Loading...
HomeMy WebLinkAboutPublic SpeakerDa - 23, 2-0 (2- ��rL" " DAVID MASHAYEKAN A few years ago, my partner and I decided to build a first -class medical building in this area. At the time, we had the option of building on sites in Corona, Temecula, or Lake Elsinore. Fortunately, Lake Elsinore is a business - friendly city and approved the project. Since the project began, however, we have been denied rights to modification several times. First of all, because we had concerns that people would gather at the gazebo after - hours, we tried to eliminate it, but were denied this request. Next, at one point, we were over - budget and hoped to get rid of the glass band around the building, but the request was denied. Further, we attempted to alter the building usage for one of the suites and were once again denied. Finally, we requested an addition of one or two small windows in an area that is not weight- bearing, but the suggested requirements by the city made it cost - prohibitive. The current obstacle impeding the completion of the project concerns the construction of the mortar and pestle on top of the building which had originally been approved on a smaller scale with a foam material. We formed a template in the original size, but it was out of proportion; it was too small in comparison to the rest of the building. The other problem was that the foam needed to be glued to the structure. We consulted the structural engineer and he suggested we build a frame model. Although the mortar and pestle is only a projection and is not weight bearing, framing will make the structure sturdier. We approached the city with several new mortar and pestle designs, which were slightly larger than the original one and composed of a frame rather than of foam. Over the course of a month, each of our proposed designs was rejected. We then submitted five entirely new designs — which ranged from 72 to 120 inches high — and asked that the city choose one, alter one, or make new suggestions. After a month and a half, on September 4`" we received approval for a 108 inch design, followed by an email request to draw it up to scale. We assumed that the city had taken that month and a half to research city codes and requirements and check with the planning director before approving the final mortar and pestle design. Based on that approval, we proceeded to build the structure at a cost of $13,600. The height of the mortar and pestle from east side of the building is only 35 feet 4 inches and from the middle of the building the height is 36 feet 4 inches We were at the final stage of construction when the city halted further progress. We were not given the opportunity to trim the rough surface and smooth the stucco to give the mortar and pestle more appeal. When designing this building, we tried to make it different from the surrounding structures in style, material, and composition (at a greater cost to us), so this projection is an important part of the building. Demolishing the mortar and pestle would increase the financial burden, alter the character of the project, and further delay construction. Therefore, because we are two months behind in construction time already and far over budget, we request that you consider granting this variance. in conclusion, please keep in mind that the construction of this building will bring over twenty new high - paying jobs to the city of Lake Elsinore. CEMENTITIOUS COATED FOAM ARCHITECTURAL FEATURE TO BE REMOVED IF MEDICAL USE IS NO I LONGER CONTINUED Q ry - E6) INSULATED & DECORATIVE GL m AZING PER PLAN Q U "'- "- -- - - '------- -- ---� TRAVERTINE TILE WAINSCOT & TRIMS 0.- ' 111 g 02 I I...- E I =��gv T. IM _ _ - - - -� STANDING SEAM METAL ROOFING Q U N NCI I ap'me�>(o �❑2 MEDIUM SAND FLOAT COLOR COATED Q w J n O STUCCO W/ REGLETS 4 PAINTED WOOD FASCIA Q] Q wow 0 i I ��>naLCaC��lj 7 I Ay I LL_ W - - - -- t- 0 1 1 T_ — 7! Z Ln 1 1 LLJ O FRONT ELEVATION Y Y ,� SCALE: 3,18 _ ,_D- C D �) `E) — - -' -- - CEMENTITIOUS COATED FOAM ARCHITECTURAL FEATURE TO BE 1 REMOVED IF MEOII:AL USE IS NO LONGER CONTINUED I - -----I -'- - -- - -- -06 DECORATIVE GLAZING, NO OPENING I -"' -- -- - -�5 TRAVERTINE TILE WAINSCOT & TRIMS I 1 STANDING SEAM A(ETAL ROOFING ! I 7/1r I I � i -- - - --�� MEDIUM SAND FLOAT COLOR COATED STUCCO W/ REGLETS - - -- " "; (21 DA18 %24 GAF - GAELS VENTS -- -- - 1 4 PAINTED WOOD FESCIA AND COLUMNS APP 10059 I 1 FLOODLIGHT LUMINAIRE (NP.) I rt oe 02/28/12 E ELEVATION o ,,, s x 2. — MATERIALS /COLORS SCHEDULE I I 1' -0' f8EPJ11G -syE ❑x NO. MATERIAL MANUFACTURER - PRODUCT d COLOR REMARKS S OF ME PROPOSED MPOR Mf. T _ o, aT — os Gu uEiu ROOfmC Rm. < — — PN„ o F <a61x= R�� M — R — ws - P-1 P,<4, -- ao_,aR bpgE, �,<x ,1M., � N .m TZ L. a,al� -- J B B B 81 U o If) rn 1) J N O < 00 LLJ aL of Q O N LJ W W I L N W O °Q r u J v/ YYQ LJ J Y 7/1r � i " "; _ /•--T- APP 10059 I 1 rt oe 02/28/12 E ELEVATION o ,,, s x 2. — MATERIALS /COLORS SCHEDULE ELEVAnorvs 1' -0' f8EPJ11G -syE ❑x NO. MATERIAL MANUFACTURER - PRODUCT d COLOR REMARKS S OF ME PROPOSED MPOR Mf. T _ o, aT — os Gu uEiu ROOfmC Rm. < — — PN„ o F <a61x= R�� M — R — ws - P-1 P,<4, -- ao_,aR bpgE, �,<x ,1M., � N .m TZ L. a,al� -- 14 M" 4 M� IN 9 Im w r r� 9 Im X111 ® TOP VIEW 14 70 aid' 391116' 16' 1116" 1ST 59 a1v 14151,16" -127 12V 211111 ' TOP'VIEW 14 TY 381116' T t la vie, 113 af IN _ 12T 211111b' 14 T�'° TOP VIEW 59 a1v 12V 0 )AMR NVO 21; 1 14 11�5' 14 t {m '16 giw 2 s 1, M 14 T� tuo Vi 11',161 14 'Jea a s 9 I=ll T f I !° if! 1E 141 Ai ;w F I=ll T f I !° if! 1E 141 Hotmail Print Message Page 1 of 1 Bill Belvin (bbelvin @Lake- Elsinore.org) Mon 10/15/12 11:08 PM namvars @hotmail.com (namvars @hotmail.com) Warren Morelion (wmorelion @Lake - Elsinore.org); Richard MacHott (rmachott @Lake - Elsinore.org) Good Afternoon Mr. Namvars, You will need to submit your request for an extension in writing or e -mail, Thanks Bill Bill Belvin Building Official City of Lake Elsinore 951 - 674 -3124 x286 http: / /co 104w.col 104.mail.live. com/ mail /PrintMessages.aspx ?cpids =40fl b509 -171 d -11 e... 10/15/2012 1I y tl€ t. F NfF, a��y October 11, 2012 Mr. Ahmad Mashayekan 16746 Lakeshore Drive, #1 Lake Elsinore, CA 92530 RE: Mortar and Pestle Feature on Medical Building on Lakeshore Drive (APN 378- 290 -005) Dear Mr. Mashayekan: As I promised at our meeting yesterday, I spoke with Acting Community Development Director Warren Morelion regarding your proposal regarding the mortar and pestle feature on the roof of your new pharmacy. You are proposing that the City of Lake Elsinore allow you to reduce the feature's height and width and to complete the surfacing and painting of both the mortar and pestle and the building so that we can see what mortar and pestle looks like in the context of the completed and painted building. Warren and I have significant doubts that the mortar and pestle feature that you have constructed can be trimmed and finished in a manner that will make it acceptable or that it will not exceed the City's Municipal Code's maximum allowable height of 35 feet. Furthermore, both the mortar and pestle feature and the monument sign were constructed without permits. We are willing to work with you, but your failure to obtain the appropriate building permits has directly led to the situation we are in now. Bill Belvin, the City Building Office, Warren and I reviewed the building plans that were submitted to the City and approved when you applied for a building permit. Mr.Belvin advised me that: Based upon the approved building plans, the architectural feature at 16800 Lakeshore Dr. was approved to be built with cementitous coated foam and not to exceed over all building height of 35 feet. The feature exceeds the 35 feet and was not built with cementitous coated foam, the contractor built it with wood frame and stucco (not per approved plans) and no inspections. A Stop work notice was issued for the feature and Monument sign that was also constructed without permits or approvals. The following is a list of corrections that will need to be submitted to the Building Division for approvals. 1. Submit a revised plan showing framing, attachments to roof, lath and stucco, flashing for plan check. 130 S. MAIN STREET LAKE C LS I NORE. CA 92530 W W W.LAKE- ELSINORE.ORG Letter to Ahmad Mashavenkan RE: Mortar and Pestle Feature October IL 2012 Page 2 of 2 2. Planning approval. 3. Need Engineering from Structural Engineer showing the roof will hold the load of new feature. 4. Show dimensions of feature not exceeding 35 feet in height. 5. Submit plans, obtain building permits and get planning approval for monument sign. 6. The following must be done within the next 10 days or a stop work will be issued for the whole project. The City expects that you will comply with these requirements in a timely manner. However, we are willing to let you demonstrate to us that the mortar and pestle feature can be modified to meet City standards and aesthetics. However, PRIOR TO COMPLETING, the mortar and pestle feature, I will need an original signed letter from you acknowledging that you will comply with the above requirements within the next 10 days, that you acknowledge that you are completing the feature at your own risk and expense, and that you will remove or redesign the mortar and pestle feature at your own cost should the City determine that the completed feature is still unacceptable. The letter will need to include a scale drawing of the building and feature, with dimensions, that you show what the feature will look like when completed. Upon receipt of your letter, we will advise whether you can proceed. If you have any questions, please contact either myself or Warren Morelion, Acting Community Development Director. Sincerely, F,r'+ Richard J. MacHott, LEED Green Associate Senior Planner cc: Warren Morelion, Acting Community Development Director Bill Belvin, Building Official Augustin Resendiz, Associate Planner Hotmail Print Message Page 1 of 1 o t',: Bill iBelvin (bbelvin @Lake- Elsinore.org) Mon 10/15/12 11:08 PM o: namvars @hotmail.com (namvars @hotmail.com) Warren Morelion (wmorelion @Lake- Elsinore.org); Richard MacHott (rmachott @Lake- Elsinore.org) Good Afternoon Mr. Namvars, You will need to submit your request for an extension in writing or e -mail, Thanks Bill Bill Belvin Building Official City of Lake Elsinore 951- 674 -3124 x286 http: / /co 104w.co1104.mail. live. com / mail /PrintMessages.aspx ?cpids =40f1 b509 -171 d -11 e... 10/17/2012 Hotmail Print Message Page 1 of 1 Bill Belvin (bbelvin @Lake - Elsinore.org) Tue 10/16/12 12:19 AM Ali Namvar (namvars @hotmaii.com) Warren Morelion (vvmorelion @Lake- Elsinore.org); Richard MacHott (rmachott @Lake- Elsinore.org) Good Afternoon Ali, I can give you till Noveniber 1'r for an extension, Thanks Bill From: Ali Namvar [mailto:namvars @hotmail.com] Sent: Monday, October 15, 2012 4:19 PM To: Bill Belvin Subject: Re: stop work Thanks bill for your help as you know we would love to complete this project we would like to extent this issue for one to one and a half to get the does you requested to provide to you thanks again for your help Sent from my iPhone On Oct 15, 2012, at 4:08 PM, "Bill Belvin" <bbelvin @Lak _Elsinore.orp wrote: Good Afternoon Mr. Namvars, You will need to submit your request for an extension in writing or e -mail, Thanks Bill Bill Belvin Building Official City of Lake Elsinore 951- 674 -3124 x286 http: / /co 104w.co1104. mail. live.com / mail /PrintMessages.aspx ?cpids =l eb8df42- 1727 -11 e2... 10/17/2012 5' "�'`