The City Council Study Session was called to order by Mayor Pape at 9:42 a.m.
ROLL CALL
PRESENT: COUNCILMEMBERS: BRINLEY, KELLEY,
METZE, PAPE
ABSENT: COUNCILMEMBERS: ALONGI
Also present were: City Manager Watenpaugh, Administrative Services
Director Boone, Community Development Director Brady, Community
Services Director Sapp, Police Chief Walsh, Assistant to the City Manager
Best, City Engineer O'Donnell, Recreation & Tourism Manager Edelbrock,
Public Works Manager and City Clerk Kasad.
A. Budget (F:30.1)
Mayor Pape noted the intent of this meeting and initiated a page by page
review of the proposed budget. He noted the addition of new positions and
additional funding for economic development. He commented on
information received yesterday in a meeting with staff regarding a proposed
retail project, particularly noting the need for new demographic and traffic
count data to facilitate projects. He stressed the need to update those
numbers and prepare brochures to assist businesses interested in coming to
the community. City Manager Watenpaugh concurred and noted that staff is
working on interim numbers to assist the developers. Councilwoman Brinley
stressed that the brochures are out of date. Mayor Pape noted a study paid
for by the developer and stressed the need for accurate numbers. Mayor Pro
Tem Kelley questioned the status of the business survey being done in
conjunction with the Chamber of Commerce and when results can be
anticipated. Larry Regis, representing the Chamber indicated that the surveys
are coming back in and follow -up work is proceeding. Assistant to the City
Manager Best indicated that 25 surveys were returned yesterday alone.
Mayor Pro Tern Kelley questioned the responses received so far. Ms. Best
indicated that there has been only cursory review of the surveys, but a
meeting is scheduled for Monday, June 8th to address them more thoroughly.
She noted that the early responses appear to show a large amount of planned
expansion of existing businesses, and indicated that they are hoping for at
least a 10% response to the 1,200 surveys mailed out.
PAGE TWO - CITY COUNCIL STUDY SESSION - JUNE 59 1998
Councilwoman Brinley noted that on the positive side there may be some
RDA funds coming in for a positive return pending the results of a lawsuit;
and noted that things are looking very good. Councilman Metze inquired
whether funds were budgeted for sponsorship of the local EDC; and noted
that the City has been approached by neighboring cities for regional efforts in
connection with the economic gardening approach. He expressed support for
the local EDC to participate with Temecula and Murrieta. Councilwoman
Brinley indicated that we are presently on the verge of a joint effort with
those cities to look at development in the I -15 corridor.
City Manager Watenpaugh noted the employee count for the Police
Department and advised that it includes the Chief, Lieutenants and all full
time equivalents. He further noted that the City's violent crime statistics
have dropped 56% in the last three years.
Mayor Pape questioned "transfers in" on page 4. Administrative Services
Director Boone clarified where those funds originate. Councilman Metze
noted that those funds are specific to certain things. Mr. Boone confirmed
that those funds are primarily directed to public works street maintenance.
Mayor Pape noted the small projected sales tax increase and inquired whether
it would include the impacts of the two new gas stations and Lake Chevrolet.
Mr. Boone confirmed that those businesses were factored in for next year.
Councilwoman Brinley inquired whether revenue figures had been received
from Lake Chevrolet yet. City Manager Watenpaugh indicated that those
factors are not known yet, but from a sales perspective it has been better than
anticipated. He advised that the Ford dealership is in the process of closing
on its property adjacent to the Chevrolet site, and staff is working with them
to facilitate opening by March of next year.
Mayor Pro Tern Kelley questioned the "sale of property" on page 7. City
Manager Watenpaugh indicated that property is being accumulated in the
Spyglass Ridge/Ramsgate projects and they have asked to purchase 4 acres
from the City.
Councilwoman Brinley questioned the changes on replacement page 8. City
Manager Watenpaugh clarified that the projections for revenue have been
corrected; and detailed the anticipated budget and adjustments. Mayor Pape
noted that the Police Services portion is about 38% of the City's revenues.
�( He also noted the elimination of the transfer to the Stadium Councilman
Metze noted that the 38% figure does not include the Fire Services funding.
Mayor Pape noted the estimates for 1997 -98 vs. 1998 -99, and questioned the
changes in the City Council, City Clerk and City Manager budgets. City
Manager Watenpaugh indicated that those were a result of one time
expenditures and the lack of an election in this budget year. Mr.
Watenpaugh also noted that the Planning Commission has not done any travel
this year, so the proposed allocation has been reduced. Councilman Metze
noted that a lot of Planning Commission meetings did not occur in the last
PAGE THREE - CITY COUNCIL STUDY SESSION - JUNE 59 1998
year. City Manager Watenpaugh noted some numerical corrections for Senior
Center, and indicated that the final dollar amount will not match the
replacement page.
Mayor Pape addressed page 9, noting the controversial motor vehicle in -lieu
fee and the projected revenue which could be lost. Councilman Metze noted
that this legislation was moving forward, but that does not mean that the State
will give back money. He noted the surplus amount at the State and the
amount taken away from local governments in recent years; and stressed the
need to find a means to backfill those funds. Councilwoman Brinley noted
that she would like to know why the money is not returned from the surplus.
City Manager Watenpaugh noted that there are ongoing discussions about
backfilling, but no guarantees. Mayor Pape noted that he saw Assemblyman
Rod Pacheco and discussed this matter; and there is an assembly bill that
would make it a constitutional amendment to backfill the money for the cities.
He stressed it was his intent to include that amendment with the other bill.
Councilman Metze stressed if the backfill is not guaranteed, he would want
them to explain to the constituents, why services have been cut. Mayor Pape
indicated that he is working with Assemblyman Haynes to have him come to
the City to provide information on a regional basis. Councilman Metze
stressed that the City is constantly called on the carpet, in spite of the fact that
other levels of government have impacted the City's finances.
Councilwoman Brinley supported the open forum format with State elected
officials. Councilman Metze stressed that residents don't interact with the
State representatives like they do local elected officials.
Mayor Pro Tem Kelley noted that there is nothing budgeted for the Juried
Arts Show, but the Cultural Arts Commission proposal will be on the agenda
for Tuesday.
Mayor Pro Tem Kelley addressed page 14 of the budget relating to the City
Attorney and commended the work she has done for the City. The other
Councilmembers concurred and expressed their appreciation for the City
Attorney's efforts. Councilwoman Brinley stressed the review of existing
contracts which has been done in addition to the Stadium Lease agreement
and ongoing litigation. City Manager Watenpaugh pointed out that a lot of
the pending litigation is now in court and taking a substantial amount of time.
Mayor Pro Tem Kelley questioned the reduction in Community Promotions
on page 15. Staff clarified that the reduction was due to the lack of elections
this fiscal year.
Administrative Services Director Boone noted that insurance on the Stadium
is the biggest increase on page 21, and clarified the increased cost.
Mayor Pape addressed page 23, regarding law enforcement; and inquired if
the proposed budget was adequate to keep pace with the current efforts.
PAGE FOUR CITY COUNCIL STUDY SESSION - JUNE 59 1998
Police Chief Walsh confirmed.
Councilman Metze questioned page 25 and questioned the increase for
Community Development. City Manager Watenpaugh indicated that the
anticipated increase is because the Director's position will be filled for an
entire year.
Mayor Pape noted an increase in the Code Enforcement budget and
questioned if it was for weekend coverage. City Manager Watenpaugh
confirmed. Councilwoman Brinley indicated that it was a priority of the
Council to have a Code Enforcement Officer available on weekends.
Councilman Metze noted that he constantly heard more about Code
Enforcement and Graffiti removal than any of the other services which have
been cut. Mayor Pape concurred that these were highly visible programs.
Councilwoman Brinley concurred that the graffiti program was sorely missed;
and commended the Chamber of Commerce for their efforts to assist with
graffiti removal. Councilman Metze suggested promoting the Chamber effort
further, as several peop'_e have indicated a willingness to assist.
Councilwoman Brinley indicated that some of the Code Enforcement problem
areas are flower vendors at various locations and ice cream trucks. She
stressed the need to be sure that the ice cream trucks are licensed. Mr. Boone
indicated that there are three licensed in the City.
Councilwoman Brinley questioned page 29 and funding for the web site. City
Manager Watenpaugh indicated that the web site is in transition. Councilman
Metze expressed appreciation for the volunteer efforts going into the web site
to get it up and running. He noted that this puts the City ahead of a number of
larger cities. Councilwoman Brinley expressed appreciation for what is
already in place and the access to information it provides. Mayor Pape
questioned the ability to place the City Council Agendas on the web site.
City Manager Watenpaugh confirmed that this would occur when the site is
operational.
City Manager Watenpaugh noted that page 30 includes the reinstitution of the
engineer position. Mayor Pape questioned the public works increases on
page 31. City Manager Watenpaugh indicated that there are only standard
increases on page 31, but page 32 shows he addition of the maintenance
position.
City Manager Watenpaugh noted that page 33 reflects reimplementation of
the Park program at '/2 operations level. He clarified the level of maintenance
and staff factors, and indicated that staff will try to increase the level of
service during the hot summer months. Mayor Pro Tem Kelley questioned
how operations are working with the user groups. Community Services
Director Sapp indicated that it is working well and they have been very
cooperative. Councilwoman Brinley suggested that the Council publicly
thank the groups for their assistance and work to keep the parks
PAGE FIVE - CITY COUNCIL STUDY SESSION - JUNE 59 1998
looking nice. Councilman Metze indicated that even at a half service level,
the City is in better shape than some cities. Mayor Pro Tem Kelley
questioned the arrangements for the Girls Softball concession stand. Mr.
Sapp indicated that there has been preliminary discussion, but he is not
certain of the present status. City Manager Watenpaugh pointed out that the
one area of complaint relates to keys for use of the restrooms, when the
designated key person does not get there to open them. Councilman Metze
inquired whether the lighting situation has been taken care of. Mr. Sapp
confirmed. Mayor Pro Tem Kelley inquired whether there were any big
tournaments coming up. Mr. Sapp indicated he was not aware of any at this
time.
Mayor Pape noted the replacement for page 39. Mayor Pro Tem Kelley
questioned the increase in employee cost. City Manager Watenpaugh
indicated that the figure presented includes benefits.
Councilman Metze noted that LEAF provides great service to the community,
and indicated that it would be nice if the City could manage to fund more.
Mayor Pape noted the reserve balance by next year as detailed on page 43.
City Manager Watenpaugh clarified the figures for the end of this fiscal year
and the 1999 fiscal year. He noted that the need for services outweighs the
actual services at this time. Councilman Metze further questioned the figures.
Administrative Services Director Boone further clarified the reserves. City
Manager Watenpaugh reminded the Council of the $1.1 million payment due
in the year 2000.
City Manager Watenpaugh noted the goals and objectives for current fiscal
year on page 44; and indicated that staff will return with new goals and
objectives for next fiscal year. Councilman Metze commended the
presentation of the goals and accomplishments. Mayor Pro Tem Kelley noted
the success of the efforts to correct the RDA deficit. Councilman Metze
noted that the City Attorney has already become familiar with existing
contracts and is working to correct problems as they come up. Mayor Pape
noted that the most exciting information on page 44 is the deficit reduction for
the RDA; and suggested with the continuance of the current revenue trend in
the next year it should balance out. Councilwoman Brinley thanked the RDA
Board for the diligent efforts to solve the problems in the RDA. Councilman
Metze pointed out that the numbers do not reflect the sales tax revenue
increases generated by RDA projects, such as the car dealerships. He
stressed that the RDA does generate sales tax. Mayor Pape inquired, with the
projects coming on line next year, whether the account would be balanced out
the next year. Mr. Boone indicated that he sees the RDA increment, as ready
to jump. Councilman Metze noted that there is a lot of new construction in
the RDA areas. Mr. Boone confirmed and noted that the number will be
known for sure in August, and he will bring information to the Council.
Councilwoman Brinley stressed the potential for positive changes to the RDA
PAGE SIX - CITY COUNCIL STUDY SESSION JUNE 511998
in the coming year, noting that it is beginning to see the light at the end of the
tunnel. Mr. Boone noted that the RDA had lost of $' /z million in tax
increment, but expressed belief that it would come back. Mayor Pape
suggested that it might be appropriate to do a mid -year budget review.
Councilman Metze questioned whether increases in property tax and State
transfers would impact the RDA, and stressed that he would not want to see
the RDA take the hits. Administrative Services Director Boone indicated
that the RDA did in the past, have to fund $1 million to the State. City
Manager Watenpaugh indicated that the budget might need to be reviewed
earlier than mid -year, as Mr. Gunn is nearing completion on some of the
funds. He noted that it will be necessary to look at the RDA rather than the
bond pools. Councilwoman Brinley noted that the RDA inherited a big
problem and is working through it.
Mayor Pro Tem Kelley questioned page 45 with regard to the management
plan for the watershed and questioned the status. City Manager Watenpaugh
indicated that direction has not yet been given to proceed. Mayor Pro Tem
Kelley questioned the campground. City Manager Watenpaugh noted
restructuring the bond debt using the lake as a funding mechanism to pay off
bonds. He clarified the limitations and noted that the City could either pay a
flat rate or run the campground itself. Mayor Pro Tem Kelley questioned the
lake concession issue for the slalom course. City Manager Watenpaugh
indicated that proposals were requested and two were received; Ms. Nanette
indicated that it was not economically feasible, but Mr. Sacks is looking at a
program to provide a slalom course. Councilman Metze expressed concern
for shared use of the channel. Mr. Watenpaugh indicated that sharing the
channel is not a problem, but they must provide insurance to cover the City.
He explained that as concessionaire, Mr. Sacks would cover the City for any
liability on the slalom.
Mayor Pro Tem Kelley questioned efforts to get food concessions for the
Lake. Mr. Watenpaugh indicated that nothing is in place yet. Mayor Pro
Tem Kelley questioned the timing for opening of the levee for pedestrian
access. Mr. Watenpaugh indicated that staff is in the process of purchasing
signs and looking at grants to fund improvements. He indicated that signs
are needed every 300 feet to prevent trespassing on private property. Mrs.
Kelley questioned compliance with the new laws for dust control. Mr.
Watenpaugh indicated that the Water District would be responsible for dust
as they would be using vehicles to make access to the wells. He suggested
that if a grant is obtained, staff might look at using Magnesium Chloride to
bind the dust. Mayor Pro Tem Kelley inquired whether EVMWD would
contribute to this effort. Mr. Watenpaugh indicated that they have no interest
in doing so.
City Manager Watenpaugh noted the Economic Strategy, previously adopted
by the Council and noted the support and assistance provided by the Chamber
of Commerce in this area. He noted that the City of Chino and others are
looking to develop a similar program. Councilman Metze noted that this
PAGE SEVEN - CITY COUNCIL STUDY SESSION - JUNE 59 1998
effort is directly responsible for contacts by Murrieta and Temecula. Mr.
Regis noted that the success is due to the tremendous cooperation between
the City, the Chamber of Commerce and the business community.
Mayor Pro Tem Kelley questioned the "park ranger program". City
Manager Watenpaugh noted that there was a desire to move forward on this
program, but the budget was eliminated so it was difficult to proceed.
Councilwoman Brinley suggested finther review of this program. Mr.
Watenpaugh concurred and noted that it is generally good for graffiti
prevention, etc.
Mayor Pape questioned the "note" for which the RDA is responsible. Mr.
Boone confirmed that this was a one time payment, and expressed hopes that
the bonds could be redone prior to this note coming due. Councilwoman
Brinley indicated that she believes it should be done in time. Mayor Pro Tem
Kelley questioned page 52 regarding the Outlet Center infrastructure payment
of $107,000; and questioned how much the Outlet Center generates for the
City coffers. Mr. Boone indicated that it generates about $800,000 per year
in sales tax and $250,000 per year in property tax.. Mayor Pro Tem Kelley
questioned if the expansion was still planned. Mr. Watenpaugh indicated that
the expansion was shelved for assessment of the situation by the new owners.
Mayor Pape questioned page 54 regarding lawsuit settlements, and whether
any excesses would be used for future debts of the RDA or to reduce the
City's contribution. Mr. Boone indicated that it would depend on the figures
which are received in August and any possible offsets.
City Manager Watenpaugh clarified the LLMD and Lake Park and
Recreation Fund budgets. He noted that $200,000 was included for the
campground. He clarified that with the LLMD, the account is a push, in that
what comes in, goes out; but noted the potential for an increase in that fund
with new residential units. Councilman Metze stressed that there would be
no increase to existing homes..
Mayor Pape noted the reference to Mission Trail on page 68. Mr.
Watenpaugh advised that Mission Trail is currently out to bid and should be
awarded the first meeting in July, with work beginning about the end of July.
Mayor Pape questioned the timing for Spring Street. Mr. Watenpaugh
indicated that it would probably begin in September. He noted that the City
Engineer has spent a lot of time in court, so an additional engineer is being
recruited to facilitate projects such as this. Mayor Pape questioned the
potential for packaging multiple projects to obtain better prices. City
Engineer O'Donnell confirmed that lower unit prices could be obtained, but
because of separate funding sources there could be a problem with packaging
them. He noted the potential for use of FEMA funds to improve Spring
PAGE EIGHT - CITY COUNCIL STUDY SESSION - JUNE 59 1998
Street, and stressed the limitations of federal requirements and regulations.
Mayor Pape questioned the start date for Spring Street. Mr. O'Donnell
indicated that realistically is would be about October 1st, but noted the
potential problems of the rainy season. City Manager Watenpaugh
suggested that an updated schedule of projects be provided with the final
budget approval. Mayor Pape stressed the importance of keeping the public
advised of pending projects so they can avoid construction areas and keep
advised that the problem areas will be corrected. Councilwoman Brinley
inquired whether utilities would be advised of upcoming street projects so
they can complete any of their projects prior to the improvements by the City.
She indicated that she was tired of the City putting out good money for a job
and the utilities coming through and damaging it. Mayor Pape questioned the
status of ordinance revisions in this area. Mr. Watenpaugh noted that some
problems were encountered in L.A. which are being reviewed, and noted that
they are currently in court, but no decision has been made. Mayor Pape
questioned whether it would be better to require curb to curb improvements.
Mr. Watenpaugh stressed the requirement for establishment of a nexus for
such requirements. Councilman Metze stressed his concern that within a
couple of years the streets are a mess again.
Mayor Pape questioned the timing for Chaney Street improvements. Mr.
Watenpaugh indicated that work is underway on the design now, and right -of-
way review is proceeding.
Mayor Pro Tem. Kelley questioned the Mission Trail status with the County.
Mr. Watenpaugh indicated that discussions for agreements are underway and
staff is currently looking at design and right -of -way.
Councilwoman Brinley questioned the Casino Drive Bridge and whether it
impacts the proposed new car agency. Mr. O'Donnell indicated that the
bridge might be down to one lane in each direction, but should not impact the
dealership.
Mayor Pape questioned the status of the Dexter Avenue traffic signal. City
Engineer O'Donnell indicated that Caltrans approval is nearly complete to
allow the design to move forward; but it is now necessary to work with
Burger King to place the improvements concurrently. Mayor Pro Tem Kelley
inquired if the Burger King project was moving forward. Mr. O'Donnell
indicated that he was trying to set up a meeting with them to focus on how
quickly the work can be done. Mayor Pape inquired if there was in fact a
lack of water for construction. Mr. Watenpaugh clarified that they just need
to pay for a booster pump to get the project going. Mayor Pro Tem. Kelley
stressed the danger of that intersection. Mr. Watenpaugh stressed that the
City has limited control of the project, as Caltrans is the lead agency. Mr.
O'Donnell indicated that staff is nearing agreement on the project, but noted
if the signal was installed today, it would need to be moved. Mayor
PAGE NINE - CITY COUNCIL STUDY SESSION - JUNE B, 1998
Pape requested a memo updating the status.
Mayor Pro Tem Kelley questioned the plans for a four way stop at Collier /74.
Mr. O'Donnell indicated that there are presently no plans. Mr. Watenpaugh
noted that the new property owners are looking to move forward based on
new demographics and traffic counts. Council discussion ensued with regard
to traffic concerns at this location. Mr. Watenpaugh stressed the need for
new demographics to proceed with development at that location.
City Manager Watenpaugh noted the Measure A fund information on pages
69 and 70. Mayor Pape questioned the status of traffic signal planning for
the intersection of Riverside Drive/Lincoln Street. Mr. O'Donnell indicated
that he was not sure of the status, but there was a question about the entrance
to the Campground, which varies the level of payment the City would be
obligated for. Mayor Pape noted that this signal would be a huge benefit to
that area.
Mayor Pape noted the additional pages regarding the graffiti program and the
Community Center. He inquired whether the roof was leaking at the
Community Center. Staff confirmed that moisture was causing damage to the
flooring and walls. Mayor Pape inquired if there was potential that additional
damage would occur if the roof was not repaired this year. Staff concurred
that this would be helpful in preventing further damage. Mayor Pro Tem
Kelley noted that the air conditioning units are non - existent. Public Works
Manager Payne indicated that if the roof are repaired the air conditioning
units should be replaced at the same time. Community Services Director
Sapp noted that part of the leakage problem is the way the air conditioning
units are situated on the roof. Mr. Watenpaugh suggested removing the air
conditioning units and replacing the roof to prevent further damage.
Councilman Metze noted preliminary discussions with the Sheriff's
Department and inquired if repairs to the Community Center would impact
those plans. He expressed concern with spending the money and finding out
that the Sheriffs Department is ready to proceed with their project. There
was general Council discussion and consensus that the roof should be
replaced to prevent further damage, and air conditioning replaced if adequate
funds are available. .
City Manager Watenpaugh noted the Main Street Program summary page and
indicated that it was incorporated as part of the proposed budget. He noted
that staff would be providing information on ongoing maintenance costs,
aside from the slurry sealing which would be coming out of the annual
program. Council questioned the tree lights and the estimated costs. Mr.
Watenpaugh clarified the costs. Councilwoman Brinley noted the aesthetics
of the lights and the enjoyment by people on Main Street; suggesting that the
City work with local businesses on a fundraising effort with matching funds.
There was general discussion of potential funding sources for the tree lights.
Mayor Pape stressed the need to keep the investment in good repair.
PAGE TEN - CITY COUNCIL STUDY SESSION -JUNE 5, 1998
Councilwoman Brinley noted the importance of replacing the parts of the
package which were originally included. Mayor Pape stressed that this is
work which has not been done for years. There was fir ther discussion of
light replacement and funding sources.
City Manager Watenpaugh noted the Campground budget and recommended
an allocation of $200,000 and noted that volunteer groups are willing to assist
with the park cleanup. Councilman Metze inquired what that allocation of
funds would buy. Community Services Director Sapp indicated that it would
restore 151 camp sites and two group areas. Mayor Pape questioned the
requested $300,000 budget vs. the recommended $200,000 budget and what
would be cut. City Manager Watenpaugh noted that the original request also
considers requested CDBG funds. There was general Council discussion of
the costs and advantages of opening the campground. Councilwoman Brinley
inquired whether the pumping station was working and what repairs would
cost. Mr. Sapp indicated that it has been repaired, permitted and approved.
Councilman Metze indicated that an ADA bar- be -que is absolutely ridiculous,
and expressed frustration with people who use handicapped placards and
don't need them. Mayor Pape questioned the money for cleanup and the
impact of volunteers on that cost. City Manager Watenpaugh indicated that
volunteers will not significantly reduce the cost of the cleanup but will help.
Mayor Pape inquired when the campground could be open to the public.
Staff indicated that with the approval of the budget they would try for the
Labor Day weekend. Mayor Pro Tern Kelley questioned the tree trimming
work and whether it was for interior or exterior trees. City Manager
Watenpaugh indicated that it would include interior and exterior trees.
Mayor Pape noted that the budget should be formally adopted at the second
meeting in June, and suggested that staff gear up for the work to begin upon
approval, so it could be open by the long weekend. He also suggested that
the volunteer groups start work in the meantime. Community Services
Director Sapp indicated that he would be meeting with the scout troops next
week. Councilman Metze indicated that he would see more interest in the
campground than the Community Center. There was Council discussion of
the funds which could be generated and general concurrence was reached that
the campground should take priority over the Community Center.
Mayor Pape noted a request to speak from Chris Hyland. Mrs. Hyland was
not present for comment.
Councilman Metze commended staff on the budget preparation and indicated
they had done a good job of addressing the concerns and giving the most
services possible. Councilwoman Brinley thanked the City Manager for his
efforts to meet with the Council individually and include their requests for
capital projects.
City Manager Molendyk noted that the WRCOG membership of $3,400 is
PAGE ELEVEN - CITY COUNCIL STUDY SESSION - JUNE 59 1998
anticipated to be increased by 20 %. Council questioned the value of this
membership.
MOVED BY BRINLEY, SECONDED BY METZE AND CARRIED BY
UNANIMOUS VOTE OF THOSE PRESENT A"1:26 P.M.