HomeMy WebLinkAboutRDR No. 2014-04 Staff ReportC I TY Q E
LADE LSI AORE
L
DREAM EXTREME-
CITY OF LAKE ELSINORE
REPORT TO PLANNING COMMISSION
TO: Honorable Chairperson
Members of the Planning Commission
FROM: Richard J. MacHott, LEED Green Associate
Planning Manager
DATE: June 17, 2014
PROJECT: Residential Design Review No. 2014 -04 - A Request by
Ryland Homes for Approval of Building Designs for 64
Single - Family Detached Residential Units Including a Model
Home Complex and Related Improvements, for a Housing
Project Located Within the Summerly Development of the
East Lake Specific Plan
APPLICANT Craig Moraes, Ryland Homes, 49 Discovery, Ste 250
& OWNER: Irvine, CA 92618
Recommendation
1. Adopt Resolution No. 2014-_, A Resolution of the Planning Commission of the
City of Lake Elsinore, California, Recommending that the City Council of the City of
Lake Elsinore Adopt Findings that the Residential Design Review No. 2014 -04 is
Consistent with the Western Riverside County Multiple Species Habitat
Conservation Plan (MSHCP).
2. Adopt Resolution No. 2014- , A Resolution of the Planning Commission of the
City of Lake Elsinore, California, Recommending to the City Council of the City of
Lake Elsinore Approval of Residential Design Review No. 2014 -04, based on the
Findings, Exhibits, and subject to the proposed Conditions of Approval.
Project Request & Location
The applicant is requesting approval of building designs for 64 single - family detached
residential units in the East Lake Specific Plan Amendment No. 6 area (Tract 31920 -8),
including a model home complex and related improvements.
RDR No. 2014 -04 FOR RYLAND HOMES AT SUMMERLY
JUNE 17, 2014
PAGE 2OF5
Environmental Setting
Project
Site
Vacant
Residential 1
East Lake Specific Plan
North
Vacant
Residential 1
East Lake Specific Plan
South
Vacant
Residential 1
East Lake Specific Plan
East
Residential and
Commercial
County of Riverside
County of Riverside
West
Vacant
Residential 1
East Lake Specific Plan
Background
The East Lake Specific Plan (ELSP) was adopted by Ordinance No. 955 by the City
Council in June 1993. The Plan consists of 3,000 acres and was originally divided into
three individual districts that included a Marina District, Lakeside Resort, and Recreation
Village. Several Amendments have been made to the East Lake Specific Plan. The
first two amendments changed the central area or Phase One of the Specific Plan. The
changes primarily reduced the number of residential units and commercial uses and
added the allowance of a golf course to the open space area of the plan. Phase One is
the development area where the commonly known "Laing Homes" project is located.
Two other amendments, Amendment No. 3 and No. 4, were related to industrial
development along Corydon Avenue which are both outside of Phase One.
Amendment No. 5 is the marina development located on Lakeshore Drive, known as
Waters Edge.
Laing Homes processed East Lake Specific Plan Amendment No. 6 which was adopted
by the City Council on July 24, 2004. This amendment replaced multi - family uses with
single - family uses, provided several parks and added a 165 -acre golf course, club
house, and maintenance and golf cart storage facility.
The project before the Planning Commission is identified as "Ryland at Summerly"
(Ryland Homes). Lots in this neighborhood range in size from 5,500 square feet to
10,641 square feet with an average lot size of 6,704 square feet.
Description of Residential Design Review No. 2014 -04
The following describes the various design components and features of the proposed
project, including floor plans, architecture, model home complex, preliminary plotting of
production units, and the conceptual wall and fence plan.
RDR No. 2014 -04 FOR RYLAND HOMES AT SUMMERLY
JUNE 17, 2014
PAGE 3OF5
Floor Plans For Ryland Residences
The proposed 64 -unit project would offer three different plans, which are described as
follows:
1. Plan 1: Two -story 2,579 square foot units (options up to 3,033 square feet) with
three bedrooms; 2.5 baths; great room; dining room, kitchen, nook, laundry, teen
room (option 4th bedroom), den (option 5th bedroom) and three -car tandem garage
(option 6th bedroom or media room).
2. Plan 2: Two -story 2,862 square foot units (options up to 2,801 square feet) with four
bedrooms; 3.5 baths; family room; dining room (option den), kitchen, nook, laundry,
study (option 5th bedroom), teen room (option 7th bedroom), and three -car tandem
garage (option 6th bedroom).
3. Plan 3: Two -story 3,150 square foot units with four bedrooms; 3 baths; great room;
dining room, formal dining room, kitchen, laundry, loft (option 5th bedroom), and
three -car tandem garage (option 6th bedroom suite).
Architecture and Treatments For Woodside Residences
The proposed project would offer three architectural styles and treatments for each of
the floor plans, including Spanish, Tuscan and Craftsman. The following describes
each of these architectural styles:
• The Spanish Style includes concrete "S" tile roofs, decorative wrought iron & clay
pipes, shutters, stucco window trim, and arched entries.
• The Tuscan Architectural Style includes concrete "S" tile roofs, projected
wainscoting stone veneer, decorative shutters, wood corbels, and vertical windows
with stucco trim.
• The Craftsman Architectural Style includes concrete flat tile roofs, siding accents at
front gable ends, wood outlookers, pot shelves, decorative shutters, vertical windows
with stucco trim, columns and stone veneer.
It should also be noted that enhanced, four -sided architectural treatments in the form of
window surrounds will be provided for all the proposed residences as a standard
feature.
Model Home Complex
The project proposes a three lot model home complex. The model home complex will
be located off of First Green. The proposed complex provides a designated handicap
RDR No. 2014 -04 FOR RYLAND HOMES AT SUMMERLY
JUNE 17, 2014
PAGE 4 OF 5
access space, full landscape and hardscape improvements, trees, and shrubs.
Conceptual Wall and Fence Plan
To ensure design consistency, the Conceptual Wall and Fence Plan for the project
shows that those similar walls and fences that are provided elsewhere in the Summerly
area will continue to be provided with the proposed project. Perimeter walls will be
decorative block with pilasters to match the existing Summerly development. Front
returns will be six -foot concrete block walls.
Analysis
City Planning and Engineering staff have reviewed the requested Design Review
application and have no concerns. Staff believes that the project's architecture;
amenities and improvements; landscaping; and walls and fences have resulted in a
well- designed residential project and are consistent with the design amenities and
features previously approved in the immediate area. In addition, the project is
compatible with the overall East Lake Specific Plan area and those existing and future
developments that neighbor the project site.
Environmental Determination
CEQA Guidelines Section 15162 establishes the standard to be used when determining
whether subsequent environmental documentation is necessary. Section 15162 states
that when an environmental document has already been adopted for a project, no
subsequent environmental documentation is needed for subsequent entitlements which
comprise the whole of the action unless substantial changes or new information are
presented by the project.
A Supplemental Environmental Impact Report (SEIR) was approved and adopted in
2004 for the East Lake Specific Plan Amendment No. 6 (SHC #2003071050). The
SEIR evaluated environmental impacts that would result from maximum build -out of the
Specific Plan, The Project does not present substantial changes or new information
regarding the potential environmental impacts of development. Therefore, no additional
CEQA documentation is necessary.
Prepared By: Kirt A. Coury,
Project Planner
Approved By: Richard J. MacHott, LEED Green Associate
Planning Manager
RDR No. 2014 -04 FOR RYLAND HOMES AT SUMMERLY
JUNE 17, 2014
PAGE 5 OF 5
Attachments:
1. Vicinity Map
2. Planning Commission Resolutions
3. Conditions of Approval
4. Color Architectural Booklet including Site and Landscaping Plans, Model Home
Complex Plan, Typical Front Yard Landscaping Plan with Wall and Fence Plan,
Building Elevations an Floor Plans
VICINITY MAP
RESIDENTIAL DESIGN REVIEW NO. 2014-04
RYLAND HOMES
I---
city OF
--------------
V
LAX,E LS.111 ll�,L
�D 0
RESOLUTION NO. 2014-
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL OF
THE CITY OF LAKE ELSINORE ADOPT FINDINGS THAT RESIDENTIAL
DESIGN REVIEW NO. 2014 -04 IS CONSISTENT WITH THE WESTERN
RIVERSIDE COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN
(MSHCP)
WHEREAS, Ryland Homes, has filed an application with the City of Lake
Elsinore requesting approval of Residential Design Review No. 2014 -04 for the
construction of a 64 single - family detached residential development including a model
home complex and associated improvements for property within the East Lake Specific
Plan Amendment No. 6 (the "Project "); and
WHEREAS, Section 6.0 of the MSHCP requires that all discretionary projects
within an MSHCP criteria cell undergo the Lake Elsinore Acquisition Process ( "LEAP ")
and Joint Project Review ( "JPR ") to analyze the scope of the proposed development
and establish a building envelope that is consistent with the MSHCP criteria; and
WHEREAS, Section 6.0 of the MSHCP further requires that the City of Lake
Elsinore adopt consistency findings demonstrating that the proposed discretionary
entitlement complies with the MSCHP cell criteria, and the MSCHP goals and
objectives; and
WHEREAS, pursuant to Lake Elsinore Municipal Code Section 17.184, requests
for design review are discretionary actions to be considered, reviewed, and approved,
conditionally approved or denied by the Lake Elsinore City Council; and
WHEREAS, the East Lake Specific Plan Amendment No. 6 is partially covered
by two distinct MSHCP criteria cells: approximately three (3) acres of the East Lake
Specific Plan Amendment No. 6 are within cell 4846 and approximately three tenths
(0.3) of an acre are within cell 4937; and
WHEREAS, the Project site within the boundaries of East Lake Specific Plan
Amendment No. 6 that are covered by the aforementioned cell sites; and
WHEREAS, the Planning Commission considered evidence presented by the
Community Development Department and other interested parties at a duly noticed
public hearing held with respect to the Project on June 17, 2014.
NOW THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. The Planning Commission has considered the Project and its
consistency with the MSHCP prior to recommending that the City Council adopt
Findings of Consistency with the MSHCP.
PLANNING COMMISSION RESOLUTION NO. 2014-
PAGE 2 OF 5
SECTION 2. That in accordance with the MSHCP, the Planning Commission
makes the following findings for MSHCP consistency:
1. The Project is a project under the City's MSHCP Resolution, and the City must
make an MSHCP Consistency finding before approval.
Pursuant to the City's MSHCP Resolution, the Project must be reviewed for
MSHCP consistency, which review shall include an analysis of the Project's
consistency with other "Plan Wide Requirements." The Project is located within
the East Lake Specific Plan (ELSP) area, specifically within the ELSP
Amendment No. 6 area. Prior to the City's adoption of the MSHCP, there were a
series of meetings between the County of Riverside, U.S. Fish and Wildlife
Service, and California Department of Fish and Game to discuss conservation
measures within the ELSP and to decide how to ensure development within the
ELSP could proceed consistently with the MSHCP and with the U.S. Army Corps
of Engineers Section 404 permit. It was determined that a target acreage of 770
acres was warranted for MSHCP conservation in the back basin area of the City.
The Project site is within the ELSP and is covered by that conservation
agreement. Part of the conservation agreement also included a requirement that
projects in the back basin area be consistent with the other "Plan Wide
Requirements" set forth in the following sections of the MSHCP: Protection of
Species Associated with Riparian /Riverine Areas and Vernal Pool Guidelines
(MSHCP, § 6.1.2), Protection of Narrow Endemic Plant Species Guidelines
(MSHCP, § 6.1.3), Additional Survey Needs and Procedures (MSHCP, § 6.3.2),
Urban/Wildlands Interface Guidelines (MSHCP, § 6.1.4), Vegetation Mapping
(MSHCP, § 6.3. 1) requirements, Fuels Management Guidelines (MSHCP, § 6.4),
and payment of the MSHCP Local Development Mitigation Fee (MSHCP
Ordinance, § 4). The Project has been reviewed in light of these sections and is
consistent therewith.
2. The Project is subject to the City's LEAP and the County's Joint Project Review
processes.
The ELSP MSCHP consistency determination was submitted to the County of
Riverside in October 2003, prior to the initiation of the City's LEAP and County's
Joint Project Review process. Nevertheless, both the City and Dudek (acting on
behalf of the County) agreed that the Project was consistent with the MSHCP
due to the extensive acreage set aside for conservation. The Project has not
been modified and was part of the overall ELSP which has been determined to
be consistent with the MSHCP.
PLANNING COMMISSION RESOLUTION NO. 2014-
PAGE 3 OF 5
3. The Project is consistent with the Riparian /Riverine Areas and Vernal Pools
Guidelines.
The previously approved ELSP Amendment No. 6 was determined to be
consistent with the Riparian /Riverine and Vernal Pool Guidelines as set forth in
MSHCP § 6.1.2. The scope and nature of the Project have not been modified
from that which was previously approved and is therefore consistent with the
Riparian /Riverine Areas and Vernal Pools Guidelines.
4. The Project is consistent with the Protection of Narrow Endemic Plant Species
Guidelines.
The previously approved ELSP Amendment No. 6 was consistent with the
Protection of Narrow Endemic Plant Species Guidelines as set forth in MSHCP §
6.1.3. The Project has not been modified from that which was previously
approved under the ELSP Amendment No. 6. Additionally, based upon prior
approvals, the entire Project site has been graded and any plant species which
may have existed on the site have been removed and replaced with
development. It is for these reasons that the Project is consistent with the
aforementioned guidelines.
5. The Project is consistent with the Additional Survey Needs and Procedures.
The previously approved ELSP Amendment No. 6 was consistent with the
Additional Survey Needs and Procedures as set forth in MSHCP § 6.3.2. The
Project has not been modified from that which was previously approved under
the ELSP Amendment No. 6, and the entire project site has been graded
pursuant to previously issued permits. The Project is consistent with the
Additional Survey Needs and Procedures of the MSHCP.
6. The Project is consistent with the Urban/Wildlands Interface Guidelines.
The previously approved ELSP Amendment No. 6 was consistent with the
Urban/Wildlands Interface Guidelines as set forth in MSHCP § 6.1.4. Because
the Project has not been modified from that which was previously approved
under the ELSP Amendment No. 6, no further MSHCP review is necessary and
the Project is consistent with the Urban/Wildlands Interface Guidelines.
7. The Project is consistent with the Vegetation Mapping requirements.
The previously approved ELSP Amendment No. 6 was consistent with the
Vegetation Mapping requirements as set forth in MSHCP § 6.3.1. Mapping was
conducted as part of the biological surveys for the original project. The Project
has not been modified from that which was previously approved and therefore is
consistent with the Vegetation Mapping requirements.
PLANNING COMMISSION RESOLUTION NO. 2014 -
PAGE 4 OF 5
8. The Project is consistent with the Fuels Management Guidelines.
The previously approved ELSP Amendment No. 6 was consistent with the Fuels
Management Guidelines as set forth in MSHCP, § 6.4. The Project site is not
within or adjacent to conservation areas where the Fuels Management
Guidelines would be required. The Project has not been modified from that
which was previously approved and therefore is consistent with the Fuel
Management Guidelines.
9. The Project overall is consistent with the MSHCP.
As stated in Finding No. 1 above, the Project is within the ELSP area which has
previously been determined to be consistent with the MSHCP.
SECTION 3. Based upon all of the evidence presented, the above findings, and
the conditions of approval imposed upon the Project, the Planning Commission hereby
recommends that the City Council find that the Project is consistent with the MSHCP.
SECTION 4. This Resolution shall take effect from and after the date of its
passage and adoption.
PASSED, APPROVED AND ADOPTED this 17th day of June 2014, by the
following vote:
David Blake, Chairman
City of Lake Elsinore Planning Commission
ATTEST:
Richard J. MacHott, LEED Green Associate
Planning Manager
STATE OF CALIFORNIA
COUNTY OF RIVERSIDE
CITY OF LAKE ELSINORE SS
PLANNING COMMISSION RESOLUTION NO. 2014-
PAGE 5 OF 5
I, Richard J. MacHott, Planning Manager of the City of Lake Elsinore, California,
hereby certify that Resolution No. 2014- as adopted by the Planning Commission of
the City of Lake Elsinore at a regular meeting held on the 17th day of June 2014, and
that the same was adopted by the following vote:
AYES
NOES:
ABSTAIN:
ABSENT:
Richard J. MacHott, LEED Green Associate
Planning Manager
RESOLUTION NO. 2014-
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, RECOMMENDING TO THE CITY COUNCIL OF
THE CITY OF LAKE ELSINORE APPROVAL OF RESIDENTIAL DESIGN
REVIEW NO. 2014 -04
WHEREAS, Ryland Homes, has filed an application with the City of Lake
Elsinore requesting approval of Residential Design Review No. 2014 -04 for the
construction of a 64 single - family detached residential development including a model
home complex and associated improvements for property located within the East Lake
Specific Plan Amendment No. 6 (the "Project "); and
WHEREAS, the Planning Commission of the City of Lake Elsinore has been
delegated with the responsibility of making recommendations to the City Council for
residential design review applications within the East Lake Specific Plan; and
WHEREAS, pursuant to the California Environmental Quality Act (Cal. Pub. Res.
Code §§ 21000 et seq.: "CEQA ") and the State Guidelines for Implementation of CEQA
(14 C.C.R. §§ 15000 et seq.: "CEQA Guidelines "), public agencies are expressly
encouraged to reduce delay and paperwork associated with the implementation of
CEQA by using previously prepared environmental documents when those previously
prepared documents adequately address the potential impacts of the proposed project
(CEQA Guidelines Section 15006); and
WHEREAS, CEQA Guidelines Section 15162 establishes the standard to be
used when determining whether subsequent environmental documentation is necessary
and says that when an environmental document has already been adopted for a project,
no subsequent environmental documentation is needed for subsequent entitlements
which comprise the whole of the action unless substantial changes or new information
are presented by the project, and
WHEREAS, a Supplemental Environmental Impact Report was approved and
adopted in 2004 for the East Lake Specific Plan Amendment No. 6 (SCH #2003071050)
and evaluated environmental impacts that would result from maximum build -out of the
specific plan, which contemplated development of single family residential development;
and
WHEREAS, the Project does not present substantial changes or new information
regarding the potential environmental impacts of development; and
WHEREAS, the Planning Commission has considered evidence presented by
the Community Development Department and other interested parties at a duly noticed
public hearing held with respect to the Project on June 17, 2014.
PLANNING COMMISSION RESOLUTION NO. 2014-
PAGE 2 OF 4
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. The Planning Commission has considered the Project prior to
making a decision to recommend that the City Council approve Residential Design
Review No. 2014 -04 for a single - family detached residential development.
SECTION 2. The Planning Commission finds and determines that no new CEQA
documentation is necessary. The Project comprises the whole of the action which was
analyzed in the previously approved and certified Supplemental Environmental Impact
Report (SCH # 2003071050) for the East Lake Specific Plan Amendment No. 6.
Approval of the Project will not change density or intensity of use; it simply establishes
standards for color palates, articulation, orientation, and design of single family
residential development. Therefore, no further environmental review is necessary.
SECTION 3. That in accordance with State Planning and Zoning Law and the
Lake Elsinore Municipal Code, the Planning Commission makes the following findings
regarding Residential Design Review No. 2014 -04:
1. The single - family detached residential development, as approved, will comply
with the goals and objectives of the General Plan, Specific Plan and the Zoning
District in which it is located.
The single- family detached residential development complies with the goals and
objectives of the General Plan and the East Lake Specific Plan Amendment No.
6. The single family homes will assist in achieving the development of a well -
balanced and functional mix of residential, commercial, industrial, open space,
recreational and institutional land uses.
2. The single - family detached residential development complies with the design
directives contained in the East Lake Specific Plan Amendment No. 6 and all
applicable provisions of the Lake Elsinore Municipal Code.
The single- family detached residential development is appropriate to the site and
surrounding developments. The three (3) architectural styles proposed will
create a distinctive street scene within the project site. Sufficient setbacks and
onsite landscaping have been provided thereby creating interest and varying
vistas. In addition, safe and efficient circulation has been achieved onsite.
3. Subject to the attached conditions of approval, the single - family detached
residential development is not anticipated to result in any significant adverse
environmental impacts.
The single- family detached residential development, as reviewed and
conditioned by all applicable City divisions, departments and agencies, will not
have a significant effect on the environment. Approval of the design for the
single- family detached residential development will not result in a substantial
PLANNING COMMISSION RESOLUTION NO. 2014-
PAGE 3 OF 4
change to the previously adopted Supplemental Environmental Impact Report.
Therefore, no additional environmental review is necessary.
4. Conditions and safeguards pursuant to Chapter 17.184.070 of the Municipal
Code, including guarantees and evidence of compliance with conditions, have
been incorporated into the approval of the Project to ensure development of the
property in accordance with the objectives of Chapter 17.184.
Pursuant to Section 17.184.070 of the Lake Elsinore Municipal Code, the Project
was considered by the Planning Commission at a duly noticed public hearing on
June 17, 2014.
SECTION 4. Based upon all of the evidence presented, the above findings, and
the conditions of approval imposed upon the Project, the Planning Commission hereby
recommends that the City Council approve Residential Design Review No. 2014 -04.
SECTION 5. This Resolution shall take effect from and after the date of its
passage and adoption.
PASSED, APPROVED AND ADOPTED this 17th day of June 2014, by the
following vote:
David Blake, Chairman
City of Lake Elsinore Planning Commission
ATTEST:
Richard J. MacHott, LEED Green Associate
Planning Manager
PLANNING COMMISSION RESOLUTION NO. 2014-
PAGE 4 OF 4
STATE OF CALIFORNIA
COUNTY OF RIVERSIDE
CITY OF LAKE ELSINORE SS
I, Richard J. MacHott, Planning Manager of the City of Lake Elsinore, California,
hereby certify that Resolution No. 2014- as adopted by the Planning Commission of
the City of Lake Elsinore at a regular meeting held on the 17th day of June 2014, and
that the same was adopted by the following vote:
AYES
NOES:
ABSTAIN:
ABSENT:
Richard J. MacHott, LEED Green Associate
Planning Manager
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2014 -04
RYLAND HOMES AT SUMMERLY LAKE ELSINORE
GENERAL
1. The proposed project (Residential Design Review No. 2014 -04) consists of building design
and construction of 64 single - family detached residential units and related improvements
for the Woodside Homes housing project located within the Summerly Development of the
East Lake Specific Plan.
2. The applicant shall defend (with counsel acceptable to the City), indemnify, and hold
harmless the City, its Officials, Officers, Employees, and Agents from any claim, action, or
proceeding against the City, its Officials, Officers, Employees or Agents to attach, set
aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or
legislative body concerning the Residential Design Review projects attached hereto.
PLANNING DIVISION
3. Within 30 days of project approval, the applicant shall sign and complete an
"Acknowledgment of Conditions" and shall return the executed original to the Community
Development Department for inclusion in the case records
4. Design Review approval for Residential Design Review No. 2014 -04 will lapse and be void
unless a building permit is issued within two (2) years of the approval date. The
Community Development Director may grant an extension of time for up to one (1) year
prior to the expiration of the initial Design Review approval. An application for a time
extension and required fee shall be submitted a minimum of one (1) month prior to the
expiration date.
5. All construction shall comply with these Conditions of Approval and those provisions and
requirements contained in the East Lake Specific Plan and Lake Elsinore Municipal Code,
prior to issuance of certificate of occupancy and release of utilities.
6. All site improvements shall be constructed as indicated on the approved building elevations
and site plans for the Residential Design Review and the model home complex.
7. Future site plotting and construction shall be consistent with these Conditions of Approval,
those conditions approved with Tentative Tract Map No. 31920 and those provisions and
requirements contained in the Municipal Code, subject to approval by the Community
Development Director or designee.
8. The following architectural details shall be provided:
Planning Commission Page 1 of 12
June 17, 2014
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2014 -04
RYLAND HOMES AT SUMMERLY LAKE ELSINORE
• All front fence returns will be decorative masonry walls. Wood fences will not be
allowed along the front elevation.
• Additional architectural enhancements and treatments shall be provided for those
side and rear elevations that are within the public view. The applicant shall
indicate which specific side and /or rear elevations will be afforded with enhanced
architectural treatments on future precise grading plans, subject to approval by
the Community Development Director or designee.
9. All weep screeds shall be a maximum three inches above any hard surface and four inches
above any earth surface.
10.Any revisions to approved site plans or building elevations shall be reviewed and approved
by the Community Development Director or designee.
11. Materials and colors depicted on the materials board shall be used unless modified by the
Community Development Director or designee.
12. The applicant shall provide a flat concrete pad or area a minimum of 3'- 0" by 7'- 0"
adjacent to the dwelling for the storage of the City trash barrels. The storage pad or area
shall conceal the trash barrels from public view, subject to the approval of the Community
Development Director or designee. Precise grading plans shall identify the location of the
aforementioned flat concrete pad and air conditioning units.
13. The building addresses (in numerals at least four inches high) shall be displayed near the
entrance and easily visible from the front of the unit and public right -of -way. The applicant
shall obtain street addresses for all production lots prior to issuance of building permit.
14. The applicant shall comply with all requirements of the City's Grading Ordinance.
Construction generated dust and erosion shall be mitigated in accordance with the
provisions of Municipal Code, Chapter 15.72 and using accepted techniques. Interim
erosion control measures shall be provided 30 days after the site's rough grading, as
approved by the City Engineer.
15. The applicant shall comply with all applicable City Codes and Ordinances.
16. Prior to issuance of building permit, building plans for the model home complex shall
comply with all American Disabilities Act (ADA) requirements, including provision of a
handicapped - accessible bathroom.
Planning Commission Page 2 of 12
June 17, 2014
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2014 -04
RYLAND HOMES AT SUMMERLY LAKE ELSINORE
17.A cash bond shall be required for the model home complex. This bond is to guarantee
removal of the temporary fencing material, parking lot, etc. that have been placed onsite for
the model home complex. The bond will be released after removal of the materials and the
site is adequately restored, subject to the approval of the Community Development Director
or designee.
18.A cash bond of shall be required for any garage conversion of the model(s). Bonds will be
released after removal of all temporary materials and the site is adequately restored,
subject to the approval of the Community Development Director or designee.
19.A cash bond shall be required for any construction trailers used during construction. Bonds
will be released after removal of trailers, subject to the approval of the Community
Development Director or designee.
20. The applicant shall pay school fees to the Lake Elsinore Unified School District prior to
issuance of building permit.
21. The project shall connect to sewer and meet all requirements of the Elsinore Valley
Municipal Water District (EVMWD). The applicant shall submit water and sewer plans to
the EVMWD and shall incorporate all district conditions and standards.
22. The design and construction of the project shall meet all County Fire Department standards
for fire protection.
23.All mechanical and electrical equipment associated with the residences shall be ground
mounted. All outdoor ground or wall mounted utility equipment shall be consolidated in a
central location and architecturally screened, subject to the approval of the Community
Development Director or designee, prior to issuance of building permit.
24. All front yards and side yards on corner lots shall be properly landscaped with automatic
(manual or electric) irrigation system to provide 100 percent landscape coverage using a
combination of drip and conventional irrigation methods. The final landscaping /irrigation
plan is to be reviewed and approved by the City's Landscape Architect Consultant and the
Community Development Director or designee. A Landscape Plan check fee will be
charged prior to final landscape approval based on the Consultant's fee plus 40 percent.
• The applicant shall plant street trees, selected from the City's Street Tree List, at a
maximum of 30 feet apart and at least 24 -inch box in size.
• Planting within 15 feet of ingress /egress points shall be no higher than 36 inches.
Planning Commission Page 3 of 12
June 17, 2014
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2014 -04
RYLAND HOMES AT SUMMERLY LAKE ELSINORE
• The landscape plan shall provide for ground cover, shrubs, and trees and meet all
requirements of the City's adopted Landscape Guidelines. Special attention to the use
of Xeriscape or drought resistant plantings with combination drip irrigation system to be
used to prevent excessive watering.
• All landscape improvements shall be bonded with a 100 percent Faithful Performance
Bond for materials and labor for two years from Certificate of Occupancy.
• All landscaping and irrigation shall be installed within an affected portion of any phase at
the time a certificate of occupancy is requested for any building.
• One of the proposed lots of the Model Home Complex shall be Xeriscaped and signage
provided identifying Xeriscape landscaping.
• The Final landscape plan shall be consistent with any approved site and /or plot plan.
• The Final landscape plan shall include planting and irrigation details.
25.All exposed slopes in excess of three feet in height within the subject tract and within
private lots shall have a permanent irrigation system and erosion control vegetation
installed, as approved by the Planning Division, prior to issuance of certificate of
occupancy.
26. Fences located in any front yard shall not exceed three feet in height with the exception
that wrought -iron fences may be five feet in height. Chain link fences shall be prohibited.
27. Garages shall be constructed to provide a minimum of twenty feet by twenty feet (20' x 20)
of interior clear space to accommodate two vehicles.
28. These Conditions of Approval and those conditions approved with Tentative Tract Map No.
31920 shall be reproduced on subsequent building plans prior to issuance of building
permit.
29. Provisions of the City's Noise Ordinance shall be satisfied during all site preparation and
construction activity. Site preparation activity and construction shall not commence before
7:00 AM and shall cease no later than 5:00 PM, Monday through Friday. Only finish work
and similar interior construction may be conducted on Saturdays and may commence no
earlier than 8:00 am and shall cease no later than 4:00 p.m. Construction activity shall not
take place Sunday or any Legal Holidays.
Planning Commission Page 4 of 12
June 17, 2014
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2014 -04
RYLAND HOMES AT SUMMERLY LAKE ELSINORE
30. The applicant shall pay all appropriate City fees.
31. The applicant shall place a weatherproof 3' x 3' sign at the entrance to the project site
identifying the approved days and hours of construction activity and a statement that
complaints regarding the operation can be lodged with the City of Lake Elsinore Code
Enforcement Division (951) 674 -3124.
32. The Homeowner's Association shall maintain all project improvements and facilities,
including the landscaping, park facilities, and drainage improvements.
33. If applicable, the applicant shall participate in the City's Lighting and Landscape
Maintenance District.
34.The developer shall comply with all of the terms and conditions of that certain First
Amended and Restated Development Agreement Between the City of Lake Elsinore and
Laing -CP Lake Elsinore LLC" which recorded on December 17, 2004 in the Official
Records of Riverside County, California as Instrument No. 1001282 and the First Operating
Memorandum of Understanding dated November 23, 2010 by and between the City and
McMillin Summerly, LLC, the successor in interest to Laing, including without limitation the
requirements of Section 12.10 relating to the provision of affordable housing or (at the
election of the developer) payment of an Affordable Housing Fee in the amount of One
Dollar and Thirty Cents ($1.30) per square foot of assessable space.
35. The applicant shall provide all prospective home buyers and home owners a written
disclosure statement identifying that the project is located within an active recreation area.
Such activities will include, but are not limited to sporting activities, water sport and
recreation activities, off road racing, sky diving, hang gliding, etc. Said written disclosure
statements shall indicate that such recreation activities will include, but are not limited to
noise impacts, excessive lighting and dust.
ENGINEERING DIVISION
General Requirements:
36.This project shall comply with the applicable Conditions of Approval of Tentative Tract
31920 as approved by City Council on July 27, 2004.
Planning Commission Page 5 of 12
June 17, 2014
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2014 -04
RYLAND HOMES AT SUMMERLY LAKE ELSINORE
37.All arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of
the roadway shall be the responsibility of the property owner or his agent. All overhead
utilities shall be undergrounded.
38. All slopes, open space, and landscaping except for public parks, school property and flood
control district facilities shall be maintained by the property owner or property owner's
association or another maintenance entity approved by the City Council.
39. In accordance with the City's Franchise Agreement for waste disposal & recycling, the
developer shall be required to contract with CR &R Inc. for removal and disposal of all
waste material, debris, vegetation and other rubbish generated during cleaning, demolition,
clear and grubbing or all other phases of construction.
40. Developer shall mitigate to prevent any flooding and /or erosion downstream caused by
development of the site and or diversion of drainage.
41.Any grading that affects "waters of the United States ", wetlands or jurisdictional
streambeds, shall require approval and necessary permits from respective Federal and /or
State agencies.
42.All required grading and improvement plans, soils, geology, hydrology and hydraulic, and
seismic reports shall be prepared by a Registered Civil Engineer.
FEES
43. The developer shall pay all Engineering Division assessed Capital Improvement, Plan
Check and Permit fees (LEMC 16.34). Applicable mitigation fees may include: Stephens
Kangaroo Habitat Fee (K -Rat), Traffic Infrastructure Fee (TIF), Transportation Uniform
Mitigation Fee (TUMF), and Drainage Fee. Fee rate will be assessed at the prevalent rate
at time of payment in full.
FLOOD PLAIN
44. Meet all requirements of LEMC 15.68 and 15.64 regarding floodplain management and
flood hazard regulations. Finish floor elevation of all buildings shall be a minimum of 1267
ft.
45. The developer shall provide written, signed and sealed certification from a registered Civil
Engineer or licensed Land Surveyor that the finished floor of each structure is at or above
the elevation of 1267 ft.
Planning Commission Page 6 of 12
June 17, 2014
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2014 -04
RYLAND HOMES AT SUMMERLY LAKE ELSINORE
46. Projects in the back basin shall comply with the special conditions to Permit No. 88-00215 -
00-RRS (Lake Elsinore Management Project)
STORM WATER MANAGEMENT / POLLUTANT PREVENTION
47. The developer shall obtain and maintain coverage under the General Permit —
Construction. A copy of the Change of Information (COI) and /or NOI shall be submitted to
the Engineering Division prior to permit issuance. A SWPPP shall be prepared,
implemented and maintained onsite to provide erosion control measures and best
management practices (BMP's) throughout all phases of construction.
48.All storm drain inlet facilities shall be appropriately marked "Only Rain in the Storm Drain"
using the City authorized marker to prevent illegal dumping in the storm drain system.
49. The developer shall submit an amendment to the Master Water Quality Management Plan
(WQMP). The requirements of WQMP may affect the overall layout of the project.
Therefore, WQMP submittal should be during the initial process of the project. The final
WQMP must be approved prior to grading permit issuance.
50. DURING CONSTRUCTION, NPDES education guidelines and Best Management Practices
(BMPs) shall be posted to inform users of this development of environmental awareness
and good housekeeping practices that contribute to protection of storm water quality and
meet the goals of the BMPs of the Riverside County NPDES Drainage Area Management
Plan.
IMPROVEMENTS
51.An Encroachment Permit shall be obtained prior to any work on City and /or State right -of-
way. The developer shall submit the permit application, required fees and documents prior
to issuance.
52. Sight distance into and out of the project location shall comply with CALTRANS Standards.
53. All landscaping and fencing at intersections shall meet City Sight Distance Standards.
54. Roof drains shall drain to a landscaped area.
55. The developer shall install permanent bench marks per City of Lake Elsinore Standards
and at locations to be determined by City Engineer.
Planning Commission Page 7 of 12
June 17, 2014
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2014 -04
RYLAND HOMES AT SUMMERLY LAKE ELSINORE
56. If existing improvements are to be modified, the existing improvement plans on file shall be
modified accordingly and approved by the City Engineer prior to issuance of building
permit.
57.10 year storm runoff shall be contained within the curb and the 100 year storm runoff shall
be contained within the street right -of -way. When either of these criteria is exceeded,
drainage facilities shall be provided.
58.All drainage facilities in this project shall be constructed to Riverside County Flood Control
District Standards.
59.All compaction reports, grade certifications, monument certifications (with tie notes
delineated on 8 Y2" x 11" Mylar) shall be submitted to the Engineering Division before final
inspection of public works improvements will be scheduled and approved.
60.All natural drainage traversing the site shall be conveyed through the site, or shall be
collected and conveyed by a method approved by the City Engineer. All off -site drainage, if
different from historic flow, shall be conveyed to a public facility, accepted by adjacent
property owners by a letter of drainage acceptance, or conveyed to a drainage easement.
61.All Public Works requirements shall be constructed and complied with as a condition of
development as specified in the Lake Elsinore Municipal Code (LEMC) and Lake Elsinore
Public Works Standard Plans.
62. The developer shall install blue dot markers in the roadway at a right angle to Fire Hydrant
locations per Lake Elsinore Standards.
63. The developer shall provide signing and striping plans for the required improvements of this
project. The plans shall also incorporate traffic calming measures on local streets.
64. Prior to acceptance of improvements, the Public Works Director may determine that
aggregate slurry, as defined in the Standard Specifications for Public Works Construction,
may be required one year after acceptance of street(s) by the City if the condition of the
street(s) warrant its application. All striping shall be replaced in kind. The applicant is the
sole responsible party for the maintenance of all the improvements until said acceptance
takes place.
GRADING
Planning Commission Page 8 of 12
June 17, 2014
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2014 -04
RYLAND HOMES AT SUMMERLY LAKE ELSINORE
65. Prior to commencement of grading operations, developer is to provide to the City with a
map of all proposed haul routes to be used for movement of export material. All such
routes shall be subject to the review and approval of the City Engineer. Haul route shall be
submitted prior to issuance of a grading permit. Export sites located within the Lake
Elsinore City limits must have an active grading permit. Hauling of over 5,000 cy subject to
City Council approval (LEMC 15.72.065). Costs incurred by City in conjunction with
approval of the haul route shall be paid by the applicant.
66. The project shall comply with CBC 1804.3 site grading requirements.
67.Applicant to provide to the City a video record of the condition of all proposed public City
haul roads. In the event of damage to such roads, applicant shall pay full cost of restoring
public roads to the baseline condition. A bond may be required to ensure payment of
damages to the public right -of -way, subject to the approval of the City Engineer.
68.A grading plan signed and stamped by a California Registered Civil Engineer shall be
submitted for City review and approval for all addition and /or movement of soil (grading) on
the site. The plan shall include separate sheets for erosion control, haul route and traffic
control. The grading submittal shall include all supporting documentation and be prepared
using City standard title block, standard drawings and design manual (available at
www.lake- elsinore.orq).
69.All grading plan contours shall extend to minimum of 50 feet beyond property lines to
indicate existing drainage pattern.
70. If the grading plan identifies alterations in the existing drainage patterns as they exit the
site, a Hydrology and Hydraulic Report for review and approval by City Engineer shall be
required prior to issuance of grading permits. All grading that modifies the existing flow
patterns and /or topography shall be approved by the City Engineer.
71. The developer shall apply for, obtain and submit to the City Engineering Division a letter
from Southern California Edison (SCE) indicating that the construction activity will not
interfere with existing SCE facilities (aka SCE NIL).
72.All grading shall be done under the supervision of a geotechnical engineer. Slopes steeper
than 2 to 1 shall be evaluated for stability and proper erosion control and approved by the
City.
73. Developer shall execute and submit grading and erosion control agreement, post grading
security and pay permit fees as a condition of grading permit issuance.
Planning Commission Page 9 of 12
June 17, 2014
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2014 -04
RYLAND HOMES AT SUMMERLY LAKE ELSINORE
74. Developer shall pay all grading permit applicable processing, permit, security and
development fees including those fees identified in an applicable development agreement.
PRIOR TO ISSUANCE OF BUILDING PERMIT
75. Provide final soils, geology and seismic report, including recommendations for parameters
for seismic design of buildings, and walls prior to building permit.
76. Need documentation of areas of HOA landscaping responsibility added to the CCR's as an
update.
77. Street and SD plans have been approved. If project changes existing driveway location,
street improvement plans will need to be revised prior to building permit.
78.All required public right -of -way dedications and easements shall be prepared by the
developer or his agent and shall be submitted to the Engineering Division for review and
approval prior to issuance of building permit.
79.All internal street improvement and signing and striping plans shall be completed and
approved by the City Engineer.
80. The developer shall pay all Capital Improvement T1 and Plan Check fees (LEMC 16.34).
PRIOR TO OCCUPANCY
81. All signing and striping and traffic control devices for the required improvements internal to
TR 31920 -8 shall be installed.
82. All public improvements internal to TR 31920 -8 shall be completed in accordance with the
approved plans or as condition of this development to the satisfaction of the City Engineer.
83. All proposed parkway, slope maintenance, and /or median landscaping shall be
constructed.
84. Any damage to existing landscape easement areas due to project construction shall be
repaired or replaced at no cost to the City.
85. TUMF fees shall be paid. The TUMF fees shall be the effective rate at the time of payment
in full in accordance with the LEMC.
Planning Commission Page 10 of 12
June 17, 2014
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2014 -04
RYLAND HOMES AT SUMMERLY LAKE ELSINORE
86. Final soil report showing compliance with recommendations, compaction reports, grade
certifications, monument certifications (with tie notes delineated on 8 1/2 x 11" mylar) shall
be submitted in .tif format on CD to the Engineering Division before final inspection will be
scheduled.
87. In the event of damage to City roads from hauling or other construction related activity,
applicant shall pay full cost of restoring public roads to the baseline condition.
88. Prior to grading or building permit close -out and /or the issuance of a certificate of use or a
certificate of occupancy, developer shall:
• Demonstrate that all structural BMPs required for TR 31920 -8 have been
constructed, installed and are functioning in conformance with approved plans and
specifications and the WQMP;
• Demonstrate that they are prepared to implement all non - structural BMPs required
for TR 31920 -8 included in the conditions of approval or building /grading permit
conditions;
• Demonstrate that an adequate number of copies of the approved project specific TR
31920 -8 Amendment to the WQMP are available for the future owners /occupants;
and
• The developer shall provide all education guidelines for Water Quality Management
Practices to the separate owners of the development, regarding the environmental
awareness on good housekeeping practices that contribute to protection of storm
water quality and meet the goals of the approved WQMP in the Riverside County
NPDES Drainage Area Management Plan. Contact the City NPDES Coordinator for
handout/guideline information.
89. The property owner shall execute and cause to be recorded an Operations and
Maintenance Agreement in the form provided by the City to inform future property owners
of the requirement to implement the approved final project- specific WQMP.
90. As -built plans for all approved plan sets shall be submitted for review and approval by the
City. The developer /developer /owner is responsible for revising the original mylar plans.
91. The approved, revised plans and Final recorded map(s) shall be provided to the City on a
CD /DVD in .tif format and as GIS Shape files of all final maps and street and storm drain
Planning Commission Page 11 of 12
June 17, 2014
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2014 -04
RYLAND HOMES AT SUMMERLY LAKE ELSINORE
plans. *ALL DATA MUST BE IN projected Coordinate System: NAD 83 State Plane
California Zone VI U.S. Fleet.
92. All final studies and reports shall be submitted in .tif format on a CD /DVD. Studies and
reports include, Soils, Seismic, Hydrology, Hydraulics, Grading, WQMP, etc.
COMMUNITY SERVICES DEPARTMENT
93. The Developer shall pay all applicable park fees.
94. Developer shall comply with all City Ordinances regarding construction debris removal and
recycling as per Section 8.32 of the Lake Elsinore Municipal Code.
LAKE ELSINORE FIRE MARSHAL
95. The applicant shall comply with all City of Lake Elsinore Fire Department requirements and
standards. Provide fire protection facilities as required in writing by the Lake Elsinore Fire
Marshal.
Planning Commission Page 12 of 12