HomeMy WebLinkAboutCC Reso No 1963-1095
RESOLUTION 1095
"WHEREAS, 'the City Council of the City of Elsinore has long sought means
to remedy the' faulty alignment of Chaney street at the Santa Fe tracks;
paralleling the Collier street r@adway, and
WHEREAS, to accomplish this work it is necessary to enter into agreements
with the Santa Fe Railroad and the COu','lty Road Department of Riverside County,
and
Whereas, it is the Council' sintent to accomplish this much needed public
works as soon as possible,
THEREFORE, BE IT RESOLVED, that by the following signatures, the members
of the City Council hereby authorize the :r-1~or or the City Administrator to
execute the necessary agreements necessary for the completion of the subject
project.
Dated: !ebru~ ~, 1963
THIS .AGREEMENT, made this .. day of
1962, by and between THE
ATCHISON t TOPEKA AND SANr It. FE HAILl.JAY COMPANY,
a corporation hereinafter referred to as
-Santa Felt and the CITY 0Ii' li?.1.$INORE, a
municipal corporation of the state of
California, hereinafter referred to as .Citytt.
W'IT1'UPe;lSE'fH:
WHEREAS, City proposes a program of realignment, improvement
and widening to width of 24 feet that portion of Chaney street between
Minthorn Street and Old Highway 71, which program includes relocation
and widening to said 24 feet the crossing of $antaFe' s track designated
by Public Utilities Commission, state of California as Crossing No.
2T-20.6, and
WBRUa, santa Fe andCi ty are in accord as to said program and
crossing relocation and santa Fe is willing that City or City's contractor
do all work under said program. except removal of existing crossing,
preparation of Santa Fe's track to receive pa.ving, including the placing
of header planks at new location, reloe8.tion of Santa Fe's communication
line, and installation of two reflectorlzed crossing signs.
NOW 'l'HEREFORE IT IS AGREliID:
1. City or City's contractor will do all work under said
program including placing pavement within track area of said crossing,
except tha.t work hereinafter specified to be done by Santa. P'e.
.. 1 -
2. Cit,- or Cit,-'s contractor will comply with Santa Fe's
rules and regulations and the instructions of Santa Fe's representatives
in relation to the proper _Mer of protecting Santa Fe's track and
traffic moving thereon, as well as wires, signals and other property of
Santa Fe, or its tenants or licenssees, at or in vicinity of the work
during the pe:t'iod of construction of said improVeIl1ent, and shall perform
the work in a manner satisfactory to Santa Fe or its designated repre-
sentative, and at such times as shall not enda.nger or interfere with the
safe operation of Santa Fe IS track and. other facilities.
:3. Santa Fe will, at expense of City: (A) Remove exuting
crossing and prepare its tracks to receive paving at new crossing, in-
cluding header planks for paved width of 24 feet. (B) Relocate Santa
Fe's communication line to clearance, side and overhead, of relocated
road:way, and (c) install two reflectorized crossing signs.
4. Work sp$cified 1n above Paragraph :3 to be done by Santa Fe
shall be done as soon. as practicable, considering completion of said
progrq, availability of material and manpower, and in consideration
thereof City will pay to Santa Fe the actual cost thereof presently
estimated by Santa Fe to be One Thousand Four Hundred Seven ($1.,40'7.00)
Dollars.
5. That upon completion of the work specified in Paragra.ph :3
hereof, Santa Fe w111 render C1 ty a bill for costs thereof and Oi ty will
promptly reimburse Sallta Fe for such costs.
6. Santa. Fe will, at its expense, maintain the street paving
within the track area of said crossing and for two feet outside thereof
so long as required to do so.
-2-
'1. City will, at its sole expense, maintain any street
improvement within said erossingother than specified to be maintained
by Santa Fe in Paragraph 6 hereof.
8. The material excavated for the relocated street and on
each side thereof, within Santa Fe t s right of way J shall be placed
within said right of way-as directed by Santa Fe's representative.
IN WrrJESS WHEREOF, THE CITY OF ELSINORE has caused these
presents to be executed by its duly qualified tiUld a.uthorized officials
purS'WUlt to authority regularly granted tbem by its City Council and
THE ATCHISON, TOPEKA AND SANTA FE RAtLWAI COMPANY has executed these
presents both as to the day and year first above written.
THE ATCHISON J TOPEKA AND StANT A FE RAILWAY COMPANY
By
Its
CITY OF ELSINORK
By .Z:;({t ~,~t/~----
Its ~t()~
ATTEST
/1". _. . _ - . / -.- .
<_',-_ ~~/..:/.., (_.~'<<.., . (/-( / -{to> ~_.~.."..{.~,_.,~':("
City Glerk'
- .3 -