Loading...
HomeMy WebLinkAbout12-17-1986 Special City Council Minutes 203 MINUTES SPECIAL CITY COUNCIL MEETING CITY OF LAKE ELSINORE 130 SOUTH MAIN STREET LAKE ELSINORE, CALIFORNIA WEDNESDAY, DECEMBER 17, 1986 --***************************************************************************** I"- LO C\J W CD <t -- -- CALL TO ORDER The regular meeting of the City Council was called to order by Mayor strigotte at 6:30 p.m. PLEDGE OF ALLEGIANCE The Pledge of Allegiance was led by Ron Kirchner. ROLL CALL , PRESENT: COUNCILMEMBERS: DOMINGUEZ, MATSON, VERMILLION, WINKLER, STRIGOTTE ABSENT: COUNCILMEMBERS: NONE Also present were: City Manager Molendyk, Assistant City Manager Gilbert, Community Services Director Miller, Public Services Dir- ector Kirchner, Tom Tincher of Pacific Heritage Company and City Clerk Oliver. DISCUSSION MATTERS Ron Kirchner gave Council an overview of the status of the Lake Management Project which is being coordinated by the Elsinore Valley Municipal Water District and their consultants, Engineering Science. He also indicated that the engineering staff needs direction relative to the design and location of the proposed bridges which will cross the outflow channel at various locations. Mr. Kirchner reviewed the following: 1- Proposed levee design, 2. Proposed inlet channel design, 3. Proposed outlet channel design, and 4 . Bridge replacement - design and location Council consensus was to place the bridge issue on the next reg- ular meeting agenda on December 23, 1986, in order to make a decision on the final design and location of the bridges. Many questions were raised by Council and lengthy discussion centered on replacement of the bridges, their location, design and ultimate funding. Mr. Molendyk indicated that Elsinore Valley Municipal Water District hopes to have input from the City by January 1, 1987. The District hopes to complete the design, hold required public hearings, 90 out to bid and be under construction by September or October of 1987. Council consensus was to place the bridge issue on the next regular meeting agenda on December 23, 1986, in order to make a decision on the final design and location of the bridges. 204 Page two Special Council Meeting December 17, 198~ 5. Pacific Heritaqe Presentation Mr. Tom Tincher of Pacific Heritage gave a project status report and explained the relocation of Lake Elsinore Bay and possible relocation of Lakepoint Park. He also addressed the location of the inlet channel, design of the outflow channel and development of property adjacent to the channel. He suggested that any changes in design be addressed at this time. After the design work is completed, it will be too late. Staff was directed to continue to coordinate information between the District and the City and to attempt to schedule regular meetings between the Water District Board and staff members and the Council and City staff members so that lines of communication are kept open and we always have the latest information regarding the lake management project. - 6. ADJOURNMENT MOVED BY WINKLER, SECONDED BY MATSON AND CARRIED UNANIMOUSLY TO ADJOURN THE SPECIAL MEETING OF THE CITY COUNCIL AT 8:32 P.M. ~;/rt~ CITY 0 LAKE ELSINORE ATTEST: ....., ..."