REPORT TO CITY COUNCIL
TO: HONORABLE MAYOR
AND MEMBERS OF THE CITY COUNCIL
FROM: GRANT M. YATES
CITY MANAGER
DATE: APRIL 22, 2014
SUBJECT: PURCHASE TRAFFIC SIGNAL POLES /MAST ARMS FOR THE
TRAFFIC SIGNAL IMPROVEMENTS AT
SUMMERHILL DRIVE AT VIA SCENICA
PROJECT NO. 4423
CANYON HILLS ROAD AT SAGE LANE
PROJECT NO. 4368
Recommendations
1. Authorize the pole /mast arms purchase for the Traffic Signal Improvements at
Summerhill Drive at Via Scenica and Canyon Hills Road at Sage Lane to
McCain, Inc. for the not to exceed amount of $53,328.00.
2. Authorize the City Manager to execute the contract with McCain, Inc.
Background
The contractor is typically responsible for the placement of orders for the pole and mast
arms and other ancillary traffic signal equipment for traffic signal projects. The time of
fabrication for traffic signal and mast arms ranges from 10 to 14 weeks depending upon
the manufacturer's current fabrication work load. The City of Lake Elsinore is pre -
ordering the poles and mast arms for the two traffic signal projects in order to facilitate
the installation process and to maintain the project completion by this summer.
Discussion
The City had requested pole and mast arms cost quotes from the two signal pole
fabricators Valmont Industries, Inc. and Ameron International. The quotes that were
received were by their distributors, McCain, Inc. and Pacific Lighting Sales, Inc.,
respectfully. The City had sent the pole schedule and letter dated April 3, 2014 detailing
the requirements for the fabrication of the poles and signal mast arms. The City also
requested an expedited fabrication cost which neither firm offers. The City reviewed the
anticipated fabrication delivery dates from each firm and determined that they were no
real benefits in delivery schedule relative to the added cost between the two proposals.
The City anticipates an 8 week time saving by pre- ordering the traffic signal poles and
mast arms. All other ancillary traffic signal equipment will be purchased by the general
contractor.
The following are the cost proposals from their distributors:
Name
Pacific Lighting Sales, Inc.
McCain, Inc.
Anticipated Proiect Schedule
Award Pole Fabrication
Place Order /Purchase Order
Pole Delivery (13 weeks)
Fabrication Time Cost
10 - 14 weeks $62,226.00
11 — 13 weeks $53,328.00
April 22, 2014
April 25, 2014
July 25, 2014
It is anticipated that the pole delivery date will coincide with the contractor's Notice to
Proceed by approximately one week, which will allow for the foundations to be placed
just prior to pole /mast arm delivery date if the materials take the full 13 weeks to
fabricate.
Fiscal Impact
The project budgets and funding sources are as follows:
Summerhill Drive at Via Scenica
Fund 205 Traffic Impact Fee $239,791.00
Anticipated Expenditures:
Pole Fabrication / Delivery $ 29,362.00
Project Management & Administration $ 1,500.00
$ 30,862.00
Canyon Hills at Sage Lane
Fund 112 Measure "A"
Fund 204 Signal CIP
Anticipated Expenditures:
Pole Fabrication / Delivery
Project Management & Administration
Prepared by: Peter Ramey
Project Engineer
$ 45,322.20
$148,234.00
$193,556.20
$ 23,966.00
$ 1,500.00
$ 25,466.00
Approved by: Vince Damasse
Director of Public Works /City Engineer
Approved by: Jason Simpson
Director Administrative Services Department
Approved by: Grant Yates
City Manager
Attachments: Vicinity Maps:
Summerhill/Via Scenica
Canyon Hills /Sage Lane
Exhibit 'A' - McCain, Inc. Quotation for Traffic Signal pole /mast arm
VICINITY MAP
Traffic Signal at
Canyon Hills Road and Sage Lane
EXHIBIT "A"
Quotation for Signal Pole /Mast Ann
\Y
OW
1\22\23121h ff
m` Ii" a \ \sue \
Peter Ramey
City of Lake Elsinore
QUOTATION
Quote #: D040414B
Agency: Lake Elsinore City of
Job Name: Poles and anchor bolts
Bid Date: 4/4/14
Bid Item
Lot Signal Poles, Arms a
Bolts for below locations:
1 SummerhillNla Scenica
1 Canyon Hills /Sage
Estimator: Diane Hawkins
(760)734 -5016
dhawkins@mccain-inc.com
Current lead time is 11 -13 wks ARO
F.O.B. Destination, Freight Allowed
Intersection plan drawing will be required
prior to releasing order to Production
Off - loading is not included
Price Extension
$23,966.00 $23,966.00
$29,362.00 $29,362.00
McCain Inc. is an international corporation with factories, vendors and suppliers located
throughout the world. Unless specifically noted, we are not aware and /or may not comply
with Buy America requirements particular to this project.
Reference Total. $63,328.00
Prices firm for 30 days. Freight included. Add sales tax.
Sale is subject to McCain's standard terms and conditions.
The information transmitted is intended only for the person'or entity to which it is addressed and may
contain confidential and/or legally privileged material. Any review, retransmission, dissemination or
other use of, or taking of any action in reliance upon, this information by persons or entities other
than the intended recipient is prohibited. .r
1f you received this in error, please contact the sender and delete the material from any computer.