REPORT TO CITY COUNCIL
TO: HONORABLE MAYOR
AND MEMBERS OF THE CITY COUNCIL
FROM: GRANT M. YATES
CITY MANAGER
DATE: DECEMBER 09, 2014
SUBJECT: Notice of Completion Seismic Retrofit Lake Elsinore City Hall &
Lake Elsinore Cultural Center, Project No. 4237
Recommendations
Accept the improvements into the City Maintained System.
2. Approve Contract Change Order No. 1 to Sea Pac Engineering in the amount
of $40,204.89.
3. Approve Contract Change Order No. 2 to Sea Pac Engineering in the amount
of $18,638.77.
4. Approve Final Contract Change Order No. 3 to Sea Pac Engineering which
will increase the contract by $53,016.16.
5. Authorize staff to file the Notice of Completion with the County Recorder.
6. Authorize staff to release contract retention monies 35 days after filing the
Notice of Completion.
Background
In August, 2008 the City of Lake Elsinore applied for the Hazard Mitigation Grant
program (DR -1731) which was funded by the Federal Emergency Management Agency
(FEMA) and implemented by the California Emergency Management Agency
(CALEMA), formerly the California Office of Emergency Services (OES). The program
was approved as a result of the 2007 fires and the funding is based on a seventy -five to
twenty -five percent ratio, with the federal share not to exceed seventy -five percent
(75 %) of the total activity costs.
Notice of Completion Seismic Retrofit Project
December 9, 2014
Page 2
On November 14, 2008 and in conjunction with the Hazard Mitigation Grant, staff
submitted an application to FEMA and CALEMA for the seismic retrofitting of City Hall
(the southern portion of the building) and the Cultural Center. The total award of the
grant was approximately $1,100,981, with $825,735.75 coming from FEMA and
$275,245.25 coming from the City of Lake Elsinore.
In early 2009, CALEMA notified the City that tentative approval had been awarded by
FEMA; however, no funds would be dispersed until the necessary historical studies had
been completed.
On December 3, 2009 FEMA representatives conducted inspections on City Hall as well
as the Cultural Center.
On September 20, 2010, FEMA notified staff that as a result of the "field study" that took
place on December 3, 2009, additional information would be required so that a
determination regarding historical findings could be determined. After staff received the
additional items from FEMA, it was identified that structural drawings of City Hall and
the Cultural Center would be needed.
On April 12, 2011 the City Council authorized a contract for Risha Engineering to
develop the engineering drawings for both buildings. In addition to being able to provide
FEMA with the requested information, the drawings also allowed the City to determine
an actual cost of retro- fitting both buildings; to determine if the cost was more than what
was originally budgeted in 2008.
In October, 2011, staff had a conference call with FEMA as well as CALEMA. Staff was
notified that they had received the drawings and just needed a few more photos of
Cultural Center and then they could complete their analysis. FEMA notified staff that
they would like to get the findings completed and have the grant funded by early 2012.
Discussion
On November 1, 2012, at 2:00 PM, the City received 5 bids from qualified contractors to
construct the Seismic Retrofit of the Cultural Center and City Hall. Sea Pac
Engineering, Inc. was the apparent low bidder. City Council awarded the construction
contract to Sea Pac Engineering, Inc. on November 13, 2012 in the amount of
$1,061,887 with a contingency of $106,188.70.
Three (3) change orders were issued to Sea Pac Engineering for additional work that
was added to the original scope of work during construction increasing the total contract
budget by $111,859.82, bringing the final construction contract amount to Sea Pac
Engineering to $ 1,173,746.82. Staff has reached an agreement with the contractor and
recommends the City Council approve the notice of completion.
Notice of Completion Seismic Retrofit Project
December 9, 2014
Page 3
On July 15, 2014, representatives from Cal OES & FEMA came for the final job walk
inspection. Staff received the final approval on all work performed and was authorized
to submit for reimbursement.
Fiscal Impact
The approved project budget for the development and construction of the Seismic
Retrofit Project totaled $1,663,202. The costs for administration, design, engineering,
inspection testing and construction for the project was $1,602,824.71. Project savings
after final close -out is $60,377.29 and will be available for future CIP Projects.
Prepared by: Deepak Solanki
Consultant Project Manager
Approved by: Vince Damasse, P.E.
Director of Public Works
Approved by: Jason Simpson
Director of Administrative Services
Approved by: Grant Yates
City Manager
Attachments: Vicinity Map
Notice of Completion
VICINITY MAP
SEISMIC RETROFIT
CITY HALL & CULTURAL CENTER
yEq�.� VF
G
R
gygNjq�� �
\
c�
Z
�co
J
�c')
,z
Z
co
FR�yK��y'ST
co
F yFq�o
q VF
m
\Q
RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:
Name City of Lake Elsinore
Street
Address 130 S. Main Street
City &
State Lake Elsinore, CA 92530
S
R
U
PAGE
SIZE
DA
MISC
LONG
RFD
COPY
M
A
L
465
426
PCOR
NCOR
SMF
NCHG
EXAM
T:
CTY
I UNI
NOTICE OF COMPLETION
FOR RECORDER'S
Notice is hereby given that:
1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described:
2. The full name of the owner is City of Lake Elsinore
3. The full address of the owner is 130 S. Main Street Lake Elsinore CA 92530
4. The nature of the interest or estate of the owner is in fee.
Seismic Retrofit of the Lake Elsinore City Hall and Lake Elsinore Cultural Center
(If other than fee, strike "in Fee' and insert, for example, "purchaser under contract of purchase," or "lessee ")
5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are:
NAMES ADDRESSES
6. A work of improvement on the property hereinafter described was completed on 06/02/2014 . The work done was:
Seismically retrofit both the Lake Elsinore City Hall and the Lake Elsinore Cultural Center
7. The name of the contractor, if any, for such work of improvement was Sea Pac Engineering, Inc
3325 Wilshire Blvd Suite 305 Los Angeles CA 90010 -1719
(If no contractor for work of improvement as a whole, insert "none') (Date of Contract)
8. The property on which said work of improvement was completed is in the city of City of Lake Elsinore
County of Riverside , State of California, and is described as follows:
Seismically retrofit both the Lake Elsinore City Hall and the Lake Elsinore Cultural Center
9. The street address of said property is 130 C Main Street R 183 N /lain Street Lake Elsinore CA 92530
(If no street address has been officially assigned, insert "none ")
Dated:
Signature of owner of corporate officer of owner
named in paragraph 2 or his agent
VERIFICATION
I, the undersigned, say: I am the Director of Public Works the declarant of the foregoing
( "President of," "Manager of," "A partner of," "Owner of," etc.)
notice of completion; I have read said notice of completion and know the contents thereof; the same is true of my own knowledge.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on December 9 20 14 at Lake Elsinore California.
(Date of signature) (City where signed)
(Personal signature of the individual wha is swearing that the contents of the notice of
completion are true)