CITY OF LAKE ELSINORE
MEMORANDUM
TO: MAYOR AND CITY COUNCIL
FROM: GRANT M. YATES
DATE: MARCH 26, 2013
SUBJECT: COMMUNITY DEVELOPMENT DEPARTMENT
MONTHLY REPORT - FEBRUARY 2013
Key Indicators
Number
Dollar Amt.
PLANNING DIVISION
Plans Submitted:
1. Commercial Design Review No. 2013 -01 and Conditional Use Permit
1
$2,800.00
No. 2013 -01 - Proposed 74 -bed Residential Senior Care Facility
located at the corner of Pottery and Rancho Street. Applicant: Lake
Elsinore Assisted Living, LLC
2. Tentative Parcel Mao No. 36551 - Applicant: Michael Schweitzer,
1
$7,900.00
SWS Engineering, Inc.
3. Residential Design Review No. 2013 -01 — Continuation of Single
1
$52344.00
Family Residential Homes Pinnacle project located within TR 28214-
5. Applicant: Ryland Homes
4. Conditional Use Permit No 2013 -02 Commercial Design Review
1
$112793.00
No. 2013 -02 and one Change No 2013 -03 — Development of 7
Eleven and Gas Station at 515 N. Main Street. Applicant: Tom
Bergerson, DMB Architects
5. Administrative Minor Design Review— Relocation of Recreation
1
$32910.00
Facility to Planning Area 42 of East Lake Specific Plan. Applicant:
Jeremy Krout, RGP Planning & Development Services
6. Residential Design Review No. 2013 -02 - Development of 26 homes
1
$5,275.00
on finished lots within Madison @ Rosetta Canyon. Applicant:
Richmond American Homes
CITY OP
LAKE LSINOlU
DREA
CITY OF LAKE ELSINORE
MEMORANDUM
TO: MAYOR AND CITY COUNCIL
FROM: GRANT M. YATES
DATE: MARCH 15, 2013
SUBJECT: MONTHLY INFORMATION MEMORANDUM
February/March 2013
Public Works...
l Ke Indicators
Numbers
Numbers
Street Maintenance
Pot Hole Repairs
Graffiti Removal
Graffiti removed from city property
Graffiti removed from private property
Graffiti Via Web Site
Graffiti Via Hotline
Graffiti Via Direct to Front Office
Storm Drains Cleaned
Illegal Dumping Clean -ups
Signs Installed
Sign Repairs
Reflective Pavement Markers Installed
Carsonite Markers Installed
Cut Back Trees from Blocking Signs
Sidewalk repairs (square feet)
Curb & Gutter Repairs (square feet)
Remove Weeds
Removed Illegal Signs
Area Sprayed With Herbicide (in Acres)
Bobcat Sweeper (various areas)
Picked up Shopping Carts
February]
March
137
106
721
373
5_94
324
127
49
4
0
24
10
8
15
24
7
118
137
0
2
54
54
11
0
0
0
17
1
1245.7
1992
287.3
4
10
1
234
129
3.75_
0
0
0
76
62
Boat Repairs
9
19
Heavy Equipment Repairs
Plan Check
21
Vehicle Maintenance Program (Fleet 2000)
Final Map
20
Weed Abatement
1
Grading
Lots Cleaned
0
City Lots Cleaned
2
9
2
Trees Trimmed
2
16
WCA Removed Trees and Stumps
Flood Plain Determination
0
City Removed Dead Trees /Stumps In Right of Way
3
9
Loads of Trash & Debris (Green Waste)
24
Illegal Dumping Clean -ups
4
8
Work Orders Completed
Encroachments Permit Applications
1
Property owner complaints about billing
25
2
Helped property owner locate their lots & questions
0
Helped Streets Clean Up Alley Ways or Drains
6 Days
Cleaned Weed Abatement Equipment
20
Painted Backflow to Help Prevent Theft
0
Worked on Claims for City Clerk's office or Finance
1
Assisted Code Enforcement in Cleaning up
Homeless Camps for Public Safety
0
Replaced Sprinkler Heads, Wiper Seals or Parts
0
Assisted Lakes with Fish kill cleanup
0
Crew Cleaned up Main St Sidewalks & Landscape
As Part of Budget Savings
16 Days
Shopping Carts Picked Up
0
Checked all Landscaped areas for Major Issues
2 bas
Removed Illegal Signs
16
Replaced refinished
trash cans on Main St.
0
0
0
35
3
4
18
7 --
0 --
2 _.
0
0
20
0
3
0
342
0
1,
V
Research Request
9
14
Plan Check
8
16
Final Map
0
1
Grading
6
9
Street Improvement
2
2
Development Review
2
4
Flood Plain Determination
1
3
Bond Release Request
1
0
Oversize Transportation Permits
4
16
Encroachments Permit Applications
17
25
Encroachment Permit Traffic Issues
9
10
for January 14, 2013. Concrete shear
wall completed for the City Hall on
February 14, 2013. Framing
completed at City Hall. Contractor
excavating for foundation system for
the Cultural Center and shoring the
facility. _
The City received notice from RCTC
that the Mill Street project was
approved by the Board and is now
funded. Staff met with TKE
Engineering (Design Firm) to provide
Sidewalk
Heald Avenue,
the details to be added to the project.
Improvements
Sumner Avenue,
35%
The final design submittal was due in
SB -8
Mill Street
March, due to the addition of Mill
Street; the final design will be done by
May. City Council approval of Change
Order No. 1 is scheduled for March
26, 2013
Design was awarded at the April 24,
2012, City Council meeting. Contracts
have been approved and DMC
Traffic Signal Street
Riverside Drive @
°
0 /°
started the design process on June 4,
Improvements
Grand Avenue
2012. Right -of -way has been
completed; preliminary design is 50%
complete. _
Staff received approval on the Right -
of -Way certificate and the Preliminary
Environmental Study. Staff is
currently waiting for the Categorical
Exemption Certificate to be
Lake Elsinore Traffic
Various School
processed by Caltrans in order to
Calming Project
locations within the
0%
finalize the Request for Authorization
City
to Proceed with Construction (RFA)
application. Once the RFA has been
submitted to Caltrans and approved,
there is a 45 day processing time by
the State.
Design engineer is modifying the 60%
Elm Street Paving /
submittal to show the ultimate
Diamond Circle
65%
improvements that were required by
Pavement
Elm Street Paving
the RFP. 60% plan check comments
Rehabilitation
were returned to the design engineer
on February 14, 2013.
Diamond Circle Rehabilitation was
awarded to Landmark Site
Contractors at the February 12, 2013,
Diamond Circle
City Council meeting. Notice to
Pavement
Diamond Circle
5%
Proceed is anticipated for March 4,
Rehabilitation
2013. Contractor to start placing curb
and Gutter and cross gutters the
week of March 11 , 2013
LAKE, PARKS & RECREATION DEPARTMENT
AGENDA REPORT
TO: City Manager
FROM: Pat Kilroy, Director of Lake, Parks & Recreation
DATE: March 18, 2013
SUBJECT: Lake, Parks & Recreation Monthly Report
PREPARED BY: Mary Santa Cruz, Office Specialist
RECOMMENDATION: Receive and file.
BACKGROUND: The following provides a summary of the Lake, Parks &
Recreation Department's program, activities and events for February 2013:
Administration
Hydroseeding and planting of native vegetation was completed on the T- peninsula of the
Levee System and will be followed by five (5) years of monitoring and maintenance to
comply with the USACE's approved Habitat Mitigation & Monitoring Plan required for the
construction of the La Laguna Boat Launch Facility.
Parks & Facilities
Renovations began at McVicker Canyon baseball fields to establish a new uniformed
distance for base paths as set forth by the little league user group, bring in additional
baseball clay to drag and level the fields; build a brand new pitching mound to meet
specifications set by little league; all in preparation for their upcoming season.
Special Events in February:
Julie Szabo, Local member of the Audubon Society, led a bird walk for the Oceanside
Birders on the levee system (2/17). Agility Trials sponsored by South Coast Vizsla Club
and managed by Lynda Tjark Agility Productions took place at McVicker Park (2/15-2/18).
This is the third year hosting this type of event in Lake Elsinore.
Upcoming Special Events for April:
• 4/6 - Smoking Tire & Campfires Car Show at La Laguna Resort.
• 4/6 & 4/7- Warrior Dash 5K Mud Run at the Stadium /Levee.
• 4/11 -4/14- Frontier Days Carnival at the La Laguna Resort.
• 4/20- Unity 5K/1 OK Walk/Run at the Stadium /Levee.
• 4/27- JDRF Walk for a Cure a Stadium /levee.
• 4/27- Unity in the Community Parade along Main Street, Graham & Heald.
u
4�
�
3
�
�
2
0
�
2
■
E
LM
CL
■
O
@
u
CL
@
0
c
ui
�
q
�
R k k 2
j=
(
j\I)))
\`
\\\
R k k 2
u
7
2
u
LM
S
$
0
LL,
u
@
271
� \
\`
\\\
±•��-
u•u•u
-u
u
7
2
u
LM
S
$
0
LL,
u
@
271
� \