Loading...
HomeMy WebLinkAboutPC Reso No 2014-13RESOLUTION NO. 2014 -13 RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, RECOMMENDING APPROVAL OF MINOR DESIGN REVIEW FOR A 2,002 SQUARE FOOT RESIDENTIAL DUPLEX WITH TWO 497 SQUARE FOOT TWO -CAR GARAGES LOCATED ON THE WEST SIDE OF POE STREET. (APN: 374 - 153 -022) WHEREAS, Mr. Jay Hattabaugh /Lakeshore Homes and Development, filed an application with the City of Lake Elsinore requesting approval of Minor Design Review for a residential duplex development. Pursuant to the Historic Elsinore Design Guidelines ( "the Project "), and WHEREAS, the Developer proposes the Project located at west side of Poe Street, also known as Assessor's Parcel No.'s 374 - 153 -022 ( "Site "); and WHEREAS, the Developer proposes a 2,002 square -foot residential duplex development and associated improvements related to lot coverage, architectural design, parking, and landscape; and WHEREAS, the Planning Commission of the City of Lake Elsinore has been delegated with the responsibility of approving Minor Design review requests for single - family residential projects; and WHEREAS, on April 15, 2014 and May 6, 2014 at a duly noticed public hearings, the Planning Commission considered evidence presented by the Community Development Department and other interested parties with respect to this item. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: SECTION 1. The Planning Commission has considered the Minor Design Review and finds that it is consistent with the Medium Density Residential Development standards and it satisfies all requirements set forth in Chapter 17.184 of the Lake Elsinore Municipal Code. SECTION 2. The Planning Commission hereby finds and determines that the Project is categorically exempt from the California Environmental Quality Act (Public Resources Code Sections 21000 et seq.: "CEQA ") and the Guidelines for Implementation of CEQA (14 California Code of Regulations, Sections 15000 et seq.: "CEQA Guidelines ") pursuant to a Class 32 categorical exemption for in -fill development projects. Specifically, the Planning Commission finds that the Project: PLANNING COMMISSION RESOLUTION NO. 2014 -13 PAGE 2 OF 5 1. Is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations as set forth herein below. 2. Will occur within the City limits. The Project Site is less than (5) acres and is substantially surrounded by urban uses. 3. The Project Site currently consists of an undeveloped vacant site area and has no value as habitat for endangered, rare or threatened species. 4. Approval of the Project will not result in any significant effects relating to traffic, noise, air quality or water quality. 5. The Project Site can be adequately served by all required utilities and public services. SECTION 3. That in accordance with State Planning and Zoning Law and the Lake Elsinore Municipal Code, the Planning Commission makes the following findings for the approval of the proposed Minor Design Review: 1. The Project, as approved, will comply with the goals and objectives of the General Plan, and the Zoning District in which the Project is located. The Project complies with the goals and objectives of the General Plan because it will assist in achieving the development of a well balanced and functional mix of residential, commercial, industrial, open space, recreational, and institutional land uses. The approval of this residential development will assist in achieving the development of a well- balanced and functional mix of residential, limited commercial, limited industrial, open space, recreational and institutional land uses by providing additional affordable housing within the City of Lake Elsinore, as well as encouraging the development and maintenance of a broad range of housing types for all income groups and age categories. It should be noted that the proposed dwelling which incorporates a "Craftsman" style architecture; will provide a well- rounded design while maintaining the desirable rural characteristics and base framework to achieve quality and compatibility in the physical design of the developing portions of the City, and serves to enhance the existing developed areas within the General Plan designation Medium Density Residential (MDR). 2. The Project complies with the design directives contained in the General Plan and all other applicable provisions of the Lake Elsinore Municipal Code. The Project is appropriate to the site and surrounding developments in that the industrial shell building has been designed in consideration of the size and shape of the property. Sufficient setbacks and enhanced onsite landscaping have been provided thereby creating interest and varying vistas PLANNING COMMISSION RESOLUTION NO. 2014 -13 PAGE 3 OF 5 as a person moves along abutting streets and within the development. In addition, safe and efficient circulation has been achieved onsite. The proposed Residential Design Review is appropriate to the site and surrounding developments in that the residential duplex project has provided; a fifteen foot (15) front yard setback, given that it has provided a side entry garage, including private open spaces; sufficient front and rear yard landscaping and safe and sufficient on -site vehicular circulation. Further, the project as proposed will complement the quality of existing development and will create a visually pleasing, non - detractive relationship between the proposed and existing projects in that the applicant is providing a "Craftsman" architecture which includes; 360- degree architectural articulation pursuant to the "Historic Elsinore Design Guidelines", such as, tile roof material, smooth stucco walls, porch entry with wood railing and decorative columns, and wood doors. 3. Subject to the attached conditions of approval, the Project is not anticipated to result in any significant adverse environmental impacts. Notwithstanding the fact that the Project is exempt from CEQA provisions pursuant to a Class 32 exemption, the Project was reviewed and conditioned by all applicable City departments to ensure that the project blends into existing development, creates the least amount of disturbance, and does not negatively impact the residents or businesses of Lake Elsinore. The Project will not have a significant effect on the environment. 4. Conditions and safeguards pursuant to Chapter 17.184 of the Municipal Code, including guarantees and evidence of compliance with conditions, have been incorporated into the approval of the Project to ensure development of the property in accordance with the objectives of Chapter 17.184. Pursuant to Section 17.184.070 of the Lake Elsinore Municipal Code, the Project was considered by the Planning Commission at duly noticed public hearings on April 15, 2014 and May 6, 2014. The Applicant shall meet all required setbacks and development standards pursuant to the Medium Residential Density development standards as mandated in the "Historic Elsinore Overlay District, which outlines all development in the Historic Elsinore Design Guidelines. SECTION 4. Based upon the evidence presented, the above findings, and the attached Conditions of Approval, the Planning Commission hereby recommends approval of the proposed Minor Design Review. SECTION 5. This Resolution shall take effect from and after the date of its passage and adoption. PLANNING COMMISSION RESOLUTION NO. 2014 -13 PAGE 4 OF 5 PASSED, APPROVED AND ADOPTED this 6th day of May, 2014. avid Blake; # airman City of Lake Elsinore ATTEST: Richard J. MacHott, LEED Green Associate Planning Manager PLANNING COMMISSION RESOLUTION NO. 2014 -13 PAGE 5 OF 5 STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE )ss. CITY OF LAKE ELSINORE ) I, Richard J. MacHott, Planning Manager of the City of Lake Elsinore, California, hereby certify that Resolution No. 2014 -13 as adopted by the Planning Commission of the City of Lake Elsinore at a regular meeting held on the 6th day of May 2014 and that the same was adopted by the following vote: AYES: CHAIRMAN BLAKE, VICE CHAIRMAN GRAY, COMMISSIONER JORDAN, COMMISSIONER MORSCH, COMMISSIONER O'NEAL NOES: NONE /Gj j "]If It�C�IT ABSENT: NONE Richard J. MacHott, LEED Green Associate Planning Manager CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. PLANNING DIVISION 1. The proposed project (Minor Design Review) is the development of a new a 2,002 square foot residential duplex with two 497 square foot two -car garages located on the west side of Poe Street. 2. The applicant shall defend (with counsel acceptable to the City), indemnify, and hold harmless the City, its Officials, Officers, Employees, and Agents from any claim, action, or proceeding against the City, its Officials, Officers, Employees or Agents to attach, set aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or legislative body concerning the project attached hereto. 3. Design Review approval for Minor Design Review will lapse and be void unless a building permit is issued within two (2) years of the approval date and construction commenced and diligently pursued to completion. The Community Development Director may grant an extension of time for up to one (1) year prior to the expiration of the initial Design Review. An application for a time extension and required fee shall be submitted a minimum of one (1) month prior to the expiration date. 4. The decision of the Planning Commission shall be final fifteen (15) days from the date of the decision, unless an appeal has been filed with the City Council pursuant to the provisions of Chapter 17.80 of the Lake Elsinore Municipal Code. GENERAL CONDITIONS 5. Within 30 days of project approval, the applicant shall sign and complete an "Acknowledgement of Conditions," and shall return the executed original to the Community Development Department for inclusion in the case records. 6. The applicant shall submit a check in the amount of $50.00 made payable to the "County of Riverside" for filing of a Notice of Exemption. The check shall be submitted to the Planning Division for processing within 48 hours of the project's approval 7. Prior to the issuance of a building permit, the applicant shall obtain and submit a "will serve" letter from Elsinore Valley Municipal Water District to the Director of Community Development. The "will serve" letter shall specifically indicate the specific water flow volumes for both domestic and fire protection water supply. It shall be within the Director of Community Development's sole discretion to determine whether the "will sere" letter is sufficient. Planning Commission Approved Page 1 of 13 May 6, 2014 CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. 8. All conditions of approval shall be reproduced upon page one of building plans submitted to the Building and Safety Division for Plan Check. All conditions of approval shall be met prior to the issuance of a Certificate of Occupancy and release of utilities. 9. All site improvements shall be constructed as indicated on the approved site plan and elevations, with revisions as noted herein. The applicant shall meet all required development standards as set forth in the Lake Elsinore Municipal Code (LEMC). Any other revisions to the approved site plan or building elevations shall be subject to the review of the Community Development Director or his designee. All plans submitted for Building Division Plan Check shall conform to the submitted plans as modified by the conditions of approval. 10. All materials and colors depicted on the approved plans shall be used. If the applicant wishes to modify any of the approved materials or colors depicted on the plans, the applicant shall submit a proposal setting forth the modifications for review by the Community Development Director or his designee. 11. The Applicant shall comply with all applicable City codes and ordinances. 12. A cash bond of $1,000.00 shall be required for any construction trailers placed on the site and used during construction. Bonds will be released after removal of trailers and restoration of the site to a state acceptable to and approved by the Community Development Director or his designee. 13. The Applicant shall comply with the City's Noise Ordinance. Construction activity shall be limited to the hours of 7:00 AM to 5:00 PM, Monday through Friday, and no construction activity shall occur on Saturdays, Sundays or legal holidays. 14. Any exterior air conditioning or other mechanical equipment shall be ground mounted and screened so as to be invisible from neighboring property or public streets. Air conditioning units and related equipment may not encroach more than two -feet (2') into the required minimum side yard setback. 15. Garages or carports shall be constructed to provide a minimum interior clear space of twenty feet (20) x twenty feet (20') for two cars. 16. The Applicant shall plant street trees, selected from the City Street Tree List, a maximum of thirty feet (30') apart along all street frontages. Planting is subject to the approval of the Community Development Director or designee prior to issuance of a Certificate of Occupancy. Planning Commission Approved Page 2 of 13 May 6, 2014 CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. 17. The Applicant shall provide shrubs and plant materials as shown on the landscape plan. Any changes to the landscape plan shall be subject to the approval of the Community Development Director or designee. The landscape plan improvements and plantings shall be fully installed prior to issuance of a Certificate of Occupancy. 18. Any planting within fifteen feet (15) of ingress /egress points shall be no higher than thirty -six inches (36 "). 19. Driveways shall be constructed of concrete per Building and Safety Division standards. 20. All walls and /or fencing need to be located off the property line. If the Applicant proposes to place any walls and /or fencing on the property line he /she must submit a notarized agreement between the subject property owner and the adjacent property owner to the Planning Department prior to installing the fence. 21. The Applicant shall construct the City's standard six foot (6) wood fence along the side and rear property lines as proposed on the submitted plans. Where views exist, the applicant shall have the option of constructing a tubular steel fence. 22. The applicant shall be required to remove any existing chain link fencing and any fencing that is in poor condition and shall replace such fencing in accordance with LEMC §17.44.130D. It shall be the responsibility of the applicant to contact the effected neighboring property owners. If the existing fencing is in good condition, this requirement may be waived per the approval of the Community Development Director or his designee. 23. The building address shall be a minimum of four inches (4 ") high and shall be easily visible from the public right -of -way. Care shall be taken to select colors and materials that contrast with building walls or trim. 24. The Applicant shall provide a flat concrete pad a minimum of 3'- 0" by 7'- 0" adjacent to each dwelling unit. The storage pad for trash barrels shall be concealed from public view. 25. The Applicant shall provide assurance that all required fees to the Lake Elsinore Unified School District have been paid prior to issuance of building permits. 26. Prior to issuance of a building permit, the Applicant shall pay park -in -lieu fees at the rate in effect at the time that the applicant requests the building permit. 27. The Applicant shall satisfy all conditions of approval prior to the issuance of a Certificate Planning Commission Approved Page 3 of 13 May 6, 2014 CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. of Occupancy and release of utilities. 28. The Applicant shall pay the Multiple Species Habitat Conservation Plan Fee (MSHCP) Local Development Mitigation Fee (fee for density less than 8 du /ac) prior to obtaining building permits. 29. The Applicant shall pay all applicable Library Capital Improvement Fund fees. 30. The applicant shall place a weatherproof 3' x 3' sign at the entrance to the project site identifying the approved days and hours of construction activity and a statement that complaints regarding the operation can be lodged with the City of Lake Elsinore Code Enforcement Division (951) 674 -3124. The sign shall be installed prior to the issuance of a grading permit. 31 (Condition added for the proposed Minor Design Review by Planning Commission on May 6, 2014) BUILDING DEPARTMENT PRIOR TO BUILDING PERMITS 32. All construction plans must be in accordance with the 2013 building codes. However, if the building permits are not obtained prior to February 18, 2015, the plans must be resubmitted to meet all current codes. 33. Prior to issuance of building permits, the applicant shall pay all appropriate fees. 34. The applicant shall place a weatherproof 3' x 3' sign at the entrance to the project site identifying the approved days and hours of construction activity (i.e., 7:00 A.M. — 5:00 P.M., Monday through Friday with no construction activity to occur on Saturdays, Sundays or legal holidays) and a statement that complaints regarding the operation can be lodged with the City of Lake Elsinore Code Enforcement Division (951) 674 -3124. The sign shall be installed prior to the issuance of a grading permit. ENGINEERING DIVISION GENERAL Planning Commission Approved Page 4 of 13 May 6, 2014 CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. 35. All slopes and landscaping within public right -of -way shall be maintained by the property owner or property owner's association or another maintenance entity approved by the City Council. 36. In accordance with the City's Franchise Agreement for waste disposal & recycling, the developer shall be required to contract with CR &R Inc. for removal and disposal of all waste material, debris, vegetation and other rubbish generated during cleaning, demolition, clear and grubbing or all other phases of construction. 37. Developer shall mitigate to prevent any flooding and /or erosion downstream caused by development of the site and or diversion of drainage. 38. All required soils, geology, hydrology and hydraulic, and seismic reports shall be prepared by a Registered Civil Engineer. FEES 39. The developer shall pay all Engineering Division assessed Development Impact Fees, Plan Check and Permit fees (LEMC 16.34). Applicable Development Impact Fees include: • Stephens Kangaroo Habitat Fee (K -Rat) — payable at Grading Permit issuance • Traffic Infrastructure Fee (TIF) — payable at Building Permit issuance • Transportation Uniform Mitigation Fee (TUMF) — payable at Building Permit or Certificate of Occupancy; and • Area Drainage Fee — payable at Building Permit issuance 40. Mitigation Fees will be assessed at the prevalent rate at time of payment in full. STORM WATER MANAGEMENT / POLLUTION PREVENTION / NPDES Design: 41. Site design shall include water quality facilities and best management practices for treatment of runoff from the site prior to entering the street. 42. The project shall identify and provide documentation to the City of the source of funding and entity responsible for operations and maintenance of the water quality facilities and best management practices implemented. Construction: Planning Commission Approved Page 5 of 13 May 6, 2014 CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. 43. Erosion & Sediment Control - Prior to the issuance of any grading or building permit, the applicant shall submit for review and approval by the City Engineer, an Erosion and Sediment Control Plan as a separate sheet of the grading plan submittal to demonstrate compliance with the City's NPDES Program, State water quality regulations for grading and construction activities and Section 4.106.2 of the California Green Building Code. The Erosion and Sediment Control Plan shall identify how all construction materials, wastes, grading or demolition debris, and stockpiles of soil, aggregates, soil amendments, etc. shall be property covered, stored and secured to prevent transport into local drainages or waters by wind, rain, tracking, or dispersion. A copy of the plan shall be kept updated as needed and be kept at the project site and available for review upon request. Post Construction: 44. Prior to the issuance of a certificate of use and /or occupancy, the applicant shall demonstrate that all best management practices (BMP's) deployed have been implemented, constructed and installed in conformance with approved plans and specifications. PARCEL MAP LOT LINE ADJUSTMENT GOVeFRFReRt Gode, hay eRtr or noted on the title sheet of the Fnap the 'FIRPFeveMeRtS to be GORStFLIGted 9F have plans submitted and approved, agreements exeGuted and seG61F'tie6 posted. ad'ustment must be processed and approved by the Engineering epartment prior to the issuance of a building permit. (Amended at time of Minor Design Review by Planning Commission on 48. All arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of the roadway shall be the responsibility of the property owner or his agent. 49. All overhead utilities up to 34 KV shall be undergrounded in accordance with Chapter 12.16 of the Lake Elsinore Municipal Code (LEMC) Planning Commission Approved Page 6 of 13 May 6, 2014 CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. 50. Underground water rights shall be dedicated to the City pursuant to the provisions of Section 16.52.030 (LEMC), and consistent with the City's agreement with the Elsinore Valley Municipal Water District. 51. The developer shall apply for, obtain and submit to the City Engineering Division a letter from Southern California Edison (SCE) indicating that the construction activity will not interfere with existing SCE facilities (aka SCE NIL). 52. The developer shall submit a copy of the "Will Serve" letter to the City Engineering Division from the applicable water agency stating that water and sewer arrangements have been made for this project. IMPROVEMENTS Design 53. The developer shall install permanent bench marks per City of Lake Elsinore Standards and at locations to be determined by City Engineer. 54. The developer shall install blue dot markers in the roadway at a right angle to Fire Hydrant locations per Lake Elsinore Standards. 55. 10 year storm runoff shall be contained within the curb and the 100 year storm runoff shall be contained within the street right -of -way. When either of these criteria are exceeded, drainage facilities shall be provided. 56. All natural drainage traversing the site shall be conveyed through the site, or shall be collected and conveyed by a method approved by the City Engineer. All off -site drainage, if different from historic flow, shall be conveyed to a public facility, accepted by adjacent property owners by a letter of drainage acceptance, or conveyed to a drainage easement. 57. Provide 18" curb on southerly property line with fencing on top. 58. identify means of how downstream eGGupant will be prohibited from bleGkiRg dFainage along southerly propeFty line. All on -site drainage shall be conveyed to the street by either sheet flow or concentrated in a non - erosive device and cross lot drainage shall not be permitted. (Amended at time of Minor Design Review by Planning Commission on May 6, 2014) Planning Commission Approved Page 7 of 13 May 6, 2014 CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. 59. The site shall be planned and developed to keep surface water from entering buildings (California Green Building Standards Code 4.106.3 and California Building code 1804.3). 60. All Public Works requirements shall be complied with as a condition of development as specified in the Lake Elsinore Municipal Code (LEMC) and Lake Elsinore Public Works Standard Plans. 61. Provide signage requiring 12' clear zone for access to second unit. Clear zone shall be requirement of CC &R's or other irrevocable recordable document. Document to be recorded prior to building permit. 62. The developer shall remove existing driveway and construct City Standard curb, gutter, sidewalk and approach. The developer shall complete construction of one -half width street improvements on Poe Street such that the ultimate right -of -way width conforms to General Plan and right -of -way cross sections. 63. Street improvement plans shall be prepared by a Registered Civil Engineer and the plans shall include curb and gutter, ac pavement, residential driveway approach, transition to existing and drainage improvements. 64. If existing improvements are to be modified, the existing improvement plans on file shall be revised accordingly and approved by the City Engineer prior to issuance of building permit. Perm itting /Construction 65. An Encroachment Permit shall be obtained prior to any work on City and /or State right - of -way. The developer shall submit the permit application, required fees and executed agreements, security and other required documentation prior to issuance. 66. All compaction reports, grade certifications, monument certifications (with tie notes delineated on 8 '' /z" x 11" Mylar) shall be submitted to the Engineering Division before final inspection of public works improvements will be scheduled and approved. 67. All improvements shall be constructed per Lake Elsinore City Standards and /or applicable specific plan. Any deviation from City standards shall be approved by the City Engineer. 68. All street improvement plans shall be approved prior to issuance of a building permit. Planning Commission Approved Page 8 of 13 May 6, 2014 CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. Acceptance of Improvements 69. The developer shall submit a written request for acceptance to the City Engineer. GRADING Design: 70. A grading plan signed and stamped by a California Registered Civil Engineer shall be submitted for City review and approval for all addition and /or movement of soil (grading) on the site. The plan shall include separate sheets for erosion control, haul route and traffic control. The grading submittal shall include all supporting documentation and be prepared using City standard title block, standard drawings and design manual (available at www.lake- elsinore.orq). 71. All grading plan contours shall extend to minimum of 50 feet beyond property lines to indicate existing drainage pattern. 72. The grading plan shall show that no structures, landscaping, or equipment are located near the project entrances that could reduce sight distance. 73. If the grading plan identifies alterations in the existing drainage patterns as they exit the site, a Hydrology and Hydraulic Report for review and approval by City Engineer shall be required prior to issuance of grading permits. 74. The developer shall obtain all necessary off -site easements and /or permits for off -site grading and /or drainage acceptance from the adjacent property owners. Perm it/Co nstructio n: 75. Developer shall execute and submit grading and erosion control agreement, post grading security and pay permit fees as a condition of grading permit issuance. 76. A preconstruction meeting with the City Public Works Inspector (Engineering Division) is required prior to commencement of ANY grading activity. 77. Prior to commencement of grading operations, developer is to provide to the City with a map of all proposed haul routes to be used for movement of export material. All such routes shall be subject to the review and approval of the City Engineer. Haul route shall be submitted prior to issuance of a grading permit. Hauling in excess of 5,000 cy shall Planning Commission Approved Page 9 of 13 May 6, 2014 CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. be approved by City Council. (LEMC 15.72.065) 78. Applicant to provide to the City a video record of the condition of all proposed public City haul roads. In the event of damage to such roads, applicant shall pay full cost of restoring public roads to the baseline condition. A bond may be required to ensure payment of damages to the public right -of -way, subject to the approval of the City Engineer. 79. Import/export sites located within the Lake Elsinore City limits must have an active grading permit. 80. All grading shall be done under the supervision of a geotechnical engineer. Slopes steeper than 2 to 1 shall be evaluated for stability and proper erosion control and approved by the City. 81. Submit an approved environmental clearance document to the Engineering Division. This approval shall identify and clear all proposed grading activity anticipated for this project. PRIOR TO ISSUANCE OF BUILDING PERMIT 82. Provide final soils, geology and seismic report, including recommendations for parameters for seismic design of buildings, and walls prior to building permit. Prior to Occupancy 83. All public improvements shall be completed in accordance with the approved plans or as condition of this development to the satisfaction of the City Engineer. 84. As -built plans for all approved plan sets shall be submitted for review and approval by the City. The developer /developer /owner is responsible for revising the original Mylar plans. 85. In the event of damage to City roads from hauling or other construction related activity, applicant shall pay full cost of restoring public roads to the baseline condition. 86. All final studies and reports, grade certifications, monument certifications (with tie notes delineated on 8 '/2 x 11" mylar) shall be submitted in .tif format on a CD /DVD. Studies and reports include, Soils, Hydrology, Hydraulics, Grading, etc. Planning Commission Approved Page 10 of 13 May 6, 2014 CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. 87. All plan sets and recorded maps shall be digitized and provided on CD /DVD as follows: • Recorded Map(s) - GIS Shape files* and .tif of recorded map. • Improvement Plans — GIS Shape files* and .tif of approved as built mylar. • Grading Plans - .tif of approved as built mylar. *GIS Shape files must be in projected Coordinate System: NAD 83 State Plane California Zone VI U.S. Fleet. 88. Final soil report showing compliance with recommendations, compaction reports, grade certifications, monument certifications (with tie notes delineated on 8 '/2 x 11" Mylar) shall be submitted in .tif format on CD to the Engineering Division before final inspection will be scheduled. 89. Prior to grading or building permit close -out and /or the issuance of a certificate of use or a certificate of occupancy, the developer shall: • Demonstrate that all structural BMPs have been constructed, installed and are functioning in conformance with approved plans and specifications; 90. Developer shall ensure all outstanding applicable processing and development fees including but not all inclusive: TUMF, MSHCP, TIF, Stephens Kangaroo Rat Habitat and area drainage are paid prior to occupancy /final approval. CITY OF LAKE ELSINORE FIRE MARSHAL GENERAL CONDITIONS 91. Lake Elsinore Fire Protection Planning Office Responsibility- It is the responsibility of the recipient of these Fire Department conditions to forward them to all interested parties. The permit number (as it is noted above) is required on all correspondence. Questions should be directed to the Riverside County Fire Department, Lake Elsinore Fire Protection Planning Division at 130 S. Main St., Lake Elsinore, CA 92530. Phone: (951) 674 -3124 Ext. 225. The following fire department conditions shall be implemented in accordance with the Lake Elsinore Municipal Code and the adopted codes at the time of project building plan submittal, these conditions are in addition to the adopted code requirements. 92. Blue Dot Reflectors- Blue retro - reflective pavement markers shall be mounted on private streets, public streets and driveways to indicate location of fire hydrants. Prior to installation, placement of markers must be approved by the Riverside County Fire Dept. 93. Minimum Hydrant Fire Flow- Minimum required fire flow shall be 1,000 GPM for 2 hours duration at 20 PSI residual operating pressure, which must be available before any Planning Commission Approved Page 11 of 13 May 6, 2014 CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. combustible material is placed on the job site. Average spacing between hydrants 250' and 500' maximum distance from any point on the street or road frontage to hydrant (6 "X4 "X2 -1 /2). 94. Roadway Gradient- Any and all access roads, driveways, and perimeter roads shall not exceed 15% at any point. 95. Separation of Occupancy- A ONE HOUR fire barrier wall for the separation of occupancies is required per the California Building Code. Fire walls, fire barriers, fire partitions, some barriers, and smoke partitions or any other wall required to have protected openings or penetrations shall be effectively and permanently identified with signs or stenciling. Such identification shall be located in accessible concealed floor, floor ceiling or attic spaces repeated at intervals not exceeding 30 feet along the wall, and include lettering not less than .5 inch in height, incorporating the suggested wording "FIRE AND /OR SMOKE BARRIER- PROTRCT ALL OPENINGS," or other wording. In accordance with R302.3. PRIOR TO BUILDING PERMIT ISSUANCE 96. Plan Check Fee- Building plan check fee made payable to The City of Lake Elsinore, and shall be submitted to the Fire Department at time plans are submitted to our office(s). 97. Water System Plans- Applicant and /or developer shall separately submit 2 sets of water system plans to the Fire Department for review. Plans must be signed by a registered Civil Engineer and /or water purveyor prior to Fire Department review and (2) copies of the signed and approved water plans shall be returned to the Fire Department before release of a building permit. 98. Prior to Building Construction Verification- This project shall be inspected and approved by the Fire marshal or designee prior to bringing combustible materials on site. During such inspection all permanent road signs shall be in place, all hydrants shall be on operating and approved for use by the water purveyor, and all permanent road surfaces shall be completed including primary and secondary access circulation. PRIOR TO BUILDING FINAL INSPECTION 99. Residential Fire Sprinkler Systems for Single family and two- family 13D- Install a complete fire sprinkler system designed in accordance with California Residential Code, California Fire Code and adopted standards. A C -16 licensed contractor must submit Planning Commission Approved Page 12 of 13 May 6, 2014 CONDITIONS OF APPROVAL FOR A MINOR DESIGN REVIEW FOR A 2,002 SQUARE -FOOT RESIDENTIAL DUPLEX LOCATED ON THE WEST SIDE OF POE STREET. plans, along with the current fee, to the Fire Department for review and approval prior to installation. 100. Designated Fire Lanes- The applicant shall prepare and submit to the Fire Department for approval, a site plan designating required fire lanes with the appropriate lane painting and /or signs. Planning Commission Approved Page 13 of 13 May 6. 2014