Loading...
HomeMy WebLinkAboutOrd. No. 1990-879ORDINANCE NO. 87° ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE APPROVING A SPECIFIC PLAN FOR THE TUSCANY HILLS DEVELOPMENT AND MAKING CERTAIN FINDINGS WITIi RESPECT TI3ERET0 WHEREAS, the City Council of the City of Lake Elsinore (the "City") has previously certified an environmental impact report No. SCH 79082906 (the "EIR~~) with respect to the Tuscany Hills Development (the ~~Project"); and WHEREAS, Homestead Land Development Corporation (the "Developer~~), as developer of the Pxoject, subsequently entered into consultation with the United States Fish and Wildlife Service regarding a Conservation Plan for Stephens' Kangaroo Rat habitat, to be implemented by a Conservation Agreement among the City, the Developer, and the United States Eish and Wildlife Service (the ~~Conservation Agreement~~) and an Agreement and Declaration of Covenants, Conditions and Restrictions on Use ("Declaration of Covenants"); and WI3EREAS, the City has caused an Addendum to the EIR to be prepared which addresses the technical changes to the ~' Project associated with the execution, delivery and performance of the Conservation Agreement and Declaration of Covenants, and which addresses the technical changes to the Project associated with the conversion of the Project from a mixed single- and multi-family development to a single-family development; and WHEREAS, the Planning Commission has previously reviewed the EIR and the Addendum and has recommended that the City Council (1) certify that the Addendum has been prepared in accordance with the requirements of the California Environmental Quality Act and the City's CEQA guidelines; <2) approve the Specific Plan Por the Project, (3) approve the Conservation Agreement and the Declaration of Covenants and (4) approve amendments to the 1980 Development Agreement for the Project; and WIiEREAS, the City Council reviewed the EIR and the Addendum thereto, each prepared in accordance with the California Environmental Quality Act, and has considered the information contained therein and in the other documents referred to therein; and WIiEREAS, the City Council has certified the Addendum to the EIR and has made the findings required.by Section -- 15091(a) of the State CEQA Guidelines, attached hereto as Attachment A; and WHEREAS, the City Council is contemporaneovsly approving the Amended and Restated 1980 Development Agreement, the Conservation Agreement and the Declaration of Covenants relating to the Project. NOW, THEREFORE, TIiE CITY COUNCIL OF THE CITY OF LAKE ELSINORE DOES ORDAIN THAT: Section 1: Upon the recommendation of the Planning Commission and based upon the findings adopted hereby with regard to the approval of the Project, attached hereto as Attachment A, the City Council hereby (i) finds that the Specific Plan for the Project area attached hereto as Exhibit A is consistent with the General Plan of the City, (ii) finds that the adoption of the Specific Plan is in the public interest, (iii) approves and adopts the Specific Plan, and (iv) approves and adopts the Mitigation Monitoring Program contained in Appendix 15 to the Specific Plan. 4'4~,~Rt;.,^.z. .a..... . ._T ,_. ~ . . __. _ ~ . .. ~ _ - ' Section 2. This Ordinance shall take effect thirty (30) days after the date of its passage. The City Clerk shall certify as to adoption of this Ordinance and cause this Ordinance to be nublished and posted in the manner required by law. PASSED UPON FIRST READING this 9th day of January, 1990, by the following roll call vote: AYES; COUNCILMEMBERS: BUCK, DOMINGUEZ, STARKEY, !~ASHBURN, !~IINKLER NOES: COUNCILP1EMBERS: NONE ABSENT: COUNCILMEMBERS: NONE ABSTAIN: COUNCILP4EMBERS: NONE PASSED, APPROVED AND ADOPTED UPON SECOND READING this 23rd day of Januarv , 1990, by the following roll call vote: AYES: COUNCILMEMBERS: BUCK, DO~IN~UEZ, STARKEv, !JASHBURN, IdINKLER NOES: COUNCILMEMBERS: NONE ABSENT: COUNCILMEMBERS: NONF ABSTAIN: COUNCILMEMBERS: NONE A ~EST: VICKI AS D, CITY CLERK CITY OF I_~KE ELSINORE APPROUED AS TO FORM AND LEGALITY: ~ ~ OHN R. HARPER, CIfY ATTOR~ ~11Y UF LHKt tLS1NUKt _~TE ~F CALIFORNIA ) :JTJNTY OF RIVERSIDE ) SS: T_TY OF LAKE ELSINORE )' I, Vicki Lynne Kasad, City Clerk of the City of Lake Elsinore, - ~... ii.,iir",rf's ~,s.,niir i. ~i.itai: ~i:i1G 1c7Y~ecjU111c~ ~ruinance hdQ 1~6 L1T'SL reaaing cn January 9, 1990, and had its second reading on January 23, 1990 and was passed by the following vote: AYES: COUNCILMEMBERS: BUCK, DOMINGUEZ, STARKEY, WASHBURN, WINKLER COUNCILMEMBERS: COUNCILMEMBERS: COUNCILM~MBERS: _ ~ CLERK CITY OF (SEAL) E I,S INORE STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) SS: CITY OF LAKE ELSINORE) NONE NONE NONE I, Vicki Lynne Kasad, City Clerk of the City of Lake Elsinore, DO HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of Ordinance No. 879 of said Council, and that the same has not been amended or repealed. DATED: J'anuary 24, 1990 ~ .~~ ~~,~, ICKI LYNNE SAD, CITY CLERK CYTY OF LAK ~Y,SINORE (SEAL) , . . ;~. . ~ ~~., ~ ., _ .. _ NOES: ABSENT: ABSTAIN: ~~7 ~ f ~ ~ Wy Y L~/ 1. FINDINGS REGARDING SIGNIFICANT EFFECTS THAT CANNOT FEASIHLY HE MITIGATED TO A LEVEL OF INSIGNIFICANCE 1.1 Topoqraphy 1.2 6eismic Impacts 1.3 Air Quality 1.4 Biological Environmental 2. POTENTIAL ENVIRONMENTAL EFFECTS WHICH ARE NOT SIGNIFICANT OR WHICH CAN BE MITIGATED TO A LEVEL OF INSIGNIFICANCE 2.1 Geology and Soils 2.2 Hydrology and Flood Control 2.3 Climate 2.4 Cultural Resources 2.5 Land Use, Zoning and General Plan 2.6 Traffic and Circulation 2.7 PubYic Services and t7tilities 2.8 Energy Conservation -i- ~~ ~ / ~; ~ 2.9 Growth Inducing Impacts 2.10 Cumulative Impacts 3. FINDINGS REGARDING ALTERNATIVES 3.1 No Project Alternative 3.2 Decreased Overall Density ATternative 3.3 Increased Overall Density Alternative 4. FINDINGS REGARDING MITIGATION MONITORING PROGRAM 4.1 Requirement of Mitigation Monitorinq Program -ii- ,. ~_ n . ..... ,~....,_ . . s« ...., _ ~ ~~ ~ITY OF LAKE CTNnAF REGARDING THE ENVIun_*_? NTA • Tti,pA T R.PORT F4R_ THE HOMESTEAD LAND DFpFr pph; tiT ORPORATION Ti)SCANY HI .T.S D p T(~pp; r~T /cnonrc.... ..' ." "-___ _ .. The State Guidelines ('Guidelines") promulgated pursuant to the California Environmental Quality Act (`CEQA") provide as follows (Guidelines Section 15091): (a) No public agency shall approve or carry out a project for which an EIR has been completed which identifies one or more significant environmental effects of the project unless the public agency makes one or more written findings for each of those sigr,ificant effects, accompanied by a brief ezplanation of the rationale for each finding. The pos~ible findings are: (1) Chanqes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effects as identified in the ffnal EIR. [This find~na shall b r rr d o sc 'findina (i) ~1 (Z) Such changes or alterations are within the responsibility and jurisdiction of another public agency an8 not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by such other agency. [This findina shall be r fo raa o ac "findina ( ) ) (3) Specific economic, social or other considerations make infeasible the mitiqation measures or project alternatives identified in the final EIR. [Thi& findina shall b r rr d 'findina [31. ] -1- , . . «.. _ ,.,_~, ,~, ., . .. _ ~ . ~ ~1~ ) I / 6 _ ~ r ~ ` Findings required for residential projects are further ezplained in Guidelines Section 15183. The Environmental Impact Report ("EZR") for the Tuscany Hilis residential project ('Project") proposed by Homestead Land Development Corporation iclentifies significant effects on the environment which may occur as a result of the Project. Section 1 of this Attachment identifies the siqnificant environmental effects of the Project which cannot feasibly be mitigated to a level of insiqnificance. Section 2 sets forth potentiai environmental effects of the Project which are not significant because of the design of the Project or which can feasibly be mitigated to a level of insignificance. Section 3 provides findings regarding the alternataives discussed in the EIR. Section 4 contains findinqs reqarding the Mitigation Monitoring Program for the Project. The findings set forth in each section are supported by facts established in the administrative recozd of the Project. 1. The City has determined that EIR mitiqation measures and proposals included as part of the Project will result in a substantial mitigation of the following effects, but that these effects cannot feasibly be mitigated to a level of insignificance. 1.1 Topogravhv. l.l.l Sianificant Effect: The Project will moderately alter the topography of the Project site. Grading of home sites will level some of the ridge and hilltop areas, and many smaller canyons will be filled. Findinas: The City hereby makes findings (1) and (3). Facts in Suvport of Findina : The following measures will result in a substantial reduction of the adverse impacts of the identified significant effect. (a) The larger lots in the southern portion of the site will help reduce topographic changes to the steeper slopes in this area. -2- ~., ~~~ ~,.~,_ :~. ~ ~ ~ 1/ (b) All City ordinances related to ~rading will be followed to minimize topographic changes. (c) Grading and earthwork improvements will be balanced on-site. (d) To the maiimum eztent feasible, grading activities will conform the ezisting land contours. (e) Approzimately 170 acres within the southern portion of the Project site will remain in their natural and ungraded state. Further, the estate lots to be developed in the southern half of the Project will encompass 57 acres on which only limited grading will occur. Approzimately 33 acres in the northern portion of the Project site will be left as open space in its natural state, another 39 acres in the northern portion will be developed for park, recreation and lake uses and a 31 acre wildlife corridor. (f) Single-loaded streets will be utilized =o help maintain the natural land form. 1.2 Seismic Impa s: 1.2.1 Sianificant Eff rt; Due to the large number of fault zones in the State of California, and within or nearby the City, the Project and ali surrounding areas are in prozimity to a number of significant fault areas. The Project site is appro:imately 1/2 mile at its closest from the Elsinore Fault Zone, and is relatively prozimate to the Glen ivy Fault, the Willard Fault and the Wildomare Fault. Additionally, the Project aite is approzimately 20 miles from the 6an Jacinto Fault and approzimately 30 miles from the San Andreas Fault. A study performed by GeoSoils, Inc. indicates that the Project site may be subject to an earthquake of magnitude 6.0 or greater during the nezt 50 years. Earthquakes of such maqnitude could cause damage to residential units. Findinas; The City hereby makes findings (1) and (3). Facts in S~,pDOrt of Findinac; The followinq measures will result in a substantial reduction of the adverse impacts of the identified significant effect. (a) The design of ~fill slopes and embankments will be sufficient to minimize earthquake impacts. Proper design, compaction and construction will -3- ..~~~.~t. ;s ~, . .,,. y.. ..,... ,x«. ,,.. _ _ _ __ ~!'~i L/ ~ reduce the potential for landslide impacts on manmade slopes. (b) All proper design criteria will be employed to minimize potential impacts to and from local geologic formations. All seismic building sequirements will be met to reduce ar eliminate impacts from seismic activity on structures. Proper engineering will ensure foundation integrity against 8ifferential settling. 1.3 Air Oualitv 1.3.1 Sianificant Effect: The City and the Project site ere within a region which is a nonattainment area for ozone and particulate matter (PM-10). The Project will adversely impact both local and regional air quality during the construction phase and during the lifetime of the completed Project. Construction activities will qenerate on-site fumes and odors from Construction machinery, as well as ezposing a larqe area of bare earth to wind which may result in the generation of significant amounts of dust. Thes~ construction impacts may be ezpected during all Fhases of construction, but will be short-term impacts in nature. Long term impacts will result from vehicular traffic associated with the Project, off-site electricity pro8uction, and on-site consumption of natural gas and other sources such as fireplaces. Findinas: The City hereby makes findings (1), (2) and (3). Facts in Support of Findinae; The following measures will result in a substantial reduction of the adverse impacts of the identified significant effect. (a) Dust generation will be controlled by watering areas prior to and during grading. Landscape vegetation will be introduced as soon as construction is completed. (b) The number of vehicle miles traveled for home-to-work trips may be reduced by: 1) various governmental efforts to induce more employers to locate in the Tri-Community Area to reduce trip length; and 2) governmental efforts to provide bus service from the Project area to employment centers in surrounding areas. (c) The developer will provide information concerning the Cal-Trans ride-sharing program to new home buyers at fts sales office. -4- ~~ (d) The neighborhood commercial center will provide for a portion of the retail needs of the Project residents. (e) The Project developer will use energy conserving design and constzuction techniques as required under State law and will comply with the requirements of Title 24 of the California Code of Regulations. (fj The Project is in compliance with the South Coast Air Quality Management Plan. 1.4 Bioloaical Environment 1.9.1 Potential Effect: The site contains various types of habitats having some bioloqical value: coastal-inland and coastal sage scrub; riparian woodlands; and brushy slopes and Sosanko clay ezposures. Within the sage scrub habitat, the presence of the Stephens' Kangaroo Rat (a federal endangered species) has been identified. Riparian habitat ezists along some drainage areas (San Jacinto River tributories). Development of the Project will result in the removai of roughly 2/3rds of the ezisting coastal sage scrub habitat from the Project site. As this habitat is removed during construction phases, associated on-site wildlife (including the Stephens' Kangaroo Rat) will decline as individuals 0re ~ either destroyed or displaced to adjacent habitat areas. Displaced individuals will crowd and disrupt adjacent local populations temporarily until competition and predation return populations to hab3tat carryinq capacity levels. Wide ranginq mammals and birds of prey will no longer be able to use the Project site for foraging activities. Certain sens3tive avian species, including the qolden eagle, the white-tailed kite, the red shouldered hawk, osprey and the Calffornia black-tailed qnatcatcher, may frequent certain areas of the Project site. Further, development of the Project will constitute an incremental loss in vegetation and wildlife resources which, when considered with other development projects scheduled or contemplated for development within the City of Lake Elsinore area, contribute to a cumulative loss of biological resources from the area. Findinas: The City hereby makes findings (1) and (3). Fact~ in Sunport of Find~na : The following measures will result in a substantial reduction of the adverse impacts of the identified significant effect. -5- ~T"1 L / (a) Development of the study site will begin in the southern portion and will progress northward in phases. Phasing wili allow for a more orderly movement of larger animals from the study site to surrounding undeveloped area. However, many smaller animals (rodents and reptiles) will probably not move out of the atudy site and will be destroyed. The open space area in the southern portion of the study area will provide habitats for some of these smaller animals. Once the development is complete more tolerant species, especially song birds, may move back into the area. (b) Natural contours and topographic features will be preserved to the greatest eztent possible in the open space areas and within a planned 31 acre wildlife corridor. The wildlife corridor provides potential links to ezisting Federal Hureau of Land Management parcels. Natural open space areas of the Project comprise approzimately 170 acres, including 117 acre parcel near the watertank site, and a 37 acre open space/park area, wk~ich will be offered for dedication to the City. In total, open space, parks, prfvate recreation areas, lake an~ wildlife corridor areas comprise approzimately a53 acres. An additional 88 acres of manufactured slopes will be contained within the Project site. (c) Protection of open space and riparian settings will be accomplished through compliance with Fish and Game Code Section 1603 and the issuance of a 1601/1603 permit from the California Department of Fish and Game. (d) A variety of species will be used for landscapinq, as appropriate to soil conditions. (e) The Project developer has obtained a California Department of Fish and Game 1603 permit with respect to modification of steam courses in riparian areas. The Project developer will comply with all the zequirements of this permit to mitigate impacts on rfparian areas. (f) Prior to grading any ocCUpied Stephens• Kangaroo Rat ("SKR") habitat at the Tuscany Hills site, the deveioper shall acquire in fee simple absolute the Initial Preserve Site, as described in the Conservation Aqreement, and shall ezecute an irrevocable offer of dedication of the Initial Preserve Site to the City or to another entity approved by the United States Fish and , Wildlife Service. -6- ~ . , ~ ;.s~.. ~... . ~ ~,., ~~ ~ ~_ ~ ~ , _ ~/ (g) Prior to grading any oCCUpied 6KR habitat in ezcess of 235.3 acres at the Tuscany Hills site, the developer shall acquire in fee simple absolute the Secondary Preserve 6ite, as described in the Conservation Aqreement, and shall ezecute an irrevocable offer of dedication of the Secondary Preserve Site to the City or to another entitX:agproved by the United States Fish and Wildlife 6ervice. (h) The developer and its successors in interest shall manage the Initial Preserve Site and the Secondary Preserve Site in a manner which is consistent with the conservation and protection of the SKR and its habitat. (i) The authorization to take any endangered or threatened species, pursuant to 6ections 7(b)(4) and 7(0)(2) of the Endangered Species Act of 1973, as amended, shall not be effective until the developer e:ecutes the Conservation Agreement and completes the acquisition of that Initial Preserve Site described therein. The eztent of any authorization to take any endangered or threatened species shall be 13mited to the gradinq of not more than 235.3 acres of occupied SKR ~ Habitat until the developer completes the acquisition of the Secondary Preserve Site, as set forth therein. (j) The developer and its successors in interest shall not alter or modify any SKR habitat in the Initial Preserve Site or the Secondary Preserve Site without prior approval by the United States Fish and Wildlife Service. (k) Authorization for incidental take will be conditioned upon implementation and compliance with the Conservation Plan as required by the Conservation Agreement to be signed by the developer, the United States Fish and Wildlife Service, and the City. (1) The developer and its successors in interest shall comply with the reportinq requirements of the Conservation Agreement and Conservation Plan. (m) If incidental take at any time does not comply with the provisions established in the Incidental Take statement, the developer shall ensure that the causative action cease immediately, and shall seek the imme8iate assistance of the United 6tates Fish and Wildiife Service (Laguna Niguel Field Office) to evaluate the impacts of incidental take and make recommendations to rectify the situation. -7- _ __ __ __ . ~,/ ~ , (n) Any Stephens• Kangaroo Rats recovered shall be deposited in the mammal collection of the Natural History Museum, County of Los Angeles. P9TENTIAL• ENVSRONMENTAL• EFFECTS WNICH ARE NOT SIGNIFICANT OR WHIGH GAN BE MITIGATED TO A L•EVEL• OF INSIGNIFI AN F' The City has determined that the following effects will not be significant, for the reasons stated below. 2.1 ~eoloav and Soils 2.1.1 Potential Effect: Development of the Project wili require substantial grading and fill activities, and will disturb local soils. Findinas: The City hereby makes finding (1). tFacts in SuvDOrt of Findinas; The following measures will mitigate the fdentified impact to a level of tnsiqnificance. (a) Development of the Project will disturb overlying soil units but will not appreciably impact underlying qeologic strata. (b) Earthwork will balance cut and fill onsite and will not require any import or ezport of soil. Grading activities will conform as much as possible to ezisting contours. All proper soil and engineering analyses will be done prior to grading. A1l grading activities will conform to City requirements. All soils onsite can be worked with a minimum amount of preparation, with the ezception of the Bosanko clays. Proper caution will De ezercised durinq removal or fill-mizing with these clays to eliminate any poss3ble impacts related to espansion. (c) Construction activities such as watering and soil stockpiling will be monitored to control onsite and offeite soil erosion. (d) Only Class II Garretson Soils has any significant value for agricultural use, amonq those soils found on the Project site. These soils are found on less than 1 percent of the Project site. Ai1 other onsite soils have only limited or very limited agricultural usefulness. -8- ~~ 2.2 Hvdroloav and Flood Con rni 2.2.1 Po n ial : The Project will alter the runoff characteristics of the Project site, as a result of the introduction of impervious roadways, sidewalks and buil8ings. Further, construction activities will temporarily increase loads to local drainage channels. Following Project implementation, runoff from the Project site will contain increased amounts of urban pollutants, includinq various hydrocarbons, tire rubber and other sutomobile. poliutants, pesticides and sediments from landscaped areas, paint or other coating substances, dust, and sediments from residential structures. Findinas: The City hereby makes finding (1). Fa c in ~nnor o Findina4; The following measures will mitigate the identified impact to a level of insignificance. (a) The Project site is not ezposed to any regional flood hazard due to its elevation above the San Jacinto River. (b) Construction activities will be designed to contain offsite runoff. Watering will be kept to the minimum required for compaction and dust suppression. Any steep, ezposed man-made slopes will be covered or hydroseeded to pzevent offsite sediment transport. (c) The slope modifications on the Project site, together with the larqe amount of landscaping and open epace, will tend to balance the overall runoff from the Project site. (d) Subdrains will be constructed in canyon fill areas where necessary. These drains wiil collect ezisting and future groundwater flows. Surface drains and subdrains may be necessary for buttress or fill stabilization. All required curb, gutter and storm drain structures will be constructed to channel surface runoff offsfte. (e) Frequent street cleaning by the City will reduce the potential for runoff pollutants produced by this Project. (f) Specific drainaqe systems will be desiqned as each planning area within the Project site develops. All drainage systems will comply with adopted -9- ~, ~; / City standards. Drainage drainage channels to the improvements as necessary from new development. systems shall utilize natural greatest eztent possible, with to accommodate expected flows (g) The developer Will construct dreins and subdrains to intercept run-off. The developer will establish an erosion control plan to be in effect during and after construction to be subject to approval of the Chief Building Official prior to issuance of grading permits. (h) The developer will develop a Master Landscape Installation and Maintenance Plan for public and private land areas to be subject to approval of the Community Development Director or his designee. 2.3 Climate• 2.3.1 Potential Effect: Development of the Project site will affect the local micro-climate. Impacts include increased humidity due to irrigation of public and private landscaping, changes in low level on-site wind patterns due to building construction, and modifications to land-to-air thermal relationships caused by building ahade and landscaping, heat absorption and retention by buildings, etc. Findinas: The City hereby makes findings (1) and (3). Facts in s~nnort of Find+'nas: (a) Micro-climate impacts of the development of the Project are not ezpected to eztend beyond the Project boundaries. These impacts are not ezpected to be adverse or significant. No feasible mitigation measures esist which could reduce the antfcipated minor impacts on the local micro-cl3mate. 2.4 rul ~ra1 R o~ e 2.4.1 potential Effect: The general area of the Project site was heavily utilized by aboriqinal populations. A significant native American village compiez has been documented to the north of the Project s3te. One previously unrecorded prehistoric archaeological site has been located on the southern portion of the site. In addition, areas of historic use have been documented in the southern portion of the Project site and in a limited portion of the northern half -10- ~,/ of the Project site. These sites appear to have been used during the Railroad/MOdern period (1881 to present). The historical sites located within the boundaries of the Project site include the Wrench Gold end Slate Prospect Site, located within the proposed wildlife corridor, a segment of the old Railroad_Canyon Road and Railroad Bridge, located along the P~oject site's easterly boundary adjoining the San Jacinto Aiver, the remains of the Ella Van Fossen residence, and the Riv-698 prehistoric site. Findinas: The City hereby makes findinq (1). Facts in Support of Findinas; The following measures will mitigate the identified impact to a level of insignificance. (a) The developer shall provide further testing and documentation of sites and appropriate mitigation as recommended by a qualified archaeologist prior to issuance of further grading permits. Appropriate mitigative measures will be undertaken to reduce or eliminate adver~e impacts to any subsequently discovered archaeological resources. (b) Further, the developer shall provide a qualified paleontologist to be present durinq grading, empowered to stop grading temporarily for the recovery of fossil remains during grading within suspect geologic ^ formations as identified in preliminary and final geologic and soils reports. 2.5 Land Use. 2oning and General Plan 2.5.1 Potential Effect: The Specific Plan for the Project must be consistent with the City's General Plan. Findinas: The City hereby makes finding (1). Facts in Suooort of Findinas; The following measures will mitigate the identified impact to a level of insignificance. (a) The Project is consistent with the current General Plan of the City, as the site land use designation in the General Plan is "Specific Plan Area", as is also consistent with the current draft of the City's proposed new qeneral plan. (b) The Specific Plan is in conformance with the intent of the City's Generai Plan (and its elements) for the reasons stated below: -11- . ,,.~._~ ~ ,. .r. ...,...,.. ,. _ _.. ~ • _. _ __ _ ~~ (1) Land Use Element: The Project site is designated Specific Plan Area (SPA) and the developer of the Project is processing the development under a specific plan. (2) Circulation Element: The Project design provides adequate internal circulation, and the Project will be required to participate in an assessment district for off-site traffic improvements. (3) Environmental Resources Manaq2ment Element: The Project provides 207 acres of open space and wildlife corri8or areas, as well as 46 acres of recreational and park areas; in addition, pursuant to the Conservation Plan, several hundred acres of additional land will be acquired by the Project developer off-site, and dedicated for preservation of 6tephen's Kangaroo Rat habitat. The Project will include firebreak areas, provision for adequate site drainage, and all buildings will be constructed to meet seismic gafety standards under City requirements. (9) Noise: The Project will be developed in accordance with the requirements of Chapter 1T.14 of the City's Zoning Ordinance relating to requirements for acoustical analysis of residential projects. (Sj Community Design Element: The Project site is located within areas of the City which are to be developed under specific plan procedures, pursuant to the City's General Plan. The Project is a planned development, governed by the provisions of the Specific Plan, and thus will present a"planned" view under the Desiqn Guidelines of the 6pecific Plan. (6) Housing: Development of the Project will help to provide a portion of the full range of housing types which are necessarp to meet the needs of the residents and the community of the City of Lake Elsinore. ' 2.5.2 Potent currently zoned R-1, implement the Projec changes for Specific in the Specific Ylan ial Effect; The Project site is R-2, R-3, C-l and OS-RE. In order to t under the Specific Plan, zone Plan Zoning are required as described for the Project. gindinas: The City bereby makes Einding (1). -12- 1~ Eacts in Sunport of Findinas: The following measures will mitigate the identified impact to a level of insignificance. (a) The Specific Plan for the Project is being processed under City Code Section 17.99.060, Nonconditional (SP) Specific Plan Zoning Procedure. Pursuant to this procedure, the Project will receive the (SP) Specific Plan zoning designation concurrently with the approval of the Specific Plan documents. Zoning within the Specific Plan area wiil be governed by the Specific Plan. The Project developer shall comply with all provisions of the Zoning Ordinance for the City, including all applicable provisions of Chapter 17.99 of the Zoninq Ordinance, and the provisions of the Specific Plan. To the eztent of any conflict between the Zoning Ordinance and the Specific Plan, the provisions of the Specific Plan will govern. (b) The locatfon and design of the Project are consistent with the goals and policies of the City's General Plan and with all other applicable plan or policies adopted by the City to date, £or the reasons set forth in Section 2.5.1 above. (c) The Project site allows the development of the Project to be well integrated with the Project site surroundings. (d) All vehicular traffic generated by the Project will be accommodated safely and without causing undue congestion upon adjoining streets, for the reasons specified in Section 2.6.1. (e) The Specific Plan describes a methodoloqy for assuring the adequate provision of public services and facilities for the land uses specified in the Specific Plan. (f) The overall design of the Specific Plan will produce an attractive, efficient and stable development. 2.5.3 PQtential Effect: The development will change the ezisting site from its current undeveloped status to medium and low density residential, open space, school and neiqhborhood commercial uses. Surrounding land uses include agricultural lands, mainly on the northwest and southeast ends of the Canyon Lake subregion, a large flood plain located adjacent to the &outheastern end of the lake, the Canyon Lake residential community, located -13- . ~. ., ~. . . ,_ ~:~:~ , , _ ~~ to the east of the lake, the Ramsgate 6pecific Plan area (mized use residential), located west of the Project site, the Cottonwood Hills development (mized use residentiai), located southeast of the Project site and the Friedman property (mized use residentiai), located to the south of the Project. Findinas: The City hereby makes findinq (1) with respect to all land use impact ezcept those specifically identified in Section 1.1. Facts in Sunoort of Find na~,; The following measures will mitigate the identified impact to a level of insignificance. (a) Development of the project will result in significant amounts of grading of the Project site. Each of the Facts in Support of Findings contained in Section 1.1 is hereby incorporated by reference. (b) Surrounding developments are consistent with the land uses proposed in th~ Specific Plan for the Project, including residential land uses, neighborhood commercial land uses, parks, recreation and open space areas, and a school site. (c) The development standards and design - guidelines for the Project specified in the Specific Plan will ensure that the land uses planned for the Project and the development of the Project will be compatible with the surrounding land uses. 2.6 Traffic and Girctiation 2.6.1 Potential ff The Project includes the construction of approzimately 2,000 single family dwelling units. New residents will generate vehicular trips that are both internal and ezternal to the Project site. Forecasted trips per day, from the traffic study appended as Appendiz C to the Addendum to the Final Environmental Impact Report, dated October, 1989, suggest that the 2,000 dwelling units contained within the Project could qenerate up to 17,100 trips per day, of which 7,400 trips per day would have origins or destinations ezternal to the Project site. These additional trips, together with vehicle trips qenerated by proposed surrounding developments, will have an impact on both internal and ezternal roadways. Findinas: The City hereby makes finding (1). -14- . , _~....~v„ _ w. ,~ ~ ~~~. ~ ~~ Facts in Support of Findinas: The following measures will mitigate the identified impact to a levei of insignificance. - (a) The forecasted average daily trips in the traffic study suggest that, at the mazimum, traffic on the proposed internal circulation system would be approzimately 95~ of its roadway desiqn capacity (Level of $EIVICE ~C'~• . (b) The Project could add up to 3,000 trips per day to Railroad Canyon Road near the I-15 Interchange, which road would then be at 42$ of its roadway design capacity (Level of Service "C"). Additional capacity is available for other development projects. (c) The Project could add up to 2,960 trips per ~ay to Greenwald Avenue, increasing the total average daily trips for that roadway to 7,360. Greenwald Avenue would then be at 61~ of its roadway design capacity (Level of Service "C'). Additional capacity is available for other development projects. (d) The proposed development has an adequate internal circulation system to handle projected traffic loads. (e) All minor streets intersecting with the proposed 88-foot nosth-south "Secondary Arterial" will be controlled by stop signs on the minor streets . (f) The approaches of the internal roadways toward Greenwald Avenue will be controlled by stop signs. (g) The Project is required to participate in an assessment district for off-site improvements. If a traffic siqnal is ultimately warranted at the intersection of Summerhill Drive and Railroad Canyon Road, the Projeet developer wouid contribute that portion of the signal cost which corresponds to the volume of intersection traffic Caused by the Project. (h) The developer shall provide information concerning the Cal-Trans riSe-sharing program to new home buyess at its sales office. (i) The Facts in Support of Findings 3n (b) and (c) of Section 1.3.1 are hereby incorporated by reference. -15- ~~3 L' / r 2.7 Public Services and Utilitie~ 2.7.1 Potential Effect: The Project will increase demand on local water supplies. The Project is ezpected to require 1.0 million g811ons per day for reaidential use and 0.63 miilion gallons per day fo= park, recreation areas end schools. Findinas; The City hereby makes finding (1). Facts in Sunoort of Findinas: The following measures will mitigate the identified impact to a level of insignificance. (a) The source of water supply to the Project will be via an Elsinore Valley Municipal Water District System. The District's treatment plant west of Canyon Lake Dam has a capacity of 15 mi113on qallons per day, which is sufficient to serve contemplated future development within the Lake Elsinore area. In addition, the District owns rights to 3.000 acre feet of the storage Capacity ~n the Railroad CanyOn Reservoir. The Project developer has received a`will-serve" letter from the District for the southern portion of the Site. (b) The water distribution system for Tuscany Hills will be phased in accordance with the phases of construction. Water storage facilities will be constructed in the first phase of infrastructure improvements. (c) The developer will use all water saving devices recognized by State law. 2.7.2 Potential Effect: The Project will increase the demand for Wastewater treatment services. The Project is anticipated to generate an averaqe daily flow of 0.51 million gallons per day. Findinas: The City hereby makes finding (1). ' ' The following measures will mitigate the identified impact to a level of insignificance. (a) The ezistinq Elsinore Valley Municipal Water District Sewage Treatment Plant, located approzimately 5 miles northwest of the Project site, is proposed to be ezpanded to a capacity of 3.0 million gallons per day by 1990. Ultimately the capacity of this plant will be 5.0 million gallons per day. In addition, a -16- ~~ . new treatment plant is proposed in the Elsinore 9alley Municipal Water District Master Plan, to be located west of the project site. The sizing and construction of all sewer facilities has been and will continue to b~ coordinated through the Elsinore Valley Municipal Water District. (D) The Project developer wiil provide necessary on-site lift stations and eztend lateral lines to the ezisting reqional sewage treatment facility. 2.7.3 Potentiai .ffpr*; The Project is ezpected to qenerate a mazimum of 15 tons per day of solid waste. Currently, residential solid waste produced in the Lake Elsinore area is disposed of in the Double Butte landfill site located at 31710 Grand Avenue in Winchester. The site is owned and operated by the County of Riverside. Development of the Project will shorten the useful life of this landfill. Findinas; The City hereby makes fin~ang (2). Facts in ~DDO of Find~na : The following measures will mitigate the identified impact to a level of insignificance. (a) Riverside County is currently zeviewing the potential for ezpansion of the present site or alternative facilities under its State law obligations relating to solid waste plans. Such ezpansion or alternative facilities will provide solid waste service for the Project. 2.7.9 Po n~ai ffp~*; Development of the Project may increase the demand for natural gas. Findinas: The City hereby makes finding (1). Eacts in Supoort of Findinas: The following measures will mitigate the identified impact to a level of insignificance. limits of the 6outhern CaliforniatGasBCompany,the service (b) The Facts in Support of Findings in Section 1.3.1(e) are hereby incorporated by reference. 2.7.5 Potential Fffpr~; Development of the Project will increase the demand for electric service. -17- _. _ __. _ ~ / t- Findinas: The City hereby makes finding (1). Facts in Suanort of Findinas: The following measures will mitigate the identified impact to a level of insiqnificance. (a) The Project site is within the Southern California Edison Company service area. Power lines will be placed underground. (b) The Facts in Support of Findings in Section 1.3.1(e) are hereby iacorporated by reference. (c) The Project will be phased to reduce large electricity consumption during initial years. 2.7.6 Potential Effect: Development of the . Project will increase demand for telephone service. Findinas: The City hereby makes finding (1). Facts in Sunvort of Findinas: The following measures will result in a substantial reduction of the adverse impacts of the identified significant effect. (a) The Project site is within the General Telephone Company service area. All new telephone lines will be buried. 2.7.7 Potential Effect; Development of the Project will increase the demand on police protection services. The Riverside County Sheriff's Department currentiy provides police protection services for the Project area. Findinas: The City hereby makes findinq (1). Facts fn Suonort of Findinas: The following measures will mitfgate the identified impact to e level of insignificance. (g) The Riverside County Sheriff's Department will provide police protection services to the Project site from an ezisting police substation located at 117 South Langstaff in the City. This station is located approzimately 10 miles from the Project site, with an average response time of less than 10 minutes. (b) Street patterns and building locations will be desiqned for good visibility. -18- ~,/ (c) Taz revenue from the Project will provide additional funding for any increase in police protection. 2.7.8 Potential Effect: Development of the proposed Project will eliminate some native sage scrub vegetation and replace it with houses and ornamental landscaping. In addition to the fire hazards to new homes, brush fire hazards will still ezist on the portion of the Project site left in open space. The Project site is within an area of estreme wildland fire danger due to unique weather factors, topoqraphy and other risk influences. Findinas: The City hereby makes finding (1). Eacts in Supnort of Findinas: The following measures will mitigate the identified impact to a level of insignificance. (a) The Riverside County Fire Department, under contract with the City, c~ill provide fire protection services to the Project. S~rvices will be provided from the Elsinore fire station located at 410 West GranB and from the substation at Greenwald Avenue. Response times will vary between 5 and 12 minutes to any location within the Project site. (b) fire break in open areas. Additional will provide funds a one-acre site wi station. Brush wiil be cleared to establish a space immediately adjacent to developed taz revenue derived from the Project for added fire protection services and 11 be preserved for a future fire (c) The developer will establish fire breaks in accordance with appropriate standards and establish a fire break plan approved by Riverside County Fire Department and the Community Development Director. 2.7.9 po n ial Development of the Project will generate additional demand for educational services. Ezisting school facilities are near or at Capacity. The Project site is located within the Lake Elsinore Unified School District. Findinas: The City hereby makes finding (1). Facts in Sunnor of F+ndina,s: The following measures will mitigate the identified impact to a level of insignificance. -19- . .~..~, _,n e. > >u <. , ~. ..,_._ . _ _ _. ~~ ~~ (a) An agreement has been reached between the developer and the Lake Elsinore Unified School District pursuant to which an 11-acre elementary school site and an adjacent 5-acre pazk will be provided in the central portion of the Project site. There will be a furthez agreement between the Project developer and the school district covering mitigation of impacts on hiqh school services. 2.7.10 Pot n iai E r,~: Development of the Project will result in an increased demand for parks and recreational facilities. Findinas: The City hereby makes finding (1). Facts in 6uovort o F+nding,c; The following measures will mitiqate the identified impact to a level of insiqnificance. (a) Lake Elsinore is a state recreational area, and Lake Elsinore State Park is located on the northwest shore of the Lake near the Project site. In eddition, two County parks are located in the vicinity of the Project site, Kabian Park and Lake Skinner County Park. Further, Yarborough Park is located in the downtown area of the City, approzimately 2 miles to the east of the Project site. (b) Three park sites are provided 3n the development plans for the Project, for a total of approzimately 46 acres of park site; additionally, there is a 26-acre lake located in the northern portion of the site. Parks, private recreation areas, open space and a wildlife corridor and lake area comprise approzimately 253 acres of the total Project site. Recreation area facilities include a ewitaming pool, basketball and tennis courts, picnic areas and totlots. 2.8 Fnerav ConcA~vat;n., 2.8.1 Po n ial fp~~• Development of the Project will result in increased energy consumption, both for vehicle trips and for household and commercial uses. Findinas: The City hereby makes finding (1). Facts in Sunoor of F~ndina : The following measures will mitigate the identified impact to a level of insignificance. -20- _ _ _ _ _ __ ~ ~., . (a) The Facts in Suppozt of Findings contained in Sectioa 1.3.1 (b), (c), (d) and (e) are hereby incorporated by reference. (b) The Project will be phased to reduce large energy consumption durinq the initial years of Project development. 2.9 Growth InBucina Imnacts 2.9.1 Potential Effect: Due to the increase in the number of residents as a result of the Project development, growth in local retail and service business is likely, as is an increase in government employment for purposes of providing new services to residents of the Project. Due to these increases in demand for various services, some additional development in areas nearby to the Project site is anticipated. Findinas: The City hereby makes finding (1). Fact~ in Supoort of Findinas: The following measures will mitiqate the identified impac~ to a level of insignificance. (a) The developer of the Project will dedicate an 11 acre elementary school site and pay school fees (or make equivalent dedications, etc.) to the Lake Elsinore Unified School District pursuant to a revised agreement with the district. (b) Development of the Project includes a small neighborhood commercial center to provide retail and other services to Project residents. (c) Development of the Project will be phased so that impacts to ezisting conditions will occur qradually. 2.10 ~umulative Impacts 2.10.1 Potential Effect: Three other development projects have been approved in the general vicinity of the Project site, Ramsgate, Cottonwood Hills and the Friedman property. The effects of these projects, in addition to the effects of the Project, could have adverse cumulative 3mpacts on biological resources (vegetation and wildlife), sir quality and traffic. -21- r~, ~~ ~/ Findinas: The City hereby makes finding(s) (1) 8nd (2) with respect to all cumulative impacts other than those 3mpacts discussed in Sections 1.3 and 1.4: Facts in Suvoort of FinBina~: The following measures will mitigate the identified impact to a level of insignificance. (a) Development of the surroundinq projects may be ezpected to have an adverse cumulative impact on the habitat of the Stephens' Kangaroo Rat. Development projects in the vicinity of the Project will be required to participate in Riverside County fee proqrams to find purchases of high-quality SKR habitat preserve, or to participate in the Riverside County Habitat Conservation Program, once this program is approved. (b) The Facts in Support of Findings in 6ections 1.3 and 2.6.1(b) and (c) are hereby incorporate8 by reference. 3.1 "NO PrO~ " A1 -rna ivr+~ 3.1.1 p~r~ntion of Aitern-tive; The EIR describes the "no project' alternative as a continuation of ezistinq conditions on the Project site. ' 3.1.2 .-~. ....~ r.iicc~s oi cn rroposea PTOI rt; Th@ City hereby finds that the •no project" alternative is environmentally superior to the Project because it wouid eliminate those environmental effects of the Project identified in 6ections 1 and 2. 3.1.3 Fffertivenec_s in Me.tina Project 4biectives: The •no project` alternative would not meet Project ob~ectives specified in the EIR because it would not satisfy, in pazt, the demand for quality dwelling units in the Lake Elsinore area, would not create a residential environment providing open space, park, wildlife corridor areas and recreational facilities, and would not provide the developer of the Project with a reasonable return on his investment. Additionally, the "no project" alternative would not provide the benefits associated with the acquisition of 6tephens' Kangaroo Rat habitat off-site, including the opportunities for enhanced management of Stephens' Kangaroo Rat habitat and opportunities Eor preservation of that endangered species. Further, the "no projeGt" alternative would _22_ ~T~ 1~ , . ~ result in increased demand in areas surrounding the City of Lake Elsinore for residential developments of the type proposed in the Project, with a resultant loss of control over development within the City limits and the City's sphere of influence. 3.1.9 Feasibilitv: The 'no project" alternative 3s not feasible. Facts in Si~,puort of Findinas: (a) The "no project" alternative is not feasible because this alternative fails to meet any of the Project objectives or to provide any of the Project benefits set forth in Section 3.1.3. (b) The "no project" alternative.is 3nfeasible because it fails to provide the economic and social benefits described in 6ection 3.1.3, including enhancement of the long-term survivability of the Stephens' Rangaroo Rat, provision of housing within the City in furtherance o£ the General Plan, and maintenance of City control over local residential development. 3,2 nscreased Overall Densitv Alternative 3.2.1 Description of Alternative: This alternative would involve a reduction in the number of single family dwelling units below the minimum number proposed by the developer. 3.2.2 Comvarison of the Effects of the Alternative to the Effects of the Proposed Proiect: The City hereby finds that this alternative is environmentally superior to the Project because it would zeduce the adverse impacts. described in Sections 1 and 2 associated with the proposed Project. 3.2.3 Fffectiveness in Meeting Project ~bjectives: The decreased overall density aiternative would not meet Project objectives specified in the EIR because ft would not result in economically feasible development on the Project site based on market conditions [need more facts in the record]. Therefore, none of the Project benefits identified in Section 3.1.3 would be achieved. 3,2,4 Feasibilitv; The decreased overall density alternative is not feasible. -23- ~z7 ~ / 1 t I' Facts in Sunnor of F~ndinay,; This alternative would require development of the Project site in a fashion which is economically lnfeasible based on current conditions. The Project applicant has concluded that this alternative is not economically feasible due to the significant amounts of qrading which must be accomplished to allow any residential development to occur at the Project site. Although the edverse environmental impacts identified in Section 2 would be somewhat reduced if a lower overall density of development on the Project site were to be achieved, the density reduction would effectively stop the Project from beinq developed and therefore the concommitant benefits of the Project described under Section 3.1.3 would be lost. 3.3 TncreacPd Overall Densi ~ A1 rns iv : 3.3.1 Description'of A1 -rna iv : This alternative would increase the number of singie family units to be developed on the Project site above the 2,000 units proposed by the Project developer. 3.3.2 ~mnarison of the Effp~+-~ ~f h A1 P F;.. to th - Effonl-~s nf *r,P v..,posed Projg~; The City hereby finds that this alternative is not environmentally - superior to the Project. Facts in S+~nport of Findinas: (a) Increased overall density would result in a greater demand on off-site traffic infrastructure, public services (including police and fire protection, achools, potable water suppiies, wastewater treatment, and solid waste disposal) and public utilitfes services. J-dverse air quality impacts would be increased, and, unless additional units were tightly clustered, impacts on topography and land forms wouid be ezacerbated. Project site drainaqe could be adversely affected as well. 3.3.3 F_.ffectiv necs in M ina P oject ~bjective~; The increased overall density alternative would meet the Project objectives. 3.3.4 Feasibilitv: The increased overall density alternataive is feasible, but would result in increased levels of adverse impacts on the environment. -24- ~~'~ ~ .~ b Q r ~ ,i 4.1 Section 21081.6 of the Public Resources Code requires that when a public agency is making the findings required by 6ection 21081(a) of the Public Resources Code, that Agency shall adopt a reporting or monitoring program for the changes to the Project which it has adopted or made a condition of Project approval in order to mitiqate or avoid significant effects on the environment. The City hereby finds that the Mit3gation Reporting and Monitoring Program set forth in Ezhibit _ to meets the requirements of Section 21081.6 of the Public Resources Code. COHEN: 101 -25- ~~ ~.~) ° _ APPENDIX 15 TO THE SPECIFIC~ Pi.AN TO RESOLUTION 8913 `il ~ ---- --__ _ _----- ~~ AND [_" REPORTING PROGRAIVI ~ ~.~ L~~ NOVEMBER 1989 Li ~~I , ~ I ll~~:~~ ~ ~ _4~ ~~~... ~s ti..~. ., ~ ~ , _ _ _ .__ _ __ _ ~/ ~ ~ ~ TUSCANY HILLS ~ MITIGATION MONITORING AND REPORTIN6 PROGRAM ~ Recently enacted legislation (Assembly Bill 3180), codified ~ as Section 21081.6 of the Public Resource Code, requires public agencies to set up monitoring and reporting programs for the purpose of ensuring compliance with those mitigation measures identified in ~ environmental impact reports and negative declarations, and adopted as conditions of project approval. ~ Presented in the accompanying matrix are those mitigation measures which have been identified in the "Findings and Facts in ~, Support of Findings Adopted by the City Council of the City of Lake ~ Elsinore Regarding the Environmental Impact Report for the Homestead Land Development Corporation Tuscany Hills Development." Adjacent to each mitigation measure is a description of how that measure will be ~ adopted, enforced or incorporated into this Specific Plan and how compliance will be monitored (in accordance with A.B. 3180). l_ l_ L I_ L ~ I` i ~ . _..~~~.~m~axx~a~_ ,v,~ ~. :~; u..~ . ~___ _~, . _ . ~._'_ r_ f~ ~'. I'_ ,_, r-- r-- ~- r~-~-, ; ~-• ~ TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Mitiaation Measure Responsibility For Monitorina Monitorina Proaram Tooopraphv 1. City ordinances related to grading will be followed to minimize topographic changes. City Engineer/Chief Building Official •-..~ .,.~.. --~ `-1 Verification Compliance to be monitored at the time of issuance of the grading per- mit(s). 2. Grading and earthwork improve- City Engineer/Chief Compliance to be evaluated at the ments will be balanced on- Building Official time of issuance of the grading per- site. To the maximum extent mit(s) and shall be monitored by in- feasible, grading activities spection and approval by the soils will conform to existing con- engineer or engineering geologist. tours. 3. Approximately 170 acres within the southern portion of the Project site will remain in their natural and ungraded state. Further, the estate lots to be developed in the southern half of the Project will encompass 57 acres on which only limited grading „ will occur. Approximately 33 acres in the northern portion of the Project site will be left as open space in its na- tural state, another 34 acres in the northern portion will be developed for park, recrea- Community Development Director Adoption of the Specific Plan shall constitute compliance with this miti- gation measure. ti ~ (..~ J'_ ~.~v ~i r~ '~" I r...~ ~~ ~~.-~ :~.~.. p....~. ..e..~, .--.~ Mitiaation Measure Toooaranhv (Continued) tion and lake uses and a 31 acre wildlife corridor. 4. Single-loaded streets will be utilized to help maintain the natural land form. Seismic 5. The design of fill slopes and embankments will be sufficient to minimize earthquake im- pacts. Proper design, compac- tion and construction will reduce the potential for land- slide impacts on manmade slopes. 6. All proper design criteria will be employed to minimize potential impacts to and from local geologic formations. All seismic building require- ments will be met to reduce or eliminate impacts from seismic activity on structures. Pro- per engineering will ensure foundation integrity against differential settling. TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility for Monitorina Monitorina Propram Community Development Director .~._' '.-_ "_.1 ".'."1 Verification Adoption of the Specific Plan shall constitute compliance with this miti- gation measure. Chief Building Issuance of grading permits and moni- Official toring through the building inspec- tion process shall constitute compli- ance with this mitigation measure. Applicant's soils engineer or engi- neering geologist shall submit a final report indicating compliance with approved grading plan(s). City Engineer Building design shall be in accor- dance with Uniform Building Code standards and shall be verified dur- ing the plan check process. Issuance of building permits shall constitute : compliance with this mitigation mea- sure. ti ~\ ,- i " f_" f.~, f_ r`-- Mitiaation Measure Air Oualitv 7. Dust generation will be con- trolled by watering areas prior to and during grading. Landscape vegetation will be introduced as soon as con- struction is completed. r- __._ .__.. _..., ~ TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility For Monitorina 8. The number of vehicle miles traveled for home-to-work trips may be reduced by: 1) various governmental efforts to induce more employers to locate in the Tri-Community Area to reduce trip length; and 2) governmental efforts to provide bus service from the Project area to employment centers in surrounding areas. City Engineer/Chief Building Official None ~ 9. The developer will provide Building Inspector information concerning the Cal-Trans ride-sharing program to new home buyers at its sales office. 10. The neighborhood commercial Community Development center will provide for a por- Director tion of the retail needs of the Project residents. Monitorina Proaram ,.~ ^ ~ i""1 Verification Watering of graded areas to minimize fugitive dust shall occur in accor- dance with the approved grading plan(s) and the requirements of the soils engineer or engineering geolo- gist. Monitoring of compliance shall be undertaken by the building inspec- tor as part of the building inspec- tion process. No monitoring required. Compliance will be monitored by veri- firation by the building inspector subsequent to the initiation of on- site marketing activities. Approval of the Specific Plan shall constitute compliance with this miti- gation measure. ti ~ (_' ; ' i` I..._' ~' ,.'_' Mitiaation Measure Air Qualitv (Continued) 11. The Project developer will use energy conserving design and construction techniques as required under State law and will comply with the require- ments of Title 24 of the Cali- fornia Code of Regulations. Bioloaical Environment 12. Development of the Tuscany Hills site will begin in the southern portion and will pro- gress northward in phases. Phasing will allow for a more orderly movement of larger animals from the study site to surrounding undeveloped area. The open space area in the southern portion of the study area will provide habitats for some of the smaller animals. 13. Natural contours and topogra- phic features will be pre- served to the greatest extent possible in the open space areas and within a planned 31 acre wildlife corridor. The wildlife carridor provides potential links to existing TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility For Monitorina Monitorina Proaram ~---, ~--~ Verification City Engineer Prior to the issuance of building permits for individual dwelling units or habitable commercial buildings, applicant shall submit and the City shall review and approve Title 24 energy calculation. Issuance of building permits shall constitute compliance with this mitigation mea- sure. Community Development Adoption of the Specific Plan shall Director constitute compliance with this miti- gation measure. Community Development Adoption of the Specific Plan shall Director constitute compliance with this miti- gation measure. ti ,\ ~.." ~. ~`" r°` ,-~- r~ r~, ;~ ,.~ ~+ r=-= ---. -=, r=, : _ ==-=, =- _; , = =~ TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility Mitiaation Measure For Monitorina Monitorina Pronram Verification Bioloaical Environment (Continued) federal Bureau of Land Manage- ment parcels. Natural open space areas of the Project comprise approximately 170 acres, including a 117 acre parcel near the watertank site and a 37 acre open space/park area, will be offered for de- dication to the City. In to- tal, open space, parks, pri- vate recreation areas, lake and wildlife corridor areas comprise approximately 253 acres. An additional 88 acres of manufactured slopes will be contained within the Project site. 14. Protection of open space and Community Development ti Applicant shall comply with the sub- ~~ riparian settings will be ac- Director mittal requirements of Sections 1603 complished through compliance of the Fish and Game Code and shall with Fish and Game Code Sec- obtain permits, as may be required, tion 1603 and the issuance of from the California Department of a 1603 permit from the Cali- Fish and 6ame. Prior to the issuance fornia Department of Fish and of grading permits, Applicant shall Game. submit and the Community Development Director shall verify compliance therewith. 15. A variety of plant species Community Development- Adoption of those landscape guide- will be used for landscaping, Director lines contained in the Specific Plan as appropriate to soil condi- and approval of tract-specific land- tions. scape plans shall constitute compli- i:. ~" ~` ~ ~~~ 1~ ~~ r~_ ~~ Mitiaation Measure Bioloqical Environment (Continued) the Secondary Preserve Site, as described in the Conserva- tion Agreement, and shall ex- ecute an irrevocable offer of dedication of the Secondary Preserve Site to the City of Lake Elsinore or to another entity approved by the United States Fish and Wildlife Ser- vice. 19. The developer and its succes- sors in interest shall manage the Initial Preserve Site and the Secondary Preserve Site in a manner which is consistent with the conservation and pro- tection of the SKR and its habitat. 20. The authorization to take any endangered or threatened spe- cies, pursuant to Sections 7(b)(4) and 7(0)(2) of the Endangered Species Act of 1973, as amended, shall not be effective until the developer executes the Conservation Agreement and completes the acquisition of that Initial Preserve Site described there- in. The extent of any author- ization to take any endangered TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility For Monitorina Monitorinq Proaram Community Development Execution and implementation of the Director Conservation Agreement shall consti- tute compliance with this mitigation measure. Community Development Execution and implementation of the Director Conservation Agreement shall consti- tute compliance with this mitigation measure. Verification ti. ~ ~ ~ ;` ~..._~ j'__. ~'^ ~...._ (_ f~, ~."_, ~~. ~.~,-~ 1~"~., 1"'"^` f"'."" """~y ~"~".y ~""~"'i - _ ' ii TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM ;F Responsibility ; Mitiaation Measure For Monitorina Monitorina Proaram *! Bioloaical Environment ~' (Continued) i':. or threatened species shall be limited to the grading of not more than 235.3 acres of oc- cupied SKR Habitat until the developer completes the acqui- sition of the Secondary Pre- serve Site, as set forth therein. 21. The developer and its succes- sors in interest shall not alter or modify any SKR habi- tat in the Initial Preserve Site or the Secondary Preserve Site without prior approval by the United States Fish and Wildlife Service. 22. Authorization for incidental take will be conditioned upon implementation and compliance with the Conservation Plan as required by the Conservation Agreement to be signed by the developer, the United States Fish and Wildlife Service, and the City of Lake Elsinore. Community Development Execution and implementation of the Director Conservation Agreement shall consti- tute compliance with this mitigation measure. Community Development Execution and implementation of the Director Conservation Agreement shall consti- tute compliance with this mitigation measure. 23. The developer and its succes- Community Development Execution and implementation of the sors in interest shall comply Director Conservation Agreement shall consti- with the reporting require- tute compliance with this mitigation ments of the Conservation measure. Agreement/Conservation Plan. Verification ti \ r---- r-- ......,, ~..~...~. ~....w w~w+~+ nwwwr .....y i : TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Mitiaation Measure Bioloaical Environment (Continued) 24. If incidental take at any time does not comply with the pro- visions established in the Incidental Take statement, the developer shall ensure that the causative action cease immediately, and shall seek the immediate assistance of the United States Fish and Wildlife Service (Laguna Niguel Field Office) to evalu- ate the impacts of incidental take and make recommendations to rectify the situation. Responsibility For Monitorina Community Development Director ....._ ; ---~ ~----y ~..-1 ~ Monitorina Proqram Execution and implementation of the Conservation Agreement shall consti- tute compliance with this mitiqation measure. 25. Any Stephens' Kangaroo Rats Community Development recovered shall be deposited Director in the mammal collection of the Natural History Museum, County of Los Angeles. Geoloav and Soils 26. Earthwork will balance cut and fill on-site and will not re- quire any import or export of soil. Grading activities will conform as much as possible to existing contours. All proper soil and engineering analyses will be done prior to grading. All grading activities will conform to City requirements. Execution and implementation of the Conservation Agreement shall consti- tute compliance with this mitigation measure. City Engineer Compiiance to be monitored at the Building Inspector time of issuance of the grading per- mit(s) and shall be monitored by the building inspector as part of the building inspection process and ap- proval of all grading activities by the Applicant's soils engineer or ~ engineering geologist. Verification \ ~ Eq~ C- P~ h`,Y ~~. ~. o~„ ¢:: Y? ~: . .~.- r~- ~•-• r-~.- ~... ~~rr+ rr. r.r.. pr..y w.....q n~....~ iv+..r I Mitiaation Measure Geoloav and Soils (Continued) All soils on-site can be work- ed with a minimum amount of preparation, with the excep- tion of the Bosanko clays. Proper caution will be exer- cised during removal or fill- mixing with these clays to eliminate any possible impacts related to expansion. TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility For Monitorina Monitorina Pro4ram Verification 27. Construction activities such Building Inspector as watering and soil stockpil- ing will be monitored to con- trol on-site and off-site soil erosion. Hvdroloqv and Flood Control 28. Construction activities will be designed to contain off- site runoff. Watering will be kept to the minimum required for compaction and dust sup- pression. Any steep, exposed manmade slopes will be covered or hydroseeded to prevent off- site sediment transport. Grading activities shall be monitored in accordance with the approved grad- ing plan(s). Issuance of final grad- ing approval by the building inspec- tor shall constitute compliance with this mitigation measure. City Engineer Compliance to be monitored at the Building Inspector time of issuance of the grading per- mit(s) and shall be monitored by the building inspector as part of the building inspection process. ti ~ r- ~____ ! ~~ r..._ ~~ Mitiqation Measure r-~...- ~-+.~ ir...t .rwr. r.r.n I+W+~'°H .~uwvr+M ~wwwi ~ : TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility For Monitorina Hvdroloav and Flood Control (Continued) 29. Subdrains will be constructed in canyon fill areas where necessary. These drains will collect existing and future groundwater flows. Surface drains and subdrains may be necessary for buttress or fill stabilization. All required curb, gutter, and storm drain structures will be constructed to channel surface runoff off- site. 30: Frequent street cleaning by the City will reduce the po- tential for runoff pollutants produced by this Project. 31. Specific drainage systems will be designed as each planning area within the Project site develops. All drainage sys- tems will comply with adopted City standards. Drainage sys- tems shall utilize natural drainage channels to the greatest extent possible, with improvements as necessary to accommodate expected flows from new development. Monitorinq Proqram City Engineer Compliance to be monitored at the Building Inspector time of issuance of the grading per- mit(s) and shall be monitored by in- spection and approval by the building inspector as part of the building inspection process and approval of all grading activities, including the installation of subdrains, by the applicant's soil engineer or engi- neering geologist. Community Development Dedication and acceptance of Project Director area street shall constitute compli- ance with this mitigation measure. City Engineer Compliance to be monitored at the Building Inspector time of issuance of the grading per- mit(s) and shall be monitored by in- spection and approval by the building inspector as part of the building inspection process and approval of all grading and drainage improvements by the applicant's soils engineer or engineering geologist. Verification ti ~ !~" ~.. C_"' r,."' r•-- r---, r-`- r--- ?~-~- r---~ . r---. ~ ;~ ~r ~ -p--~ ---~ °~--7 ~..~. TUSCANY HI LLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility Mitiaation Measure For Monitorina Monitorina Proaram Verification Hvdroloav and Flood Control (Continued) 32. The developer will construct City Engineer Compliance to be monitored at the drains and subdrains to inter- Building Inspector time of issuance of the grading per- cept run-off. The developer mit(s) and shall be monitored by in- will establish an erosion con- spector as part of the building in- trol plan to be in effect dur- spection process. ing and after construction to be subject to approval of the City Engineer/Chief Building Official prior to issuance of grading permits. 33. The developer will develop a Community Development Applicant shall submit, for approval Master Landscape Installation Director by the Community Development Direc- and Maintenance Plan for pub- tor, a Landscape Installation and lic and private land areas to Maintenance Plan. Approval of that be subject to approval of the plan shall constitute compliance with Community Development Director this mitigation measure. or his designee. Cultural Resources 34. The developer shall provide Community Development An archaeological records search further testing and documenta- Director (University of California, Riverside tion of sites and appropriate 10/89) included as part of Addendum mitigation as recommended by a to the FEIR (SCH No. 79082906), docu- qualified archaeologist prior mented prehistoric resources in the to issuance of further grading project vicinity. Applicant shall permits. Appropriate mitiga- submit, and the City shall approve, tion measures will be under- further documentation of on-site cul- taken to reduce or eliminate , tural resources prior to the issuance adverse impacts to archaeolo- ' of grading permit(s). Issuance of gical resources discovered on those permits shall constitute com- the project site. pliance vrith this mitigation measure. ti ~ r ~ 0..:.~ ~_ - ~_ ! ~ ~ ~~~ r ~ ~ ~~~ r..rr /n~'w I~+~l~ , !1ywV~ ~v~vl~ .' w~ M~+r1 ~~ rw~ ~1 w~ri I ~~:.. ~~. SP, ~l- ~: TUSCANY HILLS r MITIGATION MONITORING AND REPORTING PROGRAM '~- Responsibility ^'' Mitiaation Measure For Monitorina Monitorina Proaram Verification Cultural Resources _ (Continued) 35. The developer shall provide a Building Inspector The building inspector, during review qualified paleontologist to be of grading activities, shall monitor present during grading, empow- compliance with this mitigation mea- ered to stop grading temporar- sure. ily for the recovery of fossil remains during grading within ~ suspect geologic formations as identified in preliminary and final geologic and soils re- ports. Land Use. Zoninq and General Plan 36. The Specific Plan for the Pro- Community Development Adoption of the Specific Plan shall ject is being processed under Director constitute a determination of project City Code Section ll.99.060 consistency and represents compliance (Nonconditional (SP) Specific with this mitigation measure. Plan Zoning Procedure) Pursu- ant to this procedure, the „ Project will receive the (SP) Specific Plan zoning designa- tion concurrently with the approval of the Specific Plan documents. Zoning within the Specific Plan area will be governed by the Specific Plan. The Project developer shall comply with all provisions of the Zoning Ordinance for the City, including all applicable i provisions of Chapter 17.99 of the Zoning Ordinance and the ti ,\ ~ ~~ i ~"' ~+-... ~..~~ r.~~ r~...~.. Inw~ rr~~ I""...~. '~"""'y 1"n'Ww''. w~rr+°wi aar"'~ wrw earrr Mitiaation Measure Land Use. Zonina and General Plan (Continued) provisions of the Specific Plan. To the extent of any conflict between the Zoning Ordinance and the Specific Plan, the provisions of the Specific Plan will govern. 37. The Specific Plan describes a methodology for assuring the adequate provision of public services and facilities for the land uses specified in the Specific Plan. 38. The development standards and design guidelines for the Pro- ject specified in the Specific Plan will ensure that the land uses planned for the Project and the development of the Project will be compatible with the surrounding land uses. TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility For Monitorina Community Development Director Community Development Director Traffic and Circulation 39. The proposed development has Traffic Engineer an adequate internal circula- tion system to handle project- ed traffic loads. Monitorina Proaram Adoption of the Specific Plan shall constitute compliance with this miti- gation measure. Adoption of the Specific Plan shall constitute a determination of Project consistency and represents compliance with this mitigation measure. Compliance will be monitored at the time of final tract map approval. Approval of the finai tract map shall constitute compliance with this miti- f gation measure. Verification ,, ti. ,\ .. -, r--- r--- r--- ~'-- ~--- ^-- r--- !--- r-^r~ . r-~-~ r.ww. ;~w.wry ""n'~ "°'o^ i ' TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility Mitiaation Measure For Monitorina Monitorina Proaram Traffic and Circulation (Continued) 40. All minor streets intersecting Traffic Engineer with the proposed 88-foot north-south "Secondary Arter- ial" shall be controlled by stop signs on the minor streets. 41. The approaches of the internal Traffic Engineer roadways toward Greenwald Avenue shall be controlled by stop signs. 42. The Project is required to participate in an assessment district for off-site improve- menCs. If a traffic signal is ultimately warranted at the in.tersection of Summerhill Drive and Railroad Canyon Road, the Project developer would contribute that portion of the signal cost which cor- responds to the volume of in- tersection traffic caused by this development. Compliance will be monitored at the time of final tract map approval. Adoption of the final tract map shall constitute compliance with this miti- gation measure. Compliance will be monitored at the time of final tract map approval. Adoption of the final tract map shall constitute compliance with this miti- gation measure. Verification Traffic Engineer Compliance will be monitored at the time of final tract map approval. Approval of the final tract map shall constitute compliance with this miti- ti gation measure. ~\ TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Mitiqation Measure Responsibility For Monitorina Monitorina Proaram Public Services and Utilities Water Suoplv 43. The Project developer has re- Community Development ceived a "will-serve" letter Director from the Elsinore Valley Muni- cipal Water District for the southern portion of the site. 44. The water distribution system for Tuscany Hills will be phased in accordance with the phases of construction. Water storage facilities will be constructed in the first phase of infrastructure improve- ments. 45. The developer will use all water saving devices required -~ by State law. Sanitarv Sewers 46. The Project developer will provide necessary on-site lift stations and extend lateral lines to the existing regional sewage treatment facility. The sizing and construction of all sewer facilit;ac shall be Applicant shall deliver to the City a copy of the "Will Serve" letter from the Elsinore ~alley Municipal Water ~istrict. Receipt of that letter by the City shall constitute compliance with~ this mitigation measure. City Engineer Prior to the issuance of a Certifi- cate of Occupancy for the first dwelling unit to be constructed, the City Engineer shall ensure the com- pletion of all water storage facili- ties. Issuance of that Certificate of Occupancy permit shall constitute compliance with this mitigation mea- sure. City Engineer Unit design will incorporate State mandated water conservation measures. This mitigation measure shall be en- forced at time of building permit issuance. City Engineer Prior to the approval of any final tract map, the location, phasing, bonding and details of the sanitary sewer facilities shall be determined ~. by street configuration, lot layout and gravity flow. Approval of the final tract map shall constitute com- Verification ti ~ : _ :__:__ ~ r---' r"~_ Y~'~' Mitiaation Measure Sanitarv Sewers (Continued) ^~~ r.~.` I""'^ I°"'~.. pww+' rw°n°w+i 'rr"Y"I i TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility For Monitorina coordinated through the Elsi- nore Valley Municipal Water District. Solid Waste 47. Riverside County is currently reviewing the potential for expansion of the present site or alternative facilities un- der its State law obligations relating to solid waste plans. Such expansion or alternative facilities will provide solid waste service for the Project. Electricit Monitorina Proaram pliance with this mitigation measure. Community Development The Project shall comply with appli- Director cable provisions of A.B. 939 as enac- ted by the City. Approval of the` final tract map shall constitute com- pliance with this mitigation measure. 48. The Project site is within the City Engineer Southern California Edison . Company service area. Power ' lines will be placed under- ground. 49. The Project will be phased to reduce large electricity con- sumption during initial years. Community Development Director The conduit system for any electrical service, with associated concrete manholes and vaults, shall be in- stalled underground in accordance with utility company and City re- quirements. Approval of final tract maps shall constitute compliance with this mitigation measure. Adoption of the Specific Plan shall constitute compliance with this miti- gation measure. Verification ,. ti ~\ ~ . r-- ~--- ~- Mitiaation Measure Teleohone Service TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility For Monitorina 50. The Project site is within the City Engineer General Telephone Company ser- vice area. All new telephone lines will be buried. Police Services Monitorina Proaram The conduit system for all telephone service shall be installed under- ground in accordance with telephone company and City requirements. Ap- proval of the final tract map shall constitute compliance with this miti- gation measure. 51. Street patterns and building City Engineer Approval of final tract maps shall' locations will be designed for constitute compliance with this miti- good visibility. gation measure. 52. Tax revenue from the Project None No monitoring required. will provide additional fund- ing for any increase in police protection. Fire Deoartment Services 53. Brush will be cleared to es- Fire Marshall(County) The Riverside County Fire Department ,, tablish a fire break in open shall annually monitor brush condi- space immediately adjacent to developed areas tions to assess fire hazard proximal . to existing development. Posting and/or other notification by that Department shall constitute compli- ance with this mitigation measure. 54. Additional tax revenue derived Community Development The Specific Plan shall identify a from the Project will provide Director/Fire Marshall one-acre site for a future fire sta- funds for added fire protec- (County) tion. Adoption of the Specific Plan tion services and a one-acre i shall constitute compliance with this site will be preserved for a mitigation measure. future fire station. Verification ,, ti ~ ~ i- ~ r--' f~.` ~ f_ ,.._ "_ r"_' r-°'r r---• r°'~'+ ~w TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Mitiaation Measure ResponsibiliY.y For Monitorinq Monitorina Prouram Fire Deoartment Services (Continued) 55. The developer will establish fire breaks in accordance with appropriate standards and es- tablish a fire break plan ap- proved by the Riverside County Fire Department and the Com- munity Development Director. Educational Services 56. An agreement has been reached between the developer and the Lake Elsinore Unified School District pursuant to which an 11-acre elementary school site and an adjacent 5-acre park will be provided in the cen- tral portion of the Project site. There will be a further agreement between the Project developer and the School Dis- trict covering mitigation of impacts on high school ser- vices. Recreational Facilities Community Development Director/Fire Marshall (County) Community Development Director/Superinten- dent of Schools (School District) """'~ "'""`~ ..".~ '....~ Verification Applicant shall submit and the City and the County Fire Department shall approve a fire break plan for the Project area. Acceptance of that plan by the City and County shall constitute compliance with this miti- gation measure. Dedication of real property for on- site school facilities, and accep- tance of that dedication by the Lake Elsinore Unified School District, shall constitute compliance with this mitigation measure. Prior to the issuance of building permits, the City shall further veri- fy the payment of any applicable school fees. Issuance of building permits shall constitute compliance with this mitigation measure. 57. Three park sites are provided Community Development Approval of the Specific Plan shall in the development plans for Director constitute compliance with this miti- the Project, for a total of gation measure. approximately 46 acres of park i sites. Additionally, there is a 26-acre lake located in the ti ~\ f : I.._.' f_" f' i I'_ ~-.-. .--~ ^" r" r""" r.~w ~r TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility Mitiaation Measure For Monitorina Recreational Facilities (Continued) northern portion of the site. Parks, private recreation areas, open space and a wild- life corridor and lake area comprise approximately 253 acres of the total Project site. Recreation area facili- ties include a swimming pool, basketball and tennis courts, picnic areas and tot-lots. Enerav Conservation 58. The Project will be phased to Community Development reduce large energy consump- Director tion during the initial years of Project development. Growth-Inducina Imoacts 59. The developer of the Project Community Development will dedicate an 11-acre ele- Director/Superinten- mentary school site and pay dent of Schools school fees or make equivalent (School District) dedications, etc.) to the Lake Elsinore Unified School Dis- trict pursuant to a revised agreement with the district. Monitorina Proaram ""..~ ,-'"1 `~"1 '~"I Uerification Adoption of the Specific Plan shall constitute compliance with this miti- gation measure. Dedication of real property for on- site school facilities, and accep- tance of that dedication by the Lake Elsinore Unified School District, shall constitute compliance with this mitigation measure. Prior to the issuance of building permits, the City shall further veri- fy the payment of any applicable school fees. Issuance of building permits shall constitute compliance with this mitigation measure. ti ~ ~ ~ 60 61 Mitipation Measure Growth-Inducina Imoacts (Continued) Development of the Project inclu~es a small neighborhood commercial center to provide retail and other services to Project residents. Cumulative Imnacts Development of the surrounding projects may be expected to have an adverse cumulative impact on the habitat of the Stephens' Kangaroo Rat. De- velopment projects in the vi- cinity of the Project will be required to participate in Riverside County fee programs to fund purchases of high-qua- lity SKR habitat preserves, or to participate in the River- side County Habitat Conserva- tion Program, once this pro- gram is approved. TUSCANY HILLS MITIGATION MONITORING AND REPORTING PROGRAM Responsibility For Monitorina Monitorina Proaram Community Development Approval of the Specific Plan shall Director constitute compliance with this miti- gation measure. Community Development Adoption of an Urgency Mitigation'>Fee Director Ordinance and execution of a Memoran- dum of Understanding with the County of Riverside relative to the Interim Habitat Conservation Plan shall con- stitute compliance with this mitiga- tion measure. Verification ti ~\ 4517/77 ~~ ~ ~ _ EXHIBIT D- TO RESOLUTION 8913 / ~ SPE~C PLAN ~ SUBMITTED TO: CITY OF LAKE ELSINORE NOVEMBER 1989 ~~ r- I ~ ~ ` I_ ~ ~ TUSCANY HILLS ~ SPECIFIC PLAN ~ (_ 1_ L ~ PREPARED FOR ~' HOMESTEAD LAND DEVELOPMENT CORPORATION ~_ _ ~_ ` NOVEbiBER, 1989 L l._ l-. v.fs..u.l.~1.I ie . ~ ~ ~". f.arf_ ,:e: ~ . .. . ~ . . . . . ~ . \ . ~7 ~/ TABLE OF CONTENTS Section paee I. Fxecutive Summary ................................................. 1 II. Introduction ...................................................... 3 Site Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Project Overview ............................................. 3 Project History ............................................... 3 Purpose and Objectives . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 III. Site Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Topography ................................................. 9 Geology .................................................... 9 Seismicity .:.......................................:........ 9 Soils ..................................................... 10 Hydrology ................................................. 10 Biology ................................................... 12 Archaeolo~ ................................................ 14 IV. Land Use Plan ................................................... 16 Grading ................................................... 16 - I.and Use ................................................. 16 Open Jpace ................................................ 21 V. Circulation Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 VI. Utilities ........................................... ............. 27 WaterService .............................................. 27 Wastewater ................................................ 28 Drainage Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 Solid Waste ................................................ 30 VII. Public Facilities ................................................... 33 Police Protection ............................................ 33 Fire Protection ............................................. 33 SchooLs ................................................... 33 Parksand Recreation ......................................... 34 VIII. Development Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 Single Family Residential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 Neighborhood Commercial Zone . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 Open Space/Recreation Zone .................................. 50 ~_ . .. , , .;_ ~ ...~. ~ _... . . ~~ t ~ raee ~ IX. Design Guidelines .........:....................................... 54 General Guidelines, Purpose and Theme . . . . . . . . . . . . . . . . . . . . . . . . . . 54 ~ Landscaping Guidelines .. ... . Sit Pl i G id li 54 e ann ng u e nes . , .... ... ............................. 73 Architectural Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73 Community Walls and Fences . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . '77 ~ Signage Program ............................ ................ 79 X. Implementation ................................................... 80 [ Consistency ................................................ 80 Specific Plan Modifications/Amendments . . . . . . . . . . . . . . . . . . . . . . . . . . 81 # XI. ProjectFinancing ................................................. 83 ~ XII. ProjectPhasing .........................................:......... 85 _ Appendices ( A. Definitions t B. Technical Appendix to the Specific Plan (bound separately) ` _ __ . ~-~ ~,/ 1 ~ EXI~IlBTTS ~ P-g- 1. RegionalVicinity ................................ .................. 4 r 2. Project Vicinity .................................. .................. 5 3. ConceptualSite Plan .............................. .................. 6 ~ 4. Planning Approval History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 ( - 5. Hydrology Plan .................................. ................. 11 I 6. Concept Grading Plan ............................. ................. 16 ~ 7. Surrounding Land Uses ............................ ................. 18 8. Land Use Plan .................................. ................. 20 ~- 9. Open Space Plan ................................. ................. 22 1 10. Circulation Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 11. StreetSections .................................. ................. 25 ~ 12. StreetSections ................................. .................. 26 13. WaterPlan .................................. .................. 29 ~_ 14. Sewer Plan . ...........................:...... .................. 31 ~ 15. Storm Drain Facility Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 - 16. Typical Model Complex Plan . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 1 17. Signage Program ................................ .................. 39 . 18. SignageIdentification ............................ .................. 40 1 19. Setbacksinthe R-SF Zone ........................ .................. 42 _ 20. Garage Placer.~ent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 ~ 21. Model Signage Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 22. Monumentation, Wall and Fencing Plan - Northern Section . . . . . . . . . . . . . . . . . . 55 L 23. Monumentation, Wall and Fencing Plan - Southern Section . . . . . . . . . . . . . . . . . . 56 24. Primary Entry Monument and Streetscape . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 L L L ~~ 1 r Paee ~ 25. Primary Monument Elevation . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59 26. Secondary Entry Monument Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60 ~ 27. Secondary Monument Elevation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61 28. Tertiary Entry Monument Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 1 29. Tertiary Monument Elevation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63 ' 30. Conceptual Landscape Plan - Northern Section . . . . . . . . . . . . . . . . . . . . . . . . . . . 64 31. Conceptual Landscape Pian - Southern Section . . . . . . . . . . . . . . . . ........... 65 ~ 32. Primary Streetscape ............................................... 67 33. Sewndary Streetscape .............................................. 68 ~ 34. Interior Streetscape . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70 35. Land Use Maintenance Responsibility Plan - Northern Section . . . . . . . . . . . . . . . 71 I 36. 37. Land Use Efaintenance Responsibility Plan - Southern Section . . . . . . . . . . . . Typical Front Yard I,andscaping Plan 72 . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . 72 A ~ 38. Typical Architectural Elevations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - 74 39. Typical Architectural Elevations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..: . . . . 75 I 40. Wall and Fence Elevations .......................................... 78 ~ 41. Development Phasing Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87 - 1_ 42. Backbone Infrastructure Phasing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . a 88 I_ L [_ f__ L ~_ ~. _~,~ . _ ~ _.~~ ~ .:. _ _ . _ _ ___ _ _ _ __ ~!S'l ~ / r r t TABLES ~ Paee 1. Tuscany Hills Specific Plan Statistical Summary ...... .................... 2 . F t 2. Major Earthquake Faults ........................................... .. 9 3. Cutand Fill ................................................... . 16 [ 4. Water Usage by Land Use ................:........................ . 27 ' 5. Estimated Water Demand . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 6. Estimated Sewage Generation . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . 30 ~ 7. Estimated Student Generation . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . 33 8. Streetscape Plant Palette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66 1 9. ProjectPhasing .................................................. . 86 ~ 10. Infrastructure Phasing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90 ~~ 1 ~ TABLES ~ Paee 1. Tuscany Hills Specific Plan Statistical Summary . . . . . . . . . . . . . . . . 2 r 2 Major Earth uake Faults . . . . . . . . . . . . . q ................. ............................ 9 ~ 3. Cutand Fill ......................... ........................... 4. Water Usage by Land Use ............... ........................... 27 ~ 5. Estimated Water Demand . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 6. Estimated Sewage Generation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 1 7. Estimated Student Generation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 8. Streetscape Plant Palette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66 1 9. ProjectPhasing ......................... .......................... 86 ~ 10. Infrastructure Phasing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90 ~~~ ~ / f ~ I. EXEC[JTTVE SIJMMARY The Tuscany Hills Specific Plan has been prepared for a 973-acre site within the City of ~ Lake Elsinore. Near the southwestern and northern project boundaries are the major highways, Interstate 15 and State Route 74, respectively. Canyon Lake (Railroad Canyon Reservoir), situated in the San Jacinto River Plain, is adjacent to the southern boundary of ~ the site, and Greenwald Street bordeis the northem boundary of the site. The project includes appro~mately 709 acres of single family residential uses, 46 acres of ~ community parks, 11 acres of private recreation, an 11-acre elementary school site, and the remaining 196 acres as open space and lake uses. Table 1 provides a statistical summary of the Tuscany Hills Specific Plan. As noted in the table, the 35 percent open space . requirement is ideptified as well as shown in Exhibit 9 of this document. ( Tuscany Hills will enjoy the benefits of a master-planned community. The project will fulfill a demonstrated need in the area for additional dwelling units. The infrastructure and other r public facilities will be sufficiently sized to meet the demands of the community at buIldout. ~ In addition, specific planning and design elements will be applied to create a varied yet cohesive project. It is the intent of the Tuscany Hills project to be varied in character, yet provide complementary land uses to e~sting and proposed project components. Approximately 196 acres of natural open space, wildlife corridors, and lake areas are provided. Additional objectives of the project include: ~ o To satisfy anticipated market needs and public demand by providing a diversity of housing types and site locations which will be marketable within the developing - + economic profile of the City of L,ake Elsinore. ! o To target the residential product types and concepts mostly to emerging, growing, j and mature families. L o To include design segments in the residential products that respond to forecastable ~ demands in the market area. o To create a community identity for the Tuscany Hills project through a consistent application of architectural standards, landscape standards, and recreational facilities ` standards. L L ~ L ~ ~ ~ ~;;. _ ~_. .e.. .~~~~ _._ _. ~n. 1 1 1 r Planning Area ~ la lbZ r lc ~ 2a 2b ~ 3a° 3b ~ 4 Sa r Sb ~ Sc ~ Sd - Se ~ Sf 6 7 ~ Total TABLE 1 Tuscany Hills Speci£c Plan Statistical Summacyt Land Use Single FamIly Single Family (c) Single Family Park Park Private Recreation (c) Priva[e Recreation School Open Space Open Space Open Space Open Space Open Space Open Space/Park Wildlife Corridor Lake 1~ Gross Dwelling Acres Units 92.3' 355 483.9' 1,391 132.8' 254 5.3 -- 3.2 -- 4.3 -- 6.8 -- 10.9 -- 117.2 -- 5.2 -- SA -- 9.4 -- ~ 1.8 -- 37.4 -- 30.9 -- 26.5 972.9 2,000 L Parks, private recreation areas, open space, the wildlife conidor and lake area comprise approximately 253 acres. This acreage, plus approximately 88 acres of manufactured slopes adjacent to major arterials and interior slopes, will make up the 35 percent open space requirement L identified in the Development Agreement of 1980 (refer to Fxhibit 9). L 1Planning Areas shown on Exhibit 8 ZCommercial overlay comprises 15.2 acres + 'Includes landscaped slopes along major streets ~ 'Commercial overlay comprises 43 acres 2 ~T= ~/ 1 r II. IIVTT20DUCTI~N Site I.ocafion/Description , i Tuscany Hills is located in south central Riverside County adjacent to the northeastern city limits of Lake Elsinore, California. Exhibits 1 and 2locate the project in its regional and C local vicinity, respectively. The site is located entirely within the corporate limits of the City of Lake Elsinore. Summerhill Drive serves as the main access to Tuscany Hills from the southwest. This road intersects with Railroad Canyon Road near Interstate 15, r approximately one mile from the site. Canyon Lake (Railroad Canyon Reservoir), which ! is situated in the San Jacinto River plain, is east of the site. The project site is bounded to the north by Greenwald Street. Greenwald Street intersects with Highway 74, approximately two miles north of the site, providing access to the cities of Perris and Riverside. The Tuscany Hills site is contiguous to the western boundary of the Canyon Lake ~ community, and parallels an east-west trending ridgeline which has a peak elevation of 1,915 feet. The southern flank of this ridge descends to an elevation of ± 1,320 feet near the San Jacinto River. The canyons and swales of the property flow easterly toward the lake which ~ is wnstructed across the San Jacinto River. Slopes in this portion of the site generally range from 30 percent to 50 percent in some areas. The average slope within Tuscany Hills is approximately 35 percent. ~ Project Ovesview The Tuscany Hills Specific Plan consists of 973 acres and contains a total oF 2,000 dwelling units (Exhibit 3). Open space is an essential element of the project. Approximately 170 °" ~ acres of the southern portion of the site will be maintained in its natural condition. In addition, a 31-acre wildlife corridor has been incorporated into the design. Additionally, community parks, a lake, a school site, and private recreation areas are provided as L illustrated on the Conceptual Site Plan (Exhibit 3). Project History l Prior approvals for the site relate to the proposed Canyon Lake Hills Planned Development which began in 1978. In 1979, a general plan amendment and preannexation zone change were filed for the 2,000 dwelling unit Canyon Lake Hills Planned Development. In July ~ 1979, an EIR was submitted to the City of Lake Elsinore. In May 1980, the City and Canyon Lake Hills Developers signed a Development Agreement L which stated the conditions, terms, standards, restricuons, regulations, and requirements for the development, construction and operation of the proposed residential, commercial and open space planned development of Canyon L,ake Hills. One of the most significant L provisions in the development agreement stated that the "Rules of the Game" would be the policies, ordinances and resolutions in effect at the date of the execution of the agreement. This agreement stated that any ordinance policies or resolution adopted after the execution L of the agreement and deemed "more restrictive" would not apply to the Canyon Lake Hills development. L L L 3 r _.~. _.4 ~~~~ ~ . _ ~ ~. ,_~_ 1 1 ~ r r ~_ f [ [ ( ~ L_ TO OF COU ~ L ~ L L TO SAN DIEGO L L ~/ \LM JGS CALIFORNIA N.T.S. ~ D(HIBR 1 „~~r sso~;ar4r, ~ ~ o ~.:~.:~::,~a:: mnw.a~ f ~- f _' I-~ ~_ I_' (_' I-" C_ ..-, ~- r-• --, •~-~ °~ ~ ~~'1 "'1 ~1 D ~ ~j; No,ss,w ~C ~ ~ 1N~' ~ ~: ~ t~, ~c~~~'~°4°~.~..~~.~. .~T~~ ~ ~e~~~~ oe~ra~' + $,~ $_ ~A ~;a~o°Ya`e. oo?E:4o@.. ~k:.~ ... ~}~N:~e`. ~ `o.'>D~S.e4~F . ~ dy~ o °b~~,z~:o.\aoo.s, aobeo.,: .~ ~ ,~ .c~' .~~'s:~R. O 9~~ a.3 ~~~~,y.9~~v~zur~~.~o. z ~~ e;'., k~i~ ~:Se`',`as:ea: I g < ,~ ,$ .,~~,~~~s;,~: `~ ~ ?8de.~9@~39ii`9ea~a,~a1 Z OD,P',o4h06~bY~R~. G ~ FO~l`, p@BCC~e fi7 O ;F7t,a.3PhooQ.< .:,. da~ti~~ O O vo,"~o,,ee ~~~- 'r1 W `^4 ~`"~'N°~o~a~ kQy ; ~'avro;.. ~'A,o+;eez~ ~°„~~n,3~0e;~'~ ~., H.~s~- Z ,e~~2 ' ~ 1 ..6.°,~~~z:^ M ~i{~ -l~i.C`, ~ ~1~~ ~ ~ N o ; ~5~ ~~~ ~ ~ ' ~ 0 m ~ b'oo ~ ' " ~ ~g; ~ , ~ ~ c m = ~ a y , ~ ~ ~ '> Y GREENWALD AVENU ~ . . ;.~ so ~d ` ~'zti; ~~~~~ m ~A' ~ y ~aQ~q° ~; E~;:O ,gge y~, °m ti :0'e'D \ ~ \ ~ ~~ i;~ . m t3: i~ 1~ ~ I~ ~ `~ ~1 ~ ~l ~~ ~~ ~ ~~ _~ _ _: ~ ~.~J ~ ~ ~'~a ! ~,/ 1 r In January 1981, the developers, ABC Heritage, submitted Tentative Tract Map 17413 to cover the southern portion of Canyon Lake Hills. In the late summer of 1981, the ~ developers revised Tract 174~3 because the project as per the approved map was not buildable. A revised map was submitted in the fall of 1981, proposing a new access for the project and single loaded streets to provide for'more view lots. To enable the single-loaded streets r feasible, the developer proposed the streets as being 40 foot right-of-ways with 28 foot curb separation. ~ The United States Department of Housing and Urban Development (HUD) was, at the time, going to provide housing for Canyon Lake Hills as part of their Tide 10 program. At HUD's request, an EIS was prepared to address the following areas of concern: 1 - Distance beriveen street intersections - Impact of tract map on wildlife ~ _ Fire DepartmenYs major concern about the narrow streets Lack of access to RaIlroad Canyon Road - Street widths and offsets and the proposed "gated community" ~ Tentative Tract 17413 was finally approved by the Planning Commission on January 1982 (Elchibit 4 shows the history of planning approvals). The City Council directed the new developers, ABC Heritage, to apply for a variance on requested street widths and building ~ setbacks. An amendment to the Development Agreement for the new access road was prepared, but never executed. By AprIl 1982, the Planning Commission had approved the variance request. Subsequently, Homestead Land Development Corporation purchased L Canyon Lake Hills, and the name of the project was changed to Tuscany Hills. The - Technical Appendices that accompanies the Tuscany Hills Specific Plan document the planning and approval history for Tuscany Hills. L Putpose and Objectives The putpose of the Tuscany Hills Specific Plan is to provide the regulatory framework to L expedite and provide predictable standards of regulation for the development process of Tuscany Hills through the City of Lake Elsinore. After adoption by ordinance, a specific plan has an effect similar to the local zoning code. Tentative and final tract maps must be consistent with the applicable specific plan provisions. All detailed plans submitted in the ( future shall be consistent with this specific plan. L Preparation of this specific plan is not required for the Tuscany Hills project since the L pro~ect was approved by the City of Lake Elsinore in 1980. The purpose of this document is to "pull" together in one document and update the numerous planning and processing studies and ageements that have occurred during the life of the Canyon Lake L Hills/Tuscany Hills project, a project that essentially began in 1978. The Tuscany Hills Specific Plan identifies the general location and type of land uses and L sets standards foc various development options, as well as provides a focus for the standards and guidelines under which these areas will be developed. An important function of the Tuscany Hills Specific Plan is to ceduce the need for detailed L planning and environmental review procedures related to subsequent development of the project area. The specific plan regulations contained herein are intended to be responsive to changing community needs and desires in order to function without the need for L amendments and review. ~ ~...~.~~.a ~..s ~~. ~~ _ . ~ . _ ~,/ ~ ~ ~ ;~ i ~ ~ < ~ ~ °~ ~ 9 Qo `' / I '~ r...~.~ ::.,. ~.: . ~:{ ~ :.,~-.a~:::.:r~ ~ , {c.: . ~v.h;s y.. ° .. : it.t';'~a:. +` :• ~:::;~.i;: : ~. : ~ . :, ; / ` ! ^v r L . ~ ~ ;:GY: : ..~. . A. `.:..~i'~ ~SY~~• . } `_ ' yN::~ ~;~ ~..~ : ~ ;;/.::'y._i.. .J+:i\ i. __ ..1 ti.~~'~ ~. _ }'.~ \ ~ .~,~: ~ ~ . o ~ .'S fir .i'y;' ~.y.i~.i1: .rl.:.;~ ."t ~ ` s s;';.:p i:~i': n, '^A] '°r :~',::: ;'r '-2 " i;Y' ' > S: ~ ~ . . -aLi':tii; :.; j S ~ ; y '.~~1-':~ '.,~. .sn. "-~. . ~:~" ~ ~ ~ 4 ~L;: '~ 4 ' ol... 2~ .:1~?l''~ ~ :(•~~~`~ ~Y ti ~.~ ~'.: V' ` _ ; V.u ':'~ Y''_ :.. ~ .:IF~~~I i.4~Y .. ~::1'~~. ~•' '~r'i .. .w.::._,.f ^k~:Y:' ~:\~~~~' ' . ' ~ " ` ' L ~ ; .--~:::>::. : ~. , ..c^`.. ti;% ~ ' ~,~;::~'' ~t ~~: . ~;r:;• - ( T `i~z .4i:;;i~', L ` :~ ~ = :.,.,= ~.~ . ":f., ~;~~:. ;. ~.. r L . i a~.j~. ~tr. ~~ i ~:e¢:'~. . ~ ' .,., ;' .aV ~ . .. . " ; t -r ` .~ 4 ; .~:;. : : ~ -x: : ~~-- . ~ .~ :.,:: :.~ L : f .. <; :` ' '. ::;.,;., : . ~. ~ :; ' t.' :: ~~~:' ~~~.~~J:~,:r_:~~~ .; . .,y'y `,. ,~ . ,7;:', :.: t ~- q~ h . : _ . ~:~: ~~~::~ ~ ~ : : ~ ::.: ~ ~ L : : :~ .: :: = .r : ~ ;. _ ,~.:,.~ .~~:=.- - ~~ ,~ : :r:..:~.:::-::~K~::-:.~, .::::. v. _~~:.~:: _ . .. .. . :::1::::~. ,:~:,~:.. .. _:_xi ~i~`"'s /,r: ~i ~'==`~~'~'~$~:' ~ . . .... ~ ~ .~ ~i=~?'~'~ .;.:;::c::~3° ::~::::i~::%~ L ~ .tN,^..;a'~ ' ..._ PL~ANNING APPROVAL HISTORY LEGEND ~ ~NrMnnvE., T.P.M. 25005 155' EXHIBR 4 ~,;;M,~.,w~~._ r,~ ,.,.,w....w~ ~::~ ~,/ III. STiB ANALYSIS Topography ! Tuscany Hills is located adjacent to the foothills of the Santa Ana Mountains in southwestern Riverside County. It is contiguous to the western boundary of the Canyon ~ Lake community, and parallels an east-west trending ridgeline which has a peak elevation of 1,915 feet. The southern flank of this ridge descends to an elevation of 1,320 feet near the San Jacinto River. Slopes generally range from 30 to 50 percent, with the overall average apprmcimately 35 percent. Overall, appro~cimately 10 percent of the site has slopes r of 0-10 percent, 20 percent of the site hasslopes of 10-20 percent, 30 percent of the site has t slopes of 20-30 percent, 30 percent of the site has slopes from 30-50 percent and 10 percent of the site has slopes in excess of 50 percent. ~_ Geology r Tuscany FIills is within the Peninsular Range Geomorphic Province of Southern California j and is situated in the eastern foothills of the Santa Ana Mountains. This region is chiefly underlain by igneous and metamorphic rocks at the pre-Cenozoic age. The metamorphosed materials were originally Mesozoic sedimentary rocks. The igneous materials are mainly ~ granitic in nature. Tuscany Hills lies near the boundary of two regional geologic provinces, the Perris Block and the Santa Ana Mountains. The site contains five basic geologic units: recent alluvium of stream transported sands and gravels; older alluvium sands and gravels with a silt and clay binder; terrace deposits of sandy gravels with boulders; Santa Ana formation metamorphic rocks of the triassic age; and intrusive igneous complex, a massive collection ~ of igneous materials ranging from granodioute to gabbro. Seismicity Liquefaction during seismic events is not considered a problem at Tuscany Hills due to the shallow depth of bedrock and rocky surficial deposits. The seismicity of the region is dominated by the Elsinore fault zone. The north Elsinore fault zone lies approximately one-half mile from the southwest corner of the property. Other faults within the Elsinore fault zone which occur within four miles to the southeast consist of the Glen ivy Fault, Willard Fault, and the Wildomare Fault. Lake Elsinore occurs within a depressed fault block between the Willard and Glen ivy Faults. Other active faults are located in the general region of the project site, such as the large San Jacinto and San Andreas Fault Zones. A summary of the major faults and their distances from the site is shown on Table 2. L TABLE 2 Major Earthquake Faults L Distance from Site Fault (Miles) L Elsinore 2 San Jacinto 20 San Andreas 30 ~ L ~.a~.~: _.ti ~u ~N..~r _ ~ ~~ ~~ The soils of the project site cansist mainly of rocky and sandy loams of the Lodo, Cieneba, Garretson, and Hanford series. In addition, there are scattered areas of Bosanko clay soils and artiticial fill materials. Loose, alluvial sands and gravels coinprise the majority of the site soils. While most of these deposits are within a few feet thick, thicker deposits are located along the southern boundary and southeastern corner of the site. The only soils on-site that have presented engineering or developmenYproblems in the past in other areas are the Bosanko clays and areas with slopes greater than 45 percent. Bosanko clays must be carefully managed because they are relatively expansive when infiltrated by water. Steep slopes present grading and erosion problems. Only the Class II Ganetson soils have any significant value for agricultural use. This type of soil is available on less than one percent of Tuscany Hills. The Bosanko and Hanford soIls are Class III soils with limited agricultural potential. All other on-site soils have a Capability Classification of VII, indicating very limited agricultural usefulness. Hydralogy The depth to groundwater surface within the site is the canyon bottoms where seepage is prevalent. The site eachibits a moderate to high infIltration rate due to the nature of the metamorphic bedrock. T'he groundwater storage is continually being replenished by deep percolation of water from precipitation and stream flow. Groundwater leveis fluctuate dramatically within the wash areas. The groundwater table is near the surface within the San Jacinto River easterly and southerly of the site. '- Existing drainage of the project site is controlled by the east-west canyons and swales which channel runoff eastward toward Canyon Lake. Regional drainage flows into either the San Jacinto River or Canyon Iake. The river eventually flows into Lake ELsinore. The water quality of Canyon I.ake is marginal due to the amount of agricultural runoff from the east and northeast. The Hydrology Plan for Tuscany Hills is shown on Exhibit 5. 10 L ~ ~ ~~~ ~o ~~ ._ . ~,~ ~: ~ ~~ HYDROLOGY PLAN LEGEND ~ DRAINAGE BOUNDARIES ~ DIRECTION~ OF FLOW ~ ~ SCALE:1"=1155' EXHIBIT 5 C<F~'~~`g« ~ ,..,~.~...~.~ ~ o~~ .•d.;,,...;.~,,,,. . mu~u.~.n '°a.n ~~ ` s~oio~ Southern Section i The bulk of the project site has received little or no prior impact, except from fire and from minitnal sheep grazing. Indigenous communities are of significant extent and characteristics C species diversity. A full complement of indigenous fauna typically occupying interior scrub habitat is found on-site. ~ Three types of habitats having biological value are found on the property: extensive upland sage scrub, riparian woodlands, and adjacent brushy slopes and exposures of Bosanko clay. o Sage Scrub - The vast area constituting the western half of the southern project site and ( containing an unbroken coastal-inland sage scrub cover is inhabited by a significant ~ population federally-listed endangered Stephen's kangaroo rat, in addition to a variety of other dry land adapted mammal and reptIle species. [ o Riparian Woodlands - All riparian locales on site, including the San Jacinto River (technically under separate ownership), Cottonwood Creek, and four tcibutary arroyos of the former drainage, contain riparian habitat which is extensively utIlized by a variety ~ of fauna, including songbirds and nesting raptors. o Brushy Slopes and Bosanko Clay Exposures - Because of the limiting quality of the Bosanko substrate, grasses and forbs are generally low growing and opportunities exist ~ for establishment or persistence of noncompetitive species, including those which are rare and endemic. The Bosanko exposures are also ideal sites for spring wildflower ~ displays, containing a diversity of species. - Northern Sectio~ The biological setting of the bulk of the northern Tuscany Hills is characterized by the extensive stands of open coastal sage scrub interspersed by brushy or wooded drainage courses. The habitat of the northern half of the project site is less biologically diverse and more disturbed than the contiguous habitat in the southern half. Sheep grazing has been a past land use whose impact is still obvious. Mining and prospecting has impacted certain limited portions of the site and some off-road vehicle use and parking has impacted flat land north of Greenwald Avenue. Coastal sage scrub is the principal type of vegetative cover present on the northern half. (_ The condition and productivity of this community, including density and species diversity, is poorer than in the area immediately to the south. Shrub cover is generally not contiguous, but is instead interspersed with low-growing annual grass vegetation. `- Ttvo sign~cant habitat types are found in the northern planning area. The first is the grassy and open coastal sage scrub settings documented as being occupied by the Stephen's L kangaroo rat or where this species' presence is suspected. The following section assesses the impacts of the project to the Stephens Kangaroo Rat. ~ The second habitat of significance is the main drainage, which enters at the northwest corner of the property and e~cists at the southeast. A lateral drainage area also passes through the southern part of this area. In October 1988, Homestead obtained a 1603 L Agreement from the California Department of Fish and Game. IZ L ___ _ __ ___ _. _ _ _ _ - __ ~~ ~ Steohens Kanearoo Rat ` Development of Tuscany Hills will impact approximately 282 acres of known habitat of the ~ Stephens Kangaroo Rat, listed by the U.S. Fish and Wildlife Service as an endangered species. j To determine the effects of the proposed project on the Stephens Kangaroo Rat, a focused biological assessment was conducted by Tierra Madre Consultants, Inc., in January 1989. ~ This assessment included a literature review to identify reported occurrences of the Stephens Kangaroo Rat on, or in the vicinity of, the project site, and a survey for potential Stephens Kangaroo Rat habitat. In addition, a walkover survey of the Tuscany Hills site and a range-wide survey to find and map the populations of Stephens Kangaroo rats was ( wmpleted by O'Fanell Biological Consulting in February 1989. The results of the Tiena Madre studies are noteworthy in two respects. First, the site ` currently supports about 282 acres of occupied Stephens Kangaroo Rat habitat, distributed i in a patchy configuration typical of the species throughout the 973 acre site. Second, the entire Tuscany Hills site is contained within one of nine areas currently under study by the County of Riverside as a potential reserve for this species. This study area in which [he project site is located is known as the Canyon Lake/Kabian Park site, and includes . apprexiiriately 9,350 acres. The O'Farrell study concluded that the ICalbran Park site should not be considered as a potential preserve location because of its marginal habitat quality. ~ The preferred preserve sites were chosen on the basis of general quality of habitat and the presence of relatively continuous, significant SKR abundance. Construction of the project would result in the direct loss of the occupied Stephens - t. Kangaroo Rat habitat that is found on the site. It would also effectively eliminate the t southernmost portion of the Canyon Lake study area as a possibility for a potential reserve through d'uect loss of habitat on site and isolation of adjoining habitat found in the southern ( portion of the study area. Taking of the Stephens Kangaroo Rat is prohibited by the Endangered Species Act and this prohibition has resulted in efforts by the County of Riverside and affected cities to develop ~ a Habitat Conservation Plan and seek authorization to take specified areas in order to facilitate some continued development in the range of the Stephens Kangaroo Rat. The County is currently engaged in a program to determine the effect of a region-wide reserve '` strategy for the Stephens Kangaroo Rat in western Riverside County relating to their efforts to apply for and obtain a long-term Section 10(a) permit. L To assess the impacts of development of Tuscany Hills on the Stephens Kangaroo Rat population in light of the species as a whole, the United States Fish and Wildlife Service conducted a 5eld reconnaissance of the project site. In April 1989, portions of the Stephens L Kangaroo Rat habitat were visited by the Fish and Wildlife Service biologists, biological consultants for the County of Riverside, and representatives of the County and the Sierra Club. In addition, unpublished reports prepared by the County's biological consultants, assessing the long-term potential of habitat in the Lake Elsinore region, as well as soils L maps and other available information, were consulted. The results of these analyses indicated that the Stephens Kangaroo Rat is found at this time primarily in trace abundance (i.e. <2 borrows/100 square meters). Based on estimates of density, there may be L approxicnately 115 Stephens Kangaroo Rats on the 'I~scany Hills site. The soils and vegetational attributes, plus the relatively degraded condition of the site due to prior construction activities, dumping, and off-road vehicle use, appears to have limited the long- term potential of the site as a resecve for the Stephens Kangaroo Rat. L 13 ~ ~/ f It is the biological opinion of the U.S. Fish and Wildlife Service that the conservation ~ measure prescribed in the Tuscany Hills Project Stephens Kangaroo Rat Conservation Plan and its implementing Conservation Agreement, will not jeopardize the continued existence of the Stephens Kangaroo Rat. The net result of the program would be the elimination of the southern portion of the Canyon Lake study area in exchange for acquisition of over 600 r acres (including at least 282 acres of occupied Stephens Kangaroo Rat habitat) in the j Estelle Mountain area, a site identified as another study area for a potential Stephens Kangaroo Rat reserve, This acquired land could be wmbined with other lands to be r acquired in this area and used for establishment of a permanent reserve for the Stephens ~ Kangaroo Rat. T'he initial phase of the mitigation program for the Conservation Plan provided the J acquisition of 560 acres of good quality preserve properry to minimize the impact loss of I the law quality habitat within the project. An additional 46.7 acres of occupied habitat will be acquired and added to the preserve system to complete the mitigation of the habitat loss ~ on the project site. Archaeology r An archaeological records search of the Tuscany Hills site was conducted at the ~ Archaeological Research Unit, University of California a[ Riverside, on October 13, 1989. Based upon that records search it was determined that the entire project site had been ( previously surveyed for cultural resources, and that as a result of that survey, four (4) ( recorded prehistoric or historic sites were identified. To further scientific inquiry concerning these four recorded sites and to document the ~ ~ significance of those cultural resources in accordance with the California Environmental Quality Act, a physical reconnaissance of the project site was undertaken on November 16, 1989. The findings of that records search and on-site inspection are ~ summarized below: • The Wrench Gold and Slate Proiect Although the first recorded mining claim on this location dates to 1937, Mexican miners ( were working the area prior to the 1870s. The subject site contains artifacts from that mining prospect and comprises a partially buried house foundation with rock walls, a scatter of tin cans and automobile parts and two other associated concrete foundations ~ which date to the 1930's era. In recognition of the relatively recent nature of this site, a historic archaeologist will test, excavate, map and document this prospect prior to any direct impact (e.g. grading). These late 19th century features have been identified as relating to the original development of the region. Upon physical inspection (by a qualified archaeologist) the ~ site was found to be undisturbed but is in very poor wndition. Most, if not all, of the timbers were found to be decayed and buried in brush that has washed down the creek. L This feature is in such a state of decay (either rotten or mired in the creek bed) that this site offers limited research potential. Because of its location in the creek, it is unlikely that it would be disturbed unless the creek was either rerouted or channelized. L Through subsequent investigation of this feature, the remains of the bridge and roadbed will be recorded and described within the historical framework of the railroad operation. 14 L . ~ .,r~._ _~ _ _. ~. . ~~ • Remains of the Ella Van Fossen Residence This site wmprises the remains of the Ella Van Fossen residence which dates to the 1920's era. Miss Van Fossen was an early local environmental activist who single- handedly attempted to block construction of the Railroad Canyon Dam. In 1926-27 she burnt her residence and the sunounding environment as one final gesture of protest. Permitted grading activities, auCliorized under Tentative Tract No. 17413 - Revision No. 4 have partially impacted this feature. Melted glass, charred wood and portions of the foundation were observed during field inspection. Subsequent archaeological investigation is currently underway in an attempt to locate the privy which would be of value in the interpretation of this site. • RIV-698 This prehistoric site, located in the southern "pan handle" of the property, consists of a small milling station with accompanying light chipped stone scatter. Portions of this site have been impacted by permitted grading activities authorized under Tentative Tract No. 17413 - Revision No. 4. Archaeological investigations are currently underway, including mapping and photographic documentation of the milling feature, for the further recordation of this feature. L K ~~~~~~M x~ r..: ~ .. . . 15 ~~ ~ IV. LAND USE PLAN 1 C Site Grading The concept grading plan for Tuscany Hills is shown on Exhibit 6. Table 3 illustrates the proposed cut and fill calculations for Tuscany Hills. Grading of the site will be conducted in a manner which eliminates the need for the import or export of dirt. TABLE 3 ~ Tuscaoy Hills Gtit and Fill North South [ Cut 5,142,330 cubic yards 7,559,320 cubic yards ( Fill 4,785,370 cubic yards 7,424,000 cubic yards ~ While significant grading will occur, the grading concept for the site is intended to maintain the natural land form as closely as possible. In addition, single loaded and 28-foot street widths help to maintain the natural land form. This is especially true in the northern half of the project site in which more gentle slopes and open flat areas are found. The southern { half of the project site will necessitate increased grading as steeper ridges, where average ~ slopes of 35% are encountered, which will allow views of surrounding hills and Canyon Lake. Approximately 170 acres of the southern portion of the project will remain natural and ungraded. In addition to the open space areas, the southern portion includes appro~timately 23 acres of park land, a 37.4 acre open space/park site, and 57 acres of estate lots. Minimal -~ grading will occur in the establishment of these lots. Appro~mately 33 acres in the northern portion will be left as open space, and 34 acres will be developed as park, recreation, and lake use. In addition, the 31-acre wildlife corridor in the northern half of the project site will remain in open space. Land Use Plan Surroundin~ Land Use Most of the existing developments are located on two opposite sides (the northeast and southwest) of the lake, while the agricultural lands are mainly located on the northwest and southeast ends of the subregion. A large floodplain is located adjacent to the southeastern end of the lake. Although the lake is a regional recreational facility, it is not fully developed. Land uses surrounding the project site are predominantly undeveloped except for the Canyon Lake community, to the east (see Exhibit 7). Canyon Lake consists mainly of custom home sites. Ramsgate has an approved specific plan which includes 2,850 dwelling units. Vesting tentative tract maps are cunently in process with the City of Lake Elsinore. The Friedman property has a recorded tract map with grading and development in progress. T'he balance of the surrounding property consists of vacant, undeveloped private and federal property. Greenwald Avenue provides access to the north from the site, and Railroad Canyon Road provides the southerly access to the Canyon Lake community and Tuscany Hills. 16 L ~~..~~~,,. _~ . .,~. .._ . . .. _.._ _ _ _ _ . ~n~ ~ ~= ~ ;, , ~ . ,'._"_= i ^ , ~' ~~ , 1560 F ~540 ~ 158 ~S ^' ~50~ ~ ~~ ~ C ~ ~ ~4 h N 1 ~ ~ ~ ~ ~~ ~ 1~~ m : .. a ~ a 1 ~ `~ ,p ~ o ~ ° i a• n p P , r ~, ` ~ m ~ N '~ ' m ~~ ' ~ i ~ '_`~ Bo a ~ / / 1 ~~i ~ 1440 ~1 \ ~ ~~ _ ' <8 ~ ' ' '\J `\ \` , , / \ ~ o I i50p ~ N p ryo T ~ ~ ~, , $ ~ ,~ ,, _ ~ ' ~ . , L ~m ,520; ~ `. o ,~ ~ isao ~sso ~_ ~~ ~ ~ ~ ' ~saa ~a~zo ueo , ~__ ~ N _~ i~~ isoo L ' '/' J ~ ~ `.i ~' ;. •~ .~, '62~ L ~; ~1 ~1 •1 1 I ~~0 1 ~ 1` ~ O ~ 1~ 17 i L ' ^ ~ ' ~~ ~ /)~ ~ ' L' ~, , . ---~ ~ , _ . t,~. ~;= - L ; ~ ~ ,, ,~,... --- ---~;~: ; „ ;; ,~ ,~ L ~ L L usf2_..~,..s.u o ~ ,.. . -_-u~, ...~,r~...~ ..,. Y.ii . ._...- . _... . , - CONCEPT GR1~l~ING PLAN LEGEND ,-~,_,i LIMITS OF LANDFORM ALTERATION ~ ROUGH GRADE CONTOURS OTE: PERMISSION TO GRADE OFFSITE IN PROGRESS 11C MASS GRADED PER T. 17413-4 SCAL.E:,•-„55~ EYH~BR s C~~`~etea ~ .~.~~. ~ ~ ~ ~:~w:u~i "'da. 1 i ~ ~ f ~ ~ 1_ ~ l ~_ ~ ~ (_ ~_ L L L ~ ,~ ., ~....: . _.y , :. ~ ,,~~;. a,~.~:a ..d.,_ ... . _. . ~ _ _ _ _ _. ~~ _ _. . _ __ _ __ _ ! ~/ t ~ 'Il~sca~ Hills Specific Plan Land Uses ~ The 'Iliscany Hills land use plan consists of 4 primary land use designations: residential, parks and recreation, schools and open space (E~ibit 8). The development program consists of selling completely designed planning units of approximately 200 lots to builders. This will allow a distinct and varied product type while maintaining an overall theme for the C community. The four primary land uses are discussed below: o Residential Uses - The construction of 2,000 dwelling units is the primary component of the land use plan. These units will be constructed in four distinct phases as ~ discussed in Section XII, Project Phasing. Approximately 709 acres are devoted to residential wnstruction, primarily in the northern half and southern two-thirds of the site. ~ Due to the relatively steep and varied site conditions, development costs will be significantly higher than would occur on a more consistent site. This will require ~ that the homes be targeted to middle and upper income families. Single loaded street configurations will be more sensitive to the topography and will allow a majority of the lots to have Canyon Lake and Lake Elsinore views. f o Commercial Uses - The land use plan identifies a residential area and private ~ recreation area within the Tuscany Hills Specific Plan that include commerciai overlays. One of these areas is adjacent to the lake and may contain facilities ( associated with the Recreation Center/Beach Club. The other area that has a ~ commercial overlay is in the e~ctreme northeast corner of the project site. This area may provide neighborhood commercialland uses. ~ o Parks and Recreation - Two distinct private recreation areas and two public parks ~ are provided in the land use plan. Also included in the plan is the 37.4 acre open space/park located in the southeast portion of the site. The first private recreation ~ area (planning area 3B) is the Homeowners Association Recreation Center at the intersection of Summerhill Drive and Via Scenica in the southern half of the project. The Center is anticipated to include a competition size 7unior Olympic swimming ~ pool, wading pool, spa, tennis courts, basketball/volleyball court, tot lot, picnic area, and commumty building as approved by the Planning Commission in June 1989. A second private recreation area is located next to the proposed 26.5-acre lake in Planning Area 3A and consists of approximately 43 acres. A five-acre public park ~ in Planning Area 2A will be constructed in conjunction with and adjacent to the eleven-acre school site along Summerhill Drive and La Strada. In the northern section, also along Summerhill Drive, an 3.2-acre park site is located adjacent to the 4.3-acre private recreation area next to the lake. The precise program for this park (_ site will be approved by the City's Community Services Director. L o School - An appro~cimate 11-acre elementary school site has been incorporated into the land plan adjacent to a 5-acre public park along Summerhill Drive. The school is centrally located,in the community to minimize driving and walking distances to the school. L ~ ~ 19 L ~~,...>~u. ~. .._ ay. _~ ri . \ ~ ~ I I ' I ~~ ~~ r ~ ~ C /~ , 8 ~ ,~ c C ' 1 6 !~ ~ + ++ / g +++ + + +~++ ~ +++ ++ ~ + ~ / 6 `+i [ ~ ~:~_ i ~ t C..C_~ i ~ I ~ E ` I ~ ~. . /G ~ 36 i ' ~_ \ Yc` ` i ~G ~ ` i ~ ~8 ~ L ` s ~ ~ ~ _ 4 ` ~ ~t~4 l L L • L ` 5' ~` ~' ` ~'t c . } ~(: (( 4 l `• L l t ~ ~ ~~ ~ • ~l ~ ~ " L ( . ` ~,~`~ ~ 4` `~ `t ~ 4 i ..ii ~ , `~ ~ t:, t~' ~ . ` . -~ 4 ~ oti ~ ti W , y , ~CiA: ~ ~ ` ~ `t ` T ~ ` ~ 5A` ~. . ~ « ~ .. ~ t - < ,, < n,~~V~.~ it~l L.i: ~. i,.u~' t(~ t Vt_6t: f L 1 4 c la.y L C ~~'. l clL ~` ti ~t] L ~' e 1 ~ ' cr L l ~V i l.~~rV~.~. ~ 1. ~ .'( ~ ``~' L` u: L. ` ~ ` lt ~ L~ 4:~ w~: L ~~ ~ ~ ti ~~w ' ~ i.L1~ .K~ ~ C , l4 ~ t ` \ • V ' l ~: v'4 A ~il f ~f . ~`~`~~~'' L ti _ , ,. . . . ......... .. _..~. . . . , ~. . ~ _. . . ....±,.;. , . . . ~ . . _ . . .. . . . _. .. .. ..._. _.._.. ~ / LAND USE PLAN staciscical summary ~ ~V`.'~N V ~ ~ Arsa tand Use ~ ~~ ' t A Single Farniry 923 355 1 B Singla Family 4839 t39t 1 C Singla Famiy 1328 254 2 A Pazk 53 2 B Park 3.2 3 A Privaze Recreation 4.3 3 B Private Recreation 6.8 4 School 10.9 5 A Open Space ll71 5 B Open Space 52 5 C Open Space 5.0 5 D Open Space 9.4 5 E Open Space 1.8 5 F Open Space/Park 37.4 6 WildGfe Cortidor 309 7 Lake ~ 26.5 ~ TOTA L 9729 ~666 1. Tlie acreape fqures are an e56mated albeation (OfN! ~Jfl~ YSBS. ~ 2 BaWice d reaifed ~pen Spaea is wNaineG wi1Nn rgsdentlal figures. The ResideNial Pia~vi~g Meas ircUtle ManAxWra-USaNe Open SpaCe. ~ Reler W E'h3[ 9 br Open Spac9 Pian. 3. (C) Stq~m on Exluhit, re~ers to comnerdal werlay area me weauon a ma Mo comme,aal srtes are in plannrg areas 1 B arq 3A ~ xC POSSIBLE FIRE STATION ' ~-I~ II LOCATION SCALE:1"=1155' EXHIBIT 8 ~tu ~ ~.~~ ~ . ~.....~... m~i~u.,.,. .__ ._.... . . ~~ t ~ Open Space/Wildlife Corridors ~ Natural contours and topographic features will be preserved to the greatest e~ctent possible in the open space areas and for the 31-acre wIldlife conidor (Eachibit 9). The wIldlife corridor, which runs east/west, provides potential links to e~cisting Federal Bureau of Land Management land. Where streets cross the wildlife corridor, the project will be designed to utilize such things as drainage culverts to allow for animal crossings. Open space areas ~ to the south near the water tank will have indigenous vegetative cover and fuel break areas. The natural open space areas of Tl~scany Hills comprise appro~cimately 170 acres and are found primarily in the southern half of the project. This includes a large 117-acre parcel sunounding the water tank, and a 37-acre open space/park area in Planning Area SF. The 117-acre open space area will be dedicated to the City. Pursuant to the 1980 Development Agreement, the City has the option whether or not to accept the dedication of the 37-acre site. I Additional useable open space/manufactured slopes are found throughout the site, ~ particularly along roadways in the southern half and in the flat areas to the west of the proposed lake. The open space, parks, private recreation areas, lake and wildlife corridor ~ comprise approacimately 253 acres. This acreage, plus a minimum of 88 acres of manufactured slopes, will make up the 35 percent open space requirement ident~ed in the Development Agreement of 1980. l L_ ~ L L ~ ~_ ~ ~ ~ - 21 L . W._va.,~~ta ~.,k,. ., ....,<. _ _.~~. . ~ \~ -'v ~ W ~ a a ~g = ti o Z Z w w ~ wa ?¢ ~a ~b N J j 7 Z{~ ~ _ Z a 7 ~ 0 ;~~ Y ' 5~ Y~ ¢ a Q ~ a ~ ~g O N ~ ~~~ o~o ~~~ ~~Q ~~ Y~w~ Ya~ I~f I~ ~/ ~r - r~l ~~ ~d ~~ ~_ ~~ ~&! W 3~ ~ ~~ ~~; ~ ~~~a ~ ~ ~~o N 1~ y,"'N ~ ~ YF,-,^~`E. ,•r~ ~F„ . ~~,~,` er`~~`r':~ . fF' ~,~~~ S ~ ,.~, ~g,1 . ~ a.. ~r..~.._ . .. ^~~~ t ;.c;.- ..e~ `:,~.`•:::sr. f P~{ t~ ~ ~ ~fr f.:~~'~. ~ ~ _ .~J ~ ~J ~ '~-~`~ . ~~ ~ ~ V. CIRCULATTON PLAN ~ The areawide circulation system serving Tuscany Hills is illustrated on E~ibit 2. Regional access to Tuscany Hills is from Interstate 15 to the west of the site, or from State Route 71 west of the site via State Route 74. Southerly access will be from Railroad Canyon Road. Northerly access will be via Greenwald Avenue, which also provides access to the Canyon ~ Lake development. The road network within Tuscany Hills is characterized by a secondary arterial backbone ~- core supported by local collectors serving and/or separating each planning area (Exhibit 10). Residential streets are relatively equally divided between single and double-loaded streets. The backbone circulation system consists of a major secondary arterial highway (88' of j right-of-way) serving the property from the south and eactending to Greenwald Street on the ~ north. The collector street system extends from the major arterial, connecting the local streets which provide direct access to the individual lots. Collector streets as designated on ' Exhibit 10 will have a 66' right-of-way. ' All streets within Tuscany Hills will be dedicated to the City of Lake Elsinore. Those local streets which are accessed by dwelling units on only one side, typically designated single- ( loaded streets, will be constructed with a 40-foot right-of-way, including a concrete curb and Q gutter and sidewalk on the dwelling unit side and a curb on the opposite side of the street. Typical double-loaded local streets will be constructed with a 50-foot right-of-way, including ' a concrete curb and gutter and sidewalk on both sides of the street. Typical street sections are illustrated on Exhibits 11 and 12. L C ~ ~ L 23 ~~ ~ ~ ~ ~ ~ . t O~\J~ ~ J . ~~ ~ ~ t J CI RCULAT ION PLAN ~ ~ ~a STRADA LEGEND ~ ~ ~ ~~~~~• 88'~SECOPiDARYHOFiWAY _ J~s~ •••.•... 86' COLLELTOR STREET ~ - L Y ~k- ALL INTERIOR STREETS SHALL BE SINGLE ~ ~ LOADED STREETS OR GENERAL LDCAL ~ ~~ 2 STREEfS. (SEE EXHIBIT 12) ~ ' 9 VIA ~E ~ ~ACLE L ; ~~ _ ~ ~ SCALE:1•=1155' EXHIBR 10 ~ unsaktY ssaciates ;m ,a .~. I t_ . . . . ~ ~ . ~,.:, "'"- a.,,.,.. ;'e oi~ ~.uw.n. ~-.~,~St.; ... . . ....t.. . ._., . .,.. ~ ...,3z~;, . .... .. . ~ . . .. , . COLLECTOR STREET ~ ~vww ti ~\ ~ EXHIBIT 7 ~ SECONDARY HIGHWAY "'~" ~~e~~ ~/ ~ ~ STREET SECTIONS ~ ~ ~ ~ ~ ~ ~ 40' ¢ ~ 4' 14' 14' g~ ~ 5~ 3. 7 f I A•C. PqVEMENT Z~ ` !_ ~ l ~ s~-.- 7.59'e 7.5% ~~ i ~ 2,y .Q.. r.~. ~_ SINGLE LOADED STREET ~_ ww aNv ~• 4. T 18' 18' T ( r r s ~ s r r 2; I A.C. PAVEMEN'T~ I ~ _ ~ Z~ 2% 2% 1 ~ _ :+ s., v.- 'n.' ~^w.r ~ ,... i GENERAL LOCAL STREET IXHIBIT 12 urtssAef ssociateg ;~. ...'";*~`,~ ~.,.... ,~a::: n.:~m . ~. ~~~s Water Service ~~ The Elsinore Valley Municipal Water District (EVMWD) provides water to Tuscany Hills. EVMWD obtains a portion of its water supply from the Western Municipal Water District. The remaining water supply is received from ten active wells. Future purchased treated water supp~lies are planned to be obtained from the Eastern Municipal Water District (EMWD). It currently has no existing mains into the Tuscany Hills area, but has service mains presently providing domestic water to the community of Canyon Lake. The source of water supply to Tuscany Hills will be via a EVMWD system. A proposed booster pumping station, located in the southeast area of the site, will take suction from the existing 33" main near the DistricYs treatment plant, west of Canyon Lake Dam, and will pump water from EVMWD's system into the development. 'The plant uses a standard sand filtration system with a 13 million gallon wet well. The plant capacity of 15 million gallons per day is sufficient to serve any future development within the Lake Elsinore area. In addition, EVMWD owns the rights to 3,000 acre-feet (477 mg) of the storage capacity in Railroad Canyon Reservoir. The Temescal Water Company operates the reservou and owns the rights to the watershed run-off. Reservoir evaporation and seepage losses are shsred proportionately by the Temescal Water Company and the EVMWD. The major imported water supply to the area comes from.the Colorado River and is stored in Canyon Lake. Although natural runoff has some adverse influence, the quality of water in the lake is very similar to Colorado River water. The EVMWD is the only purveyor of imported water in the study area. -~ The EVMWD provides standards for water service in the Lake Elsinore area. The average daily demand by land use is shown below in Table 4. The total water service demand for the project is summarized in Table 5. TABLE 4 Water Usage by Land Use' Use Single FamIly Residential Commercial/Residential Mix Schools/Parks Avera_ee Da•dy Demand 500 gal./unit 120 gal./1,000 sq. ft. 4,000 gal./acre 60 gal./student *Source: Elsinore Valley Municipal Water District L 'Elsinore Valley MWD Water/Wastewater Master Plan 27 L , ., ~ e~ ~ ~ ...,.. , ~ _ , ~.~. . _ ~~ ~ TABLE 5 Estimated Water Demand ~ Dwelling Popu- Avg.Daily Ma~c.Daily Land Use Acrea e Units lation Dema~d Demandl Single Family Residential 713Z 2,000 5,000 1.0 2.0 Park/Recreation Areas 57 -0- -0- .19 .38 ~ School 11 -0- -0- .044 .88 Totals 1.63 3.26 ~ Exhibit 13 illustrates the water distribution system for Tuscany Hills. Phased development of the system is anticipated to follow the four primary phases of consuuction associated with the backbone circulation improvements. Construction of all water storage requirement ~ facilities in the southwestern portion of the site will also be included in the first phase of infrastructure improvements. ~ The system consists of construction of 18" water mains from the tank to Summerhill Road and along the prima.ry arterial to Via de La Valle. An 18" main will continue along Via de La Valle to the east. A 16" main will be installed along the remainder of Summerhill Road. ~ The remaining collector streets will have 12" and 8" water mains installed as indicated by Exhibit 13. Wastewater '" Tuscany Hills receives wastewater services from the Eisinore Valley Municipal Water ~ District (EVMWD). The EVMWD study area is divided into three major wastewater-- service areas depending on natural topography and the location of existing treatment facilities. Tuscany Hills is located within the Lake Elsinore Bas:n Wastewater Service area. This basin includes all ares which naturally drain into Lake Elsinore, plus those areas north of the lake which are tributary to the Elsinore Valley Regional Wastewater Treatment Plant. ! Major tributary areas within this basin include: Bundy Canyon, RaIlroad Canyon, Wasson Canyon, Warm Springs Canyon, and L.ake Elsinore. I The District operates the sewage treatment facIlity located three-quarters of a mile southeast of Canyon Lake Dam, to the southeast of Tuscany Hills. This facility, which currently has 10 sewage pump stations, has been programmed for e~cpansion. Current I sewage treated at this facility by the activated sludge, secondary level process (with double l chlorination) amounts to approa[imately 130,000 gallons per day. One hundred percent of this treated effluent plus an additional 65,000 gallons per day of domestic water is sold to f" the adjacent Canyon Lake golf course for irrigation purposes. - A 21" graviry sewer main from Canyon Lake, the Railroad Canyon Wastewater Reclamation Plant, and a 10" force main to reclaimed water use area, are the e~sting facilities adjacent I to Tuscany Hills. These facilities serve the Canyon Lake community. A 24" gravity sewer ~ main in Lakeshore Drive will be used to convey flow from Tuscany Hills. This facility will be upgraded to a 42" line and will convey flow to the Elsinore Valley Regional Wastewater L Reclamation Plant. L 'Maximum daily water demand is two times the average daily demand (MDD = ADD x 2). L 22.5 persons/dwelling unit. 28 l_ ~,.w,.~~ ,~ ...a_ ~,. _~~ ,~ , ~ , : ~~ ~ ~ ~2• ~ ~ ~ ~ ~ ~ 12' ~ g' 16' ~ ~2~ I a. ,2• - 16' L_ l- ,a• 16' WATER TANKS ~_ . L ~ ,2• 18 WATER PLAN ,8• SCALE:1"=1155' IXHIBfT ~ 3 uasakd' ssociatea :nc n~..~w...mmk~+n.a+w ~ ~ ~..~.. u.~.~«`~..e'eq.n mowuur \ ~ / The estimated sewage generated from the proposed project is determined according to the Elsinore Valley Municipal Water District criteria: The amount generated assumes an average daily flow of 100 gallons per person per day with an average population factor of 2.5 person/dwelling unit. Total average daily flow for the Tuscany Hills Specific Plan is summarized in Table 6. The criteria further assumes a peaking factor of 2.90 based on current EVMWD data. Peak daIly flow is detecmined by multiplying the average daily flow by the peaking factor. TABLE 6 Estimated Sewage Generadoo Land Use Dwelling Acreaee Units Average Daily Flow Po ulation MGD Single Family 713 2,000 5,000 .50 School 11 -0- -0- .Ol Total 2,000 5,000 .51 The e~sting EVMWD treatment plant, located approximately five miles northwest, is proposed to be espanded to a capacit~~ oY 3.0 million gallons per day by 1990. Ultimately, the capacity of this plant will be 5.0 million gallons per day. A new treatment plant is proposed in the EVMWD Master Plan, to be located west of the project site. The sizing and construction of all sewer facilities has been, and will continue to be, coordinated through the Elsinore Valley Municipal Water District, who ultimately has the - responsibility of owning and operating the system. Any oversizing of facilities to accommodate adjacent and other proposed land development will be done according to EVMWD standards. It is expected that the additional eacpense for oversizing facilities will be reimbursed to the project developer according to a standard system controlled by EVMWD. Phasing of the construction of all facilities will be accomplished in accordance to the overall land development Phasing Plan (Section XII). The proposed sewage disposition system is shown on Exhibit 14. The system consists prunarily of 8" sewer lines along the major arterials and collector streets. Force mains will be required along portions of Summerhill Road as indicated. A 21" line is requued along Summerhill Drive to the east to serve the estate development in the higher terrain and from the lift station north to Greenwald. Drainage Fac7ities The design of the storm drain system has considered the runoff anticipated to be generated by the proposed densities within Tuscany Hills. Specific drainage systems will be designed as each planning area develops. Drainage systems will comply with adopted City standards. The proposed drainage system utilizes natural drainage channels to the greatest extent possible, although improvements will be necessary to accommodate expected flows from new development. The proposed drainage facilities are delineated in Exhibit 15. Solid Waste Disposal Residential solid waste produced in the Lake Elsinore area is currently disposed of in the Double Butte landfill site located at 31710 Grand Avenue, Winchester. The site was opened in 1973 and is owned by the County of Riverside and.operated by the Riverside County Waste Management Waste Disposal Division. The City and Counry are reviewing the potential for expansion of the present site for commercial and/or alternative facilities. L 3~ h_~ . . ~ ~ . . .~ _ ~~ ~/ ~ ~, 8, / ~ 8' ~ ~ ~ ~ ~ F.M. ~ / ~_ 8' ~ $• 8~. f_ ~ 8' F.M ~ ~.- ~ ~ L_ $. L $- ~ L L ~_ ~_ ~ ~...,:w!'.a:, 5+r..u, ~._~ v ,~__. ~~. , . ~ .... %2, .. ., ~ , .. . .. . , . TO CANYON LAKE SEWER SYSTEM 21 F. LIFT STATION SEWER PLAN SEWER MAIN (GRAVITY FLOW) ~ ~_ FORCEMAIN(F.M.) (PUMPED) 2,• 2,• TO OFF REGIONAL ALE:7"=1155' IXHIBR ~ 4 ~ unsakef ssociat4r ~ ~ ~ .a.:«:,e~ . . n,o,.,.,u. ~~ t 33. r 32• ~ . ' 36 m C ~ ~ • z q ~ C 30' ~ 3 _ ~ 30" 36. 60 39" 1 _ ~" 36 l_ 8" f . ~. _ 24° 42" ~ .. 33' L L L L ,~ ~~Y+~e'e'.a..i; a...7. .. _.. _ . . . i:: .v'_....;a. x.' .i: _ ...._... . . ..... ... .. .. . . . ... ___._.. ..._.._.__.. STQRM DR,AIN FACII~I'Y PLAN WITFiW ASSESSMENT DISTPoCT ROADS SCALE:1"=1755' EXHIBfT 15 ~~ ~~ ~ ; . ~;: y;~ ~ ____ _ _ _ _ __ _ ~~ l, / ~ ~ VII. PUBLIC FACII.ITIFS Police Protection The Riverside County Sherift's Department will provide protection to the project area from an existing substation located at 117 South Langstaff in I,ake Elsinore. This station is located approximately 10 miles from Tuscany Hills with an average response time of less than 10 minutes. ` Fire Protection ~ Tuscany Hills is served by the Riverside County Fire Department, under a contract with the City of Lake Elsinore, on an "on-call" basis from the Elsinore Fire Station located at 410 West Graham with response time of 10-12 minutes. A possible fire station location can be accommodated in Tuscany Hills and is shown on the southwest corner of the Land Use ~ Plan (Exhibit 8). ~ Schools An 11-acre elementary school site and an adjacent 5-acre park have been provided in the ~ central portion of the site along Summerh'~ Drive. An Agreement to dedicate a school site to the Lake Elsinore Unified School I:~istrict has been reached. There is also an existing r agreement for impact mitiga[ion between the property owner and the Lake Elsinore Unified ~ School Dis[rict covering the high school (see Technical Appendix). These agreements were reached with the Lake Elsinore Unified School District and the Elsinore Union High School District. Additionally, the property owner and the School District are jointly pursuing an - ~ expedited program for the construction of an elementary school on the to-be-dedicated site. 1fie School District has requested the pursuit of a joint school/park site and agreement. ~ Estimated student generation from the project is summarized below. TABLE 7 ~ Fstimated Student Generation Dwelling Student Generation Land Use Units K-6' 7-12Z Total L Single Family Residential 2,000 1,166 400 1,566 ~ ' .583 students/dwelling unit Z .2 students/dwelling unit L L L ~ / I r Pazks and Recreation f There are a variety of public, quasi-public and private recreational facilities in the I,ake Elsinore area. i,ake Elsinore is a State Recreational Area, and I,ake Elsinore State Park ~ is located on the northwest shore of the lake. There are several privately managed campgrounds along the lake's shore. C No recreational facilities are maintained by the City of I.ake Elsinore within two miles of the project site. Yarborough Park, approximately two miles east of the project site, is the closest recreational facility. Yarborough Park is located in the downtown area of the City of Lake Elsinore. ~ The County maintains two parks in the region. Kabian Park, located on Goetz Road in Perris, at the extreme northern end of Canyon Lake, offers public trails through natural open space and scenic resources. The Park comprises appro~cimately 640 acres. Lake [ Skinner County Park offers picnicking, fishing, and water-oriented recreation within its 6,000 acres. ~ ,. The Development Agreement of 1980 includes a 35 percent open space requirement. Parks, private recreation areas, open space, the wildlife corridor, and lake area comprise approximately 253 acres. This acreage, plus approximately 88 acres of manufactured slopes make up the 35 percent open space requirement. Three park sites are provided, for total of 46 acres. One park site, in conjunction with the ~ elementary school site along La Strada and Summerhill Drive contains 11 acres for the schoolsite and 5.3 acres for the public park site. Another is a 35-acre park at the extreme southeastern corner of the study area, across the San Jacinto River. The third park, approximately 3.2 acres, is adjacent to the proposed Lake along Summerhill Drive in the - ~ northern half of the site. The precise program for this park site will be approved by the City's Community Services Director. 34 L ~ a .,~~ .a. r _ ._r _ _ _ __ ~,/ VIII. DEVEIAPMENT STANDARDS ~ Introdudion ~ This chapter establishes zoning and land use development standards for each of the land uses planned for the Tuscany Hills Spec~c Plan. E~chibit 8, Land Use Plan, depicts zoning for the entire Tuscany Hills Specific Plan. Zoning districts include the following: C o R-SF - Single-family residential zone o Gl - Neighborhood commercial zone o OS/R -Open space/recreation zone ~ The permitted uses, development regulations, and design standards of the designated zone shall apply to the appropriate project planning area, as shown on Exhibit 8. ~ This Chapter of the Tuscany Hills Specific Plan contains zoning for the entire project area which will be adopted by ordinance. When provisions wntained here wnflict with the City of Lake Elsinore Zoning Ordinance, these development standards shall supersede. ~ In addition to the Tuscany Hills Specific Plan development standards, this Specific Plan sets forth design guidelines. The design guidelines comprise Chapter IX of this text. They specify criteria for such items as landscaping, site planning, architecture, gading, signage, ~ eta It is the purpose of those guidelines to augment the development standards for Tuscany Hills. ~ Regulations For and Uses Permitted in All Zones A. Notwithstanding any other provisions of this ordinance, the following general uses ~ may be permitted in any zone classification in Tuscany Hills provided that a use (_ permit is granted pursuant to the provisions of the Lake Elsinore Zoning Ordinance. 1. Educational institutions 2. Churches, temples and other places of religious worship 3. Government uses 4 Any hospital or other facility that is licensed by the California Department of Public Health, or by the California Department of Mental Hygiene, not including a family care foster home or group home that services six or fewer persons 5. Any home or other facility for the aged or for children that is licensed by the California Department of Social Welfare or by the Riverside County Department of Public Welfare, not including a home or facility that serves six or fewer children or aged persons 6. Public utilities B. In addition to the aforementioned uses requiring a use permit, the following uses ~ may be permitted in any zone classification. No permits other than a building permit are required. L 1. Public parks and public playgrounds, lakes, iecreation or open green space, athletic playing fields, riding trails, hiking and bicycle traIls and related facilities L 2. Accessory buildings, structures and uses related and incidental to a permitted use L 3. Fire and police stations 35 L .~~., _. ~..~ r _ a~ ,.v. ~.~ ,. ~ ':a~.., ~ ~ ~ / 4. Public and quasi-public facilities 5. One single family detached residential unit per legal lot, regardless of lot size 6. Electrical, gas, cable T'V, and telephone distribution and service facilities C. General provisions, site planning guidelines, and architectural and landscaping standards shall apply to all zone contained herein unless otherwise noted. D. The City of Lake Elsinore Zoning Ordinance (hereinafter referred to as "zoning ordinance") in effect at the time of adoption of the Tuscany Hills Specific Plan shall apply to all zones unless otherwise noted herein. Single Family Residential Zone A. Purpose and Intent The R-SF Zone is intended to accommodate residential projects comprised of quality single-family residences developed in an urban environment with available public services and infrastructure. B. Fbr.mitted Uses Uses permitted in the R-SF Zone shall include those uses listed below when developed in compliance with the purpose and intent of this Chapter. 1. Single-famIly detached dwelling units; one dwelling unit per lot. 2. Accessory uses and structures pursuant to "Accessory Uses and Structures," below. 3. Temporary uses and structures pursuant to "Temporary Uses and Structures," below. 4. Small family day care and residentiai care facilities pursuant to Chapter 17.16 of the Zoning Ordinance. 5. Utility distribution and transmission facilities, including private radio, television, and paging antenna and towers. 6. Government buildings and service facilities. 7. Public parks, playgounds, community centers, recreation buildings, and public schools. 8. Manufactured houses in compliance with the provisions of Chapter 17.14 of the Zoning Ordinance. 36 .~:-~ddt,r;`sar,.s~Y~~.,,,: +.r.,a,. . a.. . -a~za.'; ~:.. ._ _. . . . . ~ , . . . ._...._._._.. . . . . .___._ . . ._.__.. .__._ _.___.. ._..__. ~~ f C. Uses Subject to a Conditional Use Permit • ~ It is recognized that certain uses whHe simIlar in characteristics to the above permitted uses may have the potential to impact sunounding properties and ~ therefore require additional approval and consideration. Uses permitted subject to approval of a use permit, pursuant to Chapter 17.74 of the Zoning Ordinance, in the R-SF Zone shall be as follows: ~' fl d h i f 1 L f li ith th i i arge am y ay care omes n comp e prov ons o . ance w s Chapter 17.16 of the Zoning Ordinance. ~ 2. Second units in compliance with the provisions of Chapter 17.17 of the Zoning Ordinance. ` 3. Keeping of exotic animals or birds, or more than three (3) dogs and/or cats, l on the same lot as a permitted dwelling for pets only and not for commercial purposes. The Planning Commission shall impose adequate limitations to ` assure that the residential character of the property and neighborhood are ~ maintained. 4. Horticultural uses, including growing of fruit, nuts, vegetables, and ~ ornamental piants for commercial purposes. D. Accessory Uses and Structures Permitted ~ The following accessory structures and uses customarHy incidental to any of the above uses shall be permitted in the R-SF Zone: ~ 1. Arbors, trellises, gazebos and simHar shade structures of open construction 2. Fences and walls 3. Garages C 4. Patio covers 5. Swimming pools and spas 6. Home occupations (in accordance with Section 17.15 of the Lake Elsinore ( Municipal Code) 7. Tennis and racquet courts 8. Pedestrian and bicycle trails ~ E. Temporary Uses Permitted The following temporary (no more than two years) uses are permitted in the R-SF I Zone, subject to the approval of the Community Development Director: 1. Temporary construction facility during construction, including trailers. 2. Temporary real estate office and model homes located within a subdivision L (see Exhibit 16). 3. Real estate signs, flags, future development signs, and directory signs in conformance with Development Standards contained herein (see Exhibits 17 L and 18). L ti ,\ MObESTEAO LAND DEVELOPhENT CORPORATION v EXHIBIT i fi ~/ r - ~ f_"'r_ _ J\ . . .ei: -~,• _ .." ~ . . ~ ~~~ _-__~ - ' ~~`'~ ~ ~ - ~7 . . _ I ,: ;- ~~; ~ ~ ~ ., , ~ ,~ ' , ; _ ~ ~ = ~. , ~ ~ % ` ~- - ~~ ne ` - f ` , e~ ~~ i ~ , . ~t L . ~ ~' I~ e ~ ~ _ _.. _ ~ > . r .. ~ - - I SIGNAGE PROGRAM NOTE: REFER TO EXHIBIT 18 FOR LEGEND ~ `~. ,.r.. - ~ ~ "_ ~ ~ , ~ ~ `' :, , NOT TO SCALE ~ 3 : ::; s ~~a:a.~ . . ~ >.° : " ~~ ~ EXHIBIT 1 T ~ ~ ~ m~ ~~~ TUSCANY HILLS °'mw = _ = L .v a ~.;: 3u. ,., i. s_y r . _. ,~ ._ _ . . . ~ .. . ~ . . . . ~.. ~~ DENTIFICATION ~ ~PICAL FLAG ~';;"~ ~7=:; -~` ~ ~ Po~n ~ IiJ~3Y ~ - `~1bL~ ~~ ~ ~~ ~ I~PJ61 flLY11Y ~ O rv.a.OrriE ~ ~B TYPICAL FUTURE USE SIGN ~_ p, „n l i~~ ~~~- ~_ ~_ `- NPICAL LADDER SIGN L_ ~:__.._.... __- - i L ,r ~~~ ~n a.,r.~..~ ~ ~ ~ : 5 ~ ~ VALTELENA ~ ~ Homatud Iand Dev. Cnrp. - ~ L NPICAL ENTRY MONUMENT ~Y L .::,.~:.~ ~,"~:.'~'d ~,'"~~"q..~n~..,~„~.a.~,~~a ~ .w ~,.~ ..,,... ,..q.o. ~~_ 4.~., w~. ~ ~~.:.a.=~ ._ _ .. F _ ._. _ , _ . . _ _ _ _ _.. ,. _..__ _ _ NOT TO SCALE EXHIBIT i 8 _ __ _ __ i ~~ 1 F. Development Standards ~ Th v ment standards shall a d l l in th R SF Z f ll i , e pp ow ng e e op y e - one: o ~ 1. Minimum lot area: The minimum lot area in the R-SF Zone shall be 4,000 square feet. The average lot area for the Tuscany Hills Specific Plan area shall be 5,500 square feet. (~ 2. Minimum street frontaee: The minimum street frontage in the R-SF Zone ~ shall be 50 feet, measured 35 feet from the sidewalk. Lots fronting on cul- de-sacs and pie-shaped lots shall have a minimum street frontage of 30 feet. ~ 3. Ma~cimum lot coveraee: The mv[imum lot coverage in the R-SF Zone shall be 60 percent. ~ 4. Minimum dwelline unit size: The minimum dwelling unit size within the R-SF Zone shall be 1,000 square feet exclusive of garage area, provided that at least 20%a of the total number of units within any phase shall exceed the minimum square footage by 15%. 5. Maximum buildin_e height: The maximum building height in the R-SF Zone shall be 35 feet, exclusive of chimneys and other appurtenances where the 1 maximum height is 37 feet. 6. Minimum setbacks: The following setbacks shall apply in the R-SF Zone ~ (see Exhibit 19): a. Front yard: 10 feet for main dwelling unit ~ b. Rear yard: 10 feet for main dwelling unit; 5 feet for accessory structures ( L a Side yard: A cumulative total of 10 feet for both sideyards of main dwelling unit; 5 feet for accessory structures L d. Garage placemen[: The point of vehicular entry to a garage of carport shall be a distance of 5 feet or less, or 20 feet or more from the back of the L sidewalk. Automatic garage door openers are required for garages set back less than 20 feet to the point of vehicular entry (Exhibit 20). ~ e. Intrusions into setbacks: Minor intrusions into setbacks will be allowed ~ for fireplaces, chimneys, eaves, balconies, ~ soundproofed pool equipment facilities and other appurtenances as may be approved by the Community Development Director or his L designee. 7. Parkine: The provisions of Chapter 17.66 of the Zoning Ordinance shall be ~ used to determine the required parking for development in the R-SF Zone. ~~ RESIDENTIAL STRUCTURAL SETBACKS - , ~ -::-.: -:;-:.-.:-::.-:-., .:::: , o, .: . -~ ~ ~-~,o, - ,.::; .:~::::::::_' _ 1' ' 9' - :::: ~::`::::;~::: : ~~ ':::::::{:::: - 7 ~ ;. ~..:: ,.m:w..~; " B' - [ .:: ~~i~:ii:3:: _ 3' . ' _ T t:; :' ~«««YH ~ ~ - 4' ....... " 6' _ ( _ 5. ?'::: : ' S' _ [:>~c:::c;:"';:';:'.~;; ... ~ 8 ::~".."...::5::: _ 4 _ ~ ~ ~' :a:~,~ ~;;+ - 7~ ' 3' ~ :'; :??H« :R:::::.: : ~ - B' ' ' :::. " T - (p: c :'^ ....... - 7 - 1' - [;;;~;;?t;:;_f`;:: ;:oc-~~~ -ic - o• - E:E>;i<:#:<::::z~ H W W 2 F N L ~:~~:~- :~, L STREET L NOT TO SCALE L ~ MINIMUM SETBACK FROM STREET ~ REAR PROPERTY LIIdE TO MAIN DWELLING UNIT ssociat~ `'`>' DENOTES INTERIOR S1DE PROPERTY LINES L .~~..~~.~.~, m..xae.. e.+... u sme (~~V fAf.Iae InYwr. Lw M+~i/Iro • y~ py~~ EXHIBIT 19 L . =~~xr. ;,;: .., ~.. _,.... _ , _. _.. _ _ ___ LOT B ~ .:::::~:.:~:::~::~:: :~:~ ,o~ .~:.: :~: : : ::~: :.:. ...-. ........... . ............ ~,/ t ~ 6 ~ P/L ~ 1 ~ ~ ~. L I L ~_ NOT TO SCALE L GAR/-~GE PLACENIENT L ~ To albw ~or varied setback, the point of vehicular entry to a garage shall be a distance of five feet (5') or less, or twenty feet (20') or more from the back of the sidewalk. Automatic garage door openers L are reqi.ired for garages set back less than ten twenty feet .(20') to the point of vehicular entry. a~ociatef ~ ~•~~.~ n...xy,.. Mr.cuu'u ~H~B~ 2~ i~wr. y~~~•r . r~ s.a~.. P/L P/L ~;/ I ~ 8. Siens: The provisions of`Section 9, Design Guidelines, shall be used to determine permitted permanent signs in the R-SF Zone. Temporary signage as permitted above shall consist of the following: ~ - Flags - Flags will be used along the major project entry, Summerhill Road, to attract visitors to the community. ~ - Future Use Signs - This sign, also of a temporary nature, notifies potential buyers of future communiry facilities and developments. C These signs will be removed upon the completion of the facility or developments. - Ladder Signs - These signs will be located at major intersections within the project to assist buyers in locating model complexes. ~ These signs are also temporary and will be removed upon 'sellout of the complex. - Entry Monument Signs - These signs will be located at major project entries. These signs are permanent. Exhibit 21 illustrates identification signs, flags, and directional signs. T`hese signs are temporary in natu*e and are typically removed when the models themselves are sold. Pennanent signs will be pursuant to the design guidelines. 9. Minor Desien review: Prior to the issuance of building permits, development for residential or commercial uses shall submit applications for design review. --- Said applications shall be approved administratively by the Community Development Director or its designee. Design review shall be completed within 30 days of submission with a determination that the project is approved, conditionally approved, or denied. The following exemptions shall apply: a. Additions or alterations to an existing structure which do not change the use from one permitted in the residential categories and which does not increase the floor area by more than 50%. b. Accessory structures other than garages, enclosed patios, workshops, cabanas, and simIlar enclosed structures containing 600 or more square feet of floor area, provided they are located no closer to a property line than the setback prescribed for the main dwelling unit, except that straight-in entry garages may be required a greater setback. c. Fences and walls: Although fences and walls do not need formal Design Review approval, their proposed location and design must be approved by the Community Development Director prior to construction or installation. 10. Desi~n standards: Chapter 17.14 of the Zoning Ordinance contains residential development standards applicable to all projects within the city regardless of zoning district. It is therefore important that the provisions of Chapter 17.14 of the Zoning Ordinance be considered together with the regulations contained herein for the R-SF Zone. Where the standards 43 A L ~~~. .~w,_..~~.~~v _~~.~ _ ~~ ` r contained in the R-SF Zone are different from those contained in Chapter 17.14,the R-SF Zone standards wntained herein shall prevail. ~ t 1 ~ ~ 1 L ~ I_ L L L L L ~ L _d~~~zk~~.,.~,~,~,.~..~.~~~ :~ri~;~,..: _„. 44 ~ „-.~ . . .. . IMTTMI~NMMMIMIR'lq~lAll{!~q'hbww~~M1MkAla~yMxiFH+rMIXI1IM'MM7~wbq~M'gwwp~~w~Mp~~XM IM~ >~HkNa4x~.bY otl . yM.,ryyb.~-yp,n . . . ' . ~ .. . . s . ~ -v I .m s~ , _ ~r ~ M~~.~ ~ o~..., a ~ ~ . ~.a 2~~ ~ 9 ~- -"` rosr '^ 4 ' ~ ownN ~+swrreia ~rrnr VISITORS ~'° PARKING ~~ .mm.~ ~ .,~. ..,~ ~ ~ . ?o" ~1:4fJ~A <•" 7~A ~ I -°~v' LI F MODEL ° ,~ ~ TOUR ~- -- o MODEL SIGNAGE IDENTIFICATION "4"• 0 ~i V ~4~ .- _ T ' ~-,~^~•_ ~ ~ ~a ~ry ~ t. TO SALES ° ,~ OFFICE -,-- .._. :b P EXFiIBR 21 C~~« m _ _ _ _. ~~ [ r # 11. Other: ; a. A maximum cul de sac length of 1,000 feet shall be allowed in the ~ R-SF Zone. b. Automatic garage door openers will be required on all garages with ~ setbacks less than 20 feet. c. Mail boxes on the street will be placed at the property line or as requued by the post office. 1 d. All driveways must be concrete; use of asphalt may be requested for review and approval of the Community Development Director. ~ e. Site development permit applications shall include: plot plans, elevations and preliminary landscape plans. The site development permit application shall be submitted in the form and number as ~ required by the Community Development Director or designee. All site development permit applications shall be reviewed by the Planning Commission. ~ f. Aiternative development standards, other than those specified for the R-SF Zone, may be requested if the developer can show how the ` project will better serve the public interest. I Neighborhood Commercial Zone L A. Purpose and Intent ~ The C-1 Zone is primarily intended to accommodate a shopping area that provides convenience goods and services for the residential neighborhoods. Because of the ~ limited size of this area and its proximity to residential neighborhoods, strict development standards have been designed to minimize possible conflicts with adjacent residential uses. Neighborhood commercial developments must be carefully L monitored to ensure continual compatibility between residential and commercial developments. Only two areas of the Tuscany Hills Specific Plan Land Use Plan allow commercial development. Although designated for single family residential development and recreational park, these two areas also allow for commercial L development as specified below. L B. Pernutted Uses Uses permitted in the C-1 Zone shall include those uses listed below when developed in wmpliance with the purpose and intent of this Chapter. Each use shall be ~ evaluated in terms of its design characteristics and specific site location pursuant to the provisions of Chapter 17.82, Design Review, of the Zoning Ordinance. L 1. Retailing of consumer convenience goods and services: An[ique shops Appliance stores, household L Art supply shops and studios Automobile parts and supply stores Bakeries L 46 L ~zyw. _.~ ~ , ~ ~ .ti.~ ~. ~~. _~- _~ . ~~ Banks and financial institutions Barber shops and beauty salons Bath shops Bicycle shops Book stores Clothing stores Confectioneries or candy stores Drug stores Dry cleaning establishments and laundry agencies and self-service dry cleaning and laundry establishments Florists Food markets, <supermarkets and grocery stores Gift shops Garden supply shops Hardware stores Hobby shops Health and fitness centers and clubs Ice cream shops and frozen yogurt shops Instant printing and duplication service provided there is no pick-up and delivery service Jewelry stores Laundries and laundromats Leather goods stores Liquor stores L,ocksmith shops Music stores News stores ~ Notions and novelry stores Nurseries, horticultural and garden supply stores Pet shops and pet supply shops Photographic shops,studios and photo engraving Produce markets Shoe stores and repair shops Stationery stores and card shops Tailorshops Travel agencies Watch repair shops 1_ 2. All land uses permitted in the single family residential zone shall be permitted in the C-1 Zone. L 3. Any other use which the Community Development Director may find to be similar in character to the uses, including accessory uses, enumerated in this section and consistent with the purpose and intent of the C-1 Zone. ~- C. Uses Subject to a Conditional Use Permit L It is recognized that certain uses, while simIlar in characteristics to the above- permitted uses, may have the potential to impact surrounding properties and, therefore,require additional approval and consideration. L Uses permitted subject to approval of a use permit, pursuant to Chapter 17.44 of the Zoning Ordinance, in the C-1 Zone shall be as follows: L 47 ~ ~«,~.~,~~ _... . ., . ~ . «,;:~. . . _ ~ , ~ _ _. _ _ _ _ __ ~, / ~ 1. Bars and wcktaIl lounges, including live entertainment 2. Car washes. 3. Delicatessens . 4. Fast food restaurants including drive-ins and drive-throughs ~ 5. Gasoline service stations 6. Restaurants,including live entertainment ~ D. Accessory Uses and Structures Permitted Uses customarily incidentai to the above uses and accessory bufldings, when located ~ on the same lot, including a storage garage for exclusive use of the patrons of the above stores and businesses. Open storage of any goods or materials is NOT permitted. ~ E. Temporary Uses Permitted r The following temporary uses (no more than two years) are permitted int the C-1 ~i Zone subject to the approval of the Community Development Director: 1. Christmas tree and pumpkin sales. 2. Temporary construction facility during construction. ~ 3. Temporary real estate officPS. 4. Model homes located within a subdivision to be used only for and during the original sale of the subdivision. ~ 5. Outdoor sales and exhibits 6. Special advertisements--flags, banners, balloons, hot au balloons 7. Real estate signs, flags, future development signs, and directory signs in - ~ conformance with Development Standards contained herein see Exhibits 17 and 18). ~ F. Development Standards The following development standards shall apply in the C-1 Zone: ~ L Site criteria: There shall be no minimum lot size required for a parcel in the C-1 Zone. However, in establishing and maintaining locations or approving uses for the C-1 Zone it shall be demonstrated that the property ~ is capable of compliance with the following criteria: a. The site can support safe and efficient on-site circulation and has L convenient access to surface streets with adequate capaciry. b. There is sufficient parcel size to ensure adequate buffering and screening where needed to protect residential developments. ~- c. The site is physically suitable for the proposed type and density of development and capable of permitting full compliance with the City's ~ development standards and practices. 2. Floor area ratio: The maximum floor area ratio in the C-1 Zone shall be L .5~. 3. Maximum buildin~hei ht: The maximum buIlding height in the Gl Zone shall be 35 feet. L 48 L _.,,~9.~a .~.,,_,,. ..,.J~..~,..~:s_ ~. .~.~. _ . ~,/ 4. Minimum setbacks: The following setbacks shall apply in the Gl Zone: a. Ten (10) foot minimum setback from a property line abutting the street. b. 'Itventy (20) foot minunum setback from a property line abutting residential and open space/recreation zonea c. No minimum setback from a property line abutting a commercial zone. 5. Parkine: The provisions of Chapter 17.66 of the Zoning Ordinance shall be used to determine the parking for development in the C-1 Zone. 6. Siens: The provisions of the Section 9, Design Guidelines, shall be used to determine permitted signs in the C-1 Zone. Temporary signage, as permitted above, shall comply with the signage program identified previously for the R-SF zone. f 7. Desgn review: No building permits shall be issued for the construction of t any building or structure in the C-1 Zone until the applicant has obtained Desi~ Review approval pursuant to the provi'sions of Chapter 17.82 of the ~ Zoning Ordinance. 8. Landscaoine: All areas not utilized for structures, parking, or other permitted uses shall be landscaped. In addition, the following minimum '- ~ standards shall apply: a. Adjacent to streets - A continuous area, a minimum of ten (10) feet ( in depth, shall be landscaped and maintained betweea parking area l and the public right-of-way. Parking areas should be screened as much as possible utilizing berms. L b. Buffer landscaping - A continuous landscape buffer, with a minimum of fifteen (15) feet in depth shall be maintained adjacent to interior L property lines which abut residential development. In addition, a minimum six (6) foot decorative block wall shall be provided. c. General - All building sites shall have a minimum landscaped ~ coverage equivalent to ten (10) percent of the total lot area. Such landscaping shall be automatically inigated and shall be evenly distributed over the site and consist of an effective combination of trees, ground cover and shrubbery, which may include landscaping L required for setbacks or buffers. A reduction in coverage may be sought and appcoved during the Design Reviewprocess in recognition of quality design. For the purpose of this provision, quality L cons~derations include the use of courtyards, atriums, creative use of ground floor public space, creative use of water elements, and the incorporation of sculpture or art work in the landscape proposal. L 9. Desien standards: Chapter 17.38 of the Zoning Ordinance contains non- residential development standards applicable to all projects within the City L regardless of zoning district. It is therefore important that the provisions of 49 L tAS~a'_.nv^,aH. FY ....w,., .53.Evk9~.,~. ~~_ ,.,*l,'f~„~.:`: ~ .... . . . ~ . ~ . ~ . , . . .. .. . _. . . . . . . . ... ___'- ._._. __. . _ _. ___. . ~~ Chapter 1738 of the Zoning Ordinance be considered together with the regulations contained herein for the Gl Zone. 10. Other. a. Allroof-mountedmechanicalequipment,satellitedishes,tanks,ducts, elevator enclosures, cooling towers, or mechanical ventilators shall be screened from the ground elevation view by architectural elements such as parapets, etc., to a minimum sight distance from immediately adjacent fronting streets. b. Site development permit applications shall include: plot plans, elevations and preliminary landscape plans. The site development permit application shall be submitted in the form and number as required by the Community Development Director. All site development permit applications shall be reviewed by the Planning Commission. c. Alternative development standards to those specified for the C-1 Zone may be requested if the developer can show how the project will better serve the public interest. Open Space/Recreation Zone ~ A. Purpose And Intent The intent of the Open Space/Recreation Zone is to reserve land for park, school, - ~ and recreation uses; and to secure natural open space as a permanent public resource, in order to protect the public health, safety, and welfare and preserve environmental and scenic resources. ~ Land placed in the Open Space/Recreation Zone shall include land under public or private ownership as follows: ~ ~ 1. Parks, picnic grounds, and piaygrounds, including neighborhood and wmmunity parks L 2. Game courts, including tennis, racquetball, and basketball 3. Athletic fields L 4. Parking lots 5. Primary and secondary schools, both public and private ~ 6. Drainage or flood control channels, creeks, rivers, lakes and floodplains, including riparian habitat areas L 7. Land which would endanger the health, safety, and public welfare of the residents, to include: L a. Areas where terrain is too steep to build upon or where grading of the land may endanger public health and safety due to erosion by flooding L 50 L .._~o ~_ _ ..w ... b. Areas subject to flooding or inundation from storm water c. Geologically unstable areas d. Greenbelt areaswhich are formed by land development by preserving the land as a natural area 8. Areas of wltural or historical value of significance 9. Areas of outstanding natural, biological, or scenic value or significance B. Pernutted Uses Those uses associated with 1-9 above. No building or land shall be used, and no buIlding or structure shail be designed, erected, structurally altered or enlarged except for the following purposes: 1. Drainage channels, bridges or crossings, watercourses, spreading grounds, settling basins, freeways, parkways, public streets, park drives, utility access roads, hiking/riding trails, and fire lanes 2. Privately owned or public recreational areas, parks, picnic grounds, playgrounds, wIldlife preserve, and such buildings and structures as are related thereto 3. Game courts, including tennis, racquetball, and basketball courts - 4. Athletic fields 5. Parking lots 6. Equestrian facilities, including trails, riding stables, show~ounds and competition facilities 7. Primary and secondary schools, both public and private 8. Public and private utility facilities, such as pump stations, transmission towers, water reservoirs, substations, and similar structures 9. Wildlife or wilderness preserves 10. Mining operations in accordance with plan 11. SimIlar uses to those listed in this section, which in the opinion of the Planning Commission, would not be detrimental or incompatible with the intent and purpose of this Zone, as set forth herein. 51 L ~~~~+ ~~,_~:~;i:-a~.~.~..~>~ _~..w~t_: . . .. _ _ _ __. _ _ __ _ ~~ ~ C. Uses Protdbited in the Open Space/Recreation Zone 1. Residential uses ~ 2. Commercial uses, other than those incidental to recreational uses permitted above ~ 3. Industrial uses ~ D. Development Standards ~ The following development standards shall apply in the Open Space/Recreation Zone: ~ 1. Minimum lot area: There is no minimum lot size requirement. r 2. Minimum street frontaee: There is no minimum street frontage width, ! provided that each lot or parcel containing a school building or structure shall have a width of not less than sixty (60) feet at the building setback line. ~ 3. Maximum lot coveraee: No structure shall be permitted except accessory buIldings or those structures related to public park and recreational facilities or utIlities. In no case shall buildings or structures exceed thirty (30) percent ~ of the total area in use, except for schools and associated bufldings. 4. Ma~cimum buHdin.e height: No building shall exceed thuty-five (35) feet in height or more than one-story, except for public and private school buIldings- ~ and structures which shall not exceed fifty (50) feet in height or four stories. 5. Minimum setbacks: There are no yard requirements for buildings which do not exceed thirty-five (35) feet in height. Any portion of a building which ~ exceeds thuty-five (35) feet in height shall be setback from the front, rear and side lot lines not less than two (2) feet for each foot by which the height exceeds thirty-five (35) feet. The front setback shall be measured from the ~ master plan roadway right-of-way line. The rear setback shall be measured from the existing rear lot line or from any recorded alley or easement; if the rear line adjoins a street, the rear setback requuement shall be the same as ~ required for a front setback. Each side setback shall be measured from the side lot line, or from a master pian roadway right-of-way line. 6. Parkine: The provisions of Chapter 17.66 of the Zoning Ordinance shall be ~ used to determine the parking for development in the Open Space/Recreation Zone. ~ 7. Mechanical equipment: All roof-mounted mechanical equipment, satellite dishes, tanks, ducts, elevator enclosures, cooling towers, or mechanical ventilators shall be screened from the ground elevation view by architectural ~ elements such as parapets, etc., to a minimum sight distance from immediately adjacent fronting streets L L 52 L ~ _, ~~..~ s _ ~,/ r ~ 8. Design review: All structures, parking facilities, or storage lots and grading operations within the Open Space/Recreation Zone shall be subject to Planning Commission approval, and shall comply with all provisions of F Chapter 15.64, Flood Hazard Areas, and Chapter 15.68, Floodplain Management, of the Zoning Ordinance. C 9. Other: No mechanical equipment, duct, elevator enclosure, cooling tower, or mechanical ventIlator shall be erected, constructed, maintained or altered anywhere on the premises unless all such equipment and appurtenances are ~ screened from public view by landscaping, walls, fences, and/or architectural structures. All fences, walls, and structures shall be of similar architectural elements, which are specifically permitted. ! f (_ ( L [_ L L L L L C L 53 L ~~~~~~~~...:.~~k.~~u~,~~ ... ~ ___ _ __ ____ _ . . . ,. _ ~/ ~. DESIGN GUIDELINF.S General Guidelines, Purpose and Theme In the planning of Tuscany Hills, careful thought has been given to the integration of structural and aesthetic elements of an active community. To ensure that the Specific Plan is implemented in a manner that will bring Tuscany Hills a sense of its own character, a central theme has been devised. The intent in conceiving a theme for Tuscany Hills is to establish an environment that reflects its European elder, the southern European regions of Spain, southern France, and Italy. Tuscany Hills should thus unite the beauty of the natural surroundings with the built environment, in the same way the gardens, vineyards, and sunounding landscape are an integral part of the Tuscany wttages and villas. This theme can be reflected both architecturally and within its landscape design. Rich earth tones and pure forms will dominate the architectural design, while the landscape design will introduce the same mosaic pattern reflective of its Tuscan example. With the fine architecture and bold landscape design, the community of Tuscany Hills will provide a unique and special environment reflective of its European parent. Compliance with these design guidelines will be determined by the Community Development Director. Specific project-wide design goals and objectives are as follows: 1. To provide the City of I.ake Elsinore with the necessary assurance that t6e Specific Plan area will develop in accordance with the quality and character proposed herein. 2. To provide guidance to developers, builders, engineers, architects, and other professionals in order to maintain the desired design quality. 3. To provide guidance to city staff, the Planning Commission, and City Council in the review of future development projects in the Specific Plan area. Landscaping Guidelines LandscaQing Goals and Objectives The following are the overall goals and objectives of the landscape guidelines: 1. To reduce emphasis on veHicular impact by careful placement of roads and parking areas, and screening of same from view. 2. To emphasize pedestrian access and circulation, especiallybetween and around roads and buIldings. Entry Statements In designing the land use plan for Tuscany Hills, it was intended that a sense of arrival, form, material selection, color, and overall theme of the project be established. The major entry road to the community, Summerhill Drive, will have monumentation signifying entry into the project. Project and neighborhood entries will establish the sense of arrival on a more specific locational basis. The entries, along with the Wall and Fencing Plan, are shown on Exhibits 22 and 23. Three levels of entry treatment are included in the Tuscany Hills project: L -.v<~+k.?._ra:..i:.wd.`~n„r.,».,.....sa,...aw;.Sw~._.,} . ........ . ...... ... .. .. 54 1 ~~ ~IONUMENTATION, WALL & FENCING PLAI~ NORTHERN SECTION ~ ~ ~ ~ ~ 4_ ~ ~ `Y ~_ L ~ i ~ e L_ L L L ~ L SOURCE: KEITH FRENCH GROUP ~.~, ~:~,~ ~._~_~,r ,u. EGENiI rimary En4Y Mooumentstiw xoodary Evlry Mooumeutn4ov t~n/PrvlatenM Iooommlelion m~ wau ewotlvySNrmWall Vmuppt Iroo Fcom :IVS S~rteo Vlew Well 'la~, Uu[ BmwEUim N.T.S. EXHIBIT 22 cC/~n,+trr ssod,rcd ~ ,....~.~.~ ,.. ~ ;*- ~•~:~•~.. __ _ _ _ _ _ _ __ _ ~~ ~~ON~TMENTATION, WALL & FENCING PLAN 9 ~UTHERN SECTION ! C ~ ~.....,.. ~ ,, .. I ' LE ~~ ~ r ~F` ~ -'?~i ~e~~~oo /I~ . ~~ Pnm=tlEOUYMou ~ ~ Q~ i`1 ~~ ~ ~ ~~~j /~-; \ <, . 4~ SrmnEUyE~vyMavumeuuuon ~~ t t~ •-..~ / f / ~~ ~ i , hl Q~ ~^ ~ ; ~ ~~ ! ~ / ~ 1. t ~i \~ \ _~ ~~ TereryRml~F^~n'Manumenuuov t ~ M1TCme Well ~ t ~` ~l ~ ` W ~' ..' .= .~.~. ~. i ~ ;~~ r, . `++`.. \\\~ ~.-' j ~ •i t ----- s~m~a.~rs~~ow.u 6\\ ~' ~."_-~ ~. ! ~ •~, \ J~ Wrou6N~ImnFeoa ~ 'r 1 •~/\ 1~ Y-' 1- Thrte-Rai1 Wmi Fente i )` i ~ \ ~ ~~(' `'J -i ,~ ~ r~oamu~~wmae~~a \ \~ ' \ ~ \L ~ \ L , ~'• ~ I ~ _ } a ' ~' ~ eieoomeum~eamaaria ~ ~~ ~/~.,.~'+ : J ~/ U ' ~ ~~~` ./t~ .C' /l1 ':_~ C ~ ~ ~~~ ~ ,~, .,, h .. i.~...r--~..... L `, .... ~ ~ + .1 . ~- ~ __ .. ~~~ t ~ , L ;f~l~. , ~ . , . ` 5t~ ~ ~ = :i~ ~~~ r ='~' 1 ': . ~ ~ ~/ ~' ~ ~ ~- ''- ~`~- ~ ~ ~ ~ - I L ; ~ ; ~ ~,p ~l .~ ~~,~~, ~: : ; , .. , ,~ , , f~-~ _ ;~ ~,~~~ /~~ ~.~ ~--.~ ~ ~ ~-~ ..~ .~-.f .;:, , ~ s~ ~ ,- ~ , .~~ ~ ~ , = - --.~ ~`~ :J JA ~ ~' f i~ ~ '''~ J i ~\ ~ /~ ~ ~_~<~ ~ ` ~ ~V ~__ ~ ~ J ~.. ' ...~ ~.. 1 L - -.._.._.._.._.._.._.._ ~ i ~ ! i i i ~ ~.._.._.._.._..~ L ~ SOURCE: KEITH FRENCH GROUP N.T.s. EXHIBIT 23 ~ ssociat~ ~ ~ ~.......'°. ~- ~ ~~.~y..~ ~/ ~ ~ 1. Primary Entry The major entry monumentation at Summerhill Drive will consist of two major ~ elements. The fust is a monument with a series of cascading waterfalls. The second element consists of a series of terraced walls with cascading water falling into poois. Tall vertical trees will serve as a back drop for this feature. Light earth tones will ~ be predominant in material choices. Exhibit 24 illustrates the Primary Entry Monument and Streetscape Plan; Exhibit 25 illustrates the Primary Entry Monument Elevation. ~ 2. Secondary Entry The secondary entry serves as an arrival point to the main project community and ~ formally sets the theme for the community. Secondary monumentation will feature the same material choices and color palette, but will be much simpler in design. Exhibits 26 and 27 illustrate the Secondary Entry Monument Plan and elevation. ~ 3. Tertiary Project Entries Entry into actual project or neighborhood areas is signified by the Tertiary/Project Entry. Overall, the project entries shall provide focus for and identification of the individual project it promotes. Tertiary monumentation will be smailer in scale, providing a transition to pedestrian scale, but will reflect the same image and design quality that is exhibited in the primary and secondary entries. The project entries are found primarily off secondary streets into individual neighborhood enclaves as illustrated on Exhibits 22 and 23. Exhibits 28 and 29 illustrate Tertiary/Project Entry monument plans and elevations. - Streetscaoes A street hierarchy has been established in order to present a clean distinction between the relative level of streets and to emphasize certain key aspects of Tuscany Hills. This hierarchy is depicted in general format terms in the Conceptual Landscape Plan, Exhibits 30 and 31, and on the Streetscape Plant Palette, Table 8. This hierarchy will in part be established by the street landscaping, which has been chosen to reflect the projecYs overall "Tuscany" theme. Careful consideration of the relationship between street and plant material characteristics will help establish a character to reinforce this theme. There are three levels of street hierarchy in Tuscany I-Iills which are discussed below: Primary Street (Summerhill Drive) A semi-formal landscape concept is proposed for Summerhill Drive and is shown in detaIl on Eachibit 32. This road will function as central "community collector" for the project. Formal groupings of large spreading Red Oaks will be planted in the parkway along Summerhill Drive. An understory of ground cover will complete the treatment. L 2. Secondary Streets The secondary street landscape wncept will be less formal, transitioning to more L formal theme of Summerhill Road. Informal groupings of London Plane trees will be planted with an understory of turf and slope planting where needed. Exhibit 33 shows the Secondary Streetscape Concept in detail. L 5~ ~ .,..,. . ,-. , ...~ , _ , _... __. _ _ ~ - _,n~."rusii~ 1 ~ ~ ~ ~ ~ ~~, ~~ ~ Primary Entry Monument & Streetscape ~ ~ ~.. ~ ~ ~ \~~C i ~ Wtu`t~. ~ l ~I~ ' ~ \ ` ~ .~-~ (aiQ 4hG ~ / n n ~ . ' ~~ ~ ~. ~ + ~" ~rrl-av~a~9t~-cci' ~ ~,--` / ~ ~ ~i1 -~ r~ohn~a~fea~ L~ I,~d~x~ J ~ . . /~~.,•.\ i 10' O.G1 \~ I MP~' zE(G ..I,. M1~~ . .. \~F` ~ I~~ 1~~~v, m15'a.\~•f.~ ~~ _ '/ ~ .. ~ a ~_ /~ (P~r ) ~- , ~" , ~ d , , Ganpvy lhlcwrd~AWi ~~AGa Gecaf~VerAL I ~ _ , ~, ` ` . ~~~ ~.. ~... ~ ~ ~~ . hiAeWal('- @ 10' OG. ~\ ' ~ ~~S /~,. I ' ' ~_ ~=~\~ . ~ ~ , _ : \ CLVbIa ~ 'f~1EhtG VJAII ~.-r ~ ; '~~ ~ ~ \ ~ a.. ~_ ~ i ~ ~. ~ ~ : . ~ \ i~~r . ~~2`~~~ ~~"f1BmC/C.(~vmreil _.._~~ \\, \~r /~ i~~~l 't % '~v'~ `'- . ~ ~~~~ i ( j1~•.: . '~~-~ ~ ~, ,T ~ ~nh~uAPa~mg • ~ / -~: , ~' ~i ~ _ { ~'` IZ7~ ~ " ~ ~ `_ -- J ,,; i ' ~;' Ter+fa W tl "' ~ f\ awt~rtelrorG ~ ~ ~ . ~ ~~ - -- ~ ~G --- - _,,~ ~ r- e ~< < ~. ~ T + ~ ~ y ~~ :~,/ . _ . . ~~ \ ~~ ~. ~~ . ~ ~. i -~ r'~ - _ ~ ~ ~ ~~ --'_~ :r s ViIIQ E ~ . - ~~" ~-_ ~ ~~~~'~~ du °4 ~1 ~ Ul~~ ~ - t~ /~ ~I~~A~OWTrQIYI I~ f ~. ~ z ~.. '~ l1"t '' . `t~ \~•` ~ ~."~\r ~ . ~ .t_~ i u. . "4. ' '~ Tae ~opo / ~` ~ F ~: ~ x' ~ ' ~W i !`~~~. ~1~~,•n L ,~ ~ ._ ~ a~ Zi~ oJld -~ ~ , ~'f~, ~ I .,~ in ~~ ,~ ` ~, ~~ ~ o. ~.~ . _ " t . ~/~~-~ ~/ ~ / ~ - _ ~J v .~` 1 ~, r `. / ~~~,~'\~tili~~~`:\\~~~`~f t ~~ _-- _....-ti.~ . ~. *F t v0i1 ~ j ' ~~ , ~ y /.z,1 ~~`~ `I `~' _ _ ° ~ \~> ~ ~, / '. ,t~~t~u4~~~A~~ t~ `- . k[°i~ ~ . 4-' / ~ Y 1a ~ \ . .t:L-.'. -; ~ ~' ,~ ~ ~^J~ 1~'( QI'I ~q @ 8^IO' 6G. _ -- - _ ~-t~,- ~ /°• t /%' ,~~17`.-i~'y~~~ i!~i1~ ~ ;; - •~ ~ ` ~\ - ~ ~IW.m 2~w'1 r'iflhv~ '/ ~~~' ` ' -~~F U ~ ~ ' ~ ~L~~ ~y ~ ~.Il ~I.i'__.. "` % .~~ ~~~ . - % ,r V ` y 1 ~ y~/ y ~/ ~ . ~ ~ ~ . / ~'~~// \ ~ ~ ~ ~'_,_~ . -, ~ ~ ; r.^./ d i - ~vn-i--y~~~~-~ , ~'~A+~dLf!f}\aE~2,~au~^ `.. . /\~~ ,~ ~ ~ -_ 1:~. 1 L ~..~_ / ~' R4~~'1`L•, ~ ~ ~ ~ ~ ~ ~~ _ ~~ _ . / / /~ /~ ~.~ - r _ ~ ~ hT.~ ~~., ~~ . \ , _ ~ ' '% ~ _ ~ '1' _ - ~ ~ `,'~ C~~ ~,\ - - ~ , ~ ~ / ~ j~ ~ ~ ~'~. ~ ~ ~ ~ .., ~ \ GaIL~Yema~ cm-I2' ~2~~~~ * - ' ~ ~ ~ 1.:'~~ Naiu-al I,aMAc,cap~,' ~ ~ ~ ~ ~ I i'~\V // ~~l ; ~ ~ /~ ` \~ ~ . \~ E%H~B~T 24 - . ' SOURCE: KEITH FRENCH GROUP ~ NoScale ('r , ~ P i ~ti: . . ;...rv;4- 0 . . ' _ - ' ~ 4.~ . . ~. . . ~ ~: ~ i ~ ' . ~i ... . ....ii:~~..~ [~..~ ..n ,~• - ' '!/A~/~In~qu~%InNRS~ .w~e_.. , ~ :1 f ~ ~ I ~ e r ~ ~ I. ~ ~ ' ~ r r ~ ~ 0 1 f r r ~ ,;:,:i~u..~..r..,•.qo..w ~ '~. . . - '}MNTg14fUGM1N,N¢,ii}~~~'~+W11N~11. n _. . ~'. r~ .:4; _ ~p : f . - ..~1U~HSN\~ . ~ Primary Entry Monument Elevation , , ~~ ~.,~^m~~ ', , ~a ~ G~'o+ Q~~~1 ~~ Ga}~ ~ ~ ~ ~ a~~~~~ ~~~ ~, ~ ~ ~~ ~~ ~ ~. ~ ~'~ ~fis ~ ~"`~~ SOURCE: KEITH FRENCH GHOUP ~I am~iTre~ (ovm~{i ~,~o w~~i p ...... rr.. qFMBM'IVTftieMNMI`l' I ~f .••.~aPixL'!.%~. ~ . .. . . . . . . . . ...:~ i :'... [ ~ ~ r~.- ~~ ..: . .. . . . . ' . ."11..,.. 1 . ~ -v ~ t I ~ ~ ~ r ~ ~ r - +I { I 4 ~ ~ ~ + ~ i ~I ~. ~ ~ I + ~ _ . :' l ,;j ~ ~ ~: VUaM11h y I SOURCE: KEI7H FRENCH GHOUP Secondary Entry Monument Plan '~ Vv~+rcai Trcc~ ~IPAMA~' {~'W~~ ~ ~~ ~~~ + + t ~- fi * * + ~, b ~ , ~ _ . ~~~~ / ~ ~ EXHIBIT26 No Scale ~ /. . .•...'~~.91•n..Aitlnrv . ,. . . . . M'Rl~'!QY:Mi1CN'NNFl'pX~i~,ii~!kbilq,vlw4~~ ~ _,r.~yyy, . ~ . . ~ ~ 1 ~ ~ . . . ~ ~ . ~ ' r r ~ ~ r ~ r ~ 0 r ~ O Secondary `~"'°"'°"""" Entry Monument Elevation '" ~ EXHIBIT 27 SOUFiCE: KEITH FRENCH GROUP No Scale ~~ ~ / ~ ~ r ~ ~ , , ~- . . . , i1!"1" m~aenMhvu4#IV~~§ ~ ~~°:'.'•'. (~ . . . ~ ~ . . ., . . , .. •~~f49 ~ . . . - ~ry~~_ . c 6cc If2 ~ ~ 30URCE: KEITH FRENCH Tertiary Entry Monument Plan ~~ ~ -~ i e t ~ r ~ r ~ ~ A r I~ 1 . . .n,w;m~-.nFwan .. . . . . . . . . . M+7P+'~SN~3~~FY'P~{%1!U~,IrWMt ~a~hr~,: ~. ~. . ~. ~: . ,[, !. ~ ~i ' .. ~ ~ '~. , Tertiary , Entry Monument Elevation ,~~ . , „ KEITH FRENCH GROUP EXHIBIT 29 Scale: 1/4" = 1' - 0' \ ~ ia m v ° ~ f ~~ ~ ~ s ~ . s F ~ ~u F m ° ~ o ~,~ ~y c„ cd y ? B ' ~ ' za ~'o ag ~~ 8 g ~u ~ ~ ~~ ~ ~c3 ~ac ~Xi Y3 3 0 ~ s ~ ~ a w a ~ ~ ~ A z ~ a a ~ ~ ~^ . h~1 Z W~ T~ U ~./ H ¢ ~ O ~ .~,~,,.,,, V Z I.~ ~ Ie..~ L.... l~ l~. ~..~ `... ....: .~.,.~ ...~t _i ~ - M ~~ ~~ m ~ ~ ?~~ ~ ~ ~~€ N ~ o Z a ~ ~ ~ _ ~ _ W ~ LL S F ~ > U ¢ ~ O y -_; -J -1 _l __J a ~ ~~ ~~ M .c a, F ~ ~ !!~ ~ ~ ~~~ ~ ~ , Z ~ ~ a w a ~ z..~ ~ A ~ ~ 1-~ a a ~ ~ ~ _ ~ _ .. ~ W LL ~.{ Z 2 W O ~ ~F~ N Y F 1 W W ~ o ~ ~ ~ N ~ ,. ~ U~° ~ ~..~ ~.. ~ ~.., ~ ~~..,., ~. _._.: ...~ ~ .~.._, ~ ~ ~ ~ ..~ ._..._.~ ~ _.._.i ~ __ _ ~/ ~ ~ TABIE 8 Typical Streetscape Plant Palette ~ Primary Street Tree ~ Queccus rubra (Red Oak )- 24" Box ` Secondary Street Trees ~ Magnolia grandiflora "Majestic Beauty" (Magnolia) - 24" Box ~ Platanus acerifolia (London Plane Tree) - 24" Box . ~ Accent Trees - (min. 15 Gal.) Pinus canariensis (Canary Island Pine) ( Interior Street Trees - Lmin. 15 Gal.l ~ ~ Geijera parviflora (Australian Willow) Ginko bIloba (Maidenhair Tree) Koelreuteria bipinnata (Chinese Flame Tree) ~ Koelreuteria paniculata (Goldenrain Tree} - Lagerstroemia lndica (Crape Myrtle) Liquidambe~ sytraciflua (American Swezt Gum) Podocarpus gracilior (Fern Pine) Prunus blireiana (Hybrid Plum) L Pyrus calleryana (Ornamental Pear) Pyrus kawakami (Evergreen Pear) Quercus ilex (Holly Oak) L Cinnamomum camphora (Camphor Tree) Pistacia chinensis (Chinese Pistache) Jacaranda acutifolia (Jacaranda) L Gleditsia triancanthus (Honey Locust) Bauginia purpurea (Purple Orchid Tree) L I Source: Keith French Group L ~ L L 66 L_ •,~~.~~ .~~,_~ m _ . . . _ , ~ _~w ~ ~ ~ ~ . ~ ~\ ~ / ~ ~ r ~ r r ~ ~ ~ ~ i- ~ ~ , ~ e . ..,..,,..,:..~..e.n. . i~e»~x rw~aw~npa:.;~, r o ~~ ~Npr;~ o. - '~ . . . . . _ . . . .. . . . ..~ .. . .... :....... ...~ ~.. . . . ~ . . . . . y.~:- .. ~. ~CANY`' ; y.~~ ~~~'.' . . . .:: s ncs Primary Streetscape ~ 0 ;~ ~~-. ~~ ~, ~ ~: . IXHI617 32 ~, f< SOURCE: KEITH FRENCH GROUP Scale:l/8"=P-0" ', ~fi :v~ . L ~ L L L \ -y Secondary Streetscape L I ~ ~ L L ,~ L L ~ilYeel'Tre? ~rlop2 f~aMfw~ Tur~ SOUFiCE: KEITH FRENCH GROUP ee~l'TreG IeWAII` EXHIBIT 33 - Scale: 1"=30'-0° ~~i b ~i ., - _ . ,; ~ . ..;,. ,au!G~o~N(YF~~d.~'a~M~'aS'kSda'alt~".-.,.., ,...~.~.,..,.~..~,.~..,. , ~ ~~ 3. Interior Streets The interior neighborhood streets within Tuscany Hills are informal and pedestrian oriented. Canopy shade trees are to be regularly spaced within beds of ground cover and will provide a canopy over the sidewalks, creating a pleasant pedestrian environment. The use of different species of trees on individual streets or neighborhoods could uniquely identify various projects within the overall community. Landscape details for interior streets are shown in Exhibit 34. Landscaoine Stand_ards and Requirements for Commercial Overlav Develooments Prior to the issuance of any buIlding permits, detailed landscape and irrigation plans shall be reviewed and approved by the City. 1. All building sites shall have a minimum landscaped coverage equivalent to ten percent (10%) of the total lot area. Landscaping shall be evenly distributed over the site and consist of an effective combination of trees, ground cover and shrubbery. 2. All projects shall provide landscape and irrigation for all areas not devoted to structures, paving, or approved storage areas. 3. All landscaping shall be maintained in a neat, clean and healthy condition, allowing the landscaping to improve and mature over the years. Landscape Maintenance Responsibili The landscape maintenance responsibility plan within Tuscany Hills is illustrated on Exhibits 35 and 36. The plan can be categorized as follows: -- ~- 1. Landscape Maintenance Districts These areas are the responsibility of the Landscape Maintenance District and ~_ include: major slope areas along circulation routes, major and secondary monumentation, primary streetscape, the wildlife corridor, and the fuel modifica[ion ~ zones along the perimeter of individual development areas. The maintenance of these facilities does not burden the City as they are paid for by the residents of Tuscany Hills. 2. Master Association Areas These areas are the responsibility of the 'il~scany Hills Master Association and include: private recreation and community facility areas, and the lake area. 3. Private These areas include slope areas within the property of individual homeowners as well as the maintenance of front yard landscaping. An illustration of typical fronC yard landscaping is provided on Exhibi[ 37. 69 .+i , ~....e-Ft . ._.. ~.... .,..uw . . ,. ~ . . . . . . ~ .. . _ ~. ~.. . . . . . ... .. ._.._ . .... ... . .. ... .___,. . ._..... .__._ __.. . ._.__.._. _ _ _ ___ __ _ . ~,/ ~ INTERIOR STREETSCAPE I Single-Loaded Street ~it-reet'fre~ ~i~opa ~ia~trw~ Cov~am~cavc/' L L L L ~ ~ L ~f"r~ef'Tru~ ~iQ~~aA~- ~Y1lil'Tt'eFi ~~ii~wail~ SOURCE: t~rnnN ~ ~^C.ot~n ~..~.-_.~..` EXHIBI3 34 Double-Loaded Street ~~ ~~IAINTENANCE RESPONSIBILIY PLAN ~~oRTHERN SE~noN & PHASING PLAN ~ ~ ~ ~_ ~. I ~_ ~_ ~ ~ L L ~. L L L L SOURCE: KEITH FRENCH GROUP ~..e_.,.,..~ . . . . . . . ... . ..... e~sx - .. - ;end (or Maiu~emoa Respooaibllity Pluo n~nceA~rn inlled by IudiNdual Oereloper dnlnined bylsodaeapeMeinlemoce Disltltt HomeowoenASSrclelloo ulledbYlutlindualUevelapea -- lom~ned by Isotlawpe Meinteo~vm DIaMq Homeownen Aasaiellan In1leEbylvdiNdualOeveloper lotaluetl by Povaa Nomeowue~ :I.p1aE10teLLOU.IdnC. IeIIM bylntliNduvlOeveloper iotelnetl by lao3~upe Maivlevaoce Die1dR Nomeoxam Ass«utiou ~nNng UN~ BounAaria Inlled byMaalerDatloper btainM by Nomroxoer'~ pssrc.ulioo ulled by Iake Elsloort &6ao1 DlsWat lotelned by LESO tellsdby MeslerDeveloper Ivlnioetl by CIty Isv6xape Me~u~einaua Mat (CLhID) IotelnN by CLMO or HomeowoNa Asso- uoo N.T.s. EXHIBIT 35 ssoeiatra ~~ ~ ~ ~~ :~ .~ ~~ I ~ ~ ~AIliTTENANCE RESPONSIBILITY PLAN ~OUTHERN ~ SECTION ~ ,..~ ~ r~ : ~ ;~ . ,. ,. , ~ / • , a / ~ ~ ~ r - \ ( : ,~ ^ hy ' _ ~ ~ f . / ~ ' '` ~ . ~ ~ ~ .. Z I -'-~ °v'Y _~ ~ L_ ~~ ~ 1 ~ '1 ~ ___I ~ _ ~ ~ I ~, 6 ~ ~ ~ 1 '~ ; ' ~ r p „ ~ ~ i~ - ' A ~ 1 { ~ I : ~ ~~_ ( ~ i ,~t , ~ ~ 3 ~ ~ Y`"3v ~ ~ ` 40 i .~> S ~.,1 5 I ~ ~ :~. ` 1:- ~ l : - , , ; ~ r; , . ~ ~~ ~_ ~,. :5B ~ ~ ,J.: , ~ ~~ 1 a ; , , ~ ~ ~ I 5A ' _.;y I ~ ~ l ; ~~ ~ ~~ ~~ ~ ~ ~ ~- ~"F 4 I ~~- € ! ~~ ` _. ~ ~~ ,~>. ~ _ i ~ J ~ ~- 1 L.._ ._.._.._.._ l. .._.._ .._.._.., I I L L ~ ~ ~.._ L L SOURCE KEITH FREWCH GROUP : & PHASING PLAN ~meuo ~ ea ¢~l ad~su 'n II dL-\1 D reloper . I ' ' .a e Mymgiy~ce Pshici ~ 5~ tl u~wvw m n.ee ~ a e ~o~mar fl ' M Oy h [axrc¢ DnN6 ~ ed ~ si wa In IIMb~I tll IG 111evel~pe~ M ' etl L Ptl ~ Ilomeoxner ~ PoIMWf ]u ~~ nme.i a 'a m,:..m~~ m - amim a.v:ao~ ~ PI eUni~PaunJants N.T.S. EXHIBIT 36 unsalre~" ~ ssoc;are3 uc • ~ ~y`w ~ . . . .i,en„r . , .. . . . ~ . . . .,..,. ~n~.~'.Yrm~4n...,. ...~ ~Sf Typical Front Yard Landscaping e Background Shrub ide Wood Gate ~ md Cover .ring Vine rete Pavers ti \ Walk Accent Shrub loweringShrub ~seeded Turf Tree ~ . EXHIeIT 37 SOURCE: KEITH FRENCH GROUP No$cale l~ Site Planning Guidelines ~ Hillside areas predominate much of the Tuscany Hills site. The development is intended not only to preserve open space areas, but to complement existing topography to minimize ~ hillside grading. Residential areas are intended to be high quality, well designed envuonments with high appeal to homeowners. The following guidelines shall apply to residential development in Tuscany Hills. r 1. Curvilinear street layouts shall be encouraged to enhance streetscape. Long runs 1 of straightlocalstreets and 90 degree bends should be avoided. r 2. The use of geometric "grid" layout should be discouraged. ~ 3. Where possible in hillside areas, units should be clustered `to preserve rock ~ outcroppings and views and to minimize hillside grading. 4. A variety of lot configurations and sizes should be utilized to accommodate various product rypes and create project interest. ~ 5. Views to open space areas and project amenities should be encouraged. ~ Architectural Guidelines The following guidelines and standards set forth the basic architectural character and design theme of Tuscany Hills. These guidelines have been developed in order to achieve a high level of appearance, assure product compatibIlity, direct character and form and to establish the community's design criteria for use by buIlders and architects. Residential Architecture Each neighborhood in Tuscany Hills should have a distinctive architectural product type and/or style associated with it while keeping wi[hin the Tuscany community theme. Nearly 1 identical homes lining streets with neither variation in buIlding placement or form shall be discouraged. Possible architectural product types and/or styles are illustrated on Exhibits 38 and 39, and major components of the Tuscany Hills residential architectural guidelines ~ are diswssed below, 1. BuIlding Massing and Scale ~ The architectural image of Tuscany Hills will be perceived primarily from public spaces such as streets, open spaces, and parks. Therefore, building massing, scale L and roof forms, as prunary design components, require careful articulation in their architectural expression to these public spaces. Appropriate: ~_ - o Articulation of wall planes L o Projections and recesses to provide shadow and depth o Maintain varied and low profiles at property boundaries ~ o Incorporate one and two story elevations conveying sense of human scale ~ 73 ~ ~~ ~ r r ~ r ~ ~ S~HlJ1T_ERS~S _ ~_ ..: I ~ A ~N ^ ~ ~ ~• ~ ~ ~ ~y. T+V.~ .. . ~!/~` ~. ~~~:.. ~ L ~ :: *t'~~ ~'- , ~. L L L ~ , ._ <.,: , ; ._::.: : _ AR,CHITFCTURE ELEVATIONS California Ranch ~~ ~ ~.oW ~~, OFCiASS <:,2 OR 5:,2 Monterey Style pOOF pfTCH EAVES 24•- 30' 4:72 -&12 ~ WfiH 1Y - 18' RAKE I I~ ~F R~SSEI ~ ~Ah ' 3'~TiLES . . , K1..r+~.. ~ t~r-t~ :. ~ ~ ~:~-... ~~ _ ~ = ~;i~r~ ~~ 'sv~-~sac Pv,c~rrr 'wwows ~ our OF DOOR MD WWOWS OR FWd(p YIfiH ~S SOURCE• tvtssFrnnN ~ EXHIB T 38 __ _ _ _ ~ FOR BASE AND FR~I.ACES LAPPED WOOD ° 1G ~,/ ( AR,CHITECTURE ELEVATIONS ~ r Mediterranean Contemporary ~ ... I LIC3iiLY GABIF OFi ~~~ SiiJCCO FP ROOF "S' TLES AWMJCaS T1CiiT FASC7JL pOOF plTpi ~ ALLOWED URLE OVE9FIANG 572-~12 ~ ~ l ~' .~ ~d.• • "`~ a'' _ ''~ u'~"'~u . ~ -' . + . ; . ' : . . ~ ~~ i. ~ ~~~ ~ J _y. .,. . . . . ~+~?`~'`: nII f ~~.~ ,,~,:: 6g °' ~ w~~~.3 on ~ ~ ACCINi BMOS OF PUSTER Dff~P SE7 ~~ ~ Ti-E. BPoCi4 OR STOPE 9iiidl~DS WlDOWS MD DOOFiS ~. L ~ ~_ (. ~ ~ L L ~ ._,~~.,~~.: ..v,....,. ~,,.._ .-_ . • ~:_ D GARAGE 17 AT; 30URCE: ~ ~ ~_~._ EXBiIBIT 39 Mediterranean Country ~,/ ( AR,CHITECTURE ELEVATIONS ~ r Mediterranean Contemporary ~ ... I LIC3iiLY GABIF OFi ~~~ SiiJCCO FP ROOF "S' TLES AWMJCaS T1CiiT FASC7JL pOOF plTpi ~ ALLOWED URLE OVE9FIANG 572-~12 ~ ~ l ~' .~ ~d.• • "`~ a'' _ ''~ u'~"'~u . ~ -' . + . ; . ' : . . ~ ~~ i. ~ ~~~ ~ J _y. .,. . . . . ~+~?`~'`: nII f ~~.~ ,,~,:: 6g °' ~ w~~~.3 on ~ ~ ACCINi BMOS OF PUSTER Dff~P SE7 ~~ ~ Ti-E. BPoCi4 OR STOPE 9iiidl~DS WlDOWS MD DOOFiS ~. L ~ ~_ (. ~ ~ L L ~ ._,~~.,~~.: ..v,....,. ~,,.._ .-_ . • ~:_ D GARAGE 17 AT; 30URCE: ~ ~ ~_~._ EXBiIBIT 39 Mediterranean Country \ ~./ ~ ~ C r ~ L ~ L L L L 2. Roof Pitches and Materials Simple pitched gable, tiip, or shed roof forms shall be the predominant roof elements in Tuscany Hills. All pitched roof materials shall be clay or concrete tIle, tone metal or copper, as approved by the City to ensure a continuity of textures and colors. _.: Appropriate: o Simple pitched gable, hip, or shed roof forms o Cornice banding for detaH o Combining one and two story elements o Creating jogs in ridge line 3. Materials and Colors Exterior building materials shall be of natural materials which are compatible with and reflect the elements of the surrounding natural environment. This includes wood, masonry, adobe, concrete, and plaster or stucc:o. Color is intended as a primary theme element reflecting the indigenous elements of the natural environment. The values should generally be light, with darker or lighter accents encouraged to highlight the character ofthe structure. Prohibited materials include vinyl or aluminum siding and dark earthtone colors. 4. Windows and Doors Recessed door, window and wall openings are characteristic elements of the intended architectural style of Tuscany Hills. Appropriate: o Relative symmetric placement of door and windows o Large windows with divided lights o Windows trimmed out or flanked with shutters 5. Garages Garages are a major visual element in single family housing. Ornamentation is encouraged as it relates to the architecture and provides visual variety along the streetscape. Appropriate: o Staggered setbacks and placements o Visual design treatments including color accents and moldings 76 L ~. . ~,_~.-L=._..... x .~..i~~,..~ .~ • . _ . _ . __.. ___. _ _ __ i 1~ ~ 6. Further Design Considerations Appropriate: ~ o The use of balconies and porches o Columns and archways inwrporated as a structural or aesthetic design ~ element o Chimneys of simple design, having same material and color as the building ~ o Private walls and fences are encouraged to provide security and privacy o Mechanical equipment must be screened from public view ~ Commercial Design Criteria ~ RetaIl structures permitted in overlay zones are intended to be complementary to the residential development in the community. The design should relate to the historical roots of Tuscany elements, inciuding formal order, symmetry, classical vocabulary (domes, arches), towers, integration of automobile, and direct relationship to the sidewalk is encouraged. ~ Adequate landscaping to soften building masses and parking areas should also be provided. ~ Appropriate: o Smooth stucco, plaster or masonry walls ~ o Regular, even panels of smooth stone veneer of a light color o Combination of flat and sloped roof surfaces of clay or concrete tile, slate, L copper o Light, natural colors Community Walls and Fences Community walls and fences consist of elements that will face public streets or view corridors or that will be constructed in relation to public facilities or use. Community walls and fences serve as a unifying element along street corridors and link community project and neighborhood arrival. The overall wall and fencing plan for Tuscany Hills was illustrated in previous Exhibit 17. Five types of walls/fences are proposed and Exhibit 40 illustrates three of the proposed product types and theu associated materials, which are discussed below: 1. Theme Wall - This wall is used exclusively along the major circulation route through the project, Summerhill Drive. 2. Secondary Stucco Wall - This type of wall is essentially the same as the theme wall, but does not incorporate the use of stone. This wall shall be utilized in all other areas of the project where a solid wall is required. 3. View Fence - In order to maintain views, this type of fence will generally be utilized where [he elevational difference is greater or equal to 15 feet within or on the boundary of individual lots. The fence could be made of glass acrylic panels for 77 L \ L/ r ~ WALL & FENCE ELEVATIONS ~ Wrought Iron Fence Downslope tkvle,~ ~ • ~~' ~'-~ I Ca1i`a~ma• P+~~ f Vhaa:~.t"~x~+Fane'rro~ '•z Mnt%rielt5' +~a'avnW~'~ ~ /J--,•, ~ ~ Stucco/Stone Theme Wall & Pilaster Secondary Stucco Wall & Pilaster F~~~pfU~ -Gponado?~?laGn ~ ~ GaiifartMn'y~.Nrs~• .y~r~ ~ • ~rJrc~m,t irmi Pa~ncw,eI N (~SNa~c~ihrca. ~. kmen~roHG'lsra+NYd tds'I°-ii3 -~ ~ -~~ ~CQI{~rr4A' ~t+K+h ~ I ' . . _ I . .. N . L ~ ~ i - " -'--' - -!- " ! ---~-. '` , i~ , ~ , ;. . i ~ ~ L ~;~ ~I I " ; ' . ~ ~ .~ ~ ~a ' '• • . ~ ~ L ~ II' . : ~ : ~:~ . . L ' .. I I ~ ~ ~~. , :~ :,.~~~~-'~~--,...~` i ~~ Y . L ' ' 30URCE• ons~t~nnN ~ma L `,~ ~._._,_.._ L EXHIBIT 40 _.__ _ _ _ __ __ ____ ~ ~,/ l ~ noise reduction or wrought iron. This view fence will aLso occur at the perimeter of development areas adjacent to open space and fuel modification zones. ~ Signage Program ' The signage program previously identified in Exhibit 18 for Tuscany Hills consists of ~ temporary and permanent elements to assist visitors in locating model complexes and identifying key facilities of Tuscany Hills. In accordance with the Development Standards contained herein, flags, use signs and ladder signs are of a temporary nature only and will be removed upon project completion. ~ The locations of entry monument signs are shown in Exhibit 17. These signs are permanent facilities. Exhibits 22 and 23 show primary, secondary and tertiary project entry ~- monumentation. Exhibits 24 through 29 provide illustrations of typical monument signage. 79 ~~ ~ X. IMPLEMENTATION As previously stated, the Tuscany Hills project Development Agreement has been approved ~ by the City of Lake Elsinore. In addition, the southern half of the project has been approved via TTM 17413, revision #4. The purpose of this document is to bring together the planning studies and agreements that have occurred to date. C However, several processes and procedures must be accomplished in order to implement the development plan contained within the Tuscany Hills Specific Plan. It must be established that the Specific Plan is consistent with all State and local requirements before it may be approved by City CouncIl. Following its approval, several steps must be completed at the regional and state levels before actual development may commence. These steps and procedures are described in detail below. [ Consistency ~ State Plannine and Zonin~Law Section 65450 of the Government Code of the State of California (known as the State Planning and Zoning Act) gives authority for the preparation of specific plans. L Section 65450 states: "The planning agency may, or if so directed by the legislative body, prepare specific plans based on the general plan and drafts of such regulations, programs, and legislation as may in its judgement be required for the systematic execution of the r general plan and the planning agency may recommend such plans and measures to the f legisla[ive body for adoption:' Article 8 through 10 of Chapter 3 of this law defines the scope, procedures for adoption and administration of specific plans and regulations. This Specific Plan has been prepared in accordance with these provisions of the State Planning -- ' and Zoning Act. California Environmental Ouality Act [ The California Environmental Quality Act of 1970 (CEQA) was enacted in response to increasing public concern over the environment. In a 1972 landmark case, Friends of ~ Mammoth et al. vs. Board of Supervisors Mono County et al., the California Supreme Court ruled that Environmental Impact Reports must be prepared for both public and private projects having a significant effect on the envuonment. Environmental Impact Reports must be prepared for all specific plans. Focused EIRs or Negative Declarations may be adequate ( for lesser projects or for component projects which are part of a Master EIR. L An EIR was prepared for the project in 1979. Subsequently, an EIS was prepared for the L project in 1982. In order to ensure that environmental issues discussed in these two documents, accurately and completely reflect current conditions associates with Tuscany Hills, an addendum to the previous environmental documents has been prepared and is contained in Appendix A. ~• Citv of Lake Elsinore General Plan ~ Section 65300 requires cities to adopt a comprehensive long-term general plan for the physical development of the City, and any land outside of its boundaries which in the planning agency's judgement bears relation to its planniag. The City of Lake Elsinore L adopted its General Plan in December 1982 (Resolution No. 82-83). The plan projects the development of the community to the year 1992. The project is consistent with the current general plan, as the site land use designation is Specific Plan. L 8~ L . . _ . .,. K vtY.~u'~ :.z".... , .> '.;5. .. ~ as. ~:: . ,.._ u .. . . , . . . . . . . . . . ~ . , ~ . ~, / Soecific Plan This Specific Plan shall be processed in accordance with the provisions of Chapter 17.99 (SPD) Specific Plan Districf; of the City of Lake Elsinore Zoning Code. This chapter provides for the processing of Nonconditional Specific Plans which allows for the approval of the Specific Plan document and zoning on the project site concurrently. As part of the process, the City Council establishes the development intensity for land uses within the project. Specific Plan Modifications/Amendments Minor modification to the approved Tuscany Hills Specific Plan will be allowed at the discretion of the Community Development Director. Any modifications to the Specific Plan must be consistent with the purpose and intent of the originally approved Specific Pian document. Appeals of the Community Development Director's decision shall be made to the Planning Commission. The Planning Commission shall act on appeal within thirty (30) days. All modifications or amendments to the approved Specific Plan, other than such minor changes, shall be processed as a Specific Plan amendment and are subject to all specific plan procedures. The following modifications constitute minor changes to the approved Specific Plan: 1) Transfer of Units: The maximum number of dweIling units in a residential area may be exceeded by up to 15% of the maximum, as long as an equal number or greater of excess units is available from a previously approved residentiai area which did not accomplish the maximum number expressed in that area to achieve an overall balance. __ 2) Roadwavs: Minor changes in roadway alignments and street sections are allowed, provided such changes are consistent with the streetscape co~cept for roads, and are subject to approval of the City Engineer and Community Development Director. 3) Phasin Program: The phasing program may be modified, provided the objectives of the program continue to be met, and provided that all infrastructure including, but not limited to roads, sewer facilities, water supply, and drainage facilities is available to serve proposed development. Any deviations from the Phasing Plan shall be subject to the approval of the Community Development Director, and if deemed to be a significant change, the Planning Commission. The following are administrative standards that apply to the implementation of future development applications (i.e., plot plans, tract maps, or parcel maps) for the Tuscany Hills Specific Plan: 1) Future tentative, or parcel maps and site plan review packages must be in substantial wnformance with the development standards and design guidelines of the Tuscany Hills Specific Plaa 2) Final subdivision or parcel maps shall be in substantial conformance with the approved tentative or parcel map as well as the approved site plan package. 3) Building permits for dwelling units shall be issued when a final subdivision map has been recorded. Permits may be issued for model units prior to the final map recordation subject to the requirements of the City. 81 L ..<._Y.,.~~r. a2..... y,l ... , ti.v . . ,. . .. . ......._.........__.... . .... ~~ [ ~ 4) Mitigation measures for envuonmental impacts shall be reviewed during the tentative map/site plan review stage. The tentative map shall be conditioned as necessary to mitigate any remaining impacts at the construction stages. ~ Approval of the final Specific Plan for the project shall be accomplished by Ordinance. 82 ~~ t ~ ~. ~ C PROJECi' FINANCING The funding teohniques to finance the public improvements and public services incident to the development of Tuscany Hills are summarized as follows 1. Assessment District Homestead I.and Development Corporation has heretofore constructed certain improvements to be acquired by the City generally described as follows: ( Acquisition of Summerhill Bridge: street, storm i drain and sanitary sewer improvements; relocation of water mains; and appurtenances and appurtenant r work together with incidental expenses in connection ~ with the foregoing. The bridge links Tuscany Hills with the property to the south. In order to pay for the cost of constructing and acquiring the improvements, the City has undertaken and completed proceedings for the formation of Assessment District No. 89-1, pursuant to the Municipal Improvement Act of 1913 (Division 12 of the Streets and Highways Code), and issuance of bonds representing unpaid assessments, pursuant to the Improvemen[ Bond Act of 1915 (Division 10 of the Streets and Highways Code). 2. Community Facilities District (Public Improvements and Services) Under the Mello-Roos Community Facilities Act of 1982 (Chapter 2.5, Part I, - r Division 2, Tide 5 of the Government Code), proceedings will be undertaken for the ~ formation of two (2) or more community facilities districts to encompass the lands within Tuscany Hills (The "CFD"). Within each CFD, a special tax and issuance of ~ bonds will be authorized. The special tax will be levied annually to pay for the cost of public services; to pay principal of and interest on bonds issued to finance public improvements; and to pay for incidental and administrative expenses in connection ~ with the foregoing. The public services and improvements are generally described as follows: Police, fire protection, maintenance of parks, ~ parkways and storm drains together with incidental and administrative expenses in connection therewith. L Construction and acquisition of improvements for streets, sidewalks, curbs and gutters; street signs and traffic signals; street lights; water and sewer, storm drains; retaining walls and slope protection; L acquisition of easements, rights-of-way and fee title to land; and incidental and administrative expenses in connection therewith. L In order to accommodate development, the CFDs shall be formed and bonds attributable thereto shall be issued as a condition to each phase of development. L L 83 L . ___._..: .. _ ~:. ~.~~...::: _ .: _ . ~~ r ~ 3. Landscapin a~ nd Li hting District Under the I.andscaping and Lighting Act of 1972 (PaR 2, Division 15 of the Streets ~ and Highways Code), proceedings will be undertaken for the formation of two (2) or more Landscaping and Lighting Districts to encompass the lands within Tuscany Hills (the "LLD"). Within each LLD, a special assessment will be authorized to be ~ levied annually to pay for the costs generally described as follows: Maintenance and servicing of street lighting, landscaped areas and other improvements authorized in the proceedings for formation of the LLD, including acquisition of land for park, recreational and open space purposes, together with incidental r and administrative expenses in connection therewith. ' In order to accommodate development, the LLDs shall be formed as a condition to ~ each phase of development. ~/ ~ ~ XII. PROJECf PHASING Tuscany Hills will be a master planned community phased over an approximate sixe year r period. Homestead Land Development Corporation is committed to buIlding a significant i portion of the units approved. However, in order to satisfy the tremendous financial commitment to infrastructure, it is necessary to provide a multitude of differing product r types to increase market absorption and reduce the capitalization of interest carry. ~ For these reasons, the development program is to sell planning units of approximately 200 lots to builders who have developed a reputation for quality construction, while still ~ exerting architectural control to assure compliance with thematic and construction quality guidelines. The project is anticipated to develop in several tentative tract maps and four major phases. ~ Phases 1 and 2 are the two phases of approved Tentative Tract Map 17413, and Phases 3 and 4 are the northern portion. ~ The phasing program for the Tuscany Hills Specific Plan is based on the following objectives: ~ 1. Provide for an orderly build-out of the community based on current market trends 2. Insure adequate public facilities and services concurrent with private development ~ 3. Provide a range of housing opportunities at a variety of densities as the community develops ~ 4. Protectthe public health,safety, and general welfare Residential development is primarily a function of current market conditions. The timing of development can only be estimated, however, a general phasing program can be 1 projected. Anticipated buIldout of the project is e~cpected to be approximately six years as illustrated by Table 9. Exhibits 41 and 42 provide development phasing plans and phasing plans for backbone infrastructure. ~- The phasing program for residential and commercial uses in Tuscany Hills consider the following factors: L 1. Phasing of grading and balancing of cut and fill to the e~ent practical ~ 2. Adequate access to Specific Plan areas 3. Infrastructure phasing 4. Marketing viability and access t_ 5. Availability of emergency access routes for each phase of development ~ Phases l and 2(Trad 17413) Phase i consists of approximately 541 units within parcels 1, 4, 5, 7 and 15. The L development of these models will start early in 1990, with first occupancy by May 1990. Included within the total amount of Phase 1, approximately 24 estate custom lots will be built. L 85 L }n,u,~....sY v '~_ .. .u...t;i>J . .. . .. .. ' ~ . . ` , \ L ~/ ~ ~ ~ Planning Unit Year ~ PM23910-1 PM23910-2 ~ PM23910 3 - PM23910-4 ~ PM23910-5 PM23910-6 ~ PM23910-7 PM25005-1 PM25005-2 ~ PM25005-3 PM25005-4 ~ PM25005-5 PM25005-6 PM25005-7 PM25005-8 PM23910-15 L_ Total I_ L ~ L ~ L ~ i._ x ~d.~4. . ._,<. _ _ .. ~ . _~, . .,.~. .. TABLE 9 Project Phasing 1990 1991 1992 1993 1994 Total 100 107 207 100 93 135 50 69 1Z2 100 152 SO 78 77 77 4 4 6 6 4 24 81 100 181 100 25 125 65 100 165 32 70 102 100 41 141 75 100 157 - 51 80 131 105 105 50 30 80 454 502 588 427 29 2000 86 }~,f ~~ ~3i a ~ ~ ~g= t ~~ m ~¢~ W t~ ~~a b N ~ 0 W ~ N \ ~ b~~ ~.~.. L..r r~r L~~ ~~ ~.. <N~ w~~ .i.~~ ..i~.r~ ~..J ~.~ .~.: ~ .. ~~ .~J ~~ ~...J r r r r r ~ ~ ~ ~ ~_ ~ST ADA m t ~ r ~ r _ ~ , y~ s _ L 9 ~ ~ w ~ N ~ ( ~ ._ Zn ,y •, l_. ~ L L L L ~ ~~__ ~ ~ ~ ,_ ~ . _ 1~ Backbone Infrastructure Phasing ASSESSMENT M~M DISTRICT 10 PHASE 2 ASSESSMENT ~ DISTRICT 2 PHASE 3 ASSESSMENT *F**F+**+ DISTR~CT 2 PHASE 4 LEGEND .... ASSESSMENT .... DISTRICT 1A PHASE 1 SCALE:1^=1155' EXFIIBIT `t2 unsad•tl ssociate,s .~ n.-~w= i~ e..~. u...:e:. ;'a~y'e° ~..,~,..,. ~~ 1 ~ Phase 2 will consist of approximately 498 units within parcels 2, 3, 6 and 8 of Tract 23910. The development of these models will start in December 1989 with fust occupancy by July 1990. ~ Phase 3 and 4(Northem Portion) Phase 3 and Phase 4 were submitted as several tentative maps in August 1989. Approval ~ of these tentative maps will allow development to occur by June 1990 and occupancy in early 1991. Phase 3 and 4 consists of approximately 962 units within parcels 8, 9, 10, 11, 12 and 13. ~ Within the master planned community all necessary infrastructure will be available when necessary to provide a wntinually balanced community. Additionally, community amenities and features will be implemented concurrent with the development to provide a balance of ~ benefits to the residents and prevent overtaxing eacisting city amenities and recreationai features. ~ Table 10 outlines the circulation and utility improvements needed in each of the product's four phases. The Ci.ty of Lake Elsinore has authorized an Assessment District to finance the backbone improvements. Homestead Land Developmen[ will be completely responsible ~ for the installation of all infrastructure, community, and backbone facilities. In addition to the infrastructure improvements discussed in Table 10, an 11-acre elementary school site with an adjacent 5-acre park site will be offered. The schooi district ~ has requested the pursuit of a joint school/park site regulatory agreement to e~cpedite the wnstruction of the school. The construction of the school would be completed by the School District by September 1990. ~_ A major Homeowners Association Recreation Center will be co~structed and available for community residents with the completion of Phase 1. In Phase 2, a public park and a private recreation area adjoining the proposed recreation lake system will be constructed ~ wifh the major backbone facilities. ~ Manufactured slope landscaping and fire safety fuel modification zones will be installed prior to the occupancy of adjacent residences. Open space implementation shall be accomplished by tracking the open space dedications of each individual final tract. The total open space area shall be at least 35 percent of the total project area. L L ~ L 89 L ~~ TABLE 10 Infrastructure Phasing Phase Imorovements Phase 1 Circulation (641 units) Backbone system consists of the major secondary arterial (Summerhill Drive) serving the site from the south being installed to the second local collector intersection adjacent to the recreational center site. The second collector (66' right-of-way) will also be installed easterly to the San Jacinto River. Utilities Water, sewer, and dry utility (electric, telephone, and gas) improvements will follow the basic installation procedure as outlined in circulation above. All offsite extensions or construction requirements will be completed prior to any occupancy. Major pumping and water storage facilities will be constructed with backbone roadway improvements in this stage. Phase 2 Circulation (332 units) Backbone street systems will include the balance of the arterial and collector system, Summerhill Drive, Bella Vista, Via Scenica, La Strada, and making a temporary emergency connection to Greenwald as an extension to Summerhill Road. The extension of Greenwald shall be in compliance with condition #1 of TTM 17413, Revision #4. Utilities Water, sewer and dry utility imp~ovements will follow the basic installation procedure outlined in circulation above. These will include 8 and 12" water mains and 8" sewer lines as indicated by Exhibits 13 and 14. All construction will be compieted prior to occupancy. Phase 3 and 4 Circulation (1,038) units The balance of the residential streets in the northern half will be installed including the e~[tension of Summerhill Drive to Greenwald. Utilities Water, sewer and dry utility improvements will follow the basic installation procedure outlined in circulation above. These will include 8 and 12" water mains and 8" sewer lines as indicated by Exhibits 13 and 14. All co~struction will be completed prior to occupancy. 90 ~f .,... _ , _,. , _ ,_. _ . __ _. _ _ _ _ _ _ _ ~,/ ! ~ In addition to the infrastructure improvements discussed in Table 10, an 11-acre elementary school site with an adjacent 5-acre park site will be offered. The school district has requested the pursuit of a joint school/park site regulatory agreement to expedite the ~ construction of the school. The construction of the school would be completed by the School District by September 1990. ~ A major Homeowners Association Recreation Center will be constructed and available for community residents with the wmpletion of Phase 1. In Phase 2, a public park and a private recreation area adjoining the proposed recreation lake system will be constructed with the major backbone facilities. ~ Manufactured slope landscaping and fire safety fuel moditication zones will be installed prior to the occupancy of adjacent residences. Open space implementation shall be accomplished by tracking the open space dedications of each individual final tract. The total ~ open space area shall be at least 35 percent of the total project area. ~ L \ ' L' / ~ ~ ~ ~ ~ ~ ~ ~ ~ ~_ ~_ ~ L ~ L APPENDICES ~ ~ ~ ~ ~ ~ f F ~ ~- ~_ ~ L L i APPENDIX A: DEFINITIONS ~/ ~/ r ~ DEFINTiTONS r For the purpose of carrying out the intent of the Tuscany fiills Specific Plan, words, phrases, and terms shall be deemed to have the meaning ascribed to them as below. Any definitions not ~ provided here shall be as provided in the Gity of Lake Elsinore Municipal Code. The word "Council" or "City Council" shall mean the City Council of the City of I,ake Elsinore, which is the governing body of the city. ~ The word "County" shall mean the County of Riverside. The word "Commission" shall mean the Ciry of Lake Elsinore Planning Commission. ~ The words "Approved by the Director" or "D'uector," shall mean the Community Development Director of the City of Lake Elsinore acting in person or through a subordinate to whom the ~ authorize to act has been delegated. The word "shall" is mandatory; the word "may" is permissive. ~ The word "State" shall mean the State of California. ~ The word "permitted" means permitted without the requirement for a discretionary permit but subjectto all other applicable regulations. The words "Zoning Code" or "Code" shall mean the Comprehensive Zoning Code of the City of- L.ake Elsinore. Access> Primary: The principal pedestrian walkway system to a dwelling unit. i Access, Secondary: An access other than the primary access. Accessory structure: A subordinate building located on a building si[e, the use of which is ~ customarily incidental to that of the main building or to the use of the land. Accessory use: A use customarily incidental and accessory to the principal use of the land, or to L a building or other structure but not necessarily located on the same building site as the principal use. Average Lot Area: The net residential area divided by the total number of residential lots within ( the entire project area. Basement: A story partly underground and having more than one-half of its height above the ground-level grade. Building. A structure having a roof supported by columns or walls. L Building height: The vertical distance measured from the ground-level grade to the top of the building directly above that point. ~ Building line: An imaginary line on a buIlding site specifying the closest point from an ultimate right-of-way or a property line where a main buiiding may be located. ~ 1 ~ . ..s s~.~..~, ..~.~..~,~.._e5~,.;_: ~_,~;;.: ... , , ~/ ! ~ Building site: A parcel or contiguous parcels of land which was established in compliance with the building site requirements of this specific plan. ~ Building site azea: The total area, measured horizontally as a level plane, of the land within the boundaries of a building site not including any street right-of-ways, vehicular easements or other easements that prohibit the surface use of the property except open space landscape or recreational ~ easements; and not including any portion which does not meet applicable district regulations when a building site is divided by such a right-of-way or easement. ~ Building site coverage: The area of the land within the perimeter of all structures located on the building site, not including the area under unenclosed eaves and unenclosed post-supported overhangs, patios, wurts, malls, swimming pools, and off-street parking facilities, divided by the building site area. ( Carport: A roofed structure, or a portion of a building, open on one or more sides, primarily for the parking of automobIles. ~ Cellar: A portion of a buIlding partly or wholly underground and having more than one-half of its height below the ground-level grade. A cellar shall not be considered a story. ~ Centerline: A line described in the first situation that applies in the following instances: a. A section line, half-section line or quarter-section line whenever a mapped highway is plotted on the "Master Plan of Arterial Highways" along a section, half-section or i quarter-section line. b. A line shown as a centerline on a map entitled "Precise Plan of Highway Alignment;' ` ~_ and any amendments thereto. c. A line shown as a centerline on a recorded tract map, an approved record of survey L map or a parcel map. d. A line in the center of the ultimate street right-of-way. L Cluster development: Refers to a residential subdivision consisting of a combination of residential lots and privately owned common recreation and open space areas arranged in accordance with a site plan with adequate provisions for permanent maintenance of the wmmon ownership facilities. ~ Common area - residential: The area within a residential development that is not occupied by residential buildings and which is owned in common by homeowners in the development, and which L is available for common use or enjoyment by all property owners in the development and their invitees (e.g. common parking facilities, recreation areas, landscaped areas, open space areas, and natural areas). L Community faclity: A noncommercial use established primarily for the benefit and enjoyment of the population of the community in which it is located. L Community information center: A temporary or permanent structure principally used as an information pavilion and/or temporary real estate sales offices for the sale of homes in Tuscany Hills, including parking and related facilities. L Community service facility: A community service wmmercial, or nonprofit, noncommercial use established primarily to service the immediate population of the communiry in which it is located. L 2 L .~u,~.r~~s ,r,~. <~. ~ ~~ ' ~ ~/ ~ ~ Conditional Use Permit: Synonymous with minor design review as discussed in Chapter VIII, Development Standards. r Conservation easement: Synonymous with all open space definitions provided herein. 1 Conventional subdivision: A subdivision consisting primarily of streets and lots. Commonly owned ~ or special use areas may be included but are secondary and supplementary to the subdivision's design. ~ Day nursery (including preschool and nursery schools): Any group of buildings, building or portion thereof used primarily for the daytime care of six or more children at any location other than their normal places or residence, excluding any children who normally reside on the premises. r Density: The number of dwelling units per gross acre. 1 Development: Residential, commercial, industrial, wmmunity facility or other construction, ~ including necessary grading, landscaping and parking, together with the land upon which the building or structures are constructed. Development unit: A portion of a development plan or tentative tract map within which all lots ~ and amenities are constructed or developed at one time or in contiguous interrelated phases as a unit of the overall proposed development. ~ Driveway: A vehiwlar passageway for the exclusive use of the occupants of a project or property and their guests. A driveway shall not be considered a street. j Dwelling single-family: A buHding containing one dwelling uni[ per building site. ~ Dwelling unit: One or more rooms in a structure, including a kitchen, designed for occupancy by one family for living and sleeping purposes, and including factory built and mobilehomes when such ( mobilehome bears an insignia of approval issued by the California Department of Housing and ~_ Community Development or a housing seal number from the Federal Department of Housing and Urban Development (HUD). L Easement: A recorded right of interest in the land of another, which entides the holder thereof to some use, privIlege or benefit out of or over said land. ~ Exterior property line: A property line abutting a public or private street. Family: One person, with or without resident domestic employees, occupying one dwelling unit; or two or more people related by blood, marriage or adoption, with or without domestic employees, _ occupying one dwelling unit; or a group of not more than six unrelated people, with or without domestic employees, occupying one dwelling unit; or a licensed family care home, foster family home, or maternity home, as defined in Title XXII, Sections 30011, 30013, 30015 of the California Administrative Code, serving six or fewer persons, when such care is provided on a twenty-four- ' hour-per-day basis; or a famIly day care home, as defined in Tide XXII, Section 30019(a) of the California Administrative Code. L Flood, One-hundred-year: The highest level of flooding that has an average frequency of occurrence in the order of one in one hundred years at a designated location, considering regional L meteorological and hydrological conditions characteristic of the geographical region involved. This also means that the level of flooding having a one percent probability of occurrence in any year. ~ F1ood plain: The land area adjacent to a watercourse which is subject to overflow of floodwaters. 3 L . <.,: _ .., ,:; ~;:<.. _ . . ~~ r ~ Floodway: The channel of a stream or other watercourse and that part of the flood plain reasonably required for passage of a flood of given magnitude. ~ Floor azea ratio: The numerical value obtained by dividing the gross floor area of a buIlding or buildings located upon a lot or parcel of land by the total area of such lot or parcel of land. f Garage, private: A buIlding, or a portion of a building, used primarily for the parking of automobiles belonging to the occupants of the property. ,~ Garage, public: A building other than a private garage used for the maintenance or temporary storage of automobiles. General P]an: Refers to the City of Lake Elsinore General Plan, and elements thereof, as they may ( pertain to the ~scany Hills Specific Plan. Grade, gFound level: The average level of the finished ground surface surrounding a buIlding. ~ Gross area: The entire land area within the boundary of a project, measured to the centerline of any abutting arterial highways. ~ Gross residential deasity: The density of a residential project computed by dividing the total number of dwelling units in the project by the gross area of the project. ~ Interior property line: A property line which does not abut a private or public street. Joint use of pazking. The shared use of off-street parking facilities by more than one type of land - t use. The same parking spaces are counted to satisfy the off-street parking requuements of more f than one land use, e.g. use of the same parking facility to satisfy the off-street parking requirements of a church and an office building. ,~ Kennel: Any property where four or more dogs, or cats, or any combination thereof, over the age of four months, are kept or maintained for any purpose. L Key lot: Any parcel show on a recorded tract map, rewrd of survey recorded pursuant to an approved division of land, parcel map, lot line adjustment or recorded Certificate of Compiiance, having side property line(s) abutting the rear property line(s) of adjacent parcels. ~._ I.ocal agency: An agency for the local performance of governmental or proprietary function withi~ limited boundaries. "I.ocal agency" does not include the state, a city, or a county. "I,ocal agency" L does include but is not limited to school districts, sanitary and sanitation districts, and water districts. L I.ot: Any parcel shown on a recorded tract map, a record of survey recorded pursuant to an approved vuion of land, lot line adjustments, a parcel map, or recorded Certificate of Compliance. A lot is not necessarily a buIlding site. L Lot Coverage: The area of the land within the perimeter of all structures located on the building site, not including the area under unenclosed eaves and unenclosed post-suppor[ed overhangs, patios, courts, malls, swimming pools, and off-street parking facilities, divided by the building site L area. Main bwlding(s): The buIlding(s) containing the main or principal use(s) of the premises, or occupied for the purpose of operating or administering the main or principal use(s). L 4 L ~, / t ~ Manufactured Open Space: Any manufactured parcel of land or water which provides a ~ recreational and/or scenic amenity to the community. This shall include major manufactured slopes when adjacent to natural open space. Master Plan of Arterial Highways: A component of the Circulation Element of the Riverside ` County General Plan designating adopted "and proposed routes for all commuter, secondary, ~ primary, and major highways and transportation conidors within the County of Riverside. Minimum Lot Area: The minimum square feet of land area for each lot. ~ Net residential azea: The area of land remaining in a project, measured in acres or square feet, after deduction of the area contained in streets (both public and private), schools, public parks, f flood control works and any other use, easement or encumbrance which prevents the surface use ~ of the property for a buIlding site or construction of structures. ( Nonconfocming structure: A lawfully established building or structure that does not conform to the regulations of this code for the district in which it is located, either at the effective date of this code or as a result of subsequenramendments to this code. I Open space (Natural): Any parcel or area of land or water which is essentially unimproved and devoted to the preservation of plant and animal life, providing scenic and aesthetic values and an area which serves as links between major recreation and open space preservation areas. ~ Open space, usable: See Usable open space. Open space transitional: Areas free and cleac of urban development. ~- Outdoor advertising structure and sign: A sign placed for the purpose of advertising products or services that are not produced, stored or sold on the property upon which the sign is located. ~~ Panhandle lot: A building site wherein the only vehicular access to the site is by way of a corridor or vehicular access way which serves no other property, is less than forty feet wide and is more than forty feet long. ~- Parking area, private: An area, other than a street, designed or used primarily for the parking of private vehicles and not open to general public use. l- Parking azea, public: An area, other than a private parking area or private street, used for the parking of vehicles and available for general public use, either free or for remuneration. I Puking uea, restric[ed: An area used for parking vehicles on a semi-permanent basis and not available to the general public for hourly or day-to-day parking. Planned development: A residential subdivision wherein residences, common open areas and landscaping, common private recreation facilities, and pedestrian and vehicular access and circulation patterns are arranged as a unified comprehensive plan with an identifiable theme or ~ concept and with adequate provisions for permanent maintenance of the common facIlities. Planning uea: An area of land which is depicted on the Tuscany Hills Specific Plan and Statistical j Summary. L ~ ~ L .....~r. st;~,._ ,.,,. ~ ._ ... ... . . . ..:... .. .. ... ~. s ~/ r ( Project: A land development readily recognizable as a unit, e.g., a residential neighborhood, ~ condominium, apartment, shopping center, office or business park development, recreation lake, golf course or similar land developm~nts. ~ Preliminary landscaping plan: A plan indicating the general location, size, type of plant materials and ground cover to be located in the yards and other open areas of a development. f Project Net Area: All of the land area included within a plan for a development project excepting those areas designated for public and private streets rights-of-way, schools, parks, and other uses ~ or easements which would preclude the use of the land therein as part of the development project. Public: Belonging and open to, and enjoyed, controlled, used and maintained by and for, the public generally. ~ Public agency: T'he United States, the State of California, the County of Riverside, the City of Lake Elsinore, special districts, and any other governmental entity authorized by law to perform ~ functions for the public or segment thereof. Recreation areas: Open space areas which offer active and passive recreation and/or scenic attraction of a local and regional significance. 1_ Residential singl~family: Refers to any residential zoning district or residential development wherein each dwelling unit is situated on a residential lot of record and no lot contains more than ~ one dwelling unit. Single-family residential includes either attached or detached single-family dwellings, planned concept subdivision, cluster developments, and may include conventional subdivisions and planned developmenta ~ Riding and h'king tra~7s: Any trail or walkway designed for and used by equestrians or pedestcians. Right-of-way: An area or strip of land either public or private, on which an irrevocable right of passage has been recorded for the use of vehicles or pedestrians or both. ` Sales Office: Real estate office which is used for sales leasing and information. I Setback azea: The area between the building line and the property line, or wFten abutting a street, the ultimate right-of-way line. ( Setback distance: The distance between the building line and the property tine, or whe~ abutting I a street, the back of curb where noted (Exhibit 18). I Sign: Any device used for visual communication or attraction, including any announcement, declaration, demonstration, display, illustration, insignia, vehicle or symbol used to advertise or promote the interests of any person, together with alt pares, materiais, frame and background. ~ Site development permit: A plan showing the details of buitd~rg EocatEOns, stract~res, parking, vehicular access, landscaping and architectural design fmr a psajeef or bu~lding site. ! Story: That portion of a building included between the upper surface ~af any floor and the upper L surface of the floor next above, except that the iogmost stary s[ia~ 6e t€~at portion af a buiiding included between the upper surface or the topmost 4aar and thz ceiling or roof a6owe. L Street: A public or private vehicular right-of-way other than an alley or dciveway, including both local streets and arterial highways. L ~ -wF;o- ..L'~..S.~o.dh . ._... »..KS?rtx.~a.~~i d.ra~:a4 i, ~.~... . . ... ~~ ! r Street opening. A curb break, or a means, place or way provided for vehicular access between a street and abutting property. r Structure: Anything constructed or erected requiring a fixed location on the ground or attached 1 to something having a fixed location on the ground except business signs, tennis court fences, and other fences around .unenclosed outdoor recreation facilities, landscape facilities, and other minor improvements. A mobilehome on a permanent foundation is a structure. ~ Tot lot: An improved and equipped play area which is intended for children up to seven (7) years of age. Tot lots include facilities as play apparatus, paved areas for wheeled toys, benches, sand ~ areas, small wading pools, and turn area. Usable open space: Usable open space intended for common use by occupants of a development, ( either privately owned and maintained or dedicated to a public agency, normally including but not l._ limited to lots, swimming pools, basketball wurts, tennis courts, picnic facilities, open landscaped areas including major slopes, and greenbelts with pedestrian walkways and equestrian and bicycle r trails. Usable open space areas do not contain the following: buildings and structures (other than 1 accessory to the main use), or impervious surfaces (e.g. public/private streets, common driveways, and off-street parking facilities) devoted to non-recreational uses; surface utility facilities, median strips for roads or parking lots; road embankments; and property not reserved for the sole use and l enjoyment of the occupants of the entire development and their guests. _ Use: The purpose for which land or a building is occupied, arranged, designed or intended, or for ( which either land or building is or may be occupied or maintained. t Yud: The open space within a buHding site that is unoccupied and unobstructed by any structure or portion of a structure from 30 inches above the finished grade upward; except that eaves, fences, ~~ ~ walls used as fences, poles, posts and other customary yard ornaments, accessories and furniture may be permitted in any yard subject to the regttlations for the district in which it is located. ~ L I z L L ~ ~ , ~~ ~~. .._ _~.._ . ~