Loading...
HomeMy WebLinkAboutCity Council Agenda Item No. 7 SupplementalREPORT TO CITY COUNCIL TO: HONORABLE MAYOR AND COUNCILMEMBERS FROM: TOM EVANS, INTERIM CITY MANAGER DATE: MAY 22, 2012 SUBJECT: (SUPPLEMENTAL) PROPOSED FENCING, LIGHTING AND LANDSCAPING IMPROVEMENTS TO THE FRONTAGE AND ENTRYWAY OF LA LAGUNA RESORT & BOAT LAUNCH Quotes City Staff requested quotes from five Construction Inc. (Contractor of new installation of the specified vinyl fencing. fencing contractors, as well as Reyes Boat Launch), for the purchase and The City received three quotes, as summarized below. Contractor Quote Job Task #1 Quote Job Task #2 Total Quote Mesa Fence Co. Inc. $17,600 $51,510 $69,110 Hemet Fence $19,232 $52,747 $71,979 Reyes Construction, Inc.s�_. {� $134,637 Recommendations 1) Award Job Task #1 for the Purchase & Installation of Vinyl Fencing for Shoreline Safety to the Mesa Fence Co. in the amount of $17,600 and authorize the City Manager to execute a purchase requisition. 2) Approve expending funds from the General Fund unallocated revenue for the installation of frontage and entryway fencing, as well as lighting and landscape improvements in an amount not to exceed of $76,510. 3) Award Job Task #2 for the Purchase & Installation of Vinyl Fencing for Frontage & Entryway to the Mesa Fence Co. in the amount of $51,510 and authorize the City Manger to execute a purchase requisition. Proposal Submitted To: Name City of Lake Elsinore Street 130 S. Main St City Lake Elsinore State CA Phone 674 -3124 ext 265 Pat Kilroy PROPOSAL MESA FENCE CO. INC Residential /Ranch/ Commercial rrnvri, mesafenceco. com 1303 W. Oleander Ave, Perris, Ca. 92571 P1r.951- 780- 4879/Fax 657 -1179 John Cooke cell 951 -830 -1696 Lic. #954583 Work To Be Performed At: Date: 5 -17 -2012 La Laguna Resort & Boat Launch Street 32040 Riverside Dr City Lake Elsinore State Ca Date of Plans Architect We hereby propose to fiinush the materials and perform the labor necessary for the completion of installing vinyl rail fence as per plans, specs and prevailing wages, as follows: JOB TASK # 1- nstall 1,072' of 4 rail fence, including 1 -16' double swing gate, TOTAL1 T,600.00 JOB TASK # 2- Install 2,332' of 4 rail, 1,160' of 2 rail and 304' of 1 rail fence, IOTA �51,510.00 NOTE: e done at same time to hold cost on material and freight. Exclusions include: anything not listed above, permits and or special licenses, other than C -13, clearing of any foliage, if applicable, weekend work. Complete job will take approximately 12 days to install. Please allow approximately 2 -3 weeks lead time for material. Material is "Certain Teed Bufftech ", certagram texture, colonial white. Please note that due to the texture of this material it is prone to collect dirt. All material is guaranteed to, be as specified, and the above work to be performed in accordance with the drawings and specifications subs - pitted for above work and completed in a substantial workmanlike manner for the sum of D�toe s ($ 69,110.00) With payments rna e as follows: NET 30, IF ACCEPTABLE, PLEASE SIGN AND RETURN, THANK YOU. Any alteration or deviation from the above -specifications involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements are contingent upon strikes, accidents or delays beyond our control. Owner is to carry fire and all other liability insurance on above property. M.F.CO. Inc. is not responsible for damage to umnarked utilities, including sprinklers. Workmen's Compensation and Liability Insurance on above work to be taken out bv: M.F.CO.INC NOTICE: Cancellation of proposal must be given in writing no less than 1 week prior to work commencing. A 10% fee for restocking of material will be applied if notice is not given. Respectfully submitted: Per. MESA FENCE CO. INC. �--� �` NOTE- This proposal may be wit Idrawn by us �ifnot accepted within: 15 days. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do work as specified. Payment will be made as outlined above. Signature Date Signature. 25959 Juniper Flats Road Homeland, CA. 92548 Phone: (951) 926 -8148 Fax: (951) 926 -1398 License # 915456 May 17, 2012 Submitted To: City of Lake Elsinore Attention: Pat Kilroy, Director of Lake, Parks & Recreation Department — Phone 951- 674 -3124 130 S. Main Street, Lake Elsinore, CA 92530 For Property At: La Laguna Resort & Boat Launch 32040 Riverside Drive Lake Elsinore, CA92530 Hemet Fence Co. Proposes To Install Vinyl Rail Fencing & Gates As Detailed Below And As Shown On The Plan Emailed From The City On 5 -7 -12: MATERIALS: All Materials To Be As Per The Specified Bufftech Wood Grain Texture Material: Task # 1 (SHORELINE SAFETY FENCING) To Include 16' Double Swing 4 Rail Gate. Price ($19,232.00 792 LF + 280 LF = 1,072 LF Of 4 -Rail Fence And 1 Each Task # 2 ) To Include 2,332 LF Of 4 -Rail Fence, 1,160 LF Of 2 -Rail Fence And 304 LF Of 1 -Rail Fence. Price $52,747.00 Prevailing Wages Are Included In Quotation. Sales Tax Is Included. All Posts Are To Be Set In Concrete Minimum 8" X 24" STANDARD EXCLUSIONS: Staking /Surveying • Permits • Location of Private Underground Utilities NOTES: 1: The pricing in this proposal is guaranteed for 60 days. Acceptance thereafter may necessitate pricing adjustments. 2: Any deviations from the above scope of work directed by purchaser at time of installation is agreed by purchaser to be added to the indicated price on a time and material basis. If changes necessitate additional trips for our crew, purchaser agrees to the additional charges. If the purchaser requires the price change prior to execution of the changes, please contact our office promptly to prevent any surcharges. Respectfully Submitted, Hemet Fence Co. X Date (Donn Simons By signing above, I agree to the the scope of work and the conditions stated above REYES CONSTRUCTION9 INC May 11, 2 012 Peter Rainey P.E. Project Manager City of Lake Elsinore 130 S. Main Street Lake Elsinore, CA. 92.530 Reference: Boat Launch Facility improvements Project No. 4237 Subject: proposal to Furnish and Install Vinyl Fence Dear Mr. Rainey: We are pleased to provide the following proposal for subcontractor work (only) for the -following item under referenced project.. ITEM DESCRIPTION QUANTITY UNIT .. . ....... UNIT PRICE EXTENSION 001 Furnish and Install Vinyl Fence 1 LS $134,637.00 $134,637.00 —(see attached quote from Alcorn Fence for details) . ..... . . . ................. ..... . ..... TOTAL AMOUNT . . . ............................. $134,637.00 Terms and Conditions: .[Tii.s proposal is based upon the following qualifications, exclusions, conditions and requirements unless specifically stipulated to the contrary in our cover page(s). These Conditions shall be incorporated into our contract. Should these Conditions be at variance with the Plans, Specifications or Conditions of the Project Documents for the noted project, these Conditions shall take precedence. 1. See attached Alcorn Fence Company quote for materials, work to be performed and exclusions. 2. Material Lead time is 3 `� to 4 112. weeks from the time of approved material submittal. 3. Installation of the new fence is estimated to be 3 weeks. Gent;ral Licew�c� No. 507501 -- - - ------- s -' 'I llomom-,l CA, 9 4. Total estimated time to furnish and install new vinyl fence is 6 4 to 7 ',,2 weeks (from approved submittal) . 5. Additional contract days will be required (TBD after approval of material submittal) 6. Concrete fence footing is -included in Alcorn's quote (12" dia. by 36" deep). 7. Removal of the old fence, any obstructions and clearing & grubbing is to be by others (not included -in this scope). 8. one (1) mobilization or demobilization effort by Alcorn Fence has been included. 9. Repairs or relocation of any utilities is not included. 10.No extended overhead has been added to this proposal. (Additional cost may be required pending time of material submittal approval. and Change Order NTP). 11.No survey or engineering costs have been -included. 12.No haul off include. 13.Based on working eight (8) hours per day, five (5) days per week, Monday-Friday. I.A.Excludes permit fees. 15.Excludes bond. if bond is required add 1%. 16.Invoice on a monthly basis. Please let me know if you have any questions or conuuents. Sincerely, REYES CONSTRUCTION, INC. "V ? Mike Ellis Attachment: Alcorn Fence Company quote (dated May 10, 2012). ctor - .Liceyise No. 5072561 13S3 S, Sigiml lit ,,'c - Pomom�t CA 91'''166 Ili,, (909) ktv (909, 622-3053 CONTRACTORS LICENSE - 122954 Y, lj, � ° // -, VC rT A CORN FENCE COMPANY P.Q. BOX 3279, 6445 OLD PEDLEY ROAD, RIVERSIDE, CA 92519 (951) 685-5871 FAX (951)685-1641 PROJECT: Lake Elsinore Boat Launch 1 Vinyl. Fence - Certain Teed Bufftech CONTRACTOR: Reyes Construction, Inc. CONTACT: Bob Jenkins ATTENTION: Elsa Alegria Date: May 10, 2012 FAX t# ;Rail Size: Small (1-1/2" x 5-1/2") Plans & Specs: Yes X No Bondable: Yes x No Installed: Yes x No Rate: .075 of I% Tax Included: Yes X No DBEIWBE: Yes No Union: Yes x No, Addendum: Alcorn Fence Company is signatory to Laborers, Operating Engineers and Cement Masons unions. ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT 1 Vinyl. Fence - Certain Teed Bufftech Color: White with Wood Texture ;Rail Size: Small (1-1/2" x 5-1/2") Installed per Manufacturer's Instructions. Maximum Posts Spacing = 8'-0' 4 - Rail 3,404 LF 2 - Rail 1,160 LF I - Rail 304 LF 16' Swing Gate (4-Rail) Double I EA Total Lump Sum $128,226.00 !Note: Material lead time will be 3-1/2 to 4-1/2 weeks ARO, Layout and Grubbing, FrIgineering and Staking Permit, Bond Premium (0.75%) Clearing and Grading Location of Underground Utilities Patching and Restoration Concrete Coring, Asphalt Patching Mow Curbs, Traffic Control Spoils Removal from Fence Line Welding Inspection and Procedure Lead Compliance, Removal of Lead Contaminated Soil from Site. Railroad Insurance, Stripping [Ail Underground conduit and Wiring ....... . . . ..... . ................. ........ . ... . . ........ .............. ...... . .......... . . . .......... Alcorn shall notify Underground Service Alert forty-eight (48) business hours prior to any excavation. However, Alcorn shall not be responsible for damage to underground facilities not properly and accurately shown on contract plans, as-built /or identified by forces other than Alcorn's. MANUFACTURERS OF CHAIN LINK FENCES --- -- ----- 7 COMPLETE INSTALLATION SERVICE