Loading...
HomeMy WebLinkAbout Item No. 6CITY OF LADE CC! LSII`IORE EXTREMEn REPORT TO CITY COUNCIL TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: GRANT M. YATES CITY MANAGER DATE: MARCH 12, 2013 SUBJECT: REQUEST TO OBLIGATE FUNDS FOR PAVEMENT REPAIR AND OVERLAY FOR HUNCO WAY Recommendation Authorize staff to obligate funds in the amount not to exceed $45,000 from Gas Tax Funds for the pavement repair and asphalt overlay of Hunco Way. Background Hunco Way is located at the intersection of Collier Avenue and the main entrance to Home Depot. Between 2001 and 2004 there was an industrial development under construction which built the ten industrial buildings who take access off of this street segment. These ten buildings constituted phase one of a two phase development plan. Included in phase two of this plan was the connection of Hunco way with Pasadena Street to the west and completion of Hunco Way in Phase I. Soon after phase two was approved the development industry as a whole quickly stopped, this development was abandoned and the replacement bond for street improvements were not submitted. Since then, the street has fallen into disrepair and is in need of paving. Discussion Staff has received several complaints about the condition of Hunco Way. In the search for funding to repair and pave the roadway, staff has assembled funds from Gas Tax through construction cost savings from the Sumner and Heald Avenue paving project. An engineering cost estimate has been produced and staff is requesting allocation of $45,000 in Gas Tax to fund the paving project on Hunco Way. This project will repair the existing roadway and install a finish course of asphalt over the whole road. If this request is approved by the City Council, the project schedule is anticipated to be as follows: AGENDA ITEM NO. 6 Pagel of 3 Hunco Way Paving, Obligate Funds March 12, 2013 Page 2 of 3 Construction Bid Award Bid Construction Start Project Completion Fiscal Impact March 18 — March 28 April 9 April 29 May 31 Fund 110 Gas Tax: $45,000.00 Prepared by: Ken A. Seumalo Director of Public Works Approved by James Riley Director of Ad inistrative Services Department Approved by: Grant M. Yates City Manager -71?' Attachments: Vicinity Map Page 2 of 3 VICINITY MAP HUNCO WAY PAVEMENT REPAIR AND OVERLAY 7s ti i i .7s ss ea T� 5� PROJECT SITE P 5� J a° o GG 9s9 `2Ja . O� >A s�. 9s90 CITY COUNCIL MARCH 12, 2013 Page 3 of 3