CALL TO ORDER
The Budget Workshop was called to order by Mayor Washburn at 8:20
a.m.
ROLL CALL
PRESENT:
COUNCILMEMBERS/BOARDMEMBERS: ALONGI, BENDER, PAPE,
WASHBURN
ABSENT:
COUNCILMEMBERS/BOARDMEMBERS: CHERVENY
Also present were city Manager/Executive Director Molendyk,
Administrative Services Director Boone, City Planner Leslie, Acting
Chief Building Official Russell, Community services Director Sapp,
Community Services Manager Best, Public Services Director Tecca,
Public Works Manager Payne, Manager of Special proj ects Watenpaugh,
Sheriff Captain Yankee, City Treasurer Kelley and City Clerk/Clerk
of the Board Kasad.
DISCUSSION ITEM
-
1. 1994-95 Fiscal Year Budget. (F:30.1)
City Manager/Executive Director Molendyk opened the budget
discussion noting that this year's budget is being formulated
later than usual because of pending final dollar amounts on
the Stadium. He detailed the 1993-94 budget revenue and.
expenditures and explained the 1994-95 projections. He noted
the recent impacts of state budget balancing on particularly
the Redevelopment Agency. He further noted that previously
administration costs were charged back to the Redevelopment
Agency, however, this is not longer possible. He indicated
that the proposed budget would utilize $1,465,000 of the
existing reserves. He further indicated that two new part
time positions are proposed in this budget, being a part time
maintenance person to address the Senior Center and Cultural
Center, and a part time clerical person for Engineering to
assist with the recently implemented parking ticket program.
He also indicated that a capital Improvement Budget of
$685,000 is proposed.
Administrative Services Director Boone detailed the capital
Improvement Project Funds available.
-
councilman/Boardmember Alongi requested clarification of the
Street related funds proposed out of the $685,000 and whether
it was only the $200,000. City Manager/Executive Director
Molendyk clarified the programs proposed.
Public Services Director Tecca presented a five year plan to
serve as a wish list and explained the proposed distribution
by priori'ty for this fiscal year, including Main
street/Sulpher Street Decontamination ($150,000), spring
Street/Sumner Avenue Decontamination Study ($50,000) , Nashland
......
PAGE TWO - BUDGET WORKSHOP MINUTES - JULY 28, 1994
Avenue Access Improvement ($200,000), Main street/Lakeshore
Drive Intersection ($30, OOO), Miscellaneous street Paving
($200,000) and Curb, Gutter, Sidewalk/Landscaping ($55,500).
Councilman/Boardmember Pape questioned the ability to track
down the past property owners to pay for the soil
decontamination projects. Mr. Tecca indicated that this was
possible, but efforts have been underway for nearly a year
with no success. Mr. Molendyk clarified that the problems to
be decontaminated relate to old gas station tanks. Mr. Tecca
further clarified that massive amounts of fuel have been found
underground and the proposed $50,000 is only for the study to
determine the extent of the problem. Councilman/Boardmember
Alongi inquired whether there was a time limit to address
these items. Mr. Tecca indicated that some progress needs to
be shown. Councilman Alongi inquired whether the $150,000 was
for complete clean up of the problem. Mr. Tecca confirmed.
Mr. Alongi further questioned the need to clean it up this
year. Mr. Tecca indicated that it might be possible to delay
it a year. Councilman/Boardmember Pape questioned the
possibility of allocating half the funds this year and half
next year. Mr. Tecca indicated that this would most likely
impact the repairs to the sidewalk, gutter, and curb after the
decontamination has been completed. Mr. Pape suggested
spreading this cost over two years. Mr. Tecca indicated in
this case, he would prefer to fund the decontamination this
year and the repairs next year. Councilman/Boardmember Alongi
questioned the impact of soil testing on the street. Mr.
Tecca indicated this impact would be minor, and he would not
have a problem with splitting the project into two years.
city Manager/Executive Director Molendyk indicated that he had
received questions regarding Limited street and questioned its
status. Mr. Tecca indicated that it is currently under design
for a two lane interim roadway. He further indicated that
there have been many requests for this road, but the money is
not available this year. Mr. Molendyk indicated that the
Council needs to know the costs for items such as this. Mr.
Tecca stressed that this is the first year of a five year
plan. Mr. Molendyk noted the Street Improvement Project and
indicated that it is felt that the Limited Street improvement
should occur with the completion of the Channel. He noted
that Council might want to consider this in lieu of the
Miscellaneous Street Improvements. Councilman/Boardmember
Alongi questioned why this would not be listed as a priority.
Public services Director Tecca continued to detail item nos.
3 to 6 on the Capital Projects List. The Main
Street/Lakeshore Project ($30,000) is in connection with a
state project for $158,000. Miscellaneous Street Paving
($200,000) is part of an annual maintenance effort to include
ei ther temporary improvements or repaving proj ects. He
stressed the need to slurry seal the chip sealed streets. He
detailed the breakdown and proposed streets from these
dollars. He noted that the overlay on Chaney Street was a
minimal patch job and needs to be overlayed again this year.
The curb, gutter, sidewalk work is proposed around schools and
provides the 20% matChing funds for SBA 121 funds; the
landscaping in this item is for finishing of Graham Avenue
project.
Councilman/Boardmember Alongi questioned the proposed
-
-
...."
PAGE THREE - BUDGET WORKSHOP KlNUTES - JULY 28, 1994
-
improvements for Illinois street, and asked whether they were
proposed as temporary with no curb, gutter or sidewalk
improvements. Mr. Tecca confirmed this was the proposal. Mr .
Alongi inquired whether this was the area where Elsinore Ready
Mix is willing to donate the concrete. Mr. Tecca indicated
that it was, however there is approximately $20,000 worth of
design work that would need to be done first. Mr. Alongi
stressed the impact of water run-off in this area and
commented that this was an opportunity to correct the problem.
-
city Manager Molendyk explained the "other items" proposed for
funding including carpet, painting, repair work on City Hall,
Community Center refurbishing and painting, replacement of
high mileage vehicles, four-wheel drive vehicle for heavy
rains and other emergency situations, and a minimal economic
program to remain visible and competitive. He noted that the
city newsletter and Autumnfest are proposed to be eliminated.
He noted that the Stadium and its operation have only the
consideration of concession revenue for maintenance, besides
the $600,000 to supplement the fist year of operations. He
stressed efforts to work toward self-sufficiency on the part
of the Stadium. with regard to studies he further explained
that the General Plan update is pursuant to a state
requirement, the Lake Elsinore Specific Plan was required by
the State as part of the Lake transfer, the Annexation 66
filing fee to LAFCO is to maintain the City's sphere of
influence, and the Cultural Center funds related to
performances to which the city has already committed.
Councilman/Boardmember Pape questioned what performances are
proposed. Community services .Director Sapp indicated that
there is a Shakespearean event to include two performances and
a workshop; and also another performance group for a series of
performances.
-
City Manager/Executive Director Molendyk indicated that the
budget as proposed would take approximately $2.5 million from
reserves to balance and leave approximately $780,000 in
reserves. councilman/Boardmember Alongi questioned any other
items which might come up this fiscal year. Mr. Molendyk
indicated that some questions remain regarding the After
School Program and the July 4th program. He further indicated
that the reserves are generally for unanticipated items such
as heavy rains, litigation, etc. He noted that while he is
not totally comfortable with the proposed level of reserves,
the organization has been downsized three times in the last
four years and capital items have not been replaced during
that period. Councilman/Boardmember Alongi expressed concern
with the small amount of reserves and questioned what happens
if major problems occur. Mayor/Boardmember Washburn indicated
that this situation would require that something else be cut.
He noted the budget as presented does not take in to account
other funding such as the $1/2 million for the Lake. He
suggested that the four-wheel drive vehicle, the Lake Edge
Specific Plan and other professional items could be funded
from that fund. Mr. Molendyk indicated that this was true
however, it is important to replace that revenue.
Mayor Pro Tem/Vice Chairman Bender expressed an overall
concern with dipping into the reserves excessively, and
approving a budget for more than the prior year's. He
expressed further concern with the potential for very minimal
reserves in next year's budget and noted the potential for
PAGE FOUR - BUDGET WORKSHOP MINUTES - JULY 28, 1994
serious revenue generation problems. He indicated that he
would like to look at deletion of some items to reduce the
impact on the reserves for this year, while working to secure
additional revenue sources for next year. He suggested not
doing as many items and reviewing the budgeted amounts. He
indicated that he may have suggestions for reductions.
City Manager/Executive Director Molendyk stressed the
importance of not spending more than is available. He -
indicated that he could go back and delete some refurbishing;
and while it is not imperative to do economic development, it
is the only thing to allow forward movement on drawing new
revenue to the community. He further indicated that it might
be possible to reevaluate the Stadium maintenance and
operations, and go back and look at what special studies are
priorities, as well as looking at what could be delayed. He
noted that the Lighting and Landscape Maintenance program as
proposed is balanced for providing street lights, median
landscaping, park maintenance, etc.
Mayor/Boardmember Washburn questioned the Graham Avenue
Landscaping and whether it is on individual meters. He
questioned whether consideration was being given to placing it
on the same system as Main Street. Mr. Molendyk clarified
that it was originally planned to be on the master system,
however, after Council discussion was placed on individual
meters; he indicated that it could be reevaluated for
conversion to the master system. Mr. Tecca indicated that
this conversion would cost approximately $200,000. Mayor
Washburn inquired what problems exist with the turf in place.
Public Works Manager Payne indicated that the problems are due
to individual property owners watering levels.
-
City Manager/Executive Director Molendyk detailed the current
fund balances and recommended expenditures for the Lake.
Manager of Special Projects Watenpaugh noted the obligation on
January 1, 1995 to take over 1/2 of the Lake Patrol function
for the Lake. He explained that the budget addresses a full
time maintenance and operations person and part time staff to
assist that person, as approved mid-year last year. He also
explained that the budget includes minimal odor control and
treatment for general maintenance of the Lake, and does not
include water quality control for the entire lake. He
stressed this budget includes minimal requirements for
operations.
Mayor /Boardmember Washburn inquired whether the Lake Edge
Specific Plan was the most important item for this year. Mr.
Watenpaugh indicated that it was important in connection with
the Master Plan.
Mayor Pro Tem/Vice Chairman Bender noted that the largest
expense was for contractual services and questioned what this
would include. Mr. Watenpaugh indicated that this was for
Sheriff or State Patrol services. City Manager/Executive
Director Molendyk noted that one proposal was received from
the Sheriff for full staff, but they are currently looking at
getting a boat from the Colorado Ri ver and using Overtime
off icers. Captain Yankee further explained the review underway
on the proposal, noting that the original proposal seemed too
high. He explained that the next proposal will include use of
reserve and overtime officers. Mr. Watenpaugh further
.....
PAGE FIVE - BUDGET WORKSHOP MINUTES - JULY 28, 1994
explained that the figure includes ongoing health department
testing and completion of the Boating and Waterways Grant
Application.
-
Administrative Services Director Boone detailed the
Redevelopment Agency Budget, estimating a carryover of
$172,000, from Fiscal Year 1993/94. Councilman/Boardmember
Alongi inquired whether there would be any additional costs
for the ball field. Mr. Molendyk indicated that staff is
optimistic that the dollars already allocated will be
sufficient. Mr. Boone clarified that the estimated final cost
for the Stadium is $22.1 million and some decisions are still
pending.
Mayor Pro Tem/vice Chairman Bender commented on the $600,000
to come from the Water District and suggested that an
alternative timing for the expenditure be worked out with the
District. Mr. Boone indicated that he could approach them.
-
Councilman/Chairman Pape noted that more Redevelopment Agency
reserves are anticipated at the end of the year than at the
beginning. Mr. Boone indicated that this was only if all
items remain as stated. Mayor/Boardmember Washburn noted that
it would be nice to get the tax increment built up to assist.
ci ty Manager Molendyk noted other impacts on this year's
budget are that some Assessed Valuations are anticipated to be
going down; and the lobbyist has informed the city that the
State has balanced its budget without impacting the cities
further, at least until after the November Election.
Mayor/Boardmember Washburn inquired in that the Council sets
policy and provides direction, what is the most direct line
for the Lake to generate the most money. He inquired whether
enforcement on users, special events, or proper zoning would
be the best approach to make it a greater revenue source.
City Manager/Executive Director Molendyk indicated that it was
important to look at the Lake in the next year. He noted that
launching helped, but water elevation became a problem;
special events bring business, but this is not a direct
revenue source for the City. He noted that under the State
Park agreement it is paying out more than it is bringing in,
so the agreement needs to be reevaluated. He further noted
that enforcement could generate revenue, but does not help to
promote the Lake and was not a big source of dollars for the
State. Mr. Watenpaugh clarified that the State did not
receive funds from enforcement, as all of those dollars went
to the Courts. He indicated that launching is the best
resource, but local enforcement of fishing regulations and
possible implementation of a day use fishing fee, possibly $2,
could also assist with revenue. He noted that improved water
quali ty will also assist, in making the Lake an improved
source of revenue.
Mayor Pro Tem/Vice Chairman Bender inquired whether
hotel/motel type occupancy tax can be assessed on the marinas
and campgrounds. Mr. Molendyk indicated that this could only
be placed on facilities within City limits, but a new law does
allow for assessment on R.V.'s; this could be looked at as a
new revenue source. Mayor Washburn concurred that this source
PAGE SIX - BUDGET WORKSHOP MINUTES - JULY 28, 1994
should be considered. Councilman/Boardmember Alongi inquired
why the City could not charge anyone who fishes on the Lake,
whether on public or pri vate property, to pay a fee. He
indicated that he has a problem with anyone using the Lake
without paying a fee. He suggested an annual fishing permit
fee, similar to the annual boating pass fee. Mr. Watenpaugh
indicated that he could obtain verification from the City
Attorney, but the $5 day use fee is for use of a boat on the
Lake; he was not certain whether this could address use of __
private property. He noted that the difficulty with this
might be in verifying property lines. Mr. Alongi questioned
the state's position on property lines and water levels. Mr.
Watenpaugh indicated that this related to the state's
enforcement rights. Councilman Alongi inquired whether the
City would have the same rights, since the City is paying for
fish. Mr. Watenpaugh indicated that he would research this
matter and provide a report to Council.
City Manager/Executive Director Molendyk stressed that this
budget is based on the prior year's level of service. He
noted that last year more money was given to non-profit
organizations and stressed the need for Council policy in this
area. He noted the "user pays" requirement and indicated that
the staff needs direction on how to deal with non-profit
groups and their use of City facilities. He stressed the need
for that policy direction to come from this budget process,
noting that the small amounts do add up.
Mayor Pro Tem/Vice Chairman Bender inquired how much this
amounted to last year. Community services Director Sapp
indicated that it was over $25,000 last year. Councilman Pape
questioned the timing for budget requests. Mr. Molendyk
clarified the type of assistance requested and indicated that
the budget proposes the same amounts for the same groups. He
indicated that addressing this as part of the budget process
will solve problems later. Mayor Washburn noted the
difficulty in providing blanket policy direction. Mr.
Molendyk concurred but stressed that these items do come up
every year, after the budget has been approved.
Councilman/Boardmember Alongi suggested that the best approach
was to assist organizations with 501 status only, noting that
possibly a bulk amount could be budgeted and requests could
only be approved as long as funds were still available. Mayor
Pro Tem/Vice Chairman Bender questioned the advisability of
this, suggesting that the events be cut out or the fees be
cut. He suggested that an equitable fee be established and
all groups be required to pay it. Councilman/Boardmember
Alongi stressed that this should only be for Lake Elsinore
non-profit groups. He noted that the City has previously
helped organizations in Temecula, and it should really only be
organizations that help a majority of Lake Elsinore residents
that recei ve funding. Mayor Pro Tem/Vice Chairman Bender
suggested that picking and choosing between organizations
should be avoided. He reiterated that a reasonable fee
structure should be established and all groups charged
equally. Councilman Alongi indicated that the Community
Center usage was not hard dollars, because a staff person is
always present anyway; he noted that a parade is a different
situation. Mayor Pro Tem Bender stressed the importance of
recouping the revenue. Mr. Alongi indicated that this was an
entirely different situation, of revenue versus services the
--
-
PAGE SEVEN - BUDGET WORKSHOP KZNUTES - JULY 28, 199.
-
taxpayers have paid for already. He stressed that 501 status
groups like H.O.P.E., School Bell and the Friends of the
Library provide a service and all residents have equal
opportunity to participate. Mr. Bender indicated that he was
looking at the general philosophy. Mayor Washburn noted that
this was a question of special needs versus hard dollars.
City Manager/Executive Director Molendyk commented that in the
past the council/Redevelopment Agency have not had a set group
of goals to agree on. He stressed the importance of an
economic plan and financial plan, and five or six major goals,
with the entire council buying in to a set program. He
indicated that staff could develop a list of major goals for
discussion at the next meeting.
-
Councilman/Chairman Pape inquired whether the $80,000 in
C.D.B.G. funds was the allocation for the Yarborough Park
improvements to be started this date. Staff confirmed. He
questioned the ADA retrofit requirements. Mr. Sapp indicated
that these are required by January of 1995, with new
playground equipment and handicap accessibility.
Councilman/Chairman Pape indicated that he was looking for any
funds which could be used to address the Lake, particularly
park or sand areas along the Lake. Mr. Sapp that there are
some dollars allocated for Lakeshore Drive areas. Mr.
Watenpaugh commented that the city is now maintaining and
watering, where possible, fertilizing and mowing; and the
grass is starting to grow. He noted that part time staff is
also being recruited to address this are. Mr. Pape indicated
that he has been down to that area and much of it does not
have grass and sprinklers are needed; he questioned the
possibility of allocating money to provide additional
improvements. Mr. Watenpaugh suggested looking at available
C.D.B.G. funds for next year. city Manager/Executive Director
Molendyk indicated that there are some park in-lieu fees
available for new projects. Mr. Boone confirmed that there is
$86,000 available. Mr. Pape indicated this would be a start
for the items discussed. councilman/Boardmember Alongi
stressed that there is no nice park along the Lake. Mr .
Molendyk noted Lakepoint Park. Mr. Alongi indicated that he
meant a park with access to the Lake. Mr. Molendyk indicated
that staff will bring back a proposal. Mr. Bender suggested
deweeding a section and placing sand. Mr. Alongi suggested a
children's area with swings, etc. Mr. Watenpaugh indicated
that this could be done, but if it is deweeded and sand is
placed it is an improvement and handicapped access
improvements will also be required. Mayor/Boardmember
Washburn noted that there are indi vidual lots in the area
which could be acquired for expansion.
Mayor /Boardmember Washburn commented that there are other
projects which receive City dollars, such as Kids on Track,
which is provided to assist the School District, but is not
cost effective. He noted that this might be an area to save
dollars to allocate more cost effectively and better benefit
the overall community.
Councilman Pape indicated that he has spoken with the School
District President regarding the possibility of joint funding
of this program. He inquired of Captain Yankee whether he
believes the Nashland Street Improvement Project will help to
eliminate the problems, noting that his area has cul-de-sacs
PAGE EIGHT - BUDGET WORKSHOP MINUTES - JULY 28, 1994
and he always thought that was preferable. Captain Yankee
indicated that he was asked about possible options and the
best option. He indicated that the project could possibly be
delayed, however the property is available now. He stressed
that he believed that this was the "best" answer, but not the
"only" answer.
Councilman Alongi indicated that he doesn't believe the street
improvement will eliminate the problem, noting that many _
streets are cul-de-sacs. He stressed that this is a problem
area with an element to be eliminated. He indicated that he
would prefer to work with and assist the owners to compensate
for the density and design problems which are inherent.
Mayor /Boardmember Washburn indicated that this discussion
gives perspective to the situation, while much of the problem
relates to absentee landowners and a multitude of other items
on Nashland, the same problems are not prevalent in single-
family owned residential areas. He stressed the need to go
after the business licenses for multi-family users. He noted
that the street improvement is a quick fix to break open the
area. Councilman/Chairman Pape indicated that he would
rather see increased enforcement in the area. Mayor/
Boardmember Washburn disagreed indicating that it is important
to change the character of the traffic flow through the area.
Captain Yankee stressed the complexity of this situation and
offered to provide more details at the next discussion.
Mayor Pro Tem/Vice Chairman Bender commented overall he would
like to see the deletion of some items, but stressed the
importance of maintaining existing facilities. He noted that
trades between proj ects could occur, with some being postponed
until warranted.
-
Councilman/Boardmember Alongi expressed disappointment that
additional police and fire services are not being addressed.
City Manager/Executive Director Molendyk noted that attempts
are being made through special enforcement and funds are being
reviewed to address the fire station.
THE BUDGET WORKSHOP WAS ADJOURNED A