REPLACEMENT -4429_ EQUIPMENT
ANNUAL_ INFORMATION TECHNOLOGY REPLACEMEN T RESERVE-ITR14 EQUIPMENT
ANNUAL VEHICLE REPLACEMENT RESERVE - 4310 t(J,ul
DIAMOND STADIUM CAPITAL REPAIR SCHEDULE (SA -BOPS) SITE I
ELECTRIC VEHICLE CHARGING STATIONS SITE IM ---------- _ --._._. _ _.--_._._.. - -..__
2ND FLOOR - CULT URAL CE N I ER BUILDING
___ _. _.— ......_.__. .._ - --_ . ._— _ —_.... _—. —_.— __ ---
COMMUNIIYCCNICR-WEST 6UILDING
COMMUNITY CE NI'ER - EAST BUILDING
....._---- __._...__._—'-----� - ------ ._._._...__ ._...._-_-- -.__.._..__.._._-- -- -- _.—....-- - --.._ ...._._..
6UILDING -ACILITIES FIRE SI RINKLER SYSI EM BUILDING REPAIRS
CITY OWNED FACILITIES 1200E REPAIRS BUILDING REPAIRS
CITY YARD RE5TROOM AND LOCKER ROOM RENOVATION - ADA BUILDING REPAIRS
♦e r I i ML nvlrMUVCNICIN I rWIN Hrrlivrmim IVINJ- rYLU19-iu& rV I UI(t
PROJECT SUMMARY BY TYPE OF PROJECT AND PRIORITY
AQUATICS CENTER
BUILDING
CFIY FACILITIES - EXPANSION
BUILDING
CITY LIBRARY
BUILDING
CORPORATE YARD UPGRADES
SITE IMPROVEMENTS
ARROYO DEL TORO DRAINAGE IM PROVEMENT
DRAINAGE
THIRD STREET DRAINAGE IMPROVEMENT - PHASE I
DRAINAGE
UNDEI2GROUNDOVERHFAD POWER LINES
SITE IMPROVEMENTS
_ _
ALIGNMENT STUDY (La Stracia, Baker, Pierce)
STUDY
CENTRAL AVENUE DRAINAGE IMPROVEMENTS
SITE IMPROVEMENTS
FACILITIES MASTER PLAN
MASTER PLAN
STORM DRAIN MASTER PLAN UPDATE --
_ --
MASTER PLAN -
— —
PARISS
_
SUMMERLAKE PARK /TERRA COTTA SPORTS FIELD RENOVATION
PARK IMPROVEMENTS
_DOG PARKS (FENCING - MCVICKER PARK)
PARK IMPROVEMENTS
LAKEPOINT PARK .ELECTRICAL
ENCLOSURE -4414
_
PARK IMPROVEMENTS W
u MACHADO PARK PLAY EQUIPMENT /REPLACEMENT - 4.416 _
PARK IMPROVEMENTS
SCADA UPGRADES
_
PARK IMPROVEMENTS —
_ SKATE ZONE ATSERENITY PARK- 4419
PARK IMPROVEMENTS
SUMMERLAKE PARK PLAY EQUIPMENT/REPLACEMENT -4417
PARKIMPROVEMENTS
YARBOROUGH PARK PLAY EQUIPMENT/REPLACEMENT -4418
PARK IMPROVEMENTS
CITY PARK & YARBOROUGH PARK. IMPROVEMENTS
_
PEPPER AND DAWES S I RH F DRAINAGE
PARK IMPROVEMENTS
ROSETTA PARK IMPROVEMENTS
— PARK IMPROVEMENTS
SERENITY PARK IMPROVEMENTS _ —
PARK IMPROVEMENTS
WHISKER'S FISHING BEACH IMPROVEMENTS
_ -4369
PARK IMPROVEMENTS
ADA DRINKING FOUNTAIN REPLACEMENT
PARK IMPROVEMENTS
ALBERHILL RANCH PARK SPORTS FIELD RENOVATIONS
_
PARK IMPROVEMENTS
CREEKSIDE PARK PLAYGROUND RENOVATION _
PARK IMPROVEMENTS
LAKEPOINT PARK SPORTS FIELD RENOVATION
PARK IMPROVEMENTS
mffkl
IVILVICKLR LANYUNSPURIS LIGHTING REPAIR _ PARK IMPROVEMENTS
CITY PARK SPORTS LIGHTING RENOVATION PARK IMPROVEMENTS
IA LAGUNA BEACH ACCESS PEDESTRIAN RAMP PARK. IMPROVEMENTS
SENIOR CENTER PATIO SHADE STRUCTURE PARK IMPROVEMENTS
LA LAGUNA MARINA PARK IMPROVEMENTS ry
LAKESHORE DR ANDTERRA COTTA STREETSCAPE DESIGN /RENOVATION
LANDSCAPING
GRAND AVENUE LANDSCAPING DESIGN & RENOVATION
LANDSCAPING
MCVICKER CANYON FIRE STATION LANDSCAPING RENOVATION
_
LANDSCAPING —
BIKE & PATHWAY MASTER PLAN —
MASTER PLAN
_
LAKE FACILITIES IMPROVEMENTS
_
— PARE( IMPROVEMENTS
LAKE INLET CHANNEL
PARK IMPROVEMENTS
_
FUTURE PROJECTS
MACHADO STREET LANDSCAPING RENOVATION
LANDSCAPING
LINCOLN STREET LANDSCAPING, DESIGN, AND RENOVATION
LANDSCAPING
TUSCANY HILLS PARK SPORTS RENOVATION
PARK IMPROVEMENTS
SUMMERLAKE PARK /TERRA COTTA SPORTS FIELD RENOVATION
PARK IMPROVEMENTS
SWICK & MATTCH PARK FENCING
----------
_
PARK IMPROVEMENTS v-
--_—._----------..___......__.__—__ _._....-- .- ._- ---
SWICK & MATICII SPORTS FIELD RENOVATION
---- _..__.._.— ----
PARK IMPROVEMENTS
WIDENING OF CASINO DRIVE, FROM MALAGA TO RA ILROA_D_CANY_O_N
IMPROVEMENT PROJECT
- -'-----__.----- -- ---- -- ....._.__._ _. .. _
ADAM /HEALD AVENUE DRAINAGE
_ _STREET' .. —
DRAINAGE_
ALLAN STREET DRAINAGE IMPROVEMENTS
DRAINAGE
CENTRALAVENUE DRAINAGE IMPROVEMENTS
- --- '-- - -�—._
DRAINAGE
_....—.....—_—_..._..___._......_...__.__.____._.---_...__....._--....._._
LOVdELL AND POE STREET - DRAINAGE
_._.__..___....._— _.--_--._.__.
DRAINAGE
LAKESHORE DR DRAINAGE
DRAINAGE
_
PEPPER AND DAWES S I RH F DRAINAGE
DRAINAGE
CAPITAL IMPROVEMENT PLAN APPROPRIATIONS - FY2015 -16 & FUTURE
PROJECT SUMMARY BY TYPE OF PROJECT AND PRIORITY
PROJECT
NEBRASKA STREET DRAINAGE
L MAmawc
SUMNER AVENUE DRAINAGE.
DRAINAGE
CONSTRUCT SECOND STREFT BRIDGE OVER 1 -15 FREEWAY
BRIDGE
AUTO CENTER DRIVE. & SAN JACINTO RIVER BRIDGE SEISMIC RETROFIT
BRIDGE
OLD COURTHOUSE BUILDING
BUILDING REPAIRS
CIVIC CENTER, COMMUNITY CENTER AND CORPORATE YARD
BUILDINGS
CANYON HILLSSPORIS F-IEI_D RENOVATION
PARK IMPROVEMENTS
ELLIS STREET RECONSTRUCTION (POTTERY TO FRANKLIN)
STREET IMPROVEMENT PROJECT
MORTON- CHAMPION STREET IMPROVEMENTS
STREET IMPROVEMENT PROJECT
NIC_HOLS ROAD INTERCHANGE _ J
STREET IMPROVEMENT PROJECT
TRAFFIC SIGNAL INSTALLATION AT SUMMERIIILL &LA STRADA
TRAFFIC SIGNAL IMPROVEMENTS
_ MAIN ST /1 -15 INTERCHANGE RAMP SIG NALIZATION TRAFFIC SIGNAL IMPROVEMENTS
TRAFFIC SIGNAL - GRAND AVE AND MACY STREET TRAFFIC SIGNAL IMPROVEMENTS
TRAFFIC SIGNAL- PHASING MODIFICATION TRAFFIC SIGNAL IMPROVEMLN IS
TRAFFIC SIGNAL - STATE HWY 74 & GUNNERSON �� TRAFFIC SIGNAL IMPROVEMENTS